ML12159A352: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Oyster Creek Public Meeting June 6 | {{#Wiki_filter:Oyster Creek Public Meeting June 6 2012 June 6, 2012 Nuclear Regulatory Commission - Region I | ||
===Introductions=== | ===Introductions=== | ||
Oyster Creek 2011 Performance Results Presentation from EPA Presentation from NRC Questions & Answers | Oyster Creek 2011 Performance Results Presentation from EPA Presentation from NRC Meeting Agenda Presentation from NRC Questions & Answers | ||
NRC Annual Assessment Summary of Oyster Creek Exelon operated the plant safely Oyster Creek was in the Licensee Response Column of NRCs Action Matrix in 2011 The NRC plans to perform baseline inspections in 2012 | NRC Annual Assessment Summary of Oyster Creek Exelon operated the plant safely Oyster Creek was in the Licensee Response Column of NRCs Action Matrix in 2011 The NRC plans to perform baseline inspections in 2012 | ||
NRC Inspection Activities at Oyster Creek for 2011 5589 hours of direct inspection Two resident inspectors on site Event response Inspect | NRC Inspection Activities at Oyster Creek for 2011 5589 hours of direct inspection Two resident inspectors on site Event response Inspect over 20 areas of plant performance p | ||
p p | |||
Examples include operator performance, risk management, equipment issues, and fire protection | |||
Nine regional inspections Four team inspections Triennial Fire Protection EP Exercise Evaluation NRC Inspection Activities at Oyster Creek for 2011 Operator Licensing Examinations Security Baseline | |||
Environmental Protection Agency (EPA) | Environmental Protection Agency (EPA) | ||
(EPA) | |||
Region 2 | Region 2 | ||
| Line 38: | Line 39: | ||
Requests for Information The NRC staff requested information on: | Requests for Information The NRC staff requested information on: | ||
Whether facility configurations, as confirmed by seismic and flooding walkdowns, are in compliance with current facility design bases The adequacy of facility design bases with respect to seismic and flooding hazards Current communications system power supplies and their availability during a prolonged SBO event The required staffing necessary to respond to a multiunit, prolonged SBO event | Whether facility configurations, as confirmed by seismic and flooding walkdowns, are in compliance with current facility design bases The adequacy of facility design bases with respect to seismic and flooding hazards Current communications system power supplies and their availability during a prolonged SBO event The required staffing necessary to respond to a multiunit, prolonged SBO event | ||
Rulemaking Activities On March 20, 2011, the NRC issued an advanced notice of proposed rulemaking regarding a potential revision to the Station Blackout rule. | Rulemaking Activities On March 20, 2011, the NRC issued an advanced notice of proposed rulemaking regarding a potential revision to the Station Blackout rule. | ||
On April 18 18, | On April 18 2011 the NRC issued an On April 18, 2011, the NRC issued an advanced notice of proposed rulemaking regarding the integration of EOPs, SAMGs, and EDMGs. | ||
Next Steps on Tier 1 Orders and Request for Information Develop implementation guidance for the orders and requests for information Review licensee responses to the orders and requests for information Conduct follow up inspections | Next Steps on Tier 1 Orders and Request for Information Develop implementation guidance for the orders and requests for information Review licensee responses to the orders and requests for information Conduct follow up inspections | ||
More Information NRCs public website: | More Information NRCs public website: | ||
http://www.nrc.gov/japan/japan-info.html Frequently Asked Questions Contact Scott Burnell, Public Affairs Officer, at 301-415-8204 NRC | http://www.nrc.gov/japan/japan-info.html Frequently Asked Questions Contact Scott Burnell, Public Affairs Officer, at 301-415-8204 NRC i ti bli t | ||
f th NRC is accepting public comments on any of the recommendations Please send comments to JLD_Public.Resource@nrc.gov | |||
NRC Social Media Channels Blog: http://public-blog.nrc-gateway.gov/ | NRC Social Media Channels Blog: http://public-blog.nrc-gateway.gov/ | ||
Flickr: http://www.flickr.com/photos/nrcgov/ | |||
Flickr: http://www.flickr.com/photos/nrcgov/ | Flickr: http://www.flickr.com/photos/nrcgov/ | ||
Twitter: https://twitter.com/#!/nrcgov YouTube: http://www.youtube.com/user/NRCgov RSS: http://www.nrc.gov/public-involve/listserver.html#rss 13 | Twitter: https://twitter.com/#!/nrcgov YouTube: http://www.youtube.com/user/NRCgov RSS: http://www.nrc.gov/public-involve/listserver.html#rss 13 | ||
Contacting the NRC Report an emergency (301) 816-5100 (call collect) | Contacting the NRC Report an emergency (301) 816-5100 (call collect) | ||
Report a safety concern (800) 695-7403 695 7403 Allegation@nrc.gov General information or questions www.nrc.gov | Report a safety concern (800) 695-7403 (800) 695 7403 Allegation@nrc.gov General information or questions www.nrc.gov | ||
References http://www.state.nj.us/ | References http://www.state.nj.us/ | ||
http://www.nrc.gov/reading-rm/doc-collections/fact-sheets/buried-pipes-tritium.html | http://www.nrc.gov/reading-rm/doc-collections/fact-sheets/buried-pipes-tritium.html | ||
End of Presentation Nuclear Regulatory Commission Region I Toms River, NJ June 6, 2012}} | End of Presentation Nuclear Regulatory Commission Region I Region I Toms River, NJ June 6, 2012}} | ||
Latest revision as of 01:45, 12 January 2025
| ML12159A352 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 06/06/2012 |
| From: | Hunegs G NRC/RGN-I/DRP/PB6 |
| To: | |
| HUNEGS, GK | |
| Shared Package | |
| ML12137A544 | List: |
| References | |
| Download: ML12159A352 (16) | |
Text
Oyster Creek Public Meeting June 6 2012 June 6, 2012 Nuclear Regulatory Commission - Region I
Introductions
Oyster Creek 2011 Performance Results Presentation from EPA Presentation from NRC Meeting Agenda Presentation from NRC Questions & Answers
NRC Annual Assessment Summary of Oyster Creek Exelon operated the plant safely Oyster Creek was in the Licensee Response Column of NRCs Action Matrix in 2011 The NRC plans to perform baseline inspections in 2012
NRC Inspection Activities at Oyster Creek for 2011 5589 hours0.0647 days <br />1.553 hours <br />0.00924 weeks <br />0.00213 months <br /> of direct inspection Two resident inspectors on site Event response Inspect over 20 areas of plant performance p
p p
Examples include operator performance, risk management, equipment issues, and fire protection
Nine regional inspections Four team inspections Triennial Fire Protection EP Exercise Evaluation NRC Inspection Activities at Oyster Creek for 2011 Operator Licensing Examinations Security Baseline
Environmental Protection Agency (EPA)
(EPA)
Region 2
Fukushima Lessons Learned July 2011 Near-Term Task Force (NTTF) report issued September/October 2011 NTTF recommendations prioritized into 3 tiers March 2012 The NRC staff issued the Tier 1 orders and requests for information
Orders The NRC staff ordered licensees to:
Develop strategies and procure additional equipment to address beyond-design-basis natural phenomena and multiunit events Include a reliable hardened vent in Mark I and Mark II containments Enhance spent fuel pool instrumentation for beyond design basis accidents
Requests for Information The NRC staff requested information on:
Whether facility configurations, as confirmed by seismic and flooding walkdowns, are in compliance with current facility design bases The adequacy of facility design bases with respect to seismic and flooding hazards Current communications system power supplies and their availability during a prolonged SBO event The required staffing necessary to respond to a multiunit, prolonged SBO event
Rulemaking Activities On March 20, 2011, the NRC issued an advanced notice of proposed rulemaking regarding a potential revision to the Station Blackout rule.
On April 18 2011 the NRC issued an On April 18, 2011, the NRC issued an advanced notice of proposed rulemaking regarding the integration of EOPs, SAMGs, and EDMGs.
Next Steps on Tier 1 Orders and Request for Information Develop implementation guidance for the orders and requests for information Review licensee responses to the orders and requests for information Conduct follow up inspections
More Information NRCs public website:
http://www.nrc.gov/japan/japan-info.html Frequently Asked Questions Contact Scott Burnell, Public Affairs Officer, at 301-415-8204 NRC i ti bli t
f th NRC is accepting public comments on any of the recommendations Please send comments to JLD_Public.Resource@nrc.gov
NRC Social Media Channels Blog: http://public-blog.nrc-gateway.gov/
Flickr: http://www.flickr.com/photos/nrcgov/
Flickr: http://www.flickr.com/photos/nrcgov/
Twitter: https://twitter.com/#!/nrcgov YouTube: http://www.youtube.com/user/NRCgov RSS: http://www.nrc.gov/public-involve/listserver.html#rss 13
Contacting the NRC Report an emergency (301) 816-5100 (call collect)
Report a safety concern (800) 695-7403 (800) 695 7403 Allegation@nrc.gov General information or questions www.nrc.gov
References http://www.state.nj.us/
http://www.nrc.gov/reading-rm/doc-collections/fact-sheets/buried-pipes-tritium.html
End of Presentation Nuclear Regulatory Commission Region I Region I Toms River, NJ June 6, 2012