0,
- 4.
ORIGINAL SONGS MAINTENANCE ORDER NO:
08021808000 1111111 111lIll ilI l111111111111111111111 111ll 11111 11ii UNIT d
gýýX3&
"AT'3GORY: 70 -
Work In Progress IEP]E"TITIVI: MAINT.
NO.
30002002000 tES:?ONSIBILE ORG:ELECTRICAL UNIT 2 INTERVAL 01 FREQUENCY -
W MAINTENANCE TYPE:
SV QLQUIPMENT ID: S21806EB007 RC:CB CONST.
CODE:N/A
- U SYSTEM
PKA ACCOUNTING DISTRIBUTION:0121 7221
'UNC DESC:
125VDC STATION BATTERY 2D1
,OCATION.
AREA:
CB ROOM:
306E ELEVATION:
050 COLUMN:
18.5N1 PRIORITY: DD QC WITNESS/HOLD REQD:
N IQUAL CLASS:2 NOTE:
WORKLIST ATTACHED JESCRIPTION:
WEEKLY 1E BATTERIES INSP.-
UNI-2 RCY-CRITIAL/TS/RCM/PMO/AR040201281-97 REMARKS:
New Add BJOX.
REQUESTOGR DATA:
CREW CODE:
EWO DCP:
ENVIRN QUAL:
N PROJECT CODE:
SEIS:
1 REQUESTING DEPT:
EL2
[b)-
REQUESTOR NAME!:
(b)(6)
PAX:
REQUIR*EKNTS:
FIRE PROT.
ADMIN.
REQD?
Y WORK AUTH REQD?
N SECURITY REQD?
N WORK AUTH TYPE?
N SSR REQD?
ASME CODE WORK?
N NO.
NIA ENGINEERING REQD?
N HO TO DISP NCR?
N NO.
N/A FME REQUIREMENTS?
N TEMPORARY MOD.?
N NO.
N/A R.E.P.
EVAL.
REQD?
N CREACUS BREACH?
N FCN REQ0?
NO:
ECP REQD?
NO.
SCHEDULING:
R.M.
DUE DATE FITTS:
DUE DATE SCHEDULED START DATE SCHEDULED COMP DATE W-*
1(6ý1
ý(6) z 2/26/2008 2/26/2008 2/26/2008 2/27/2008 00:00 07 :00 00:30 18:00 VIOLATION DATE 2/28/2008 01:00 MO OBJECTIV'E:
Per ~orm wE~ekly inspection of 1E batterys.
08021 808-0 PCOR QUALITY DOCUMENT BEST AVAILABLE COPY l..bi SIGNE__---OU_-A"
'T DOCUMEIW 0C""NATOR DATE r?)
Page 1 07 & F
I (WORK PLAN DETAIL CONTINUED)
WITH THE EXCEPTION OF SECTION 6.9, ON ALL WORK LISTED COMPONENTS.
- 2.
VISUALLY INSPECT THE GENERAL APPEARANCE AND CLEANLINESS OF EACH BATTERY AND BAITERY AREA AS FOLLOWS:
A.
AS NECESSARY, WIPE THE CbLL JARS, BATTERY RACKS, AND FLOOR WITH A SOLJTION OF BICARBONATE SODA AND COLD, DISTILLED OR DI WATER.
B.
WIPE AGAIN USING CLEAN DISTILLED OR DI WATER.
C.
VEREFY NON-ESSENTIAL EQUIPMENT AND DEBRIS HAS BEEN REMOVED FROM EACi BATTERY ROOM.
?LANNING APPROVALS:
FIRE PROTECTION REVIEW WORK PLANNED WORN PLANNED REVIEW WORK SCHEDULED PROCEDURE LIST:
BY DATE 02/12/96 02/12/96 02/12/96 02/20/08 TIME 14:14:00 14:13:59 14:26:45 07 :54 : 52 PROCEDURE ID REV TCN I
SO123-I-2.2 007 002 Desc:
125 VDC PILOT CELL BATTERY INSPECTION CRAFT INFORMAT ION:
CRAFT CODE CRAFT DESCRIPTION 1
EL ELECTRICIAN 2
SP FIRST LINE SUPERVISOR WORK DONE:
QTY ESTIMATED HOURS ACTUAL HOURS 2.0 6.0 1.0 2.0 Work Started:
Date 7- &
/
/ 0 Time -
0 7
-,3 1 1 1
Plu 6C-c1eo C,~'
I gdvP-/ 6V)
G A'-rr~.t6-A-
0802i 808-0 Paqe 5
0 (WORK DONE CONTINUED)
Z6~~-/?$v24 (b)(6)__
08021808-0 Page 6
4 NUCLEAR ORGANIZATION UNITS 1,2 AND 3 MAINTENANCE PROCEDURE REVISION 7 S0123-1-2.2 PAGE 2 OF 47 TCN 7-2 1.0 OBJECTIVES 1.1 T-his procedure provides guidance for performing the Weekly 125 volt Battery Bank and Charger operability verification checks.
1.2 This procedure satisfies the surveillance requirements specified in the Unit 2 and Unit 3 Technical Specifications, LCO - SR, Sections 3.8.4.1, 3.8.5.1, 3.8.6.1, and Table 3.8.6-1 Category "A" Limits.
1.3 This procedure performed at least monthly, satisfies the requirements stated in IEEE Std. 450-1980.
1.4 This procedure Is applicable to the 125 VDC Station Battery Banks.
2.0 REFERENCES
2.1 Refer to Attachment 1 for the Procedure Resource List.
3.0 PREREQUISITES 3.1 Before starting work, the user SHALL verify this procedure is current by referring to NDMS or one of the other methods listed in S0123-1-1.3.
3.2 Enter the following data:
MOA#
1
~c7 t % OS 00 IUni tI Equip Id: Is 2180("e-6 0 0 3.3 This procedure MAY be performed while Equalize Charging the Battery Bank unless one of the conditions listed in Section 3.4 is true.
08021808-0
NUCL1--AR ORGANIZATION UNITS 1, 2 AND 3 MAINTENANCE PROCEDURE REVISION 7 S0123-1-2.2 PAGE 7 OF 47 TCN 7-2 NOTE:
When taking Battery Bank Terminal Voltage, use a Fluke 187
( equivalent or better) set on the 500V range. It necessary, reference Design Calc' E4C-O 17.
6.2 Battery Bank Voltage TIS RUIEMENT 63.2.1 Measure Battery Bank Terminal voltage, Record readings below.
SACCEPTANCE CRITERIA All 125 VDC Battery Banks: [!
129.17 VDC 131.40 Voc SAT Go to Step 6.2.2.
UNSAT Perfons Cb)Forrect Actions as Follows.
IN,(6F
.1 Immediately notify your Supervisor of the "UNSAT"condition.
ACPL
.2 This Supervisor SHALL report a failed Surveillance according to Procedure SO 123-1-1.3.
CHK CPL
.3 Notify the Engineer, and generate an AR.
)
CHK CPL 08021808-0 4Em
/I.)