{{#Wiki_filter:Sheet 1 of 2 Status'N U Seismic Walkdown Checklist (SWC)
{{#Wiki_filter:Sheet 1 of 2 Status'N U Seismic Walkdown Checklist (SWC)
Equipment ID No. 0AC097                               Equip. Class"2 (20) Control Panels & Cabinets Equipment Description Diesel GeneratorOAG12 ControlPanel Location: Bldg. Diesel Generator                 Floor El. 127               Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)
Equipment ID No. 0AC097 Equip. Class"2 (20) Control Panels & Cabinets Equipment Description Diesel Generator OAG12 Control Panel Location: Bldg. Diesel Generator Floor El. 127 Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one           Y)NE of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                       Y] NEI UE N/A[
Y)NE
: 3. Is the anchorage free of corrosion that is more than mild surface                       Y[O ND UED N/Al]
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?               YP4 NEl UO N/AD
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 5. Is the anchorage configuration consistent with plant documentation?                   Y$ NE UE] N/AU (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation?
Y3NEI UE
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
Y] NEI UE N/A[
                                                              <C-3 >
Y[O ND UED N/Al]
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                             C-310
YP4 NEl UO N/AD Y$ NE UE] N/AU Y3NEI UE 12 Enter the equipment class name from Appendix B: Classes of Equipment.
.nrr*.nnnndi.nr, Nn* R.9-19-171
<C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3
.nrr*.nnnndi.nr, Nn* R.9-19-171 C-310


Sheet 2 of 2 Equipment IoD No.       AC097                   Equip. Class" (20) Control Panels & Cabinets Equipment Description Diesel GeneratorOA G12 ControlPanel Interaction Effects
Sheet 2 of 2 Equipment IoD No.
: 7. Are soft targets free from impact by nearby equipment or structures?       Yo NEI UEI N/A[3
AC097 Equip. Class" (20) Control Panels & Cabinets Equipment Description Diesel Generator OA G12 Control Panel Interaction Effects
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YKJ] NIl U-    N/AL-and masonry block walls not likely to collapse onto the equipment?
: 7. Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?               YK NEl UOI N/AU
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 10. Based on the above seismic interaction evaluations, is equipment free     Y    NO UU1 of potentially adverse seismic interaction effects?
: 9. Do attached lines have adequate flexibility to avoid damage?
Other Adverse Conditions
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
: 11. Have you looked for and found no other seismic conditions that could       YW NEI U" adversely affect the safety functions of the equipment?
Yo NEI UEI N/A[3 YKJ] NIl U-N/AL-YK NEl UOI N/AU Y
NO UU1 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YW NEI U" adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
C-     C       ,  S..n2et-             +LcZ Evaluated by:.                                                                     Date:     ? ,5"//-..
C-C S..n2et-  
461-1 !!&#xfd; 4 41--                                                     /2.5                                 V Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                 C-311 (fnrrP.nnndpnr.P Nn
+LcZ Evaluated by:.
* RR-19-17.1
Date:  
?,5"//-..
461-1 !!&#xfd; 4 41--
V
/2.5 Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 (fnrrP.nnndpnr.P Nn
* RR-19-17.1 C-311


0
'-U 0
'-U a.-   0)
a.-
0)
: 0. o
: 0. o
* 0
* 0 0
  -  0 c
c m
m
-3 CD C) 0 C-)
          -3 CD C) 0 C-)
CC) 4I
CC) 4I


Sheet 1 of 2 Status:Q N U Seismic Walkdown Checklist (SWC)
Sheet 1 of 2 Status:Q N U Seismic Walkdown Checklist (SWC)
Equipment ID No. OAGO12                               Equip. Class' 2 (17) Engine Generators Equipment Description El Standby Diesel Generator Location: Bldg. Diesel Generator                 Floor El. 127               Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)
Equipment ID No. OAGO12 Equip. Class'2 (17) Engine Generators Equipment Description El Standby Diesel Generator Location: Bldg. Diesel Generator Floor El. 127 Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchora2e
Anchora2e
: 1. Is the anchorage configuration verification required (i.e., is the item one             Y[& NEI of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one Y[& NEI of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                       YPI NE UD N/AD
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surface                       YO NEI UD- N/AD3 oxidati'on? ,,
: 3. Is the anchorage free of corrosion that is more than mild surface oxidati'on?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?               YO ND UDI N/A'-
YPI NE UD N/AD YO NEI UD-N/AD3
: 5. Is the anchorage configuration consistent with plant documentation?                     YeN     U"] N/AD3 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 6. Based on the above anchorage evaluations, is the anchorage free of                     Y$ NO UD3 potentially adverse seismic conditions?
YO ND UDI N/A'-
2 1  Enter the equipment class name from Appendix B: Classes of Equipment.
: 5. Is the anchorage configuration consistent with plant documentation?
                                                              <C-3 >
YeN U"] N/AD3 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                               C-313 f .nrrs nnnHPdnn.P. Nn
: 6. Based on the above anchorage evaluations, is the anchorage free of Y$ NO UD3 potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
<C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-313 f.nrrs nnnHPdnn.P. Nn
* RR-19-171
* RR-19-171


Sheet 2 of 2 Equipment ID No. OAGO12                         Equip. Class12 (17) Engine Generators Equipment Description El Standby Diesel Generator Interaction Effects
Sheet 2 of 2 Equipment ID No. OAGO12 Equip. Class12 (17) Engine Generators Equipment Description El Standby Diesel Generator Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y[. NEI U-' N/All
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. re   vereadequpmet,celin ties nd ighing istibuionsysems
Y[.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YJ2 NOI Urn N/Al]
NEI U-' N/All
and masonry block walls not likely to collapse onto the equipment?
: 8. re vereadequpmet, istibuionsysems celin ties nd ighing
A'e ceU,/,i oes or rntitnr>. 6 IoWe,$,.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               YA NEI Ul] N/Al]
A'e ceU, 1
: 10. Based on the above seismic interaction evaluations, is equipment free       YQ&#xfd; NEI UF of potentially adverse seismic interaction effects?
/,i oes or rnti tnr>. 6 IoWe,$,.
Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?
: 11. Have you looked for and found no other seismic conditions that could       YPO NOI U--1 adversely affect the safety functions of the equipment?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Comments (Additional pages may be added as necessary) 5e75,,c re-e/,-,A         & V-eenp     aVV /6 Me #uv           ,4     //-e   e,/ V
YJ2 NOI Urn N/Al]
                                      ~~~~1F4~l   .4e;< / Av   i4e il,           /'~   '
YA NEI Ul] N/Al]
Evaluated by:                                                                       Date;           )-?/
YQ&#xfd; NEI UF Other Adverse Conditions
                                '000Y                                                           ,;&#xfd;/zq of& -
: 11. Have you looked for and found no other seismic conditions that could YPO NOI U--1 adversely affect the safety functions of the equipment?
                                                      < C-4 >
Comments (Additional pages may be added as necessary) 5e75,,c re-e/,-,A  
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                       C-314 rnrrPmsnnnr1iP.ln Nn
& V-eenp aVV /6 Me #uv  
* RRA-1-17
,4  
//-e e,/
V
~~~  
~1F4~l.4e;< / Av i4e il,  
/'~
Evaluated by:
Date;  
)-?/
'000Y
,;&#xfd;/zq &
of -
< C-4 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrPmsnnnr1iP.ln Nn
* RRA-1-17 C-314


cl,
cl, 03
  -. 03
'3 z
  '3 z     0n CA c
0n CA c
m 30 CD C)
m 30 CD C)
G)
G)
Line 98: Line 124:


'D
'D
    *&#xfd;   0
*&#xfd; 0 CD 0
  -    CD 0
z '
z '
m
m
          .0
.0
          -*0 CD 53
-*0 CD 53


-3   0
-3 0
* 0 (A
* 0 (A
m CD 2*
m CD 2*
CD
CD


K -0C O   D
K -0C O D
~CD 0 3u C.) C 0
~CD 0 3u C.) C 0
m 30 CD
m 30 CD
      -. 1 5-
-. 15-


-0 D&#xfd; 0 3) 0 M"
D&#xfd;  
-0 0
3) 0 M "
m 3o CD C)
m 3o CD C)


Sheet 1 of 2 Status:     N U Seismic Walkdown Checklist (SWC)
Sheet 1 of 2 Status:
Equipment ID No. OAP060                             Equip. Class"2 (05) Horizontal Pumps Equipment Description El DIG Fuel Oil TransferPump Location: Bldg. Diesel Generator Floor El. ,2aoIi/ia..Room, Area D/G-3 Building                                   2"- t78,r-Manufacturer, Model, Etc. (optional'but recommended)
N U Seismic Walkdown Checklist (SWC)
Equipment ID No. OAP060 Equip. Class"2 (05) Horizontal Pumps Equipment Description El DIG Fuel Oil Transfer Pump Location: Bldg. Diesel Generator Floor El.  
,2aoIi/ia..Room, Area D/G-3 Building 2"- t78,r-Manufacturer, Model, Etc. (optional'but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage.
Anchorage.
I. Is the anchorage configuration verification required (i.e., is the item one YONM of the 50% of SWEL items requiring such verification)?
I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   Y1A NO UOI- N/AE
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surface                   Yf     NEI UO N/AE oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?           YI* NEI' UE     N/AE 1V0       rh~..~                     otm                                 vcre-e-,
YONM Y1A NO UOI-N/AE Yf NEI UO N/AE
c-
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 5. Is the anchorage configuration consistent with plant documentation?                 YE NE UE N/AI (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
YI* NEI' UE N/AE 1V0 rh~..~
: 6. Based on the above anchorage evaluations, is the anchorage free of                   YNLIuEl potentially adverse seismic conditions?
otm c-vcre-e-,
12 Enter the equipment class name from Appendix B: Classes of Equipment.
: 5. Is the anchorage configuration consistent with plant documentation?
                                                          <C-3 >.
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                               C-320
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
(.nrrP.nnndlnr.P. Nn RR-1 9-173
YE NE UE N/AI YNLIuEl 12 Enter the equipment class name from Appendix B: Classes of Equipment.
<C-3 >.
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3
(.nrrP.nnndlnr.P. Nn RR-1 9-173 C-320


Sheet 2 of 2 Equipment ID No. OAP060                         Equip. Class" (05) Horizontal Pu   s Equipment Description El DIG Fuel Oil TransferPump Interaction Effects
Sheet 2 of 2 Equipment ID No. OAP060 Equip. Class" (05) Horizontal Pu s
: 7. Are soft targets free from impact by nearby equipment or structures?       Y4 NE UD N/AO
Equipment Description El DIG Fuel Oil Transfer Pump Interaction Effects
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[INUI UI N/Al and masonry block walls not likely to collapse onto the equipment?
: 7. Are soft targets free from impact by nearby equipment or structures?
        *%.")               oe~bttr Or     4OvSCtr(   --
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               Y$ NE    UO N/AD
*%.")
: 10. Based on the above seismic interaction evaluations, is equipment free       YP NO U[-]
oe~bttr Or 4OvSCtr(
of potentially adverse seismic interaction effects?
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Y4 NE UD N/AO Y[INUI UI N/Al Y$ NE UO N/AD YP NO U[-]
Other Adverse Conditions
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     . YN NEI UD adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could.
YN NEI UD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added, as necessary)
Comments (Additional pages may be added, as necessary)
_____M___
_____M___
ft Evaluated by:         L**#4EEZ                                                     Date: _____      ____.
ft Evaluated by:
                                                                                              '1 .Z) /2-
L**#4EEZ Date:  
                                                    < C-4 >
'1.Z)  
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                   C-321 CnrrP.-nnnr-nr*. Nn
/2-
* RR-19-17.T
< C-4 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 CnrrP.-nnnr-nr*. Nn
* RR-19-17.T C-321


- u 0
u 0
* 0 0~C cn CD 3
* 0 0~C cn CD 3
()
()
Line 158: Line 195:


Sheet Iof 2 Status:0 N U Seismic Walkdown Checklist (SWC)
Sheet Iof 2 Status:0 N U Seismic Walkdown Checklist (SWC)
Equipment ID No. 0AP163                           Equip. Class 2 (05) Horizontal Pumps Equipment Description Emergency Service Water Booster Pump A Location: Bldg. Diesel Generator           Floor El. ik211z_     p1 iWRoom, Area DIG-i Building Manufacturer, Model, Etc. (optional but recommended)
Equipment ID No. 0AP163 Equip. Class 2 (05) Horizontal Pumps Equipment Description Emergency Service Water Booster Pump A Location: Bldg. Diesel Generator Floor El.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record theresults ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
ik211z_
p1 iWRoom, Area DIG-i Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record theresults of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one         YO NJ9 of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one YO NJ9 of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YIr NE UE N/AO
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surface                   YE4 NEI Ul N/AL oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?           Ypa NEI UL N/AL
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 5. Is the anchorage configuration consistent with plant documentation?                 YE NEI UE N/AI9 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation?
: 6. Based on the above anchorage evaluations, is the anchorage free of                   YN NEI UE potentially adverse seismic conditions?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
12Enter the equipment class name from Appendix B: Classes of Equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
                                                          <C-3 >
YIr NE UE N/AO YE4 NEI Ul N/AL Ypa NEI UL N/AL YE NEI UE N/AI9 YN NEI UE 12 Enter the equipment class name from Appendix B: Classes of Equipment.
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                         C-323 rnrrmnnnr1Pnrn Nn - RR-19-171
<C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrmnnnr1Pnrn Nn - RR-19-171 C-323


Sheet 2 of 2 Equipment ID No. 0AP163                       Equip. Class12 (05) Horizontal Pumps Equipment Description Emergency Service Water Booster Pump A Interaction Effects
Sheet 2 of 2 Equipment ID No. 0AP163 Equip. Class12 (05) Horizontal Pumps Equipment Description Emergency Service Water Booster Pump A Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y,   NO UO N/AD
: 7. Are soft targets free from impact by nearby equipment or structures?
Y, NO UO N/AD
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YW NEI UL N/AD and masonry block walls not. likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YW NEI UL N/AD and masonry block walls not. likely to collapse onto the equipment?
tL(? Al,             1 tFq ct/eSsV ev     ecvre,/y 4tfida6           /VO Me- cet/,r11 AD
tL(? Al, tFq1 ct/eSsV ev ecvre,/y 4tfida6  
                  ,~C49e         o-, Hkib~'~                 ri         not- ec~4     c&v-~             t~4e-It( i4:) 0/b     f-a l bio
/VO Me-cet/,r11 AD  
                                    /.           4 "--./S 'Ni -e 'entL,       cei/at lh.oo*   .. son1
,~C49e o-, Hkib~'~
: 9. Do attached lines have adequate flexibility to avoid damage?               P4 NEI U! N/A1
ri not-ec~4 c&v-~
: 10. Based on the above seismic interaction evaluations, is equipment free         ANEIUO of potentially adverse seismic interaction effects?
t~4e-It( i4:)
Other Adverse Conditions
0/b f-a l /.
: 11. Have you looked for and found no other seismic conditions that could       YR NEI U-adversely affect the safety. functions of the equipment?
4 "--./S 'Ni -e 'entL, bio cei/at lh.o o*  
.. son1
: 9. Do attached lines have adequate flexibility to avoid damage?
P4 NEI U!
N/A1
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
ANEIUO Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YR NEI U-adversely affect the safety. functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by:                                                                     Date:     9       '2 -
Evaluated by:
Q= &#xfd;Ab V
Date:
                                                    <C-4 >
9  
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                     C-324 rnrrPnnndPneP Nn
'2 -
Q=&#xfd;Ab V
<C-4 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrPnnndPneP Nn
* R,-19-17.
* R,-19-17.
C-324


~~U)fl 0
~~U)fl 0
D D CD,
D D CD,
-4   0 3.
-4 0
3.
C/
C/
m
m
        .0 c
.0 c
        -4.
-4.
3 CD C)
3 CD C)


-      o
o
:0
:0 0
* 0
-~C:
  -~C:
m 3o CD 0)
m 3o CD 0)
        -.0
-.0


Sheet 1 of 2 Status:@ N U Seismic Walkdown Checklist (SWC)
Sheet 1 of 2 Status:@ N U Seismic Walkdown Checklist (SWC)
OA-TO010 Equipment ID No. 4AT-W               IA T */;i/i 2- Equip. Class". (21) Tanks or Heat Exchangers (Vertical)
OA-TO010 Equipment ID No. 4AT-W IA T  
Equipment Description E1 Diesel GeneratorFuel Oil Day Tank Location: Bldg. Diesel Generator               Floor El. 127             Room, Area. D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)
*/;i/i 2-Equip. Class". (21) Tanks or Heat Exchangers (Vertical)
Equipment Description E1 Diesel Generator Fuel Oil Day Tank Location: Bldg. Diesel Generator Floor El. 127 Room, Area. D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist fordocumenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist fordocumenting other comments.
Anchorage
Anchorage
* 1. Is the anchorage configuration verification required (i.e., is the item one           Y[    NEI of the 50% of SWEL items requiring such verification)?
* 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                     Y[9 NEI UI N/A-
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surface                     Y[K NEI U-    N/ADl oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?             YK NEI UD- N/AD
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 5. Is the anchorage configuration consistent with plant documentation?                   YJK NEI U-- N/ADl (Note: This question only applies if the item is one of the 50% for, which an anchorage configuration verification is required.) 3 i/40-4n~4c~'(~~tf~v~ei 4           '~-Irs   ,
Y[
: 6. Based on the above anchorage evaluations, is the anchorage free of                   Y)NU potentially adverse seismic conditions?
NEI Y[9 NEI UI N/A-Y[K NEI U-N/ADl YK NEI UD-N/AD
12 Enter the equipment class name from Appendix B: Classes of Equipment.
: 5. Is the anchorage configuration consistent with plant documentation?
                                                            < C-3 >
YJK NEI U-- N/ADl (Note: This question only applies if the item is one of the 50% for, which an anchorage configuration verification is required.) 3 i/40-4n~4c~'(~~tf~v~ei 4  
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                             C-327 r.nrrPqnnndn1n'.P Nn
'~-Irs
* RR-19-171
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y)NU 12 Enter the equipment class name from Appendix B: Classes of Equipment.
< C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrPqnnndn1n'.P Nn
* RR-19-171 C-327


Sheet 2 of 2 Equipment ID No. OAT40                         Equip. Class 12 (21) Tanks or Heat Exchangers (Vertical)
Sheet 2 of 2 Equipment ID No. OAT40 Equip. Class12 (21) Tanks or Heat Exchangers (Vertical)
Equipment Description El Diesel GeneratorFuel Oil Day Tank Interaction Effects
Equipment Description El Diesel Generator Fuel Oil Day Tank Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YM NE Ur N/AEl
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YP4 NE UD N/AD and masonry block walls not likely to collapse onto the equipment?
YM NE Ur N/AEl
          ,0o 0qAf5bnPX                   r~ ct-i7 0.,415            ,e
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YP4 NE and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               YVI NO UO N/AU
,0o 0qAf5bnPX 0.,415 r~ ct-i7  
: 10. Based on the above seismic interaction evaluations, is equipment free     YX NEI UD of potentially adverse seismic interaction effects?
,e UD N/AD
Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?
: 11. Have you looked for and found no other seismic conditions that could       Y,   NO UE" adversely affect the safety functions of the equipment?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YVI NO UO N/AU YX NEI UD Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y, NO UE" adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by:         M       -r,*.
Evaluated by:
5t                                                  Date:   A"/ zaY/4-Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                   C-328
M 5t
.nrri-nnndPnr.P Nn
-r,*.
* RR-19-17R
Date: A"/ zaY/4-Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3
.nrri-nnndPnr.P Nn
* RR-19-17R C-328


z   U) 0 m
z U) 0 m
30 CD
30 CD


Sheet 1 of 2
Sheet 1 of 2
                                                                                                \           ~Status:@xY N U Seismic Walkdown Checklist (SWC)U Equipment ID No. 0AT096                                       Equip. Class"2 (21) Tanks or Heat Exchangers (Horizontal)
\\
Equipment Description El Diesel GeneratorLube Oil Storage Tank Location: Bldg. Diesel Generator                       Floor El. 127                   Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)
~Status:@xY N U Seismic Walkdown Checklist (SWC)U Equipment ID No. 0AT096 Equip. Class"2 (21) Tanks or Heat Exchangers (Horizontal)
Equipment Description El Diesel Generator Lube Oil Storage Tank Location: Bldg. Diesel Generator Floor El. 127 Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one                 YDN) of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                           Y;    NEI U-' N/ADl
YDN)
: 3. Is the anchorage free of corrosion that is more than mild surface                           YJI NDI- UD N/AED oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                   Ypk NDI UD- N/ADl:
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 5. Is the anchorage configuration consistent with plant documentation?                         YDI NDI UD- N/As4.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
I           /7'   .1     A e."r~~   21       %  ~ ,i A IL- ftv' AtOf e   60 n h PVP     -0'0           -    0 " W. el             7
I  
: 6. Based on the above anchorage evaluations, is the anchorage free of                                 ND UD potentially adverse seismic conditions?
/7'  
12Enter the equipment class name from Appendix B: Classes of Equipment.
.1 A
e."r~~
21  
~  
,i Y;
NEI U-' N/ADl YJI NDI-UD N/AED Ypk NDI UD-N/ADl:
YDI NDI UD-N/As4.
ND UD A I L - ftv' AtOf e 60 n h PVP  
-0'0 0 " W. el 7
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
4C-3 >
4C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                                     C-330 r.nrrmqnnndrnr.P.* Nn
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrmqnnndrnr.P.* Nn
* RR-19-171
* RR-19-171 C-330


Sheet 2 of 2 Equipment ID No. 0AT096                         Equip. Class12 (21) Tanks or Heat Exchangers (Horizontal)
Sheet 2 of 2 Equipment ID No. 0AT096 Equip. Class12 (21) Tanks or Heat Exchangers (Horizontal)
Equipment Description El Diesel GeneratorLube Oil Storage Tank Interaction Effects
Equipment Description El Diesel Generator Lube Oil Storage Tank Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YX* NO UO N/AU
: 7. Are soft targets free from impact by nearby equipment or structures?
YX* NO UO N/AU
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[M Nol UOi. N/AU and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[M Nol UOi. N/AU and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?               Yo NEI UO N/AU
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment free     Y5 NE UO of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditions
Yo NEI UO N/AU Y5 NE UO Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       YA NOl UU adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YA NOl UU adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by:         44~z                                                         Date:
Evaluated by: 44~z Date:
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                   C-331 rTnrrP.AnnnrlAnr. Nn
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rTnrrP.AnnnrlAnr.
* RR-19-173
Nn
* RR-19-173 C-331


  -~0 z*0
-~0 z  
*0
* 0
* 0
'33 cn m
'33cn m
n CD 0) co
n CD co 0)


Sh     t1of2 Status         N U Seismic WalkdownClieck1ist-(SWC)
Sh t1of2 Status N U Seismic WalkdownClieck1ist-(SWC)
Equipment ID No.               A 030 Equipment Description C.go vfr.e Equip. Classt 60h (P) F-.*
Equipment ID No.
                                                                              *'*_Vi,*                 .t       t7,/z     ,-*
A 030 Equip. Classt (P) F-.*
Lcto:Bldg. 18                         Floor El. 1Z   (0S Rot'-A'ra                                                   "
Equipment Description C.go vfr.e 60h
Manufacturer, Model, Etc. (optional but recommended)
*'*_Vi,*  
Instructions for Completing Checklist This chekdlist. may-,be uised tp document the results of the Seismic Walkdownof an item Of equipment on the SWEL. The space below each of the folloviing 4ueistlns may'be used to recordtthe results of judgments and findings. Additional space is provided at the end of this checklist for docudtlenting -othercomments.
.t t7,/z Lcto:Bldg. 18 Floor El.
S 1Z (0
Rot'-A'ra Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This chekdlist. may-,be uised tp document the results of the Seismic Walkdownof an item Of equipment on the SWEL. The space below each of the folloviing 4ueistlns may'be used to recordtthe results of judgments and findings. Additional space is provided at the end of this checklist for docudtlenting -other comments.
: 1. Is the anchorage configuration verification required (i.e., is the item one YANI-of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one YANI-of the 50% of SWEL items requiring such verification)?
44&#xfd;I'd PVJr                           0 (o2,00'V"-5"-
44&#xfd; I'd PVJr 0 (o 2,00'V"-5"-
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                     YKQNI UF N/AO t-5k 4AA44             10."                t   4     ic     f/t
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the ancShorage free of codrosion that is more than mild surface                     Y_.NI" UDI N/AD' oxidation?
YKQNI UF N/AO t-5k 4AA44
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?               YA'[3IUQI N/AQ
: 10.
: 5. Is the anchorage configuration consistent with plant documentation?-                   Y&#xfd; N[3 UF3 N/A[r (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
t 4
: 6. Based on the above anchorage evaluations, is the anchorage free of                     YXN[        UQ potentially adverse seismic conditions?
ic f/t
12 Enter the equipment class name from Appendix B: Classes of Equipment.
: 3. Is the ancShorage free of codrosion that is more than mild surface Y_.NI" UDI N/AD' oxidation?
                                                                % C-3 >
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
Peach Bottom Atomic Power Station Unit 3                                                                                 C-333 MPR-3812, Revision 3
: 5. Is the anchorage configuration consistent with plant documentation?-
(-nrr~mnnnrfP.nr&#xfd;n   Nn* R-19-171
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y A'[3IUQI N/AQ Y&#xfd; N[3 UF3 N/A[r YXN[
UQ 12 Enter the equipment class name from Appendix B: Classes of Equipment.
% C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3
(-nrr~mnnnrfP.nr&#xfd;n Nn* R-19-171 C-333


Sheet 2 of 2 Equipment ID No.             .(
Sheet 2 of 2 Equipment ID No..(
Equipment Description Interaction Effects                 .  -
Equipment Description Interaction Effects
: 7. Are soft targets free. frn- immpact&#xfd; by nearby equipmejit or structures?. Yg NO3 UQ N/AO
: 7. Are soft targets free. frn-immpact&#xfd; by nearby equipmejit or structures?.
Yg NO3 UQ N/AO
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[O NQ3 U[3 NIAOI and masonry block walls not likely to collapse onto t e equip ent?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[O NQ3 U[3 NIAOI and masonry block walls not likely to collapse onto t e equip ent?
: 9. Do attachedlines have adequate flexibility to avoid damage?               yZ 41i U-I N/AO q       -
: 9. Do attachedlines have adequate flexibility to avoid damage?
1.0. based on the aboveseismic interaction evaluatioos, is'equiplnent free.     -,        NO UOi of potentially adverse seismic interaction effects?
yZ 41i U-I N/AO q
I.. .  ",.'," .      ......" _.              S,. *:    ,                    '1   ,'--.'z Mk                      I,   .
1.0. based on the aboveseismic interaction evaluatioos, is'equiplnent free.
* t'i( i ." .')
NO UOi of potentially adverse seismic interaction effects?
I..
S,.
Mk
'1  
,'--.'z I,
.
* t'i( i  
.".')
Other Adverne Conditions
Other Adverne Conditions
: 11. Have you looked for and found no other seismic conditions that could       YJI'-NO UOI adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YJI'-NO UOI adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by:                                                                           Date:         I       -
Evaluated by:
Date:
I
( C4 >
( C4 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrr(mnnndPnr.P Nn         RR-19-17C-                                                                           C-334
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrr(mnnndPnr.P Nn RR-19-17C-C-334


0 z 'o
'- 0 z 'o 0
* 0
. cn m
  . cn m
"0&deg; 3CD CA)
        "0&deg; 3
C 0
CD C
0 0
0CA) 0 0


    -~0 z*0 Z ;a
-~0 z  
-3   CD 0 cn C.)
*0 Z ;a
        "0 m
-3 CD 0 cn C.)
CD 3
"0 m
C 2
3CD C
0 0*
2 0
0*
0
0


Sheet 1 of 2 Status:0 N U Seismic Walkdown Checklist (SWC)
Sheet 1 of 2 Status:0 N U Seismic Walkdown Checklist (SWC)
Equipment ID No. 0AV036                           Equip. Class"2 (09) Fans Equipment Description Battery Room Exhaust FanA Location: Bldg. Radwaste                   Floor El. 165               Room, Area R/W-32 Manufacturer, Model, Etc. (optional but recommended)
Equipment ID No. 0AV036 Equip. Class"2 (09) Fans Equipment Description Battery Room Exhaust Fan A Location: Bldg. Radwaste Floor El. 165 Room, Area R/W-32 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one YJMNEI of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YX    NO ULI N/All
YJMNEI
: 3. Is the anchorage free of corrosion that is more than mild surface                   YXNO U!] N/Al]
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                   NO U! N/Al-
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 5. Is the anchorage configuration consistent with plant documentation?                 YV NO" ULI N/AL]
: 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
COi-(,tR4eamna tr~ae-Me             t>,46     62&#xfd;'O-s-q-eO,IZLV.6
COi-(,tR4eamna tr~ae-Me t>,46 62&#xfd;'O-s-q-eO,IZLV.6
: 6. Based on the above anchorage evaluations, is the anchorage free of                   YENO UO potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
32Enter the equipment class name from Appendix B: Classes of Equipment.
YX NO ULI N/All YXNO U!] N/Al]
                                                          <KC-3 >
NO U! N/Al-YV NO" ULI N/AL]
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-337 rnrrmnnndn-nrP Nn" RR-19-173
YENO UO 32 Enter the equipment class name from Appendix B: Classes of Equipment.
<KC-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrmnnndn-nrP Nn" RR-19-173 C-337


Sheet 2 of 2 Equipment ID No. 0AV036                       Equip. Class12 (09) Fans Equipment Description Battery Room Exhaust FanA Interaction Effects
Sheet 2 of 2 Equipment ID No. 0AV036 Equip. Class12 (09) Fans Equipment Description Battery Room Exhaust Fan A Interaction Effects
: 7. Are softt                         by nearby equipment or structures?     YXND UQ N/AD
: 7. Are softt by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YtKND U- N/AD and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
YNearAY       6048cI'l-         olejidte ly         Vlo4A.
YNearAY 6048cI'l-olejidte ly Vlo4A.
A0t499tOb'aOvOmr-&#xa3;.
A0t499tO urn+
urn+
b'aO vOmr-&#xa3;.
: 9. Do attached lines have adequate flexibility to avoid damage?             Y)(NL- UD N/AE`
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment free     YX ND Ur of potentially adverse seismic interaction effects?
YXND UQ N/AD YtKND U-N/AD Y)(NL-UD N/AE`
Other Adverse Conditions
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
: 11. Have you looked for and found no other seismic conditions that could       Y   NEI U adversely affect the safety functions of the equipment?O           Ie'     or* .eac4 V'i viesul u ofpw            7T ent     1                     M-Comments .(Additional pages may be added as necessary)
YX ND Ur Other Adverse Conditions
Evaluated by:                                                                     Date:     __. /
: 11. Have you looked for and found no other seismic conditions that could Y
o._I   _          I-'0X
NEI U adversely affect the safety functions of the equipment?O Ie' or*.eac4 V'i ofpw viesul u ent 1
                                                                                                !3-/     IZ
7T M-Comments.(Additional pages may be added as necessary)
                                                    < C-4 >
Evaluated by:
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                     C-338 rlnrrinnnrPnr.P NKn* R-1 9-171
Date:
o._I /
I- '0X
! 3-/
IZ
< C-4 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rlnrrinnnrPnr.P NKn* R-1 9-171 C-338


  -~0 z   0 3
-~0 z 0 3
* 0
0
          ~~T-S CCD 00
~~T-S CCD 00


  -  CD z   ~3 0
CD z ~
3 0
c m
c m
        -5" 3CD
-5" 3
          -C C) 0 0
CD
-C C) 0 0
0)
0)


-&#xfd;   02 z 0 CD 0 si >
-&#xfd; 02 z 0 CD 0 si >
: 0. 3 on, 5
: 0. 3 on, R.
R.
5 0
0 m
m 30 CD 0)
30 CD 0)


D3 3 CD 0
D3 3
CD 0
c m
c m
30 CD CA 0)
30 CD CA 0)


Sheet 1 of 2 Status:)   N U Seismic Walkdown Checklist (SWC)
Sheet 1 of 2 Status:)
Equipment ID No. 0AV064                               Equip. Class12 (09) Fans Equipment Description DIG Building Vent Supply Fan Location: Bldg. Diesel Generator                 Floor El. 151               Room, Area D/G-P             g Building Manufacturer, Model, Etc. (optional but recommended)                   :Amtifl,     OLOW1aR *T*N       13L Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
N U Seismic Walkdown Checklist (SWC)
Equipment ID No. 0AV064 Equip. Class12 (09) Fans Equipment Description DIG Building Vent Supply Fan Location: Bldg. Diesel Generator Floor El. 151 Room, Area D/G-P g
Building Manufacturer, Model, Etc. (optional but recommended)
:Amtifl, OLOW1aR  
*T*N 13L Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one YT(NE of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                     YZIND UE" N/AD
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surface                       YE(NE] UD N/AD oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?               Y[f NDI UD' N/ADl
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 5. Is the anchorage configuration consistent with plant documentation?                   Ye/ND- UEI N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation?
: 6. Based on the above anchorage evaluations, is the anchorage free of                     Y~dN[D ULI potentially adverse seismic conditions?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
12 Enter the equipment class name from Appendix B: Classes of Equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
                                                              'C-3 >
YT(NE YZIND YE(NE]
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                                 C-343 rnrrm..qnnnHP-nr.&#xfd;- Nn " RR-19-171
UE" N/AD UD N/AD Y[f NDI UD' N/ADl Ye/ND-UEI N/AD Y~dN[D ULI 12 Enter the equipment class name from Appendix B: Classes of Equipment.
'C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrm..qnnnHP-nr.&#xfd;- Nn " RR-19-171 C-343


Sheet 2 of 2 Equipment ID No. 0AV064                         Equip. Class12 (09) Fans Equipment Description DIG Building Vent Supply Fan Interaction Effects
Sheet 2 of 2 Equipment ID No. 0AV064 Equip. Class12 (09) Fans Equipment Description DIG Building Vent Supply Fan Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?     YdfN5 UE] N/Al]
: 7. Are soft targets free from impact by nearby equipment or structures?
A)O ,Mr-v       TARO67,TS.
A)O, Mr-v TARO67,TS.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yff NEl UL- N/Al]
YdfN5 UE] N/Al]
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yff NEl UL-N/Al]
and masonry block walls not likely to collapse onto the equipment?
and masonry block walls not likely to collapse onto the equipment?
kIO   0v~
kIO 0v~
V6ZML2'OMC           l6i5'
V6ZML2'OMC l 6i5'
: 9. Do attached lines have adequate flexibility to avoid damage?             Y[N'NOI UI0 N/Al]
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment free     Y[aNEI UE" of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Other Adverse Conditions
Y[N'NOI UI0 N/Al]
: 11. Have you looked for and found no other seismic conditions that could     Y[A' NEl U--
Y[aNEI UE" Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y[A' NEl U--
adversely affect the safety functions of the equipment?
adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
VIA Evaluated by:.                                                                   Date: AbOW
V I A Evaluated by:.
                                                                                          -1IZ8f/261 -
Date: AbOW
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                               C-344 (lnrrm.*nnndHnr.P Nn - RR=19-171
-1IZ8f/ 261 -
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 (lnrrm.*nnndHnr.P Nn - RR=19-171 C-344


j3 0 z   o~
j3 0
* 0 0
z o~
0 0
c m
c m
CD
CD
        .0
.0


OgD
OgD
-. 0 0
-. 0 0
C'.
C'.
Z:-
Z:-
m
m
        .0 C
.0 C
2 CD
2 CD
        ~0.
~0.
0 0
0 00)
0)


Sheet 1 of 2 Status: )N U Seismic Walkdown Checklist (SWC)
Sheet 1 of 2 Status:  
Equipment ID No. 0BK032                           Equip. Class1 2 (09) Fans Equipment Description Emergenc Cooling Tower Fan B Location: Bldg. Emergency                   Floor El. 195               Room, Area ECT-6 Cooling Towers Manufacturer, Model, Etc. (optional but recommended)
) N U Seismic Walkdown Checklist (SWC)
Equipment ID No. 0BK032 Equip. Class12 (09) Fans Equipment Description Emergenc Cooling Tower Fan B Location: Bldg. Emergency Floor El. 195 Room, Area ECT-6 Cooling Towers Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one Y4 NEI of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                     YRj NEI U'       N/AEl
Y4 NEI
: 3. Is the anchorage free of corrosion that is more than mild surface                     Y[K NEI UI] N/Al]
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
YRj NEI U' N/AEl
: 3. Is the anchorage free of corrosion that is more than mild surface Y[K NEI UI] N/Al]
oxidation?
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?             Y/9] NEIl UI' N/ALl
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 5. Is the anchorage configuration consistent with plant documentation?                   YI/"NOl UI- N/AU (Note: This question only applies if the item is one of the 50% for which an anchora econfiguration verification is required.)
Y/9] NEIl UI' N/ALl
r4otr Anrtvra                            Iv~                       -oA~
: 5. Is the anchorage configuration consistent with plant documentation?
M4                   ~   /r-
YI/"NOl UI-N/AU (Note: This question only applies if the item is one of the 50% for which an anchora econfiguration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                   Y1. NEI UEl potentially adverse seismic conditions?
r4otr A nrtvra Iv~  
-oA~
M4  
~ /r-
: 6. Based on the above anchorage evaluations, is the anchorage free of Y1.
NEI UEl potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
12 Enter the equipment class name from Appendix B: Classes of Equipment.
                                                          "C-3 >
"C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                             C-347 Cnrrqnnnr1PnrP. Nn ' Rq-19-173
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 Cnrrqnnnr1PnrP. Nn ' Rq-19-173 C-347


Sheet 2 of 2 Equipment ID No. 0BK032                           Equip. Class'2 (09) Fans Equipment Description Emergenc Cooling Tower FanB Interaction Effects
Sheet 2 of 2 Equipment ID No. 0BK032 Equip. Class'2 (09) Fans Equipment Description Emergenc Cooling Tower Fan B Interaction Effects
: 7. Are soft targets free from impact by, nearby equipment or structures?         YMNEI Ur- N/AEl
: 7. Are soft targets free from impact by, nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y&#xfd;(NO U-1 N/AU and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
LC.ceA C.          6&#xfd;, .. L   ldO   E rT. Tlvvm'C&#xfd;rt, no ove, 44Se"le--6'4 J 1 b t4te          Syst-,C4
C.
                                                .L"40   Vti -S Xt &#xfd;-Z3-A
LC.ceA 6&#xfd;,.. L ldO E rT. Tlvvm'C&#xfd;rt, no ove, 44Se"le--6'4 J
: 9. Do attached lines have adequate flexibility to avoid damage?               Y7(NEI Ur' N/A[l
t4 1 b te Syst-,C4  
: 10. Based on the above seismic interaction evaluations, is equipment free       YpqNEIUUO of potentially adverse seismic interaction effects?
.L"40 Vti -S Xt &#xfd;-Z3-A
Other Adverse Conditions
: 9. Do attached lines have adequate flexibility to avoid damage?
: 11. Have you looked for and found no other seismic conditions that could       YL NO Url adversely affect the safety functions of the equipment?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YMNEI Y&#xfd;(NO Y7(NEI Ur-N/AEl U-1 N/AU Ur' N/A[l YpqNEIUUO Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YL NO Url adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
L41A4&#xfd; 0, l-.y Moa'1,~r ynot'W/             (e,(fryv     /D L6M/t4~                             g   ~   t Evaluated by:           &-?,ja C-Jr k1or Date:         2-/2-Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                 C-348 rnrrmnnndrInri. Nn" R,-19-17.1
Moa'1,~r ynot'W/ (e,(fryv  
/D L6M/t4~
L41A4&#xfd; 0, l-.y g  
~
t Evaluated by:
&- ?,j a C-k1or Date:
2-/2-Jr Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrmnnndrInri. Nn" R,-19-17.1 C-348


S~0 3
S~0 3
z   o*
z o*
0 3) 0~
0 3)0~
0 S
0S c) m CD CI
c) m CD CI


Sheet 1 of 2 Status:     )N U Seismic Walkdown Checklist (SWC)
Sheet 1 of 2 Status:  
Equipment ID No. 0BP057                                 Equip. Class12 (06) Vertical Pumps P.niiinmr~iit Th   ~rint~nn Rmi~rcpnri,       S'orui,'o Wator Pmnn R                                   A A.( A/%(IAAI~A Location: Bldg. Pump Structure                 Floor El. 112               Room, Area P/H-*     Vg.--
)N U Seismic Walkdown Checklist (SWC)
Equipment ID No. 0BP057 Equip. Class12 (06) Vertical Pumps P.niiinmr~iit Th  
~rint~nn Rmi~rcpnri, S'orui,'o Wator Pmnn R A A.( A/%(IAAI~A Location: Bldg. Pump Structure Floor El. 112 Room, Area P/H-*
Vg.--
Manufacturer, Model, Etc. (optional but recommended)
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one             YIIN5 of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                       Y'    NE UD N/AE
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surface                       YXNO UO N/Aii oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 5. Is the anchorage configuration consistent with plant documentation?                     YW NE UE N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.).
: 5. Is the anchorage configuration consistent with plant documentation?
: 6. Based on the above anchorage evaluations, is the anchorage free of                     YNEI UE potentially adverse seismic conditions?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.).
12 Enter the equipment class name from Appendix B: Classes of Equipment.
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
                                                            <&#xfd;C-3 >
YIIN5 Y '
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                                 C-350 C.nrrP.nnndlPnrP. Nn - R.-19-17.1
NE UD N/AE YXNO UO N/Aii YW NE UE N/AD YNEI UE 12 Enter the equipment class name from Appendix B: Classes of Equipment.
<&#xfd; C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C.nrrP.nnndlPnrP. Nn - R.-19-17.1 C-350


Sheet 2 of 2 Equipment ID No. 0BP057                       Equip. Class 12 (06) Vertical Pumps Equipment Description Emergency Service Water Pump B Interaction Effects
Sheet 2 of 2 Equipment ID No. 0BP057 Equip. Class 12 (06) Vertical Pumps Equipment Description Emergency Service Water Pump B Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y<NLI- UFII N/Af
: 7. Are soft targets free from impact by nearby equipment or structures?
        ,No       5'~OnA
,No 5'~
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YR NEI U[t N/Al and masonry block walls not likely to collapse onto the equipment?
OnA
: 9. Do attached lines.have adequate flexibility to avoid damage?               YX Nil U-1 N/All
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 10. Based on the above seismic interaction evaluations, is equipment free     YX NO UD of potentially adverse seismic interaction effects?
: 9. Do attached lines.have adequate flexibility to avoid damage?
Other Adverse Conditions
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
: 11. Have you looked for and found no other seismic conditions that could       Yd ND U'
Y<NLI-UFII N/Af YR NEI U[t N/Al YX Nil U-1 N/All YX NO UD Other Adverse Conditions
                                                                              .        N                  ,U" adversely affect the safety functions of the equ&#xfd;ipment?,
: 11. Have you looked for and found no other seismic conditions that could Yd ND U' adversely affect the safety functions of the equ&#xfd;ipment?,
Comments.(Additional pages may be added as necessary)                                                   .
N
C GIC-                  ,-P._Fpoop Evaluated by:.       I"r - -4                                                     Date: q/11 /
,U" Comments.(Additional pages may be added as necessary)
IC-C G
,-P F poop Evaluated by:. I"r  
- -4 Date:
q/11 /
qlidiorz
qlidiorz
                                                    < C-4>
< C-4>
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                               C-351 rnrrm-nnndr.nr.P. Nn
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrm-nnndr.nr.P. Nn
* PS-19-171
* PS-19-171 C-351


I z   oD 0~ 0
I z
* 0 M
oD 0~ 0
cD m
* 0M cD m
          .M C.
.M C.
          -D CD 0
-D CD 0
            -4
-4


CO 03 0
CO 0 3 0
c)
c)


Sheet 1 of 2 Status.*1 N U Seismic Walkdown Checklist (SWC)
Sheet 1 of 2 Status.*1 N U Seismic Walkdown Checklist (SWC)
Equipment ID No. OBV030                               Equip. Class"2 (09) Fans Equipment Description ControlRoom Emergeny Ventilation Supply Fan B Location: Bldg. Turbine                         Floor El. liJf   .*    Room, Area"?f2.-       Fi-It Manufacturer, Model, Etc. (optional but recommended)
Equipment ID No. OBV030 Equip. Class"2 (09) Fans Equipment Description Control Room Emergeny Ventilation Supply Fan B Location: Bldg. Turbine Floor El.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment. on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
liJf Room, Area"?f2.- Fi-It Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment. on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one             Y&#xfd;&sect;NEj of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                       Y,% NEI UE N/A[l
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surface                       Y&#xfd;O NEI UO N/Af]
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?               YIN NEI UO N/AEJ
: 5. Is the anchorage configuration consistent with plant documentation?
: 5. Is the anchorage configuration consistent with plant documentation?                     Ypn NEI UEI N/AE]
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
a nd t oraqe    6,sx/'oo'     /b 5-- ~779--0 5k/-Jeef              /taA-- 0
Y&#xfd;&sect;NEj Y,% NEI UE N/A[l Y&#xfd;O NEI UO N/Af]
: 6. Based on the above anchorage evaluations, is the anchorage free of                       YO  NEI E potentially adverse seismic conditions?
YIN NEI UO N/AEJ Ypn NEI UEI N/AE]
12 Enter the equipment class name from Appendix B: Classes of Equipment.
a nd toraqe 6,sx/'oo'  
                                                              <C-3 >
/b 5-- ~779--0 5k/-J eef
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                               C-354 (ThrrP&#xfd;nnnrin&#xfd;np- Nn
/taA--
* R.q-12-17.*l
0
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YO NEI E 12 Enter the equipment class name from Appendix B: Classes of Equipment.
<C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 (ThrrP&#xfd;nnnrin&#xfd;np-Nn
* R.q-12-17.*l C-354


Sheet 2 of 2 Equipment ID No. OBV030                           Equip. Class"2 (09) Fans Equipment Description ControlRoom Emergency Ventilation Supply FanB Interaction Effects
Sheet 2 of 2 Equipment ID No. OBV030 Equip. Class"2 (09) Fans Equipment Description Control Room Emergency Ventilation Supply Fan B Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?           /ZNEI UEJ N/AEI AID' 6 0 F&-    kuyelt
: 7. Are soft targets free from impact by nearby equipment or structures?
    -8. Are-overhead equipment, distribution systems, ceiling tiles and lighting,       N] UEi N/A[ -'
AID' 60F&- kuyelt
NJ--
/ZNEI UEJ N/AEI
and masonry block walls not likely to collaps onto the equipment?           /-
-8. Are-overhead equipment, distribution systems, ceiling tiles and lighting, NJ--
                                ,t~~~~~o~~~4,>,~~~)
N] UEi N/A[ -'
                                            /~4     VV         ~   coJ~       D~,~~~e       "Iv1 d/ue 7')Gd&#xfd;r
and masonry block walls not likely to collaps onto the equipment?  
: 9. Do attached lines have adequate flexibility.to avoid damage?               Y$M N[l UrI N/AEI
/-
: 10. Based on the above seismic interaction evaluations,. is equipment free     YM NINUUE of potentially adverse seismic interaction effects?
,t~~~~~o~~~4,>,~~~)  
Other Adverse Conditions
"Iv1
: 11. Have you looked for and found no other seismic conditions that could       Y[X NEI UE]
/~4 VV  
~
coJ~
D~,~~~e d/ue 7')Gd&#xfd;r
: 9. Do attached lines have adequate flexibility. to avoid damage?
: 10. Based on the above seismic interaction evaluations,. is equipment free of potentially adverse seismic interaction effects?
Y$M N[l UrI N/AEI YM NINUUE Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y[X NEI UE]
adversely affect the safety functions of the equipment?
adversely affect the safety functions of the equipment?
          .rj,         4..r_/         r'     far Flow, 5 /uv ,4-OA F5-*        f" dy       /e     '/,'       ,
.rj, 4..r_/
ai4k Fa.             ?~k 0-9 1 eead,,61/f fv-   yesWO~     4 61-es-~/ t'e/
r' far Flow, 5  
                                                                              -mA-Date:       ?12h-
/uv F5-*
                                                                                                /0P//
,4-OA f"
V Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                     C-355 rnrrm'qnnn'in.P Nn
dy  
* RR-19-1773
/e  
'/,'
ai 4k Fa.
0-
?~k 91 eead,,61/f fv-yesWO~
4 61-es t'e/  
-mA-  
-~/
Date:  
?12h-
/0 P//
V Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrm'qnnn'in.P Nn
* RR-19-1773 C-355


  -    w
w
    !.0
!.0
  '3-
'3-
-J cn m
-J cn m-o 23 CD C,,
          -o 2
3 CD C,,
0
0


.,    w
w
~
~
~ CA
~ CA
,~
~
~
~
~
z ~* ~
~
~
z  ~* ~
  ~
CA
CA
~     -u CD
~  
'3   -
-u CD
Lw
'3 Lw
-J
-J  
~     ~r 0
~r
C
~
      =
0 C
=
CA m
CA m
        .0 C
.0C CD
CD
~6-5 0w 0C,,
          ~6-5 0
w 0
C,,
0
0


A   =r z ~
A  
3*
=r z ~
m CD C) 3 0
3
0
* m 3
CD C) 0 0


-. 0 0
-. 0 0
< >u 0
< >u 0
CA m
CA m
      -D 0
-D 0
w*
w*
0
0


Sheet 1 of 2 Status:     N U Seismic Walkdown Checklist (SWC)
Sheet 1 of 2 Status:
Equipment ID No. 0BV035                             Equip. Class12 (09) Fans Equipment Description Emergenc Switchgear Ventilation ExhaustFan B Location: Bldg. Radwaste                     Floor El. 165               Room, Area R/W-32 Manufacturer, Model, Etc. (optional but recommended)
N U Seismic Walkdown Checklist (SWC)
Equipment ID No. 0BV035 Equip. Class12 (09) Fans Equipment Description Emergenc Switchgear Ventilation Exhaust Fan B Location: Bldg. Radwaste Floor El. 165 Room, Area R/W-32 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one         YI4NO of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   Y)'ND UD N/AD
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surface                   Y    NI- UEI N/AD.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?               NA NEUI    DN/A[1
: 5. Is the anchorage configuration consistent with plant documentation?
: 5. Is the anchorage configuration consistent with plant documentation?                 Y*f NEI UEI N/AE.
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
eOJJFi6'4UA'noN       M-1-CHes     I)YC     62 &#xfd;6 - -&#xfd; q7 S&-d   izt>,/. d
eOJJFi6'4UA'noN M-1-CHes I)YC 62 &#xfd;6 - -&#xfd; q7S&-d izt>,/. d
: 6. Based on the above anchorage evaluations, is the anchorage free of                   Y~f NEI UED potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
YI4NO Y)'ND UD N/AD Y
                                                          *C-3 >
NI-UEI N/AD.
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                             C-360 r.nrrmqnnndPnc. In
NA NEUI DN/A[1 Y*f NEI UEI N/AE.
Y~f NEI UED 12 Enter the equipment class name from Appendix B: Classes of Equipment.
*C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrmqnnndPnc. In
* R-12-17.
* R-12-17.
C-360


Sheet 2 of 2 Equipment ID No. 0BV035                           Equip. Class1 2 (09) Fans Equipment Description Emergenc Switchgear Ventilation ExhaustFan B Interaction Effects.
Sheet 2 of 2 Equipment ID No. 0BV035 Equip. Class12 (09) Fans Equipment Description Emergenc Switchgear Ventilation Exhaust Fan B Interaction Effects.
: 7. Are soft targets free from impact by nearby equipment or structures?         XjNEI U" N/AU 8.: Are overhead equipment, distribution systems, ceiling tiles and lighting, YX NEl U-        N/AUl and masonry block walls not likely to collapse onto the equipment?
: 7. Are soft targets free from impact by nearby equipment or structures?
        *. 5::..J~45                                   i~~r~ be+       ol     w/
8.: Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?                 Y)NI- UEJ N/AU
*. 5 ::..J~45 i~~r~ be+
: 10. Based on the above seismic interaction evaluations, is equipment free         Y)*N     U..
ol w/
of potentially adverse seismic interaction effects?
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
XjNEI U" N/AU YX NEl U-N/AUl Y)NI-UEJ N/AU Y)*N U..
Other Adverse Conditions
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could         YP(NE   U     --
: 11. Have you looked for and found no other seismic conditions that could YP(NE U
adversely affiet the safety. functions of the equipment?
adversely affiet the safety. functions of the equipment?
                  %Ile3O~f/-O                        I9Ydwn         Ov'ej       5     sWcoc
%I le3O~
                *                        , ,,'(n .5   0/   .A           *olj TbreotleAJ~         Ao*    VI"OJ      Ve          -  'Q
I9Ydwn Ov'ej 5
                                                                          ~~A         r-e~   Af
sWcoc f/-O
                                                                                                    .yA~
,,,'(n  
Comments (Additional pages may be added as necessary) 4l/A Evaluated by:                                                                         Date:   (_6/N_1WI__
.5 0/  
4-301-zo(z Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                     C-361
.A  
*olj TbreotleA J~  
~~A r-e~  
.yA~
Ao* VI"OJ Ve
'Q Af Comments (Additional pages may be added as necessary) 4l/A Evaluated by:
Date:
(_6/ N_ 1WI__
4-301-zo(z Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3
(.nrrA-nnnriP.nr. Nn
(.nrrA-nnnriP.nr. Nn
* RR-19-171
* RR-19-171 C-361


OD j3 0 0
OD j3 0 0
  ~ 3 z   0 M     -0 0
~ 3 z
  -4 L43 m
0 M  
        .0 3C)
-0 0
-4 L43 m
.0-,
3C)
C) w 0C,
C) w 0C,


Stattt&#xfd;JYN U Seismic Walkdown Checklist (SWC).
Stattt&#xfd;JYN U Seismic Walkdown Checklist (SWC).
A Equipment IDNo.                   C, VO / 3 A,           Equip. Class'2     ..  (4 07)    15014&#xfd;vlr Equipment Description               6   t9'414(     ROO&         P     A!2,,-f Location: Bldg.           -'              Floor El. L&T         Room, Area       'FA,' Oe0A         (A. a/s coss'e,'/ h Manufacturer, Model, Etc. (op tional but recommended)                                                                         / /*//:
A Equipment ID No.
C, / VO 3 A, Equip. Class'2 (4
Equipment Description 6
t9'414(
ROO&
P A!2,,-f
: 07) 15014&#xfd;vlr Location: Bldg.
Manufacturer, Model, Etc. (op Floor El.
L&T Room, Area  
'FA,' Oe0A (A.
a/s coss'e,'/
h tional but recommended)  
/ /*//:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additionil space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additionil space is provided at the end of this checklist for documenting other comments.
Anchorawe
Anchorawe
: 1. Is the anchorage configuration verification required (i.e., is the item one             Y   NiNO of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one Y
: 2. Is the anchage free of bent, broken, missing or loose hardware?                           YJANO UI- N/A-5gea          C49 Isthanc4
NiNO of the 50% of SWEL items requiring such verification)?
: 3. Is the anchorage free of corrosion that is more than mild surface                       YRNO UCr N/A-oxidation?
: 2. Is the anchage free of bent, broken, missing or loose hardware?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?                         UCI N/Ar-YANOI
Isthanc4 5gea C49 YJANO UI-N/A-
: 5. Is the anchorage configuration consistent with plant documentation?                     YAjNC      UI- N/A['
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
: 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of                       V4&#xfd;NO UO potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
YRNO UCr N/A-YANOI YAjNC UCI N/Ar-UI-N/A['
                                                                  < C-3>
V4&#xfd;NO UO 12 Enter the equipment class name from Appendix B: Classes of Equipment.
Peach Bottom Atomic Power Station Unit 3                                                                             C-363 MPR-3812, Revision 3 rnrrPfqnnnlAinr.f   Nn ' RR-19-A7.
< C-3>
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrPfqnnnlAinr.f Nn ' RR-19-A7.
C-363


Sheet 2 of 2 Equipment ID No.                   t?6V OS         Equip. Classi2W       .L+/-
Sheet 2 of 2 Equipment ID No.
Equipment Descript ion                       t,                         F4c-Interaction Effects
Equipment Descript t?6V OS Equip. Classi2W  
: 7. Are soft targets free from impact by Rearby equipment or structures?     Y%9-r[l U-   N/ACI NO
.L+/-
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yr-NOI UO N/ACI and masonry block walls not likely to collapse onto the equipment?                       hoo0.6 No~Pi     604'   :-                                    ,le.         Is
ion F4c-t, Interaction Effects
: 9. Do attached lines have adequate flexibility to avoid damage?             Y5E4O UQI N/ACI
: 7. Are soft targets free from impact by Rearby equipment or structures?
: 10. Baseo on the above seismic 'interaction evaluations, is'eqtuipment free   Y~fNC Urj of potentially adverse seismic interaction effects?
NO Y%9-r[l U-N/ACI
Other Adverse Conditions
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yr-NOI and masonry block walls not likely to collapse onto the equipment?
: 11. Have you looked for and found no other seismic conditions that could       Y5,,N-J Ur adversely affect the safety functions of the equipment?
No~Pi 604'  
,le.
UO Is N/ACI hoo 0.6
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Baseo on the above seismic 'interaction evaluations, is'eqtuipment free of potentially adverse seismic interaction effects?
Y5E4O UQI N/ACI Y~fNC Urj Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y5,,N-J Ur adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated                                                                        Date:   q//( 2-       .
Date:
21& 1ZZ L -- -
q//( 2-Evaluated 21& 1 ZZ L -- -
                                                      ,< C-4 )>
,< C-4 )>
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrPqnnnrI~nr.P n   Rn.-1-9-171-                                                                   C-364
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrPqnnnrI~nr.P n Rn.-1-9-171-C-364


  -0w
-0w 0
* 0 z       0g 0
z 0g 0
CD 0,
CD 0,
m 1.0
m 1.0
          -o 3
-o 3
CD 2
CD 2(D
(D
'-4 5*
            '-4 5*


  -  fl j&#xfd; 0~
fl j&#xfd; 0~
z   04!
z 04!
* 0 T-m C
0T-m mC CD 0
m CD 0
C)
C)


Sheet 1 of 2 Status:&N U Seismic Walkdown Checklist (SWC)
Sheet 1 of 2 Status:&N U Seismic Walkdown Checklist (SWC)
*Equipment ID No. 0DE377                               Equip. Class"2 (21) Tanks or Heat Exchangers           L     t (I4r, o'20,-0 Equipment Description E4 Diesel GeneratorLube Oil Cooler Location: Bldg. Diesel Generator               Floor El. 127           Room, Area     .         ()/6 Building Manufacturer, Model, Etc. (optional but recommended)
* Equipment ID No. 0DE377 Equip. Class"2 (21) Tanks or Heat Exchangers L
t (I4r, o'20,-0 Equipment Description E4 Diesel Generator Lube Oil Cooler Location: Bldg. Diesel Generator Floor El.
127 Room, Area.
()/6 Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one           YX NEI of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one YX NEI of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                     YI?1'N-    ULI N/AD
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surface                     Y[E/NI-     UED N/AD oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?             YENI- U00 N/AD
YI?1'N-ULI N/AD Y[E/NI-UED N/AD
: 5. Is the anchorage configuration consistent with plant documentation?                   Y1 NDI Ui N/ADl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verificatin required.)
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
dw%,cv1                                 1         >1-. colcu(&o-w Alo. 6
YENI-U00 N/AD
: 6. Based on the above anchorage evaluations, is the anchorage free of                     YX NDI UD-potentially adverse seismic conditions?
: 5. Is the anchorage configuration consistent with plant documentation?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
Y1 NDI Ui N/ADl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verificatin required.)
                                                            < C-3 >
dw%, cv1 1
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                               C-367 CnrrmP.nnndPnr'.P Nn" PW-R -17.
>1-. colcu(&o-w Alo. 6
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YX NDI UD-12 Enter the equipment class name from Appendix B: Classes of Equipment.
< C-3 >
Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 CnrrmP.nnndPnr'.P Nn" PW-R -17.
C-367


Sheet 2 of 2 EquipmentI       No. 0DE377                     Equip. Class12 (21) Tanks or Heat Exehangers!           (   ,0 Equipment Description E4 Diesel GeneratorLube Oil Cooler Interaction Effects
Sheet 2 of 2 EquipmentI No. 0DE377 Equip. Class12 (21) Tanks or Heat Exehangers!
: 7. Are soft targets free from impact by nearby equipment or structures?       YIE1'NO UO N/AO 00                   ,'919OT,
(  
: 8. Are overhead equipment, distribution.systems, ceiling tiles and lighting, -YE 4 U UI" N/A5.
,0 Equipment Description E4 Diesel Generator Lube Oil Cooler Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?
YIE1'NO UO N/AO 00  
,'919OT,
: 8. Are overhead equipment, distribution.systems, ceiling tiles and lighting, -YE 4 U UI" N/A5.
and masonry block walls not likely to collapse onto the equipment?
and masonry block walls not likely to collapse onto the equipment?
U qlA36n.
U f qlA36n.
f                -
: 9. Do attached lines have adequate flexibility to avoid damage?
: 9. Do attached lines have adequate flexibility to avoid damage?               YE3"NE] UD N/AEl
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free     Yg NE ULI of potentially adverse seismic interaction effects?
YE3"NE] UD N/AEl Yg NE ULI Other Adverse Conditions
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y[R(NU UU adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could       Y[R(NU UU adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
NAl/
NAl/
Evaluated by:                                                                     Date:     9(h*hQ)1-fUlva Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3                                                                                   C-368 r.nrrP.nnndi-nrP Nn
Evaluated by:
* RR-19-17.1
Date:
9(h*hQ)1-fUlva Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrP.nnndi-nrP Nn
* RR-19-17.1 C-368


a)
a)
.-3 0 z *0 0
.-3 0
z  
*0 0
5.
5.
m
m
        -D C
-DC 2
2 CD
CD
        =
=
        .- 4.
.- 4.
0 m
0 m
('3
('3
        -4
-4
        -.1
-.1


;o C',
;o C',
00 C&#xfd; a.-
00 C&#xfd; a.-
m 3a CD C) 0 m
m 3a CD C) 0 m
      -.4
-.4


.-. 0 0
0 0
-. 0 cn a
0 cn a
0O m
0O m
      -4}}
-4}}

Latest revision as of 19:25, 11 January 2025

Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-310 Through Page C-371
ML13003A038
Person / Time
Site: Peach Bottom 
Issue date: 11/16/2012
From: Schlaseman C
MPR Associates
To:
Office of Nuclear Reactor Regulation, Exelon Generation Co
References
RS-12-173 MPR-3812, Rev 3
Download: ML13003A038 (62)


Text

Sheet 1 of 2 Status'N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0AC097 Equip. Class"2 (20) Control Panels & Cabinets Equipment Description Diesel Generator OAG12 Control Panel Location: Bldg. Diesel Generator Floor El. 127 Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Y)NE

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y] NEI UE N/A[

Y[O ND UED N/Al]

YP4 NEl UO N/AD Y$ NE UE] N/AU Y3NEI UE 12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3

.nrr*.nnnndi.nr, Nn* R.9-19-171 C-310

Sheet 2 of 2 Equipment IoD No.

AC097 Equip. Class" (20) Control Panels & Cabinets Equipment Description Diesel Generator OA G12 Control Panel Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yo NEI UEI N/A[3 YKJ] NIl U-N/AL-YK NEl UOI N/AU Y

NO UU1 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YW NEI U" adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

C-C S..n2et-

+LcZ Evaluated by:.

Date:

?,5"//-..

461-1 !!ý 4 41--

V

/2.5 Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 (fnrrP.nnndpnr.P Nn

  • RR-19-17.1 C-311

'-U 0

a.-

0)

0. o
  • 0 0

c m

-3 CD C) 0 C-)

CC) 4I

Sheet 1 of 2 Status:Q N U Seismic Walkdown Checklist (SWC)

Equipment ID No. OAGO12 Equip. Class'2 (17) Engine Generators Equipment Description El Standby Diesel Generator Location: Bldg. Diesel Generator Floor El. 127 Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora2e

1. Is the anchorage configuration verification required (i.e., is the item one Y[& NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidati'on?

YPI NE UD N/AD YO NEI UD-N/AD3

4. Is the anchorage free of visible cracks in the concrete near the anchors?

YO ND UDI N/A'-

5. Is the anchorage configuration consistent with plant documentation?

YeN U"] N/AD3 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Y$ NO UD3 potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C-313 f.nrrs nnnHPdnn.P. Nn

  • RR-19-171

Sheet 2 of 2 Equipment ID No. OAGO12 Equip. Class12 (17) Engine Generators Equipment Description El Standby Diesel Generator Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Y[.

NEI U-' N/All

8. re vereadequpmet, istibuionsysems celin ties nd ighing
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

A'e ceU, 1

/,i oes or rnti tnr>. 6 IoWe,$,.

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YJ2 NOI Urn N/Al]

YA NEI Ul] N/Al]

YQý NEI UF Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YPO NOI U--1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) 5e75,,c re-e/,-,A

& V-eenp aVV /6 Me #uv

,4

//-e e,/

V

~~~

~1F4~l.4e;< / Av i4e il,

/'~

Evaluated by:

Date;

)-?/

'000Y

,;ý/zq &

of -

< C-4 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrPmsnnnr1iP.ln Nn

  • RRA-1-17 C-314

cl, 03

'3 z

0n CA c

m 30 CD C)

G)

C)

'D

  • ý 0 CD 0

z '

m

.0

-*0 CD 53

-3 0

  • 0 (A

m CD 2*

CD

K -0C O D

~CD 0 3u C.) C 0

m 30 CD

-. 15-

-0 0

3) 0 M "

m 3o CD C)

Sheet 1 of 2 Status:

N U Seismic Walkdown Checklist (SWC)

Equipment ID No. OAP060 Equip. Class"2 (05) Horizontal Pumps Equipment Description El DIG Fuel Oil Transfer Pump Location: Bldg. Diesel Generator Floor El.

,2aoIi/ia..Room, Area D/G-3 Building 2"- t78,r-Manufacturer, Model, Etc. (optional'but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage.

I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YONM Y1A NO UOI-N/AE Yf NEI UO N/AE

4. Is the anchorage free of visible cracks in the concrete near the anchors?

YI* NEI' UE N/AE 1V0 rh~..~

otm c-vcre-e-,

5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YE NE UE N/AI YNLIuEl 12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >.

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3

(.nrrP.nnndlnr.P. Nn RR-1 9-173 C-320

Sheet 2 of 2 Equipment ID No. OAP060 Equip. Class" (05) Horizontal Pu s

Equipment Description El DIG Fuel Oil Transfer Pump Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
  • %.")

oe~bttr Or 4OvSCtr(

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y4 NE UD N/AO Y[INUI UI N/Al Y$ NE UO N/AD YP NO U[-]

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could.

YN NEI UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added, as necessary)

_____M___

ft Evaluated by:

L**#4EEZ Date:

'1.Z)

/2-

< C-4 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 CnrrP.-nnnr-nr*. Nn

  • RR-19-17.T C-321

u 0

  • 0 0~C cn CD 3

()

0 0

0

Sheet Iof 2 Status:0 N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0AP163 Equip. Class 2 (05) Horizontal Pumps Equipment Description Emergency Service Water Booster Pump A Location: Bldg. Diesel Generator Floor El.

ik211z_

p1 iWRoom, Area DIG-i Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record theresults of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO NJ9 of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YIr NE UE N/AO YE4 NEI Ul N/AL Ypa NEI UL N/AL YE NEI UE N/AI9 YN NEI UE 12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrmnnnr1Pnrn Nn - RR-19-171 C-323

Sheet 2 of 2 Equipment ID No. 0AP163 Equip. Class12 (05) Horizontal Pumps Equipment Description Emergency Service Water Booster Pump A Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Y, NO UO N/AD

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YW NEI UL N/AD and masonry block walls not. likely to collapse onto the equipment?

tL(? Al, tFq1 ct/eSsV ev ecvre,/y 4tfida6

/VO Me-cet/,r11 AD

,~C49e o-, Hkib~'~

ri not-ec~4 c&v-~

t~4e-It( i4:)

0/b f-a l /.

4 "--./S 'Ni -e 'entL, bio cei/at lh.o o*

.. son1

9. Do attached lines have adequate flexibility to avoid damage?

P4 NEI U!

N/A1

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

ANEIUO Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YR NEI U-adversely affect the safety. functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by:

Date:

9

'2 -

Q=ýAb V

<C-4 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrPnnndPneP Nn

  • R,-19-17.

C-324

~~U)fl 0

D D CD,

-4 0

3.

C/

m

.0 c

-4.

3 CD C)

o

0 0

-~C:

m 3o CD 0)

-.0

Sheet 1 of 2 Status:@ N U Seismic Walkdown Checklist (SWC)

OA-TO010 Equipment ID No. 4AT-W IA T

  • /;i/i 2-Equip. Class". (21) Tanks or Heat Exchangers (Vertical)

Equipment Description E1 Diesel Generator Fuel Oil Day Tank Location: Bldg. Diesel Generator Floor El. 127 Room, Area. D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist fordocumenting other comments.

Anchorage

  • 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?

Y[

NEI Y[9 NEI UI N/A-Y[K NEI U-N/ADl YK NEI UD-N/AD

5. Is the anchorage configuration consistent with plant documentation?

YJK NEI U-- N/ADl (Note: This question only applies if the item is one of the 50% for, which an anchorage configuration verification is required.) 3 i/40-4n~4c~'(~~tf~v~ei 4

'~-Irs

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y)NU 12 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrPqnnndn1n'.P Nn

  • RR-19-171 C-327

Sheet 2 of 2 Equipment ID No. OAT40 Equip. Class12 (21) Tanks or Heat Exchangers (Vertical)

Equipment Description El Diesel Generator Fuel Oil Day Tank Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

YM NE Ur N/AEl

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YP4 NE and masonry block walls not likely to collapse onto the equipment?

,0o 0qAf5bnPX 0.,415 r~ ct-i7

,e UD N/AD

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YVI NO UO N/AU YX NEI UD Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y, NO UE" adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by:

M 5t

-r,*.

Date: A"/ zaY/4-Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3

.nrri-nnndPnr.P Nn

  • RR-19-17R C-328

z U) 0 m

30 CD

Sheet 1 of 2

\\

~Status:@xY N U Seismic Walkdown Checklist (SWC)U Equipment ID No. 0AT096 Equip. Class"2 (21) Tanks or Heat Exchangers (Horizontal)

Equipment Description El Diesel Generator Lube Oil Storage Tank Location: Bldg. Diesel Generator Floor El. 127 Room, Area D/G-3 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YDN)

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

I

/7'

.1 A

e."r~~

21

~

,i Y;

NEI U-' N/ADl YJI NDI-UD N/AED Ypk NDI UD-N/ADl:

YDI NDI UD-N/As4.

ND UD A I L - ftv' AtOf e 60 n h PVP

-0'0 0 " W. el 7

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

4C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrmqnnndrnr.P.* Nn

  • RR-19-171 C-330

Sheet 2 of 2 Equipment ID No. 0AT096 Equip. Class12 (21) Tanks or Heat Exchangers (Horizontal)

Equipment Description El Diesel Generator Lube Oil Storage Tank Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

YX* NO UO N/AU

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[M Nol UOi. N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yo NEI UO N/AU Y5 NE UO Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YA NOl UU adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: 44~z Date:

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rTnrrP.AnnnrlAnr.

Nn

  • RR-19-173 C-331

-~0 z

  • 0
  • 0

'33cn m

n CD co 0)

Sh t1of2 Status N U Seismic WalkdownClieck1ist-(SWC)

Equipment ID No.

A 030 Equip. Classt (P) F-.*

Equipment Description C.go vfr.e 60h

  • '*_Vi,*

.t t7,/z Lcto:Bldg. 18 Floor El.

S 1Z (0

Rot'-A'ra Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This chekdlist. may-,be uised tp document the results of the Seismic Walkdownof an item Of equipment on the SWEL. The space below each of the folloviing 4ueistlns may'be used to recordtthe results of judgments and findings. Additional space is provided at the end of this checklist for docudtlenting -other comments.

1. Is the anchorage configuration verification required (i.e., is the item one YANI-of the 50% of SWEL items requiring such verification)?

44ý I'd PVJr 0 (o 2,00'V"-5"-

2. Is the anchorage free of bent, broken, missing or loose hardware?

YKQNI UF N/AO t-5k 4AA44

10.

t 4

ic f/t

3. Is the ancShorage free of codrosion that is more than mild surface Y_.NI" UDI N/AD' oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?-

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y A'[3IUQI N/AQ Yý N[3 UF3 N/A[r YXN[

UQ 12 Enter the equipment class name from Appendix B: Classes of Equipment.

% C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3

(-nrr~mnnnrfP.nrýn Nn* R-19-171 C-333

Sheet 2 of 2 Equipment ID No..(

Equipment Description Interaction Effects

7. Are soft targets free. frn-immpactý by nearby equipmejit or structures?.

Yg NO3 UQ N/AO

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[O NQ3 U[3 NIAOI and masonry block walls not likely to collapse onto t e equip ent?
9. Do attachedlines have adequate flexibility to avoid damage?

yZ 41i U-I N/AO q

1.0. based on the aboveseismic interaction evaluatioos, is'equiplnent free.

NO UOi of potentially adverse seismic interaction effects?

I..

S,.

Mk

'1

,'--.'z I,

.

  • t'i( i

.".')

Other Adverne Conditions

11. Have you looked for and found no other seismic conditions that could YJI'-NO UOI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by:

Date:

I

( C4 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrr(mnnndPnr.P Nn RR-19-17C-C-334

'- 0 z 'o 0

. cn m

"0° 3CD CA)

C 0

0 0

-~0 z

  • 0 Z ;a

-3 CD 0 cn C.)

"0 m

3CD C

2 0

0*

0

Sheet 1 of 2 Status:0 N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0AV036 Equip. Class"2 (09) Fans Equipment Description Battery Room Exhaust Fan A Location: Bldg. Radwaste Floor El. 165 Room, Area R/W-32 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YJMNEI

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

COi-(,tR4eamna tr~ae-Me t>,46 62ý'O-s-q-eO,IZLV.6

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YX NO ULI N/All YXNO U!] N/Al]

NO U! N/Al-YV NO" ULI N/AL]

YENO UO 32 Enter the equipment class name from Appendix B: Classes of Equipment.

<KC-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrmnnndn-nrP Nn" RR-19-173 C-337

Sheet 2 of 2 Equipment ID No. 0AV036 Equip. Class12 (09) Fans Equipment Description Battery Room Exhaust Fan A Interaction Effects

7. Are softt by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

YNearAY 6048cI'l-olejidte ly Vlo4A.

A0t499tO urn+

b'aO vOmr-£.

9. Do attached lines have adequate flexibility to avoid damage?

YXND UQ N/AD YtKND U-N/AD Y)(NL-UD N/AE`

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YX ND Ur Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y

NEI U adversely affect the safety functions of the equipment?O Ie' or*.eac4 V'i ofpw viesul u ent 1

7T M-Comments.(Additional pages may be added as necessary)

Evaluated by:

Date:

o._I /

I- '0X

! 3-/

IZ

< C-4 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rlnrrinnnrPnr.P NKn* R-1 9-171 C-338

-~0 z 0 3

0

~~T-S CCD 00

CD z ~

3 0

c m

-5" 3

CD

-C C) 0 0

0)

-ý 02 z 0 CD 0 si >

0. 3 on, R.

5 0

m 30 CD 0)

D3 3

CD 0

c m

30 CD CA 0)

Sheet 1 of 2 Status:)

N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0AV064 Equip. Class12 (09) Fans Equipment Description DIG Building Vent Supply Fan Location: Bldg. Diesel Generator Floor El. 151 Room, Area D/G-P g

Building Manufacturer, Model, Etc. (optional but recommended)

Amtifl, OLOW1aR
  • T*N 13L Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YT(NE YZIND YE(NE]

UE" N/AD UD N/AD Y[f NDI UD' N/ADl Ye/ND-UEI N/AD Y~dN[D ULI 12 Enter the equipment class name from Appendix B: Classes of Equipment.

'C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrm..qnnnHP-nr.ý- Nn " RR-19-171 C-343

Sheet 2 of 2 Equipment ID No. 0AV064 Equip. Class12 (09) Fans Equipment Description DIG Building Vent Supply Fan Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

A)O, Mr-v TARO67,TS.

YdfN5 UE] N/Al]

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yff NEl UL-N/Al]

and masonry block walls not likely to collapse onto the equipment?

kIO 0v~

V6ZML2'OMC l 6i5'

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y[N'NOI UI0 N/Al]

Y[aNEI UE" Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[A' NEl U--

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

V I A Evaluated by:.

Date: AbOW

-1IZ8f/ 261 -

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 (lnrrm.*nnndHnr.P Nn - RR=19-171 C-344

j3 0

z o~

0 0

c m

CD

.0

OgD

-. 0 0

C'.

Z:-

m

.0 C

2 CD

~0.

0 00)

Sheet 1 of 2 Status:

) N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0BK032 Equip. Class12 (09) Fans Equipment Description Emergenc Cooling Tower Fan B Location: Bldg. Emergency Floor El. 195 Room, Area ECT-6 Cooling Towers Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Y4 NEI

2. Is the anchorage free of bent, broken, missing or loose hardware?

YRj NEI U' N/AEl

3. Is the anchorage free of corrosion that is more than mild surface Y[K NEI UI] N/Al]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?

Y/9] NEIl UI' N/ALl

5. Is the anchorage configuration consistent with plant documentation?

YI/"NOl UI-N/AU (Note: This question only applies if the item is one of the 50% for which an anchora econfiguration verification is required.)

r4otr A nrtvra Iv~

-oA~

M4

~ /r-

6. Based on the above anchorage evaluations, is the anchorage free of Y1.

NEI UEl potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

"C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 Cnrrqnnnr1PnrP. Nn ' Rq-19-173 C-347

Sheet 2 of 2 Equipment ID No. 0BK032 Equip. Class'2 (09) Fans Equipment Description Emergenc Cooling Tower Fan B Interaction Effects

7. Are soft targets free from impact by, nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

C.

LC.ceA 6ý,.. L ldO E rT. Tlvvm'Cýrt, no ove, 44Se"le--6'4 J

t4 1 b te Syst-,C4

.L"40 Vti -S Xt ý-Z3-A

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YMNEI Yý(NO Y7(NEI Ur-N/AEl U-1 N/AU Ur' N/A[l YpqNEIUUO Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YL NO Url adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Moa'1,~r ynot'W/ (e,(fryv

/D L6M/t4~

L41A4ý 0, l-.y g

~

t Evaluated by:

&- ?,j a C-k1or Date:

2-/2-Jr Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrmnnndrInri. Nn" R,-19-17.1 C-348

S~0 3

z o*

0 3)0~

0S c) m CD CI

Sheet 1 of 2 Status:

)N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0BP057 Equip. Class12 (06) Vertical Pumps P.niiinmr~iit Th

~rint~nn Rmi~rcpnri, S'orui,'o Wator Pmnn R A A.( A/%(IAAI~A Location: Bldg. Pump Structure Floor El. 112 Room, Area P/H-*

Vg.--

Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.).

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YIIN5 Y '

NE UD N/AE YXNO UO N/Aii YW NE UE N/AD YNEI UE 12 Enter the equipment class name from Appendix B: Classes of Equipment.

<ý C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 C.nrrP.nnndlPnrP. Nn - R.-19-17.1 C-350

Sheet 2 of 2 Equipment ID No. 0BP057 Equip. Class 12 (06) Vertical Pumps Equipment Description Emergency Service Water Pump B Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

,No 5'~

OnA

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines.have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y<NLI-UFII N/Af YR NEI U[t N/Al YX Nil U-1 N/All YX NO UD Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Yd ND U' adversely affect the safety functions of the equýipment?,

N

,U" Comments.(Additional pages may be added as necessary)

IC-C G

,-P F poop Evaluated by:. I"r

- -4 Date:

q/11 /

qlidiorz

< C-4>

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrm-nnndr.nr.P. Nn

  • PS-19-171 C-351

I z

oD 0~ 0

  • 0M cD m

.M C.

-D CD 0

-4

CO 0 3 0

c)

Sheet 1 of 2 Status.*1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No. OBV030 Equip. Class"2 (09) Fans Equipment Description Control Room Emergeny Ventilation Supply Fan B Location: Bldg. Turbine Floor El.

liJf Room, Area"?f2.- Fi-It Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment. on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yý§NEj Y,% NEI UE N/A[l YýO NEI UO N/Af]

YIN NEI UO N/AEJ Ypn NEI UEI N/AE]

a nd toraqe 6,sx/'oo'

/b 5-- ~779--0 5k/-J eef

/taA--

0

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO NEI E 12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 (ThrrPýnnnrinýnp-Nn

  • R.q-12-17.*l C-354

Sheet 2 of 2 Equipment ID No. OBV030 Equip. Class"2 (09) Fans Equipment Description Control Room Emergency Ventilation Supply Fan B Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

AID' 60F&- kuyelt

/ZNEI UEJ N/AEI

-8. Are-overhead equipment, distribution systems, ceiling tiles and lighting, NJ--

N] UEi N/A[ -'

and masonry block walls not likely to collaps onto the equipment?

/-

,t~~~~~o~~~4,>,~~~)

"Iv1

/~4 VV

~

coJ~

D~,~~~e d/ue 7')Gdýr

9. Do attached lines have adequate flexibility. to avoid damage?
10. Based on the above seismic interaction evaluations,. is equipment free of potentially adverse seismic interaction effects?

Y$M N[l UrI N/AEI YM NINUUE Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[X NEI UE]

adversely affect the safety functions of the equipment?

.rj, 4..r_/

r' far Flow, 5

/uv F5-*

,4-OA f"

dy

/e

'/,'

ai 4k Fa.

0-

?~k 91 eead,,61/f fv-yesWO~

4 61-es t'e/

-mA-

-~/

Date:

?12h-

/0 P//

V Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrm'qnnn'in.P Nn

  • RR-19-1773 C-355

w

!.0

'3-

-J cn m-o 23 CD C,,

0

w

~

~ CA

,~

~

~

z ~* ~

~

CA

~

-u CD

'3 Lw

-J

~r

~

0 C

=

CA m

.0C CD

~6-5 0w 0C,,

0

A

=r z ~

3

  • m 3

CD C) 0 0

-. 0 0

< >u 0

CA m

-D 0

w*

0

Sheet 1 of 2 Status:

N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0BV035 Equip. Class12 (09) Fans Equipment Description Emergenc Switchgear Ventilation Exhaust Fan B Location: Bldg. Radwaste Floor El. 165 Room, Area R/W-32 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

eOJJFi6'4UA'noN M-1-CHes I)YC 62 ý6 - -ý q7S&-d izt>,/. d

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YI4NO Y)'ND UD N/AD Y

NI-UEI N/AD.

NA NEUI DN/A[1 Y*f NEI UEI N/AE.

Y~f NEI UED 12 Enter the equipment class name from Appendix B: Classes of Equipment.

  • C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrmqnnndPnc. In

  • R-12-17.

C-360

Sheet 2 of 2 Equipment ID No. 0BV035 Equip. Class12 (09) Fans Equipment Description Emergenc Switchgear Ventilation Exhaust Fan B Interaction Effects.

7. Are soft targets free from impact by nearby equipment or structures?

8.: Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

  • . 5 ::..J~45 i~~r~ be+

ol w/

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

XjNEI U" N/AU YX NEl U-N/AUl Y)NI-UEJ N/AU Y)*N U..

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YP(NE U

adversely affiet the safety. functions of the equipment?

%I le3O~

I9Ydwn Ov'ej 5

sWcoc f/-O

,,,'(n

.5 0/

.A

  • olj TbreotleA J~

~~A r-e~

.yA~

Ao* VI"OJ Ve

'Q Af Comments (Additional pages may be added as necessary) 4l/A Evaluated by:

Date:

(_6/ N_ 1WI__

4-301-zo(z Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3

(.nrrA-nnnriP.nr. Nn

  • RR-19-171 C-361

OD j3 0 0

~ 3 z

0 M

-0 0

-4 L43 m

.0-,

3C)

C) w 0C,

StatttýJYN U Seismic Walkdown Checklist (SWC).

A Equipment ID No.

C, / VO 3 A, Equip. Class'2 (4

Equipment Description 6

t9'414(

ROO&

P A!2,,-f

07) 15014ývlr Location: Bldg.

Manufacturer, Model, Etc. (op Floor El.

L&T Room, Area

'FA,' Oe0A (A.

a/s coss'e,'/

h tional but recommended)

/ /*//:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additionil space is provided at the end of this checklist for documenting other comments.

Anchorawe

1. Is the anchorage configuration verification required (i.e., is the item one Y

NiNO of the 50% of SWEL items requiring such verification)?

2. Is the anchage free of bent, broken, missing or loose hardware?

Isthanc4 5gea C49 YJANO UI-N/A-

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YRNO UCr N/A-YANOI YAjNC UCI N/Ar-UI-N/A['

V4ýNO UO 12 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3>

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 rnrrPfqnnnlAinr.f Nn ' RR-19-A7.

C-363

Sheet 2 of 2 Equipment ID No.

Equipment Descript t?6V OS Equip. Classi2W

.L+/-

ion F4c-t, Interaction Effects

7. Are soft targets free from impact by Rearby equipment or structures?

NO Y%9-r[l U-N/ACI

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yr-NOI and masonry block walls not likely to collapse onto the equipment?

No~Pi 604'

,le.

UO Is N/ACI hoo 0.6

9. Do attached lines have adequate flexibility to avoid damage?
10. Baseo on the above seismic 'interaction evaluations, is'eqtuipment free of potentially adverse seismic interaction effects?

Y5E4O UQI N/ACI Y~fNC Urj Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y5,,N-J Ur adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Date:

q//( 2-Evaluated 21& 1 ZZ L -- -

,< C-4 )>

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrPqnnnrI~nr.P n Rn.-1-9-171-C-364

-0w 0

z 0g 0

CD 0,

m 1.0

-o 3

CD 2(D

'-4 5*

fl jý 0~

z 04!

0T-m mC CD 0

C)

Sheet 1 of 2 Status:&N U Seismic Walkdown Checklist (SWC)

  • Equipment ID No. 0DE377 Equip. Class"2 (21) Tanks or Heat Exchangers L

t (I4r, o'20,-0 Equipment Description E4 Diesel Generator Lube Oil Cooler Location: Bldg. Diesel Generator Floor El.

127 Room, Area.

()/6 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YX NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YI?1'N-ULI N/AD Y[E/NI-UED N/AD

4. Is the anchorage free of visible cracks in the concrete near the anchors?

YENI-U00 N/AD

5. Is the anchorage configuration consistent with plant documentation?

Y1 NDI Ui N/ADl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verificatin required.)

dw%, cv1 1

>1-. colcu(&o-w Alo. 6

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YX NDI UD-12 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >

Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 CnrrmP.nnndPnr'.P Nn" PW-R -17.

C-367

Sheet 2 of 2 EquipmentI No. 0DE377 Equip. Class12 (21) Tanks or Heat Exehangers!

(

,0 Equipment Description E4 Diesel Generator Lube Oil Cooler Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

YIE1'NO UO N/AO 00

,'919OT,

8. Are overhead equipment, distribution.systems, ceiling tiles and lighting, -YE 4 U UI" N/A5.

and masonry block walls not likely to collapse onto the equipment?

U f qlA36n.

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YE3"NE] UD N/AEl Yg NE ULI Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[R(NU UU adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

NAl/

Evaluated by:

Date:

9(h*hQ)1-fUlva Peach Bottom Atomic Power Station Unit 3 MPR-3812, Revision 3 r.nrrP.nnndi-nrP Nn

  • RR-19-17.1 C-368

a)

.-3 0

z

  • 0 0

5.

m

-DC 2

CD

=

.- 4.

0 m

('3

-4

-.1

o C',

00 Cý a.-

m 3a CD C) 0 m

-.4

0 0

0 cn a

0O m

-4