{{#Wiki_filter:1 2000 RS-1 4-004 RS-14-004 January 6, 2014 January ATTN:
{{#Wiki_filter:RS-1 4-004 January 6, 2014 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277, 50-278, and 72-29
A  TIN: Document ControlControl Desk Director,   Division   of Spent Fuel Storage Director, Division of Spent              Storage and and Transportatio Transportationn Office Office ofof Nuclear   Material     Safety and Material Safety      and Safeguards Safeguards U. S. Nuclear Nuclear Regulatory Regulatory Commission Commission Washington,DC Washington,     DC 20555-0001 Peach Bottom Atomic Power Station, Units Peach                                            Units 2 and and 33 Renewed Facility Operating License Nos.          Nos. DPR-44 DPR-44 andand DPR-56 DPR-56 NRC Docket Nos. 50-277, 50-278, and           and 72-29 72-29


==Subject:==
==Subject:==
Withdrawal Withdrawal of    of Exemption Exemption Request Request for for Transnuclear Transnuclear TN-68 Casks Casks Loaded Loadedwith  with Fuel Bundles Bundles with with Incorrect Incorrect Cooling Cooling Times Times
Withdrawal of Exemption Request for Transnuclear TN-68 Casks Loaded with Fuel Bundles with Incorrect Cooling Times


==References:==
==References:==
1.
1.
: 1. Letter     from P.
Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, "Exemption Request for Transnuclear TN-68 Casks Loaded with Fuel Bundles with Incorrect Cooling Times," dated May 23, 2013 2.
Letter from    P. R.
Letter from J. C. Nguyen (U.S. NRC) to P. R. Simpson (Exelon Generation Company, LLC), "Peach Bottom Exemption Request (TAC No. L24749),"
R. Simpson Simpson (Exelon Generation Company, Company, LLC) to U.     U.S.
dated December 17, 2013 In Reference 1, Exelon Generation Company, LLC (EGC) requested NRC approval of a one-time exemption for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) from the requirements of 10 CFR 72.212(b)(3) and (b)(11). Specifically, the exemption request addressed the non-compliance of four spent fuel assemblies with the terms and conditions of the Transnuclear, Inc. (TN)
S. NRC, "Exemption      Request "Exemption Request for Transnuclear TN-68 Casks         CasksLoaded Loadedwith withFuel Fuel Bundles Bundles withwith Incorrect     Cooling Times,"
Certificate of Compliance (CoC) Number 1027, Amendment 0, at the time of loading.
Incorrect Cooling      Times,"dated dated May May23,2013 23, 2013
In Reference 2, the NRC documented that an exemption is not appropriate at this time. The NRC based the conclusion upon the four spent fuel assemblies were in compliance with the CoC requirements as of September 14, 2001, and that the NRC had dispositioned the erroneous loading as a violation, but not a continuing one. Therefore, since a non-compliance no longer exists, an exemption is not needed.
: 2. Letter    from J.
Based upon Reference 2, EGC withdraws the exemption request made in Reference 1.
Letter from   J. C.
1 RS-14-004 January 6, 2014 A TIN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 2000 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277, 50-278, and 72-29
C. Nguyen (U.S.(U.S. NRC) to P. R. R. Simpson Simpson (Exelon (Exelon Generation Generation Company, Company, LLC),LLC), "Peach "Peach Bottom Exemption Request  Request (TAC No. L24749),"
L24749),"
dated December December 17, 2013  2013 In Reference Reference 1, 1, Exelon Exelon Generation Generation Company, Company, LLC  LLC (EGC)
(EGC) requested    NRC approval requested NRC       approval of of aa one-one-time   exemption   for the Peach time exemption for the PeachBottom    Bottom Atomic Atomic Power Power Station Station (PBAPS),
(PBAPS), Units Units 22 and and33 Independent IndependentSpentSpentFuelFuelStorage StorageInstallation Installation(ISFSI)
(ISFSI) from from the the requirements requirements of  of 10 10CFR CFR 72.212(b)(3) 72.212(b)(3) and (b)(11).
(b)(11). Specifically,           exemption request addressed Specifically, the exemption                  addressedthe  thenon-complian non-compliance   ce ofof four four spent spent fuel fuel assemblies assemblieswith  with the the terms termsand andconditions conditionsofofthe theTransnuclear, Transnuclear,Inc. Inc.(TN)
(TN)
Certificate Certificate of Compliance (CoC) (CoC) Number Number 1027, 1027, Amendment Amendment0,0,atatthe thetime timeofofloading.
loading.
In In Reference Reference 2, 2, the the NRC NRC documented documented that   that an an exemption exemption isis not not appropriate appropriate at atthis this time.
time. The The NRC    based  the conclusion      upon    the NRC based the conclusion upon the four spent   four  spentfuel fuel assemblies assemblieswerewereinincompliance compliancewith  with the the CoC CoC requirements requirements as  as of of September September14,    14, 2001, 2001, and andthat thatthe theNRC NRC had had dispositioned dispositioned the  the erroneous erroneousloading loading as asaaviolation, violation, butbut not not aa continuing continuing one. Therefore, Therefore,since sinceaanon-complian non-compliance ce no no longer longer exists, exists, an an exemption exemption is is not not needed.
needed.
Based Based upon upon Reference Reference 2,  2, EGC EGC withdraws withdraws the the exemption exemption request request made made in in Reference Reference 1.1.


U.S. Nuclear Regulatory Commission January January 6, 6, 2014 2014 Page 2 There are no no regulatory regulatory commitments commitments contained containedinin this thisletter.
==Subject:==
letter.
Withdrawal of Exemption Request for Transnuclear TN-68 Casks Loaded with Fuel Bundles with Incorrect Cooling Times
Should Should you you have any questions concerning thisthis letter, letter,please please contact contact me me at at (630)
 
(630) 657-2823.
==References:==
R Patrick R. Simpson Manager - Licensing cc:     NRC   Regional Administrator NRC Regional   Administrator -- Region Region II}}
: 1. Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, "Exemption Request for Transnuclear TN-68 Casks Loaded with Fuel Bundles with Incorrect Cooling Times," dated May 23,2013
: 2. Letter from J. C. Nguyen (U.S. NRC) to P. R. Simpson (Exelon Generation Company, LLC), "Peach Bottom Exemption Request (TAC No. L24749),"
dated December 17, 2013 In Reference 1, Exelon Generation Company, LLC (EGC) requested NRC approval of a one-time exemption for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) from the requirements of 10 CFR 72.212(b)(3) and (b)(11). Specifically, the exemption request addressed the non-compliance of four spent fuel assemblies with the terms and conditions of the Transnuclear, Inc. (TN)
Certificate of Compliance (CoC) Number 1027, Amendment 0, at the time of loading.
In Reference 2, the NRC documented that an exemption is not appropriate at this time. The NRC based the conclusion upon the four spent fuel assemblies were in compliance with the CoC requirements as of September 14, 2001, and that the NRC had dispositioned the erroneous loading as a violation, but not a continuing one. Therefore, since a non-compliance no longer exists, an exemption is not needed.
Based upon Reference 2, EGC withdraws the exemption request made in Reference 1.
1 RS-14-004 January 6, 2014 A TIN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 2000 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277, 50-278, and 72-29
 
==Subject:==
Withdrawal of Exemption Request for Transnuclear TN-68 Casks Loaded with Fuel Bundles with Incorrect Cooling Times
 
==References:==
: 1. Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, "Exemption Request for Transnuclear TN-68 Casks Loaded with Fuel Bundles with Incorrect Cooling Times," dated May 23,2013
: 2. Letter from J. C. Nguyen (U.S. NRC) to P. R. Simpson (Exelon Generation Company, LLC), "Peach Bottom Exemption Request (TAC No. L24749),"
dated December 17, 2013 In Reference 1, Exelon Generation Company, LLC (EGC) requested NRC approval of a one-time exemption for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) from the requirements of 10 CFR 72.212(b)(3) and (b)(11). Specifically, the exemption request addressed the non-compliance of four spent fuel assemblies with the terms and conditions of the Transnuclear, Inc. (TN)
Certificate of Compliance (CoC) Number 1027, Amendment 0, at the time of loading.
In Reference 2, the NRC documented that an exemption is not appropriate at this time. The NRC based the conclusion upon the four spent fuel assemblies were in compliance with the CoC requirements as of September 14, 2001, and that the NRC had dispositioned the erroneous loading as a violation, but not a continuing one. Therefore, since a non-compliance no longer exists, an exemption is not needed.
Based upon Reference 2, EGC withdraws the exemption request made in Reference 1.
 
U.S. Nuclear Regulatory Commission January 6, 2014 Page 2 There are no regulatory commitments contained in this letter.
Should you have any questions concerning this letter, please contact me at (630) 657-2823.
cc:
NRC Regional Administrator - Region I U.S. Nuclear Regulatory Commission January 6, 2014 Page 2 There are no regulatory commitments contained in this letter.
Should you have any questions concerning this letter, please contact me at (630) 657-2823.
R Patrick R. Simpson Manager - Licensing cc:
NRC Regional Administrator - Region I U.S. Nuclear Regulatory Commission January 6, 2014 Page 2 There are no regulatory commitments contained in this letter.
Should you have any questions concerning this letter, please contact me at (630) 657-2823.
R Patrick R. Simpson Manager - Licensing cc:
NRC Regional Administrator - Region I}}

Latest revision as of 00:03, 11 January 2025

Withdrawal of Exemption Request for Transnuclear TN-68 Casks Loaded with Fuel Bundles with Incorrect Cooling Times
ML14006A355
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/06/2014
From: Simpson P
Exelon Generation Co
To:
Document Control Desk, NRC/NMSS/SFST, Office of Nuclear Reactor Regulation
References
RS-14-004, TAC L24749
Download: ML14006A355 (2)


Text

RS-1 4-004 January 6, 2014 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277, 50-278, and 72-29

Subject:

Withdrawal of Exemption Request for Transnuclear TN-68 Casks Loaded with Fuel Bundles with Incorrect Cooling Times

References:

1.

Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, "Exemption Request for Transnuclear TN-68 Casks Loaded with Fuel Bundles with Incorrect Cooling Times," dated May 23, 2013 2.

Letter from J. C. Nguyen (U.S. NRC) to P. R. Simpson (Exelon Generation Company, LLC), "Peach Bottom Exemption Request (TAC No. L24749),"

dated December 17, 2013 In Reference 1, Exelon Generation Company, LLC (EGC) requested NRC approval of a one-time exemption for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) from the requirements of 10 CFR 72.212(b)(3) and (b)(11). Specifically, the exemption request addressed the non-compliance of four spent fuel assemblies with the terms and conditions of the Transnuclear, Inc. (TN)

Certificate of Compliance (CoC) Number 1027, Amendment 0, at the time of loading.

In Reference 2, the NRC documented that an exemption is not appropriate at this time. The NRC based the conclusion upon the four spent fuel assemblies were in compliance with the CoC requirements as of September 14, 2001, and that the NRC had dispositioned the erroneous loading as a violation, but not a continuing one. Therefore, since a non-compliance no longer exists, an exemption is not needed.

Based upon Reference 2, EGC withdraws the exemption request made in Reference 1.

1 RS-14-004 January 6, 2014 A TIN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 2000 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277, 50-278, and 72-29

Subject:

Withdrawal of Exemption Request for Transnuclear TN-68 Casks Loaded with Fuel Bundles with Incorrect Cooling Times

References:

1. Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, "Exemption Request for Transnuclear TN-68 Casks Loaded with Fuel Bundles with Incorrect Cooling Times," dated May 23,2013
2. Letter from J. C. Nguyen (U.S. NRC) to P. R. Simpson (Exelon Generation Company, LLC), "Peach Bottom Exemption Request (TAC No. L24749),"

dated December 17, 2013 In Reference 1, Exelon Generation Company, LLC (EGC) requested NRC approval of a one-time exemption for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) from the requirements of 10 CFR 72.212(b)(3) and (b)(11). Specifically, the exemption request addressed the non-compliance of four spent fuel assemblies with the terms and conditions of the Transnuclear, Inc. (TN)

Certificate of Compliance (CoC) Number 1027, Amendment 0, at the time of loading.

In Reference 2, the NRC documented that an exemption is not appropriate at this time. The NRC based the conclusion upon the four spent fuel assemblies were in compliance with the CoC requirements as of September 14, 2001, and that the NRC had dispositioned the erroneous loading as a violation, but not a continuing one. Therefore, since a non-compliance no longer exists, an exemption is not needed.

Based upon Reference 2, EGC withdraws the exemption request made in Reference 1.

1 RS-14-004 January 6, 2014 A TIN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 2000 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277, 50-278, and 72-29

Subject:

Withdrawal of Exemption Request for Transnuclear TN-68 Casks Loaded with Fuel Bundles with Incorrect Cooling Times

References:

1. Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, "Exemption Request for Transnuclear TN-68 Casks Loaded with Fuel Bundles with Incorrect Cooling Times," dated May 23,2013
2. Letter from J. C. Nguyen (U.S. NRC) to P. R. Simpson (Exelon Generation Company, LLC), "Peach Bottom Exemption Request (TAC No. L24749),"

dated December 17, 2013 In Reference 1, Exelon Generation Company, LLC (EGC) requested NRC approval of a one-time exemption for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Independent Spent Fuel Storage Installation (ISFSI) from the requirements of 10 CFR 72.212(b)(3) and (b)(11). Specifically, the exemption request addressed the non-compliance of four spent fuel assemblies with the terms and conditions of the Transnuclear, Inc. (TN)

Certificate of Compliance (CoC) Number 1027, Amendment 0, at the time of loading.

In Reference 2, the NRC documented that an exemption is not appropriate at this time. The NRC based the conclusion upon the four spent fuel assemblies were in compliance with the CoC requirements as of September 14, 2001, and that the NRC had dispositioned the erroneous loading as a violation, but not a continuing one. Therefore, since a non-compliance no longer exists, an exemption is not needed.

Based upon Reference 2, EGC withdraws the exemption request made in Reference 1.

U.S. Nuclear Regulatory Commission January 6, 2014 Page 2 There are no regulatory commitments contained in this letter.

Should you have any questions concerning this letter, please contact me at (630) 657-2823.

cc:

NRC Regional Administrator - Region I U.S. Nuclear Regulatory Commission January 6, 2014 Page 2 There are no regulatory commitments contained in this letter.

Should you have any questions concerning this letter, please contact me at (630) 657-2823.

R Patrick R. Simpson Manager - Licensing cc:

NRC Regional Administrator - Region I U.S. Nuclear Regulatory Commission January 6, 2014 Page 2 There are no regulatory commitments contained in this letter.

Should you have any questions concerning this letter, please contact me at (630) 657-2823.

R Patrick R. Simpson Manager - Licensing cc:

NRC Regional Administrator - Region I