ML13099A336: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:WBN2Public Resource From: | {{#Wiki_filter:1 WBN2Public Resource From: | ||
Sent: | Boyd, Desiree L [dlboyd@tva.gov] | ||
Sent: | |||
Thursday, March 21, 2013 8:48 AM To: | |||
Poole, Justin; Arent, Gordon; Bryan, Robert H Jr; Hon, Andrew Cc: | |||
Boyd, Desiree L | |||
==Subject:== | ==Subject:== | ||
2012-03 WBN Project Plan - Unit 2.pdf Attachments: | 2012-03-21 - WBN Project Plan - Unit 2.pdf Attachments: | ||
Thank you | 2013-03-21 - WBN Project Plan - Unit 2.pdf Please see attached for todays 9:15 phone call. | ||
Thank you | |||
~*~*~*~*~*~*~*~*~*~*~ | ~*~*~*~*~*~*~*~*~*~*~ | ||
Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764 NOTICE: This electronic message transmission contains information which may be TVA SENSITIVE, TVA RESTRICTED, or TVA CONFIDENTIAL. Any misuse or unauthorized disclosure can result in civil penalties. If you are not the intended recipient, be aware that any disclosure, copying, distribution or use of the content of this information is prohibited. If you have receive this communication in error, please notify me immediately by e-mail and delete the original message. | Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764 NOTICE: This electronic message transmission contains information which may be TVA SENSITIVE, TVA RESTRICTED, or TVA CONFIDENTIAL. Any misuse or unauthorized disclosure can result in civil penalties. If you are not the intended recipient, be aware that any disclosure, copying, distribution or use of the content of this information is prohibited. If you have receive this communication in error, please notify me immediately by e-mail and delete the original message. | ||
Hearing Identifier: | Hearing Identifier: | ||
Watts_Bar_2_Operating_LA_Public Email Number: | |||
787 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF3F54C8A2) | |||
==Subject:== | ==Subject:== | ||
2012-03 WBN Project Plan - Unit 2.pdf Sent Date: | 2012-03-21 - WBN Project Plan - Unit 2.pdf Sent Date: | ||
3/21/2013 8:47:56 AM Received Date: | |||
3/21/2013 8:48:02 AM From: | |||
Boyd, Desiree L Created By: | |||
dlboyd@tva.gov Recipients: | |||
"Boyd, Desiree L" <dlboyd@tva.gov> | "Boyd, Desiree L" <dlboyd@tva.gov> | ||
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> | Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov> | ||
| Line 34: | Line 44: | ||
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov> | Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov> | ||
Tracking Status: None "Hon, Andrew" <Andrew.Hon@nrc.gov> | Tracking Status: None "Hon, Andrew" <Andrew.Hon@nrc.gov> | ||
Tracking Status: None Post Office: | Tracking Status: None Post Office: | ||
Recipients Received: | TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 735 3/21/2013 8:48:02 AM 2013-03-21 - WBN Project Plan - Unit 2.pdf 153985 Options Priority: | ||
Standard Return Notification: | |||
No Reply Requested: | |||
Yes Sensitivity: | |||
Normal Expiration Date: | |||
Recipients Received: | |||
WBN UNIT 2 PROJECT PLAN: 03/21/2013 | WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 2 of 42 SOURCE: POD UPDATES, COMMITMENTS I. | ||
: 1. Common Service Station Transformer (CSST) A & B Credit | SUBMITTAL LOOK-AHEAD Item No. | ||
Description Resp. Person Due Date License Amendments / Technical Specifications | |||
: 1. | |||
: 3. Fuel Storage | Common Service Station Transformer (CSST) A & B Credit Shea August 1, 2013 | ||
: 4. RCS Dose Equivalent Iodine | : 2. | ||
: 5. Hydrology Bases Change | SSER Open Item 32: | ||
: 6. CCS Maintenance | Revise Diesel Generator Frequency Allowable Value. [Commitment 113676066] | ||
Hilmes TBD | |||
Revised Proposal from Flowserve to Bechtel FlowServe COMPLETE | |||
Issue Purchase Order Wiggall COMPLETE | |||
Provide Runout Analysis FlowServe March 25, 2013 | |||
Westinghouse draft evaluation of analysis impacts COMPLETE | |||
Westinghouse final analysis impact evaluation Morgan April 16, 2013 | |||
Add Flowserve and Westinghouse evaluations to LAR write-up. | |||
Wiggall April 15, 2013 | |||
Finalize and Submit LAR to NRC. | |||
Licensing TBD | |||
: 3. | |||
Fuel Storage Bryan April 26, 2013 | |||
: 4. | |||
RCS Dose Equivalent Iodine Bryan April 26, 2013 | |||
: 5. | |||
Hydrology Bases Change Bryan April 26, 2013 | |||
: 6. | |||
CCS Maintenance Bryan April 26, 2013 | |||
WBN UNIT 2 PROJECT PLAN: 03/21/2013 | WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 3 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No. | ||
Description Resp. Person Due Date SSER Appendix HH Open Items (requiring submittal) | |||
: 1. | |||
SSER Open Item 1: | SSER Open Item 1: | ||
Following completion of cable pulls, submit letter to NRC either: | Following completion of cable pulls, submit letter to NRC either: | ||
Affirming no power assisted cable pulls were made, or | |||
Documenting any power assisted cable pulls. | |||
[Commitment 113676047] | [Commitment 113676047] | ||
Hilmes January 17, 2014 | |||
: 2. | |||
SSER Open Item 13: | SSER Open Item 13: | ||
Submit an ASME Section XI Inservice Test Program for the first ten year interval six months before receiving an Operating License. [Commitment NCO080008033: | |||
Item 017 of Enclosure 2 of letter T90 080128 001] | Item 017 of Enclosure 2 of letter T90 080128 001] | ||
McDonald / Crouch June 12, 2014 | |||
: 3. | |||
SSER Open Item 37: | SSER Open Item 37: | ||
Submit changes to the Emergency Plan (REP) prior to fuel load. | |||
[Commitment 111032952] | [Commitment 111032952] | ||
Detchemendy November 15, 2013 | |||
: 4. | |||
SSER Open Item 41: | SSER Open Item 41: | ||
Update the following to provide two unit capability: | Update the following to provide two unit capability: | ||
Plant design displays [Commitment 111033086], and | |||
dose assessment models [Commitment 113841821] | |||
Hilmes November 15, 2013 | |||
: 5. | |||
SSER Open Item 43: | SSER Open Item 43: | ||
Submit Emergency Plan implementing procedures no less than 180 days before schedule issuance of Operating License. [Commitment 113841955] | |||
Detchemendy November 15, 2013 | |||
: 6. | |||
SSER Open Item 61: | SSER Open Item 61: | ||
Fuel Thermal Conductivity Degradation Model (PAD Code) - Note: currently this is a License Condition - tracking PWROG activity to update code. [Commitment 113676152] | |||
Koontz July 26, 2013 | |||
WBN UNIT 2 PROJECT PLAN: 03/21/2013 | WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 4 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No. | ||
Perform an EMI survey of the containment high range radiation monitors after they are | Description Resp. Person Due Date | ||
: 7. | |||
SSER Open Item 79: | |||
Perform an EMI survey of the containment high range radiation monitors after they are installed in WBN Unit 2, and submit the results to the NRC within two weeks of the survey being completed. [Commitment 112177753] | |||
Hilmes March 4, 2014 | |||
: 8. | |||
SSER Open Item 83: | SSER Open Item 83: | ||
Provide Letter verifying completion of data storm test on DCS. [Commitment 113676093] | |||
Hilmes August 30, 2013 | |||
: 9. | |||
SSER Open Item 132: | SSER Open Item 132: | ||
: a. Issue EDCR to add high VCT level alarm to the main control room annunciator system Hilmes Complete | |||
: a. Issue EDCR to add high VCT level alarm to the main control room annunciator system | : b. Submit letter documenting that plant modifications to add high VCT level alarm to main control room annunciator system have been completed. [Commitment 113111704] | ||
: b. Submit letter documenting that plant modifications to add high VCT level alarm to main | Arent Complete | ||
: | : c. Revise appropriate procedures (SOI, GO) to limit the number of operating pumps and isolate potential boron dilution paths as required by the Chapter 15 analysis. Also revise the ARIs and AOIs as needed to account for the new VCT high level alarm. | ||
: d. Submit letter documenting that procedure changes associated with limiting the number of operating primary water pumps and isolating potential boron dilution paths have been | Wallace December 16, 2013 | ||
: d. Submit letter documenting that procedure changes associated with limiting the number of operating primary water pumps and isolating potential boron dilution paths have been made. [Commitment 113111705] | |||
Arent January, 2014 | |||
: 10. | |||
SSER Open Item 134: | SSER Open Item 134: | ||
Modifications for Cherokee and Douglas Dams will be designed and implemented prior to WBN Unit 2 Startup. [Commitment 113880166] | |||
Williams July 1, 2014 | |||
WBN UNIT 2 PROJECT PLAN: 03/21/2013 | WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 5 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No. | ||
: 1. As-Constructed Fire Protection Report | Description Resp. Person Due Date Other Submittals | ||
: 2. U2 FSAR With As-Constructed Figures | : 1. | ||
As-Constructed Fire Protection Report [Commitment 113461862] | |||
: 4. Submit a merged U2 FSAR / U1 UFSAR | Hilmes July 18, 2014 | ||
: 5. As-Constructed PRA | : 2. | ||
: 6. TMI Commitment Review Letter | U2 FSAR With As-Constructed Figures [Commitment 112068531] | ||
Arent September 12, 2014 | |||
: 3. | |||
Prior to fuel load, a final report will be submitted following certain validation activities as described in the IPEEE Design Report (Enclosure 1). [Commitment 111027893] | |||
Koontz / Enis July 18, 2014 | |||
: 4. | |||
Submit a merged U2 FSAR / U1 UFSAR [Commitment 111360889] | |||
Licensing April 2016 | |||
: 5. | |||
As-Constructed PRA [Commitment 111029124] | |||
Guey / Koontz July 18, 2014 | |||
Milestone - start PSA Update April 1, 2013 | |||
Data Update Apr 1, 2013-Oct 31, 2013 | |||
System Update Apr 1, 2013 - Feb 28, 2014 | |||
Human Reliability Analysis Update Apr 1, 2013 - Feb 28, 2014 | |||
Draft Quantification Feb 28, 2014 - Mar 17, 2014 | |||
Independent review Mar 10, 2014 - April 4, 2014 | |||
Final Quantification Apr 4, 2014 - April 30, 2014 | |||
Summary Report Apr 25, 2014 - May 30, 2014 | |||
Milestone - Closure Submittal to NRC June 16, 2014 | |||
: 6. | |||
TMI Commitment Review Letter [Commitment 113967286] | |||
Licensing January 24, 2014 | |||
WBN UNIT 2 PROJECT PLAN: 03/21/2013 | WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 6 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No. | ||
Description Resp. Person Due Date Other Submittals | |||
: 7. | |||
Letter to terminate Part 30/40 License after receipt of Part 50 License | |||
[Commitment 113967302] | [Commitment 113967302] | ||
: 8. ASME Section III N-3 Report | Licensing December 4, 2015 | ||
: 8. | |||
ASME Section III N-3 Report [Commitment 113967305] | |||
Crouch September 2014 | |||
: 9. | |||
Letter to NRC for notification of Vital Area Boundary Restoration | |||
[Commitment 110850749] | [Commitment 110850749] | ||
: 10. Unit 2 Completion Letter | Licensing January 24, 2014 | ||
: 11. PAM variable Calculation for EOP reviews | : 10. | ||
: 12. TMI Action Item Status Letter | Unit 2 Completion Letter [Commitment 113967311] | ||
: 13. Facility Operating License No. NPF-90, Unit 1 | Licensing August 8, 2014 | ||
: 14. RAIs on Tech. Specs. & Eagle 21 | : 11. | ||
: 15. Eagle 21 Potter & Brumfield Relay Open Items | PAM variable Calculation for EOP reviews [Commitment 113967317] | ||
: 16. SG Alternate Repair Criteria | Clark November 1, 2013 | ||
: 12. | |||
[Commitment 111027916 - 02 | TMI Action Item Status Letter Arent April 30, 2014 | ||
: 13. | |||
Facility Operating License No. NPF-90, Unit 1 Arent December 12, 2013 | |||
: 14. | |||
RAIs on Tech. Specs. & Eagle 21 Hilmes March 28, 2013 | |||
: 15. | |||
Eagle 21 Potter & Brumfield Relay Open Items Hilmes March 28, 2013 | |||
: 16. | |||
SG Alternate Repair Criteria Goetcheus August 2, 2013 | |||
: 17. | |||
Regulatory Framework Update [for status as of 06/30/2013] | |||
[Commitment 111027916 - 02 Elton July 23, 2013 | |||
WBN UNIT 2 PROJECT PLAN: 03/21/2013 | WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 7 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No. | ||
: 1. Unit Differences Update Letter [Commitment 112145218 - 01] | Description Resp. Person Due Date Regional Submittals | ||
: 1. | |||
Unit Differences Update Letter [Commitment 112145218 - 01] | |||
Stockton May 16, 2013 | |||
WBN UNIT 2 PROJECT PLAN: 03/21/2013 | WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 8 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No. | ||
Description Resp. Person Due Date Fukushima | |||
: 1. | : 1. | ||
NRC Order EA-12-049; Mitigating Strategies Order: | NRC Order EA-12-049; Mitigating Strategies Order: | ||
Licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment and SFP cooling capabilities following a beyond-design-basis external event. Must be implemented in all modes. [Commitment 113868651] | |||
Williams/Spink NRC Update August 28, 2013 | |||
: 2. | |||
NRC Order EA-12-049; Mitigating Strategies Order: | NRC Order EA-12-049; Mitigating Strategies Order: | ||
Provide reasonable protection for the associated equipment from external events. Such | Strategies must be capable of mitigating a simultaneous loss of all alternating current (AC) power and loss of normal access to the ultimate heat sink and have adequate capacity to address challenges to core cooling, containment, and SFP cooling capabilities at all units on a site. [Commitment 113871962] | ||
Williams/Spink NRC Update August 28, 2013 | |||
: 3. | |||
NRC Order EA-12-049; Mitigating Strategies Order: | |||
Provide reasonable protection for the associated equipment from external events. Such protection must demonstrate that there is adequate capacity to address challenges to core cooling, containment, and SFP cooling capabilities at all units on a site. | |||
[Commitment 113871973] | [Commitment 113871973] | ||
Williams/Spink NRC Update August 28, 2013 | |||
: 4. | |||
NRC Order EA-12-051; Order: | NRC Order EA-12-051; Order: | ||
Licensees to provide instrumentation, able to withstand design-basis natural phenomena and remain reliable at temperature, humidity and radiation levels at saturation conditions, to | Licensees to provide instrumentation, able to withstand design-basis natural phenomena and remain reliable at temperature, humidity and radiation levels at saturation conditions, to monitor SFP water level from the control room. | ||
DCN 59683, Spent Fuel Pool Level Indication 10% of package | |||
[Commitment 113872005] | [Commitment 113872005] | ||
Williams/Spink NRC Update August 28, 2013 | |||
: 5. | |||
10 CFR 50.54 F Letter Request for Information: | 10 CFR 50.54 F Letter Request for Information: | ||
Licensees to reevaluate the seismic hazards at their sites against current NRC | Licensees to reevaluate the seismic hazards at their sites against current NRC requirements and guidance, and if necessary, update the design basis and SSCs important to safety to protect against the updated hazards. [Commitment 113872017] | ||
Williams/Spink April 29, 2013 | |||
WBN UNIT 2 PROJECT PLAN: 03/21/2013 | WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 9 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No. | ||
Licensees to reevaluate the flooding hazards at their sites against current NRC | Description Resp. Person Due Date Fukushima | ||
: 6. | |||
10 CFR 50.54 F Letter Request for Information: | |||
Licensees to reevaluate the flooding hazards at their sites against current NRC requirements and guidance, and if necessary, update the design basis and SSCs important to safety to protect against the updated hazards. [Commitment 113872029] | |||
Williams/Spink May 29, 2015 | |||
: 7. | |||
10 CFR 50.54 F Letter Request for Information: | 10 CFR 50.54 F Letter Request for Information: | ||
Recommendation 9.3 requires licensees to evaluate communication and staffing needs for multi-unit events. [Commitment 113872040] | |||
Williams/Spink April 30, 2013 | |||
WBN UNIT 2 PROJECT PLAN: 03/21/2013 | WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 10 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No. | ||
Description Resp. Person Due Date Waste Confidence | |||
: 1. | |||
TVA actions on Waste Confidence: | |||
Finalize contractor outputs on reports for Waste Confidence Plan Vigluicci / Baker March 31, 2013 | |||
WBN UNIT 2 PROJECT PLAN: 03/21/2013 | WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 11 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No. | ||
Description Resp. Person Due Date Significant New Regulatory Issues | |||
: 1. | |||
: 3. DOEL Reactor Vessel Issues | New Station Blackout Rule | ||
: 4. Shutdown Seals - Westinghouse Submits Topical Report | Ongoing rulemaking Hilmes Late 2014 | ||
: 2. | |||
10 CFR 50.46 Rule Change | |||
Oxidation limits | |||
Ongoing rulemaking Koontz/Westinghouse Spring 2013 | |||
: 3. | |||
DOEL Reactor Vessel Issues Hemmer March 5, 2013 | |||
: 4. | |||
Shutdown Seals - Westinghouse Submits Topical Report Koontz COMPLETE}} | |||
Latest revision as of 09:33, 11 January 2025
| ML13099A336 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 03/21/2013 |
| From: | - No Known Affiliation |
| To: | Division of Operating Reactor Licensing |
| References | |
| Download: ML13099A336 (12) | |
Text
1 WBN2Public Resource From:
Boyd, Desiree L [dlboyd@tva.gov]
Sent:
Thursday, March 21, 2013 8:48 AM To:
Poole, Justin; Arent, Gordon; Bryan, Robert H Jr; Hon, Andrew Cc:
Boyd, Desiree L
Subject:
2012-03-21 - WBN Project Plan - Unit 2.pdf Attachments:
2013-03-21 - WBN Project Plan - Unit 2.pdf Please see attached for todays 9:15 phone call.
Thank you
~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764 NOTICE: This electronic message transmission contains information which may be TVA SENSITIVE, TVA RESTRICTED, or TVA CONFIDENTIAL. Any misuse or unauthorized disclosure can result in civil penalties. If you are not the intended recipient, be aware that any disclosure, copying, distribution or use of the content of this information is prohibited. If you have receive this communication in error, please notify me immediately by e-mail and delete the original message.
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
787 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF3F54C8A2)
Subject:
2012-03-21 - WBN Project Plan - Unit 2.pdf Sent Date:
3/21/2013 8:47:56 AM Received Date:
3/21/2013 8:48:02 AM From:
Boyd, Desiree L Created By:
dlboyd@tva.gov Recipients:
"Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Hon, Andrew" <Andrew.Hon@nrc.gov>
Tracking Status: None Post Office:
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 735 3/21/2013 8:48:02 AM 2013-03-21 - WBN Project Plan - Unit 2.pdf 153985 Options Priority:
Standard Return Notification:
No Reply Requested:
Yes Sensitivity:
Normal Expiration Date:
Recipients Received:
WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 2 of 42 SOURCE: POD UPDATES, COMMITMENTS I.
SUBMITTAL LOOK-AHEAD Item No.
Description Resp. Person Due Date License Amendments / Technical Specifications
- 1.
Common Service Station Transformer (CSST) A & B Credit Shea August 1, 2013
- 2.
SSER Open Item 32:
Revise Diesel Generator Frequency Allowable Value. [Commitment 113676066]
Hilmes TBD
Revised Proposal from Flowserve to Bechtel FlowServe COMPLETE
Issue Purchase Order Wiggall COMPLETE
Provide Runout Analysis FlowServe March 25, 2013
Westinghouse draft evaluation of analysis impacts COMPLETE
Westinghouse final analysis impact evaluation Morgan April 16, 2013
Add Flowserve and Westinghouse evaluations to LAR write-up.
Wiggall April 15, 2013
Finalize and Submit LAR to NRC.
Licensing TBD
- 3.
Fuel Storage Bryan April 26, 2013
- 4.
RCS Dose Equivalent Iodine Bryan April 26, 2013
- 5.
Hydrology Bases Change Bryan April 26, 2013
- 6.
CCS Maintenance Bryan April 26, 2013
WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 3 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No.
Description Resp. Person Due Date SSER Appendix HH Open Items (requiring submittal)
- 1.
SSER Open Item 1:
Following completion of cable pulls, submit letter to NRC either:
Affirming no power assisted cable pulls were made, or
Documenting any power assisted cable pulls.
[Commitment 113676047]
Hilmes January 17, 2014
- 2.
SSER Open Item 13:
Submit an ASME Section XI Inservice Test Program for the first ten year interval six months before receiving an Operating License. [Commitment NCO080008033:
Item 017 of Enclosure 2 of letter T90 080128 001]
McDonald / Crouch June 12, 2014
- 3.
SSER Open Item 37:
Submit changes to the Emergency Plan (REP) prior to fuel load.
[Commitment 111032952]
Detchemendy November 15, 2013
- 4.
SSER Open Item 41:
Update the following to provide two unit capability:
Plant design displays [Commitment 111033086], and
dose assessment models [Commitment 113841821]
Hilmes November 15, 2013
- 5.
SSER Open Item 43:
Submit Emergency Plan implementing procedures no less than 180 days before schedule issuance of Operating License. [Commitment 113841955]
Detchemendy November 15, 2013
- 6.
SSER Open Item 61:
Fuel Thermal Conductivity Degradation Model (PAD Code) - Note: currently this is a License Condition - tracking PWROG activity to update code. [Commitment 113676152]
Koontz July 26, 2013
WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 4 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No.
Description Resp. Person Due Date
- 7.
SSER Open Item 79:
Perform an EMI survey of the containment high range radiation monitors after they are installed in WBN Unit 2, and submit the results to the NRC within two weeks of the survey being completed. [Commitment 112177753]
Hilmes March 4, 2014
- 8.
SSER Open Item 83:
Provide Letter verifying completion of data storm test on DCS. [Commitment 113676093]
Hilmes August 30, 2013
- 9.
SSER Open Item 132:
- a. Issue EDCR to add high VCT level alarm to the main control room annunciator system Hilmes Complete
- b. Submit letter documenting that plant modifications to add high VCT level alarm to main control room annunciator system have been completed. [Commitment 113111704]
Arent Complete
- c. Revise appropriate procedures (SOI, GO) to limit the number of operating pumps and isolate potential boron dilution paths as required by the Chapter 15 analysis. Also revise the ARIs and AOIs as needed to account for the new VCT high level alarm.
Wallace December 16, 2013
- d. Submit letter documenting that procedure changes associated with limiting the number of operating primary water pumps and isolating potential boron dilution paths have been made. [Commitment 113111705]
Arent January, 2014
- 10.
SSER Open Item 134:
Modifications for Cherokee and Douglas Dams will be designed and implemented prior to WBN Unit 2 Startup. [Commitment 113880166]
Williams July 1, 2014
WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 5 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No.
Description Resp. Person Due Date Other Submittals
- 1.
As-Constructed Fire Protection Report [Commitment 113461862]
Hilmes July 18, 2014
- 2.
U2 FSAR With As-Constructed Figures [Commitment 112068531]
Arent September 12, 2014
- 3.
Prior to fuel load, a final report will be submitted following certain validation activities as described in the IPEEE Design Report (Enclosure 1). [Commitment 111027893]
Koontz / Enis July 18, 2014
- 4.
Submit a merged U2 FSAR / U1 UFSAR [Commitment 111360889]
Licensing April 2016
- 5.
As-Constructed PRA [Commitment 111029124]
Guey / Koontz July 18, 2014
Milestone - start PSA Update April 1, 2013
Data Update Apr 1, 2013-Oct 31, 2013
System Update Apr 1, 2013 - Feb 28, 2014
Human Reliability Analysis Update Apr 1, 2013 - Feb 28, 2014
Draft Quantification Feb 28, 2014 - Mar 17, 2014
Independent review Mar 10, 2014 - April 4, 2014
Final Quantification Apr 4, 2014 - April 30, 2014
Summary Report Apr 25, 2014 - May 30, 2014
Milestone - Closure Submittal to NRC June 16, 2014
- 6.
TMI Commitment Review Letter [Commitment 113967286]
Licensing January 24, 2014
WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 6 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No.
Description Resp. Person Due Date Other Submittals
- 7.
Letter to terminate Part 30/40 License after receipt of Part 50 License
[Commitment 113967302]
Licensing December 4, 2015
- 8.
ASME Section III N-3 Report [Commitment 113967305]
Crouch September 2014
- 9.
Letter to NRC for notification of Vital Area Boundary Restoration
[Commitment 110850749]
Licensing January 24, 2014
- 10.
Unit 2 Completion Letter [Commitment 113967311]
Licensing August 8, 2014
- 11.
PAM variable Calculation for EOP reviews [Commitment 113967317]
Clark November 1, 2013
- 12.
TMI Action Item Status Letter Arent April 30, 2014
- 13.
Facility Operating License No. NPF-90, Unit 1 Arent December 12, 2013
- 14.
RAIs on Tech. Specs. & Eagle 21 Hilmes March 28, 2013
- 15.
Eagle 21 Potter & Brumfield Relay Open Items Hilmes March 28, 2013
- 16.
SG Alternate Repair Criteria Goetcheus August 2, 2013
- 17.
Regulatory Framework Update [for status as of 06/30/2013]
[Commitment 111027916 - 02 Elton July 23, 2013
WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 7 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No.
Description Resp. Person Due Date Regional Submittals
- 1.
Unit Differences Update Letter [Commitment 112145218 - 01]
Stockton May 16, 2013
WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 8 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No.
Description Resp. Person Due Date Fukushima
- 1.
NRC Order EA-12-049; Mitigating Strategies Order:
Licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment and SFP cooling capabilities following a beyond-design-basis external event. Must be implemented in all modes. [Commitment 113868651]
Williams/Spink NRC Update August 28, 2013
- 2.
NRC Order EA-12-049; Mitigating Strategies Order:
Strategies must be capable of mitigating a simultaneous loss of all alternating current (AC) power and loss of normal access to the ultimate heat sink and have adequate capacity to address challenges to core cooling, containment, and SFP cooling capabilities at all units on a site. [Commitment 113871962]
Williams/Spink NRC Update August 28, 2013
- 3.
NRC Order EA-12-049; Mitigating Strategies Order:
Provide reasonable protection for the associated equipment from external events. Such protection must demonstrate that there is adequate capacity to address challenges to core cooling, containment, and SFP cooling capabilities at all units on a site.
[Commitment 113871973]
Williams/Spink NRC Update August 28, 2013
- 4.
NRC Order EA-12-051; Order:
Licensees to provide instrumentation, able to withstand design-basis natural phenomena and remain reliable at temperature, humidity and radiation levels at saturation conditions, to monitor SFP water level from the control room.
DCN 59683, Spent Fuel Pool Level Indication 10% of package
[Commitment 113872005]
Williams/Spink NRC Update August 28, 2013
- 5.
10 CFR 50.54 F Letter Request for Information:
Licensees to reevaluate the seismic hazards at their sites against current NRC requirements and guidance, and if necessary, update the design basis and SSCs important to safety to protect against the updated hazards. [Commitment 113872017]
Williams/Spink April 29, 2013
WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 9 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No.
Description Resp. Person Due Date Fukushima
- 6.
10 CFR 50.54 F Letter Request for Information:
Licensees to reevaluate the flooding hazards at their sites against current NRC requirements and guidance, and if necessary, update the design basis and SSCs important to safety to protect against the updated hazards. [Commitment 113872029]
Williams/Spink May 29, 2015
- 7.
10 CFR 50.54 F Letter Request for Information:
Recommendation 9.3 requires licensees to evaluate communication and staffing needs for multi-unit events. [Commitment 113872040]
Williams/Spink April 30, 2013
WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 10 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No.
Description Resp. Person Due Date Waste Confidence
- 1.
TVA actions on Waste Confidence:
Finalize contractor outputs on reports for Waste Confidence Plan Vigluicci / Baker March 31, 2013
WBN UNIT 2 PROJECT PLAN: 03/21/2013 Page 11 of 42 SOURCE: POD UPDATES, COMMITMENTS Item No.
Description Resp. Person Due Date Significant New Regulatory Issues
- 1.
New Station Blackout Rule
Ongoing rulemaking Hilmes Late 2014
- 2.
10 CFR 50.46 Rule Change
Oxidation limits
Ongoing rulemaking Koontz/Westinghouse Spring 2013
- 3.
DOEL Reactor Vessel Issues Hemmer March 5, 2013
- 4.
Shutdown Seals - Westinghouse Submits Topical Report Koontz COMPLETE