{{#Wiki_filter:U.S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 2 of7 GENERIC DESIGN INFORMATION TEMPLATE FOR RNP I                                                           Vendor Design Reference        Additional                                                                                    Licensee Evaluation Topic       I       Parameter Summary           I         Document#           I  Comments Test or Analysis Results EC 89580, Attachment D -
{{#Wiki_filter:U.S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 2 of7 GENERIC DESIGN INFORMATION TEMPLATE FOR RNP I
Design           I Customer technical requirements I NCP-Z-0006, Rev. 0- SFP Wide       EA-12-051,                                                      The vendor instrumentation design was reviewed and determined to ad equately 1       1                            specification for SFPLI       Range Level Instrumentation                                             N/A Specification                                                                        1  NEI-12-02                                                      meet the specification requirements.
Topic I
Remote Level Sensors.pdf Qualification is based on a Qualification analyses Doc.
Parameter Summary I
combination of tests and analyses or similarity as described below.
Vendor Design Reference I Document#
I        51-9202556-005 Test and analyses results meet requirements of The vendor qualification documentation was reviewed and concluded to EA-12-051 , 1.4                                                  adequately demonstrate the instrumentation could reliably function in its installed 2         Test Strategy     I Qualification tests and analyses               32-9221237-         NEI-12-02, 3.4 EA 21-051 , JLD-ISG-2012-03, and NEI12-02 environment(s) during a postulated Beyond Design Bases External Event are summarized in qualification     003_Calc_Qualification for a                                           Rev. 1-(BDBEE).
EC 89580, Attachment D -
analyses report 51-9202556-005.     Waveguide Support and Horn End Assembly Temperature rating of Power Control Panel Environmental 149°F allowing for 9°F rise above ambient. The primary channel instrumentation electronics are located outside the SFP qualification for                                         Qualification Analyses Doc.
1 1 Design I Customer technical requirements I NCP-Z-0006, Rev. 0- SFP Wide 1
area. The vendor instrumentation design temperature, humidity, and dose limits 3         electronics         Temperature, humidity and dose     51-9202556-005 Section 2.3     NEI 12-02, 3.4 NEMA 4X enclosure prevents moisture      bound the expected environmental conditions during a postulated BDBEE.
Specification specification for SFPLI Range Level Instrumentation Remote Level Sensors.pdf Qualification is based on a I
enclosure with intrusion.
Qualification analyses Doc.
display                                                                                                                                           3 Radiation withstand analyzed to 1x1 0 Rads Measurement capability through Initial testing (without horn cover) demonstrated saturated steam and smoke.
combination of tests and analyses 51-9202556-005 or similarity as described below.
successful measurement capability through Testing performed to demonstrate steam and smoke. Subsequent testing of the the radar horn cover was effective radar horn and cover demonstrated adequate Environmental       at preventing moisture intrusion     Qualification Analyses Doc.
2 Test Strategy I Qualification tests and analyses 32-9221237-are summarized in qualification 003_Calc_Qualification for a analyses report 51-9202556-005.
operation during sustained simulated SFP boiling  The radar horn cover qualification testing adequately demonstrated acceptable testing for level   within the horn and wave guide       51-9202556-005, Section 2.3, conditions, and that the horn cover was effective operation during exposure to simulated SFP boiling conditions.
Waveguide Support and Horn End Assembly Environmental qualification for Qualification Analyses Doc.
sensor             pipe.                               2.4, 2.5, 2.7, Appendix Band in preventing moisture intrusion within the horn components in                                               supporting references     EA-12-051, 1.4 4                                                                                                                and wave guide pipe.                              The horn cover adhesive manufacturer radiation test data adequately SFP area-           Radar horn cover (fused silica             66-9200846-002         NEI 12-02, 3.4 demonstrated the adhesive would not experience unacceptable degradation for Saturated           glass), metal waveguide pipe and             51-9220845-001 The horn cover adhesive is a silicone elastomer  radiation exposure in excess of that expected for the postulated beyond design steam &             horn are not susceptible to                 51-9221032-000 manufactured by Down Corning (Sylgard 170).      bases event over the required mission time.
3 electronics Temperature, humidity and dose 51-9202556-005 Section 2.3 enclosure with display Measurement capability through saturated steam and smoke.
radiation           radiation degradation.                       66-9225632-000 The adhesive manufacturer radiation test data Manufacturer test data supports adequately demonstrates the adhesive would not acceptable radiation degradation experience unacceptable degradation for resistance for the radar horn                                                                                   8 exposures up to 1.64 x1 0 Rads.
Testing performed to demonstrate the radar horn cover was effective Environmental at preventing moisture intrusion Qualification Analyses Doc.
cover adhesive.
testing for level within the horn and wave guide 51-9202556-005, Section 2.3, sensor pipe.
2.4, 2.5, 2.7, Appendix Band components in supporting references SFP area-Radar horn cover (fused silica 66-9200846-002 4
Saturated glass), metal waveguide pipe and 51-9220845-001 steam &
horn are not susceptible to 51-9221032-000 radiation radiation degradation.
66-9225632-000 Manufacturer test data supports acceptable radiation degradation resistance for the radar horn cover adhesive.
Qualification Analyses Doc.
Qualification Analyses Doc.
51-9202556-005, Sections Environmental                                               2.3, 2.5, Appendix A and testing for level                                           supporting references                      Sensor and indication are demonstrated to Temperature and humidity testing                                                                                                     The level sensor electronic housing are located outside the SFP area. The sensor                                                         38-9218218-000,                         withstand the manufacturer ratings 80°C (sensor) 5                                  and analysis of sensor and                                    NEI 12-02, 3.4                                                   vendor instrumentation design temperature, humidity, and dose limits bound the electronics                                                    38-9218214-000,                         and 70°C (indication), 100% RH. Radiation indication                                                                                          3                  expected environmental conditions during a postulated BDBEE.
51-9202556-005, Sections Environmental 2.3, 2.5, Appendix A and testing for level Temperature and humidity testing supporting references sensor and analysis of sensor and 38-9218218-000, electronics indication 38-9218214-000, housing-USNRC Bulletin 79-01 B Table 5
housing-                                                USNRC Bulletin 79-01 B Table                  withstand analyzed to 1x10 Rads.
outside SFP C-1, Reg. Guide 1.209 Additional Comments EA-12-051, NEI-12-02 EA-12-051, 1.4 NEI-12-02, 3.4 NEI 12-02, 3.4 EA-12-051, 1.4 NEI 12-02, 3.4 NEI 12-02, 3.4 Test or Analysis Results N/A Test and analyses results meet requirements of EA 21-051, JLD-ISG-2012-03, and NEI12-02 Rev. 1-Temperature rating of Power Control Panel 149°F allowing for 9°F rise above ambient.
outside SFP                                                           C-1, Reg. Guide 1.209
NEMA 4X enclosure prevents moisture intrusion.
Radiation withstand analyzed to 1 x1 03 Rads Initial testing (without horn cover) demonstrated successful measurement capability through steam and smoke. Subsequent testing of the radar horn and cover demonstrated adequate operation during sustained simulated SFP boiling conditions, and that the horn cover was effective in preventing moisture intrusion within the horn and wave guide pipe.
The horn cover adhesive is a silicone elastomer manufactured by Down Corning (Sylgard 170).
The adhesive manufacturer radiation test data adequately demonstrates the adhesive would not experience unacceptable degradation for exposures up to 1.64 x1 08 Rads.
Sensor and indication are demonstrated to withstand the manufacturer ratings 80°C (sensor) and 70°C (indication), 100% RH. Radiation withstand analyzed to 1 x1 03 Rads.
Licensee Evaluation The vendor instrumentation design was reviewed and determined to adequately meet the specification requirements.
The vendor qualification documentation was reviewed and concluded to adequately demonstrate the instrumentation could reliably function in its installed environment(s) during a postulated Beyond Design Bases External Event (BDBEE).
The primary channel instrumentation electronics are located outside the SFP area. The vendor instrumentation design temperature, humidity, and dose limits bound the expected environmental conditions during a postulated BDBEE.
The radar horn cover qualification testing adequately demonstrated acceptable operation during exposure to simulated SFP boiling conditions.
The horn cover adhesive manufacturer radiation test data adequately demonstrated the adhesive would not experience unacceptable degradation for radiation exposure in excess of that expected for the postulated beyond design bases event over the required mission time.
The level sensor electronic housing are located outside the SFP area. The vendor instrumentation design temperature, humidity, and dose limits bound the expected environmental conditions during a postulated BDBEE.  


U. S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 3 of7
U. S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 3 of7 Topic Parameter Summary Radar horn cover (fused silica glass), metal waveguide pipe and Thermal &
      #                                                                Vendor Design Reference         Additional                                                                                   Licensee Evaluation Topic                Parameter Summary                                                                        Test or Analysis Results Document#              Comments Thermal and radiation aging not applicable to metal waveguide in SFP area. The horn cover Radar horn cover (fused silica                                                                                                        The glass and metallic instrumentation components located within the SFP area adhesive is a silicone elastomer manufactured glass), metal waveguide pipe and                                                                                                      are not susceptible to aging due to thermal and/or radiation effects.
horn are not susceptible to Radiation Aging radiation degradation.
by Down Corning (Sylgard 170). The adhesive Thermal &          horn are not susceptible to Qualification analyses Doc.                  manufacturer radiation test data adequately Radiation Aging    radiation degradation.                                                                                                                The horn cover adhesive manufacturer radiation test data adequately 51-9202556-005, Section 2.5    EA-12-051, 1.4 demonstrates the adhesive would not experience 6        - organic                                                                                                                                                demonstrated the adhesive would not experience unacceptable degradation for 51-9221032-000          NEI12-02, 3.4 unacceptable degradation for exposures up to components in      Horn cover adhesive manufacturer                                                            6                                        radiation exposure in excess of that expected for the postulated bey?nd design 66-9225632-000                          1.64 x10 Rads. The silicone adhesive is rated SFP area          radiation test data and                                                                                                              bases event over the required mission time. The horn cover adhes1ve to withstand temperatures extremes of -45 to temperature withstand                                                                                                                temperature ratings are acceptable and readily bound the expected conditions for 200°C, which adequately bound the postulated specifications.                                                                                                                      the postulated beyond design bases event.
6
- organic components in Horn cover adhesive manufacturer SFP area radiation test data and temperature withstand specifications.
SFPLI remote transmitter and Basis for Dose power control panel qualified to Requirement 1 x1 03 Rads based on industry operating experience.
7 Based on engineering judgment, the expected total integrated dose for the radar horn cover adhesive would not exceed 1 x1 06 Rads over the required mission time for the instrumentation.
Seismic withstand capability of Seismic VEGAPULS 62 ER sensor,
8 Qualification indicators, power control panel, mounting brackets, waveguide pipe Sloshing NRC RAis indicated a SFP seismic induced sloshing analyses is required. If wave impact is predicted, then the hydrodynamic forces should be included in the mounting design loading 9
combinations.
Vendor Design Reference Document#
Qualification analyses Doc.
51-9202556-005, Section 2.5 51-9221032-000 66-9225632-000 AREVA Document No. 51 -
9202556-005, Qualification Analysis of VEGAPULS 62 ER Through Air Radar 51-9221032-000 66-9225632-000 Qualification analyses Doc.
51-9202556-005, Section 2.1, Appendix D and supporting references 11-9203036-000, 17 4-9213558-006 Allowable seismic combined with hydrodynamic loading that the horn mounting can withstand is analyzed in 32-9221237-003.
Predicted loading from impact and drag due to slosh is calculated in Attachment BH 9221237-003 Calc Qualification for a Waveguide Support and Horn End Assembly. verification and sensitivity study to predict slosh phenomena is evaluated in Attachment AW, NAI-1809-004 Hydraulic Response Calc.
Additional Licensee Evaluation Test or Analysis Results Comments Thermal and radiation aging not applicable to metal waveguide in SFP area. The horn cover The glass and metallic instrumentation components located within the SFP area adhesive is a silicone elastomer manufactured are not susceptible to aging due to thermal and/or radiation effects.
by Down Corning (Sylgard 170). The adhesive manufacturer radiation test data adequately The horn cover adhesive manufacturer radiation test data adequately EA-12-051, 1.4 demonstrates the adhesive would not experience demonstrated the adhesive would not experience unacceptable degradation for NEI12-02, 3.4 unacceptable degradation for exposures up to radiation exposure in excess of that expected for the postulated bey?nd design 1.64 x106 Rads. The silicone adhesive is rated bases event over the required mission time. The horn cover adhes1ve to withstand temperatures extremes of -45 to temperature ratings are acceptable and readily bound the expected conditions for 200°C, which adequately bound the postulated the postulated beyond design bases event.
temperatures for sustained SFP boiling conditions.
temperatures for sustained SFP boiling conditions.
SFPLI remote transmitter and          AREVA Document No. 51 -                      Analyses based on operating experience Basis for Dose    power control panel qualified to      9202556-005, Qualification                    concludes the electronics are not susceptible to  A location specific dose calculation was performed for the remot~ electr?nics, 3
Analyses based on operating experience A location specific dose calculation was performed for the remot~ electr?nics, concludes the electronics are not susceptible to which demonstrated the sensor total integrated dose (TID) over 1ts requ1red degraded performance up to this dose threshold.
Requirement        1x1 0 Rads based on industry        Analysis of VEGAPULS 62 ER                      degraded performance up to this dose threshold . which demonstrated the sensor total integrated dose (TID) over 1ts requ1red operating experience.                     Through Air Radar                                                                          mission time is enveloped by the vendor instrumentation design limit of 1x1 03 51-9221032-000                          The adhesive manufacturer radiation test data     Rads.
mission time is enveloped by the vendor instrumentation design limit of 1 x1 03 The adhesive manufacturer radiation test data Rads.
7                          Based on engineering judgment,              66-9225632-000          NEI12-02, 3.4 adequately demonstrates the adhesive would not the expected total integrated dose                                                                                                    The horn cover adhesive manufacturer radiation test data adequately experience unacceptable degradation for demonstrated the adhesive would not experience unacceptable degradation for for the radar horn cover adhesive                                                  exposures up to 1.64 x1 06 Rads.                 radiation exposure in excess of that expected for the postulated beyond design 6
NEI12-02, 3.4 adequately demonstrates the adhesive would not The horn cover adhesive manufacturer radiation test data adequately experience unacceptable degradation for demonstrated the adhesive would not experience unacceptable degradation for exposures up to 1.64 x1 06 Rads.
would not exceed 1 x1 0 Rads                                                                                                          bases event over the required mission time.
radiation exposure in excess of that expected for the postulated beyond design bases event over the required mission time.
over the required mission time for the instrumentation.
VEGAPULS 62 ER sensor, indicators, power The vendor instrumentation seismic testing adequately demonstrates the NEI 1-02, 3.4 control panel, mounting brackets, waveguide equipment is capable of reliably operating during a seismic event.
Qualification analyses Doc.
pipe are seismically qualified toRRS levels from EPRI TR-1 07330 Seismic induced sloshing analyses concluded that wave impact on the horn end assembly is The vendor horn end mounting can withstand the expected seismic and N/A predicted and the expected combined hydrodynamic loading caused by sloshing during a postulated BDBEE.
Seismic withstand capability of 51-9202556-005, Section 2.1,                    VEGAPULS 62 ER sensor , indicators, power VEGAPULS 62 ER sensor ,                                                                                                          The vendor instrumentation seismic testing adequately demonstrates the Seismic                                                  Appendix D and supporting                        control panel , mounting brackets, waveguide 8                              indicators, power control panel,                                  NEI 1-02, 3.4                                                   equipment is capable of reliably operating during a seismic event.
hydrodynamic and seismic forces are less than the allowable hydrodynamic and seismic forces.  
Qualification                                                    references                            pipe are seismically qualified toRRS levels from mounting brackets, waveguide 11-9203036-000,                                          EPRI TR-1 07330 pipe 174-9213558-006 Allowable seismic combined Sloshing          NRC RAis indicated a SFP            with hydrodynamic loading seismic induced sloshing analyses  that the horn mounting can is required . If wave impact is    withstand is analyzed in 32-predicted, then the hydrodynamic    9221237-003.
forces should be included in the    Predicted loading from impact                  Seismic induced sloshing analyses concluded mounting design loading            and drag due to slosh is                        that wave impact on the horn end assembly is combinations.                      calculated in Attachment BH          N/A      predicted and the expected combined              The vendor horn end mounting can withstand the expected seismic and 9
9221237-                                                                                      hydrodynamic loading caused by sloshing during a postulated BDBEE.
hydrodynamic and seismic forces are less than 003 Calc Qualification for a                    the allowable hydrodynamic and seismic forces .
Waveguide Support and Horn End Assembly. verification and sensitivity study to predict slosh phenomena is evaluated in Attachment AW, NAI-1809-004 Hydraulic Response Calc.


U. S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 4 of7 AREVA Doc. 51-9228351-Spent Fuel Pool 000, "Through Air Radar                                                                      The vendor factory acceptance test demonstrated reliable operation of the SFP instrumentation        Functionality testing was Spent Fuel Pool Level                          Testing demonstrated that the SFPLI met the   level instrumentation under normal conditions and under various simulated test 10        system                performed during the factory                                      N/A Instrument (SFPLI) Factory                          specification functional requirements. conditions (e.g. steam exposure). The testing demonstrated the instrumentation functionality test      acceptance test. See #16 Acceptance Test (FAT)                                                                        met design accuracy and repeatability specifications.
U. S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 4 of7 Spent Fuel Pool instrumentation Functionality testing was 10 system performed during the factory functionality test acceptance test. See #16 procedure 11 Boron Build-Up Not applicable to Robinson Test and analyses were performed for the horn cover and Pool-side adhesive to demonstrate adequate 12 Bracket Seismic seismic withstand capability.
procedure Report for H.B. Robinson" 11        Boron Build-Up        Not applicable to Robinson                    N/A                 N/A                               N/A                                                           N/A Qualification analyses Doc.
Analysis Perform seismic induced sloshing analyses to assess hydrodynamic wave force on the radar horn.
51-9202556-005 and                                                                                                                                                          I supporting reference 174-9213558-006, Waveguide horns including the mounting are Calculations seismically qualified to EPRI TR-107330 or site-32-9208751-002, specific RRS.
Additional Brackets (Sensor Seismic withstand of sensor 13 Electronics and brackets and electronic enclosure Electronic mounting Enclosure)
32-9221237-003                                                                        The test and analyses of the horn cover and adhesive demonstrate adequate Test and analyses were                    51-9221 032-000                                                                      seismic withstand capability.
AREVA Doc. 51-9228351-000, "Through Air Radar Spent Fuel Pool Level Instrument (SFPLI) Factory Acceptance Test (FAT)
Testing and analyses horn cover and adhesive performed for the horn cover and          66-9225632-000 support the components can tolerate horizontal Pool-side          adhesive to demonstrate adequate          66-9225469-000                                                                        The vendor horn end assembly including the mounting can withstand the and vertical accelerations up to 1OOg and SFP 12        Bracket Seismic    seismic withstand capability.                                    NEI12-02, 3.4                                                   expected seismic and hydrodynamic loading caused by sloshing during a sloshing loads up to 3.37 psi.
Report for H.B. Robinson" N/A Qualification analyses Doc.
Analysis                                              Sloshing analyses was                                                                        postulated BDBEE.
51-9202556-005 and supporting reference 17 4-9213558-006, Calculations 32-9208751-002, 32-9221237-003 51-9221 032-000 66-9225632-000 66-9225469-000 Sloshing analyses was performed by an alternate vendor than the vendor whom supplied the radar level instrumentation Predicted loading from impact and drag due to slosh is calculated in Attachment AW-NAI-1809-004 Hydraulic Response Calc Qualification analyses Doc.
Perform seismic induced sloshing  performed by an alternate Seismic induced sloshing analyses concluded analyses to assess hydrodynamic    vendor than the vendor whom that wave impact on the horn end assembly is wave force on the radar horn.      supplied the radar level predicted and the expected combined instrumentation Predicted hydrodynamic and seismic forces are less than loading from impact and drag the allowable hydrodynamic and seismic forces.
51-9202556-005, Section 2.1, Appendix D and supporting references 11-9203036-002, EPRI TR-107330, 17 4-9213558-006 Calculations 32-9208751-002, 32-9221237-003 32-9221971-000 CPL-HBR2-S-001, Rev. 10, "Specifications for standard supports" The vendor factory acceptance test demonstrated reliable operation of the SFP N/A Testing demonstrated that the SFPLI met the level instrumentation under normal conditions and under various simulated test specification functional requirements.
due to slosh is calculated in Attachment AW- NAI-1809-004 Hydraulic Response Calc Qualification analyses Doc.
conditions (e.g. steam exposure). The testing demonstrated the instrumentation met design accuracy and repeatability specifications.
51-9202556-005, Section 2.1, Appendix D and supporting references Additional                                                    11-9203036-002, Brackets                                                    EPRI TR-107330, Seismic withstand of sensor          174-9213558-006                          Sensor brackets and electronic enclosure     Sensor brackets and electronic enclosure are qualified analytically and by seismic (Sensor 13                            brackets and electronic enclosure          Calculations        NEI 12-02, 3.4   mounting are seismically qualified to EPRI TR- testing to adequately demonstrates the equipment is capable of reliably operating Electronics and mounting                      32-9208751-002,                                107330 or site-specific RRS.         after a seismic event.
N/A N/A N/A I
Electronic Enclosure)                                                  32-9221237-003 32-9221971-000 CPL-HBR2-S-001, Rev. 10, "Specifications for standard supports"
Waveguide horns including the mounting are seismically qualified to EPRI TR-107330 or site-specific RRS.
The test and analyses of the horn cover and adhesive demonstrate adequate Testing and analyses horn cover and adhesive seismic withstand capability.
support the components can tolerate horizontal and vertical accelerations up to 1 OOg and SFP The vendor horn end assembly including the mounting can withstand the NEI12-02, 3.4 sloshing loads up to 3.37 psi.
expected seismic and hydrodynamic loading caused by sloshing during a postulated BDBEE.
Seismic induced sloshing analyses concluded that wave impact on the horn end assembly is predicted and the expected combined hydrodynamic and seismic forces are less than the allowable hydrodynamic and seismic forces.
Sensor brackets and electronic enclosure Sensor brackets and electronic enclosure are qualified analytically and by seismic NEI 12-02, 3.4 mounting are seismically qualified to EPRI TR-testing to adequately demonstrates the equipment is capable of reliably operating 1 07330 or site-specific RRS.
after a seismic event.  


U.S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 5 of7 Sensor, displays, and power control panel have been tested and/or analyzed for shock and vibration.
U.S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 5 of7 Shock and vibration withstand testing and analyses for sensor, displays, power control panel Shock &
The test parameter values provided in IEC Standards, IEC 60068-2-6 (vibration) and IEC 60068-2-27 (shock), tables are               .
Test and analyses were 14 Vibration performed for the horn cover and adhesive to demonstrate adequate shock withstand. Additional testing was performed for the power control panel assembly.
recommendations and not mandatory testmg levels. The test parameter values were selected to be consistent with previous shock and vibration testing performed on the VEGA supplied equipment. The test parameter values specified envelope the expected levels for the equipment installed location, du~ to_ the fact that the equipment is mounted to se1_sm1c st.ructure~
Qualification Analysis Doc. 51-9202556-005, Sections 2.2 and supporting references MIL-S-901 D, MIL-STD-167-1 38-9193058-000, EN 60068-2-27, 38-9218022-000, NEI 12-02, 3.4 EN 60068-2-6, 38-9218023-000, 51-9221032-000 66-9225632-000 32-9221237-003 66-9225469-000 38-922804 7-000 Sensor, displays, and power control panel have been tested and/or analyzed for shock and vibration.
The shock and vibration testing performed for the SFP level ins~rument~tion .
The test parameter values provided in IEC Standards, IEC 60068-2-6 (vibration) and IEC 60068-2-27 (shock), tables are recommendations and not mandatory testmg levels. The test parameter values were selected to be consistent with previous shock and vibration testing performed on the VEGA supplied equipment. The test parameter values specified envelope the expected levels for the equipment installed location, du~ to_ the fact that The shock and vibration testing performed for the SFP level ins~rument~tion.
the equipment is mounted to se1_sm1c st.ructure~
within the plant. This approach 1s cons1s~ent_w1th adequately demonstrates the sensor and power control panel Will be reliable m the similar technology used in the same application installed design location.
within the plant. This approach 1s cons1s~ent_w1th adequately demonstrates the sensor and power control panel Will be reliable m the similar technology used in the same application installed design location.
at other installations.
at other installations.
Qualification Analysis Doc. 51-9202556-005, Sections 2.2                                                                        Seismic Qualification of the VEGAPULS 62 ER syst~m, i~cluding ~he _Power The vibration testing deviated from the IEC and supporting references                                                                        Control Panels and VEGADIS 62 display is summanzed m the Se1sm1c Test Shock and vibration withstand                                                  60068-2-6 recommended frequency range and MIL-S-901 D,                                                                            Report. The system was qualified to an Areva supplied OBE and SSE_ eart~quake testing and analyses for sensor,                                                displacement magnitude for large power plant MIL-STD-167-1                                                                              which bounds site SSE. A seismic technical review of the vendor qualification displays, power control panel                                                equipment (TABLE C.2). In-lieu of the 10-55 Hz 38-9193058-000,                                                                            report per AD-EG-ALL-1126 Attachment 3 ~as p_erformed. The re~ort al~~
Seismic Qualification of the VEGAPULS 62 ER syst~m, i~cluding ~he _Power The vibration testing deviated from the IEC Control Panels and VEGADIS 62 display is summanzed m the Se1sm1c Test 60068-2-6 recommended frequency range and Report. The system was qualified to an Areva supplied OBE and SSE_ eart~quake displacement magnitude for large power plant which bounds site SSE. A seismic technical review of the vendor qualification equipment (TABLE C.2). In-lieu of the 10-55 Hz report per AD-EG-ALL-1126 Attachment 3 ~as p_erformed. The re~ort al~~
and minimum displacement of 0.15 mm EN 60068-2-27,                                                                            contains a discussion of environmental qualification of the system m add1t1?n to Shock &                  Test and analyses were                                                    recommended in TABLE C.2, the power and 14                                                                    38-9218022-000,          NEI 12-02, 3.4                                                    seismic loading. Control Room Indicators are lnternationallnstrum~nt~ wh1ch Vibration          performed for the horn cover and                                                control panel vibration testing utilized a narrower EN 60068-2-6,                                                                            have been used in Control Rooms for years in Safety-Related appllcat1on ..
and minimum displacement of 0.15 mm contains a discussion of environmental qualification of the system m add1t1?n to recommended in TABLE C.2, the power and seismic loading. Control Room Indicators are lnternationallnstrum~nt~ wh1ch control panel vibration testing utilized a narrower have been used in Control Rooms for years in Safety-Related appllcat1on..
adhesive to demonstrate adequate                                                frequency band (5-25 Hz) and a more limiting 38-9218023-000, shock withstand. Additional                                                  displacement magnitude (1.6 mm). These 51-9221032-000                                                                            The post modification testing will demonstrate reliable op~ratio~ of_ the   .
frequency band (5-25 Hz) and a more limiting displacement magnitude (1.6 mm). These The post modification testing will demonstrate reliable op~ratio~ of_ the values were deemed to be acceptable and instrumentation, which confirms no damage occurred dunng sh1ppm~, handling enveloping for equipment rigidly mounted to a and installation. Similarly, the performance of monthly channel funct1o~al Seismic Category I structure, based on comparisons will serve to confirm proper operation of the instrume~tat1on, or engineering judgment.
testing was performed for the                                                values were deemed to be acceptable and 66-9225632-000                                                                            instrumentation, which confirms no damage occurred dunng sh1ppm~, handling power control panel assembly.                                                  enveloping for equipment rigidly mounted to a 32-9221237-003                                                                            and installation. Similarly, the performance of monthly channel funct1o~al Seismic Category I structure, based on 66-9225469-000                                                                            comparisons will serve to confirm proper operation of the instrume~tat1on, or engineering judgment.
provide a means of early detection of potential instrument degradation.
38-9228047-000                                                                            provide a means of early detection of potential instrument degradation.
The shock testing deviated from the IEC 60068-The test and analyses of the horn cover and adhesive demonstrate adequate 2-27 recommended peak acceleration and capability to withstand shock and vibration.
The shock testing deviated from the IEC 60068-The test and analyses of the horn cover and adhesive demonstrate adequate 2-27 recommended peak acceleration and capability to withstand shock and vibration.
duration for land-based permanently installed equipment. In-lieu of the 15 g's peak acceleration and duration of 11 m-sec recommended in TABLE A.1, the power and control panel vibration testing utilized an~
duration for land-based permanently installed equipment. In-lieu of the 15 g's peak acceleration and duration of 11 m-sec recommended in TABLE A.1, the power and control panel vibration testing utilized an~
acceleration of 1Og with a 6 m-sec durat1on.
acceleration of 1 Og with a 6 m-sec durat1on.
These values were deemed to be acceptable and enveloping for equipment rigidly mounted to a seismic Category I structure, based on engineering judgment.
These values were deemed to be acceptable and enveloping for equipment rigidly mounted to a seismic Category I structure, based on engineering judgment.
Testing and analyses horn cover and adhesive support the components can tolerate horizontal and vertical accelerations up to 1OOg and SFP sloshino loads up to 3.37 psi.
Testing and analyses horn cover and adhesive support the components can tolerate horizontal and vertical accelerations up to 1 OOg and SFP sloshino loads up to 3.37 psi.  


U.S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 6 of7 Requirements 15                            Not required by order                             N/A                        N/A                                N/A                                                                  N/A Traceability AREVA Doc. 51-9228351-Inspection of waveguide, test of  000, "Through Air Radar The vendor factory acceptance test demonstrated reliable operation of the SFP Factory            functionality of power transfer to Spent Fuel Pool Level Test demonstrates that specification         level instrumentation under normal conditions and under various simulated test 16        Acceptance            battery, sensor measurement      Instrument (SFPLI) Factory                N/A requirements were met.               conditions (e.g. steam exposure). The testing demonstrated the instrumentation Test              accuracy and effects of steam and        Acceptance Test (FAT) met design accuracy and repeatability specifications.
U.S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 6 of7 Requirements Not required by order 15 Traceability Inspection of waveguide, test of Factory functionality of power transfer to 16 Acceptance battery, sensor measurement Test accuracy and effects of steam and water in waveguide Normal and accident conditions 17 Channel Accuracy SFP level measurement accuracy Power Lifetime of battery backup at full 18 Consumption load Technical Application-specific information on 19 the installation, operation, and Manual maintenance of the SFPLI Periodic indication checks, 20 Calibration calibration checks, calibration N/A AREVA Doc. 51-9228351-000, "Through Air Radar Spent Fuel Pool Level Instrument (SFPLI) Factory Acceptance Test (FAT)
water in waveguide            Report for H.B. Robinson" EC 89580 Attachment AA -                          Normal conditions accuracy +/-1 inch, error due to The vendor factory acceptance test demonstrated reliable operation of the SFP 01-9228622-002_Robinson                              all effects including 212°F saturated steam +/-3 Channel              Normal and accident conditions                                        EA-12-051, 1.7                                                        level instrumentation under normal conditions and under various simulated test 17                                                                      Instruction Manual                                                  inches.
Report for H.B. Robinson" EC 89580 Attachment AA -
Accuracy          SFP level measurement accuracy                                          NEI12-02, 3.7                                                         conditions (e.g. steam exposure). The testing demonstrated the instrumentation Accuracy verified during factory acceptance met design accuracy and repeatability specifications.
01-9228622-002_Robinson Instruction Manual Qualification Analysis Doc. 51-9202556-005, Section 2.9, EC 89580 Attachment AA 9228622-002_Robinson Instruction Manual Section 12 Attachment AA- 01-9228622-002_Robinson Instruction Manual Attachment AA- 01-9228622-002_Robinson Instruction Manual Sections 7.0 and 9.1 N/A N/A N/A The vendor factory acceptance test demonstrated reliable operation of the SFP Test demonstrates that specification level instrumentation under normal conditions and under various simulated test N/A requirements were met.
conditions (e.g. steam exposure). The testing demonstrated the instrumentation met design accuracy and repeatability specifications.
Normal conditions accuracy +/-1 inch, error due to The vendor factory acceptance test demonstrated reliable operation of the SFP EA-12-051, 1.7 all effects including 212°F saturated steam +/-3 level instrumentation under normal conditions and under various simulated test NEI12-02, 3.7 inches.
conditions (e.g. steam exposure). The testing demonstrated the instrumentation Accuracy verified during factory acceptance met design accuracy and repeatability specifications.
testing.
testing.
Qualification Analysis Doc. 51-Based on vendor analyses the battery capacity is deemed sufficient to support 9202556-005, Section 2.9, EC Power              Lifetime of battery backup at full                                    EA-12-051, 1.6,                                                       reliable instrument channel operation until off-site resources can be deployed by 18                                                                  89580 Attachment AA                            Battery capacity at full load is expected to easily Consumption                        load                                                  NEI 12-02, 3.6                                                       the mitigating strategies in response to Order EA-12-049.
Based on vendor analyses the battery capacity is deemed sufficient to support EA-12-051, 1.6, Battery capacity at full load is expected to easily reliable instrument channel operation until off-site resources can be deployed by NEI 12-02, 3.6 the mitigating strategies in response to Order EA-12-049.
9228622-002_Robinson                                              exceed 72 hours.
exceed 72 hours.
Instruction Manual Section 12 Application-specific information on  Attachment AA- 01-9228622-                                                                              The vendor technical manual has been reviewed, accepted and incorporated in Technical                                                                                                                            N/A 19                            the installation, operation, and      002_Robinson Instruction              N/A Manual                                                                                                                                                          the engineering change package.
N/A The vendor technical manual has been reviewed, accepted and incorporated in N/A the engineering change package.
maintenance of the SFPLI                    Manual EA-12-051, 1.8 NEI 12-02, 3.8 Based on negligible drift rate of VEGA electronics experienced over Attachment AA- 01-9228622-        large user base,                                                       The vendor technical manual has been reviewed, accepted and incorporated in Periodic indication checks,        002_Robinson Instruction    periodic calibration                                                     the engineering change package.
EA-12-051, 1.8 NEI 12-02, 3.8 Based on negligible drift rate of VEGA electronics experienced over large user base, The vendor technical manual has been reviewed, accepted and incorporated in periodic calibration N/A the engineering change package.
20        Calibration                                                                                                                          N/A calibration checks, calibration              Manual                is not needed.
is not needed.
Sections 7.0 and 9.1            Functional verification can be achieved using cross channel checks and functional checks
Functional verification can be achieved using cross channel checks and functional checks  
                                                                                                      *per vendor manual.
*per vendor manual.  


U.S . Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 7 of7 Failure Modes                                                                                                                         The instrumentation is required to function to provide SFP level indication for a and Effects                                                                                                                          beyond design bases event. Performance of a FMEA is not warranted for this 21            Analysis                                                    N/A              N/A                         N/A                     type of an application . Reasonable assurance that both channels are not N/A (FMEA)                                                                                                                            susceptible to a common mode failure is provided by satisfying the NEI 12-02 guidance.
U.S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 7 of7 Failure Modes and Effects 21 Analysis (FMEA)
Qualification Analysis Doc. 51-9202556-005, Section 2.6 and                                                        The EMI/RFI susceptibility and emissions testing performed for the waveguide supporting references                                                            radar transmitter provides adequate assurance the instrumentation will be 58-9214362-000,                                                              compatible in the design location . The testing was conservatively performed with 38-9218963-000,                                                              unshielded interconnecting wiring.
N/A 22 EM! Testing Emissions and susceptibility testing for VEGAPULS 62 ER N/A Qualification Analysis Doc. 51-9202556-005, Section 2.6 and supporting references 58-9214362-000, 38-9218963-000, 38-9218965-000, 38-9218966-000, 38-9218962-000, 38-9218967-000, 38-9218968-000, 38-9218969-000, 38-9218970-000, 38-9218964-000 The instrumentation is required to function to provide SFP level indication for a beyond design bases event. Performance of a FMEA is not warranted for this N/A N/A type of an application. Reasonable assurance that both channels are not susceptible to a common mode failure is provided by satisfying the NEI 12-02 guidance.
38-9218965-000,                  VEGAPULS 62 ER has been tested for Emissions and susceptibility                                                                                    Post-modification testing will further demonstrate acceptable operation in the 22        EM! Testing                                              38-9218966-000,          N/A emissions to both MIL and IEC standards and for testing for VEGAPULS 62 ER                                                                                        installed location.
The EMI/RFI susceptibility and emissions testing performed for the waveguide radar transmitter provides adequate assurance the instrumentation will be compatible in the design location. The testing was conservatively performed with unshielded interconnecting wiring.
38-9218962-000,                      susceptibility to IEC standards 38-9218967-000, 38-9218968-000,                                                              During a postulated BDBEE, it is possible that intermittent UHF radio operation 38-9218969-000,                                                              could occur in the vicinity of the radar transmitter. Successful long-term SFP 38-9218970-000,                                                              monitoring capability during a postulated BDBEE would not be inhibited by 38-9218964-000                                                              potential intermittent radio transmission interference.}}
VEGAPULS 62 ER has been tested for N/A emissions to both MIL and IEC standards and for Post-modification testing will further demonstrate acceptable operation in the susceptibility to IEC standards installed location.
During a postulated BDBEE, it is possible that intermittent UHF radio operation could occur in the vicinity of the radar transmitter. Successful long-term SFP monitoring capability during a postulated BDBEE would not be inhibited by potential intermittent radio transmission interference.}}

Latest revision as of 10:37, 10 January 2025

Completion of Required Actions for NRC Order EA-12-051 with Regard to Reliable Spent Fuel Pool Level Instrumentation
ML15187A229
Person / Time
Site: Robinson 
Issue date: 06/27/2015
From: Glover R
Duke Energy Corp, Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-051, RNP-RA/15-0040
Download: ML15187A229 (32)


Text

U.S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 2 of7 GENERIC DESIGN INFORMATION TEMPLATE FOR RNP I

Topic I

Parameter Summary I

Vendor Design Reference I Document#

EC 89580, Attachment D -

1 1 Design I Customer technical requirements I NCP-Z-0006, Rev. 0- SFP Wide 1

Specification specification for SFPLI Range Level Instrumentation Remote Level Sensors.pdf Qualification is based on a I

Qualification analyses Doc.

combination of tests and analyses 51-9202556-005 or similarity as described below.

2 Test Strategy I Qualification tests and analyses 32-9221237-are summarized in qualification 003_Calc_Qualification for a analyses report 51-9202556-005.

Waveguide Support and Horn End Assembly Environmental qualification for Qualification Analyses Doc.

3 electronics Temperature, humidity and dose 51-9202556-005 Section 2.3 enclosure with display Measurement capability through saturated steam and smoke.

Testing performed to demonstrate the radar horn cover was effective Environmental at preventing moisture intrusion Qualification Analyses Doc.

testing for level within the horn and wave guide 51-9202556-005, Section 2.3, sensor pipe.

2.4, 2.5, 2.7, Appendix Band components in supporting references SFP area-Radar horn cover (fused silica 66-9200846-002 4

Saturated glass), metal waveguide pipe and 51-9220845-001 steam &

horn are not susceptible to 51-9221032-000 radiation radiation degradation.

66-9225632-000 Manufacturer test data supports acceptable radiation degradation resistance for the radar horn cover adhesive.

Qualification Analyses Doc.

51-9202556-005, Sections Environmental 2.3, 2.5, Appendix A and testing for level Temperature and humidity testing supporting references sensor and analysis of sensor and 38-9218218-000, electronics indication 38-9218214-000, housing-USNRC Bulletin 79-01 B Table 5

outside SFP C-1, Reg. Guide 1.209 Additional Comments EA-12-051, NEI-12-02 EA-12-051, 1.4 NEI-12-02, 3.4 NEI 12-02, 3.4 EA-12-051, 1.4 NEI 12-02, 3.4 NEI 12-02, 3.4 Test or Analysis Results N/A Test and analyses results meet requirements of EA 21-051, JLD-ISG-2012-03, and NEI12-02 Rev. 1-Temperature rating of Power Control Panel 149°F allowing for 9°F rise above ambient.

NEMA 4X enclosure prevents moisture intrusion.

Radiation withstand analyzed to 1 x1 03 Rads Initial testing (without horn cover) demonstrated successful measurement capability through steam and smoke. Subsequent testing of the radar horn and cover demonstrated adequate operation during sustained simulated SFP boiling conditions, and that the horn cover was effective in preventing moisture intrusion within the horn and wave guide pipe.

The horn cover adhesive is a silicone elastomer manufactured by Down Corning (Sylgard 170).

The adhesive manufacturer radiation test data adequately demonstrates the adhesive would not experience unacceptable degradation for exposures up to 1.64 x1 08 Rads.

Sensor and indication are demonstrated to withstand the manufacturer ratings 80°C (sensor) and 70°C (indication), 100% RH. Radiation withstand analyzed to 1 x1 03 Rads.

Licensee Evaluation The vendor instrumentation design was reviewed and determined to adequately meet the specification requirements.

The vendor qualification documentation was reviewed and concluded to adequately demonstrate the instrumentation could reliably function in its installed environment(s) during a postulated Beyond Design Bases External Event (BDBEE).

The primary channel instrumentation electronics are located outside the SFP area. The vendor instrumentation design temperature, humidity, and dose limits bound the expected environmental conditions during a postulated BDBEE.

The radar horn cover qualification testing adequately demonstrated acceptable operation during exposure to simulated SFP boiling conditions.

The horn cover adhesive manufacturer radiation test data adequately demonstrated the adhesive would not experience unacceptable degradation for radiation exposure in excess of that expected for the postulated beyond design bases event over the required mission time.

The level sensor electronic housing are located outside the SFP area. The vendor instrumentation design temperature, humidity, and dose limits bound the expected environmental conditions during a postulated BDBEE.

U. S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 3 of7 Topic Parameter Summary Radar horn cover (fused silica glass), metal waveguide pipe and Thermal &

horn are not susceptible to Radiation Aging radiation degradation.

6

- organic components in Horn cover adhesive manufacturer SFP area radiation test data and temperature withstand specifications.

SFPLI remote transmitter and Basis for Dose power control panel qualified to Requirement 1 x1 03 Rads based on industry operating experience.

7 Based on engineering judgment, the expected total integrated dose for the radar horn cover adhesive would not exceed 1 x1 06 Rads over the required mission time for the instrumentation.

Seismic withstand capability of Seismic VEGAPULS 62 ER sensor,

8 Qualification indicators, power control panel, mounting brackets, waveguide pipe Sloshing NRC RAis indicated a SFP seismic induced sloshing analyses is required. If wave impact is predicted, then the hydrodynamic forces should be included in the mounting design loading 9

combinations.

Vendor Design Reference Document#

Qualification analyses Doc.

51-9202556-005, Section 2.5 51-9221032-000 66-9225632-000 AREVA Document No. 51 -

9202556-005, Qualification Analysis of VEGAPULS 62 ER Through Air Radar 51-9221032-000 66-9225632-000 Qualification analyses Doc.

51-9202556-005, Section 2.1, Appendix D and supporting references 11-9203036-000, 17 4-9213558-006 Allowable seismic combined with hydrodynamic loading that the horn mounting can withstand is analyzed in 32-9221237-003.

Predicted loading from impact and drag due to slosh is calculated in Attachment BH 9221237-003 Calc Qualification for a Waveguide Support and Horn End Assembly. verification and sensitivity study to predict slosh phenomena is evaluated in Attachment AW, NAI-1809-004 Hydraulic Response Calc.

Additional Licensee Evaluation Test or Analysis Results Comments Thermal and radiation aging not applicable to metal waveguide in SFP area. The horn cover The glass and metallic instrumentation components located within the SFP area adhesive is a silicone elastomer manufactured are not susceptible to aging due to thermal and/or radiation effects.

by Down Corning (Sylgard 170). The adhesive manufacturer radiation test data adequately The horn cover adhesive manufacturer radiation test data adequately EA-12-051, 1.4 demonstrates the adhesive would not experience demonstrated the adhesive would not experience unacceptable degradation for NEI12-02, 3.4 unacceptable degradation for exposures up to radiation exposure in excess of that expected for the postulated bey?nd design 1.64 x106 Rads. The silicone adhesive is rated bases event over the required mission time. The horn cover adhes1ve to withstand temperatures extremes of -45 to temperature ratings are acceptable and readily bound the expected conditions for 200°C, which adequately bound the postulated the postulated beyond design bases event.

temperatures for sustained SFP boiling conditions.

Analyses based on operating experience A location specific dose calculation was performed for the remot~ electr?nics, concludes the electronics are not susceptible to which demonstrated the sensor total integrated dose (TID) over 1ts requ1red degraded performance up to this dose threshold.

mission time is enveloped by the vendor instrumentation design limit of 1 x1 03 The adhesive manufacturer radiation test data Rads.

NEI12-02, 3.4 adequately demonstrates the adhesive would not The horn cover adhesive manufacturer radiation test data adequately experience unacceptable degradation for demonstrated the adhesive would not experience unacceptable degradation for exposures up to 1.64 x1 06 Rads.

radiation exposure in excess of that expected for the postulated beyond design bases event over the required mission time.

VEGAPULS 62 ER sensor, indicators, power The vendor instrumentation seismic testing adequately demonstrates the NEI 1-02, 3.4 control panel, mounting brackets, waveguide equipment is capable of reliably operating during a seismic event.

pipe are seismically qualified toRRS levels from EPRI TR-1 07330 Seismic induced sloshing analyses concluded that wave impact on the horn end assembly is The vendor horn end mounting can withstand the expected seismic and N/A predicted and the expected combined hydrodynamic loading caused by sloshing during a postulated BDBEE.

hydrodynamic and seismic forces are less than the allowable hydrodynamic and seismic forces.

U. S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 4 of7 Spent Fuel Pool instrumentation Functionality testing was 10 system performed during the factory functionality test acceptance test. See #16 procedure 11 Boron Build-Up Not applicable to Robinson Test and analyses were performed for the horn cover and Pool-side adhesive to demonstrate adequate 12 Bracket Seismic seismic withstand capability.

Analysis Perform seismic induced sloshing analyses to assess hydrodynamic wave force on the radar horn.

Additional Brackets (Sensor Seismic withstand of sensor 13 Electronics and brackets and electronic enclosure Electronic mounting Enclosure)

AREVA Doc. 51-9228351-000, "Through Air Radar Spent Fuel Pool Level Instrument (SFPLI) Factory Acceptance Test (FAT)

Report for H.B. Robinson" N/A Qualification analyses Doc.

51-9202556-005 and supporting reference 17 4-9213558-006, Calculations 32-9208751-002, 32-9221237-003 51-9221 032-000 66-9225632-000 66-9225469-000 Sloshing analyses was performed by an alternate vendor than the vendor whom supplied the radar level instrumentation Predicted loading from impact and drag due to slosh is calculated in Attachment AW-NAI-1809-004 Hydraulic Response Calc Qualification analyses Doc.

51-9202556-005, Section 2.1, Appendix D and supporting references 11-9203036-002, EPRI TR-107330, 17 4-9213558-006 Calculations 32-9208751-002, 32-9221237-003 32-9221971-000 CPL-HBR2-S-001, Rev. 10, "Specifications for standard supports" The vendor factory acceptance test demonstrated reliable operation of the SFP N/A Testing demonstrated that the SFPLI met the level instrumentation under normal conditions and under various simulated test specification functional requirements.

conditions (e.g. steam exposure). The testing demonstrated the instrumentation met design accuracy and repeatability specifications.

N/A N/A N/A I

Waveguide horns including the mounting are seismically qualified to EPRI TR-107330 or site-specific RRS.

The test and analyses of the horn cover and adhesive demonstrate adequate Testing and analyses horn cover and adhesive seismic withstand capability.

support the components can tolerate horizontal and vertical accelerations up to 1 OOg and SFP The vendor horn end assembly including the mounting can withstand the NEI12-02, 3.4 sloshing loads up to 3.37 psi.

expected seismic and hydrodynamic loading caused by sloshing during a postulated BDBEE.

Seismic induced sloshing analyses concluded that wave impact on the horn end assembly is predicted and the expected combined hydrodynamic and seismic forces are less than the allowable hydrodynamic and seismic forces.

Sensor brackets and electronic enclosure Sensor brackets and electronic enclosure are qualified analytically and by seismic NEI 12-02, 3.4 mounting are seismically qualified to EPRI TR-testing to adequately demonstrates the equipment is capable of reliably operating 1 07330 or site-specific RRS.

after a seismic event.

U.S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 5 of7 Shock and vibration withstand testing and analyses for sensor, displays, power control panel Shock &

Test and analyses were 14 Vibration performed for the horn cover and adhesive to demonstrate adequate shock withstand. Additional testing was performed for the power control panel assembly.

Qualification Analysis Doc. 51-9202556-005, Sections 2.2 and supporting references MIL-S-901 D, MIL-STD-167-1 38-9193058-000, EN 60068-2-27, 38-9218022-000, NEI 12-02, 3.4 EN 60068-2-6, 38-9218023-000, 51-9221032-000 66-9225632-000 32-9221237-003 66-9225469-000 38-922804 7-000 Sensor, displays, and power control panel have been tested and/or analyzed for shock and vibration.

The test parameter values provided in IEC Standards, IEC 60068-2-6 (vibration) and IEC 60068-2-27 (shock), tables are recommendations and not mandatory testmg levels. The test parameter values were selected to be consistent with previous shock and vibration testing performed on the VEGA supplied equipment. The test parameter values specified envelope the expected levels for the equipment installed location, du~ to_ the fact that The shock and vibration testing performed for the SFP level ins~rument~tion.

the equipment is mounted to se1_sm1c st.ructure~

within the plant. This approach 1s cons1s~ent_w1th adequately demonstrates the sensor and power control panel Will be reliable m the similar technology used in the same application installed design location.

at other installations.

Seismic Qualification of the VEGAPULS 62 ER syst~m, i~cluding ~he _Power The vibration testing deviated from the IEC Control Panels and VEGADIS 62 display is summanzed m the Se1sm1c Test 60068-2-6 recommended frequency range and Report. The system was qualified to an Areva supplied OBE and SSE_ eart~quake displacement magnitude for large power plant which bounds site SSE. A seismic technical review of the vendor qualification equipment (TABLE C.2). In-lieu of the 10-55 Hz report per AD-EG-ALL-1126 Attachment 3 ~as p_erformed. The re~ort al~~

and minimum displacement of 0.15 mm contains a discussion of environmental qualification of the system m add1t1?n to recommended in TABLE C.2, the power and seismic loading. Control Room Indicators are lnternationallnstrum~nt~ wh1ch control panel vibration testing utilized a narrower have been used in Control Rooms for years in Safety-Related appllcat1on..

frequency band (5-25 Hz) and a more limiting displacement magnitude (1.6 mm). These The post modification testing will demonstrate reliable op~ratio~ of_ the values were deemed to be acceptable and instrumentation, which confirms no damage occurred dunng sh1ppm~, handling enveloping for equipment rigidly mounted to a and installation. Similarly, the performance of monthly channel funct1o~al Seismic Category I structure, based on comparisons will serve to confirm proper operation of the instrume~tat1on, or engineering judgment.

provide a means of early detection of potential instrument degradation.

The shock testing deviated from the IEC 60068-The test and analyses of the horn cover and adhesive demonstrate adequate 2-27 recommended peak acceleration and capability to withstand shock and vibration.

duration for land-based permanently installed equipment. In-lieu of the 15 g's peak acceleration and duration of 11 m-sec recommended in TABLE A.1, the power and control panel vibration testing utilized an~

acceleration of 1 Og with a 6 m-sec durat1on.

These values were deemed to be acceptable and enveloping for equipment rigidly mounted to a seismic Category I structure, based on engineering judgment.

Testing and analyses horn cover and adhesive support the components can tolerate horizontal and vertical accelerations up to 1 OOg and SFP sloshino loads up to 3.37 psi.

U.S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 6 of7 Requirements Not required by order 15 Traceability Inspection of waveguide, test of Factory functionality of power transfer to 16 Acceptance battery, sensor measurement Test accuracy and effects of steam and water in waveguide Normal and accident conditions 17 Channel Accuracy SFP level measurement accuracy Power Lifetime of battery backup at full 18 Consumption load Technical Application-specific information on 19 the installation, operation, and Manual maintenance of the SFPLI Periodic indication checks, 20 Calibration calibration checks, calibration N/A AREVA Doc. 51-9228351-000, "Through Air Radar Spent Fuel Pool Level Instrument (SFPLI) Factory Acceptance Test (FAT)

Report for H.B. Robinson" EC 89580 Attachment AA -

01-9228622-002_Robinson Instruction Manual Qualification Analysis Doc. 51-9202556-005, Section 2.9, EC 89580 Attachment AA 9228622-002_Robinson Instruction Manual Section 12 Attachment AA- 01-9228622-002_Robinson Instruction Manual Attachment AA- 01-9228622-002_Robinson Instruction Manual Sections 7.0 and 9.1 N/A N/A N/A The vendor factory acceptance test demonstrated reliable operation of the SFP Test demonstrates that specification level instrumentation under normal conditions and under various simulated test N/A requirements were met.

conditions (e.g. steam exposure). The testing demonstrated the instrumentation met design accuracy and repeatability specifications.

Normal conditions accuracy +/-1 inch, error due to The vendor factory acceptance test demonstrated reliable operation of the SFP EA-12-051, 1.7 all effects including 212°F saturated steam +/-3 level instrumentation under normal conditions and under various simulated test NEI12-02, 3.7 inches.

conditions (e.g. steam exposure). The testing demonstrated the instrumentation Accuracy verified during factory acceptance met design accuracy and repeatability specifications.

testing.

Based on vendor analyses the battery capacity is deemed sufficient to support EA-12-051, 1.6, Battery capacity at full load is expected to easily reliable instrument channel operation until off-site resources can be deployed by NEI 12-02, 3.6 the mitigating strategies in response to Order EA-12-049.

exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

N/A The vendor technical manual has been reviewed, accepted and incorporated in N/A the engineering change package.

EA-12-051, 1.8 NEI 12-02, 3.8 Based on negligible drift rate of VEGA electronics experienced over large user base, The vendor technical manual has been reviewed, accepted and incorporated in periodic calibration N/A the engineering change package.

is not needed.

Functional verification can be achieved using cross channel checks and functional checks

  • per vendor manual.

U.S. Nuclear Regulatory Commission to Serial: RNP-RA/15-0040 Page 7 of7 Failure Modes and Effects 21 Analysis (FMEA)

N/A 22 EM! Testing Emissions and susceptibility testing for VEGAPULS 62 ER N/A Qualification Analysis Doc. 51-9202556-005, Section 2.6 and supporting references 58-9214362-000, 38-9218963-000, 38-9218965-000, 38-9218966-000, 38-9218962-000, 38-9218967-000, 38-9218968-000, 38-9218969-000, 38-9218970-000, 38-9218964-000 The instrumentation is required to function to provide SFP level indication for a beyond design bases event. Performance of a FMEA is not warranted for this N/A N/A type of an application. Reasonable assurance that both channels are not susceptible to a common mode failure is provided by satisfying the NEI 12-02 guidance.

The EMI/RFI susceptibility and emissions testing performed for the waveguide radar transmitter provides adequate assurance the instrumentation will be compatible in the design location. The testing was conservatively performed with unshielded interconnecting wiring.

VEGAPULS 62 ER has been tested for N/A emissions to both MIL and IEC standards and for Post-modification testing will further demonstrate acceptable operation in the susceptibility to IEC standards installed location.

During a postulated BDBEE, it is possible that intermittent UHF radio operation could occur in the vicinity of the radar transmitter. Successful long-term SFP monitoring capability during a postulated BDBEE would not be inhibited by potential intermittent radio transmission interference.