{{#Wiki_filter:FENOC^           \                                                                       5501 North StateRoute2 Oak Harbon Ohio 43449 FirstEnergy  Nuclear
{{#Wiki_filter:FENOC^
                  @eratingCompany Brirn D. fules                                                                                      419-321-7676 WcePresident,Nuelear February     9, 2016 L-16-003                                                               10 cFR 2.2A2 ATTN: Document       ControlDesk U.S.NuclearRegulatory      Commission Washington,     DC 20555-001
\\
Fi rstEnergy Nuclear
@erating Company 5501 North State Route 2 Oak Harbon Ohio 43449 419-321-7676 Brirn D. fules Wce President, Nuelear February 9, 2016 L-16-003 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-001 10 cFR 2.2A2


==SUBJECT:==
==SUBJECT:==
Davis-Besse Nuclear Power Station Docket No. 50-346, License No. NPF-3 FirstEnerqy_Nyclear Operating Company's (FENOC's\\ S.ixth Six-Month Status Report in


Davis-Besse    NuclearPowerStation DocketNo.50-346,LicenseNo. NPF-3 FirstEnerqy_Nyclear  OperatingCompany's(FENOC's\S.ixthSix-MonthStatusReportin Response     to March12.2012Commission        OrderModilyino  LicenseswithReoardto ReliableSpent-F-uel   PoolInstrumentation  (OrderNumberEA-12-051)
===Response===
(CACNo.MF0960)
to March 12. 2012 Commission Order Modilyino Licenses with Reoard to Reliable Spent-F-uel Pool Instrumentation (Order Number EA-12-051)
On March12,2A12,the NuclearRegulatory          Commission   (NRCor Commission)   issued an order(Reference   1) to FENOC.Reference1 was immediately         effectiveanddirects FENOCto havea reliableindicationof the waterlevelin associated         spentfuelstorage pools. Specificrequirements    are outlinedin Attachment 2 of Reference1.
(CAC No. MF0960)
Reference1 requiredsubmission      of an initialstatusreport60 daysfollowingissuanceof the finalinterimstaff guidance   (Reference 2) and an overallintegratedplanpursuantto SectionlV, ConditionC. Referen     ce 2 endorsesindustryguidancedocumentNuclear Energy           (NEI)
On March 1 2,2A12, the Nuclear Regulatory Commission (NRC or Commission) issued an order (Reference
Institute    12-A2,Revision1 (Reference                         andexeeptions
: 1) to FENOC. Reference 1 was immediately effective and directs FENOC to have a reliable indication of the water level in associated spent fuel storage pools. Specific requirements are outlined in Attachment 2 of Reference 1.
: 3) withclarifications identifiedin Reference   2. Referen e 4 providedthe FENOCinitialstatusreport regardingrequirements    for reliablespentfuelpoolinstrumentation. Reference5 providedthe FENOCoverallintegratedplanfor BeaverValleyPowerStation(BVPS),
Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance (Reference
UnitNos.1 and2, Davis-Besse       NuclearPowerStation(DBNPS),       and PerryNuclear PowerPlant(PNPP).
: 2) and an overall integrated plan pursuant to Section lV, Condition C. Referen ce 2 endorses industry guidance document Nuclear Energy Institute (NEI) 12-A2, Revision 1 (Reference
Reference1 requiressubmissionof a statusreportat six-monthintervalsfollowing submittalof the overallintegratedplan. Reference     3 providesdirectionregardingthe contentof the statusreports.The purposeof this letteris to providethe sixth
: 3) with clarifications and exeeptions identified in Reference
: 2. Referen e 4 provided the FENOC initial status report regarding requirements for reliable spent fuel pool instrumentation.
Reference 5 provided the FENOC overall integrated plan for Beaver Valley Power Station (BVPS),
Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station (DBNPS),
and Perry Nuclear Power Plant (PNPP).
Reference 1 requires submission of a status report at six-month intervals following submittal of the overall integrated plan. Reference 3 provides direction regarding the content of the status reports. The purpose of this letter is to provide the sixth


Davis-Besse   NuclearPowerStation L-16-003 Page2 six-monthstatusreportpursuantto SectionlV, ConditionC.2,of Reference1,that delineates progressmadein implementing   the requirements of Reference   1. The attachedreportfor DBNPSprovidesan updateof milestoneaccomplishments            sincethe laststatusreport,including anychangesto the compliance   method,schedule,   or need for relief/relaxation andthe basis,if any.
Davis-Besse Nuclear Power Station L-16-003 Page 2 six-month status report pursuant to Section lV, Condition C.2, of Reference 1, that delineates progress made in implementing the requirements of Reference
The NRCstaffalsoissuedan interimstaffevaluation(Reference       6) that included requestsfor additionalinformation  (RAls). The NRCstaffsubsequently    indicatedthe intentionto completethe ongoingreviewof the responses     to Reference1 by conducting auditsand utilizingthe ePortalsystemfor reviewof RAl responses(Reference       7). The attachedreporthasbeenupdatedto reflectthis      process change.
: 1. The attached report for DBNPS provides an update of milestone accomplishments since the last status report, including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.
This lettercontainsno newregulatorycommitments.lf you haveanyquestions regardingthis report,pleasecontactMr.ThomasA. Lentz,Manager- FleetLicensing, at 330-315-0810.
The NRC staff also issued an interim staff evaluation (Reference
I declareun{er penalty
: 6) that included requests for additional information (RAls). The NRC staff subsequently indicated the intention to complete the ongoing review of the responses to Reference 1 by conducting audits and utilizing the ePortal system for review of RAl responses (Reference 7). The attached report has been updated to reflect this process change.
                ',      of perjurythatthe foregoingis trueand correct.Executedon February _q       zo1o.
This letter contains no new regulatory commitments. lf you have any questions regarding this report, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at 330-315-0810.
I declare un{er penalty of perjury that the foregoing is true and correct. Executed on February
_q  
', zo1o.
Respectfully,
Respectfully,
#*/#e^
#*/#e^
BrianD. Boles
Brian D. Boles


==Attachment:==
==Attachment:==
Davis-Besse Nuclear Power Station Six'th Six-Month Status Report for the lmplementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation


Davis-Besse  NuclearPowerStationSix'thSix-MonthStatusReportfor the lmplementation  of OrderEA-12-051,   OrderModifyingLicenseswith Regardto ReliableSpentFuelPoolInstrumentation
==References:==
: 1.
NRC Order Number EA-12-051
, Order Modifoing Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated March 12,2012.
: 2.
NRC Interim Staff Guidance JLD-ISG
-2012-A3, Compliance with Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool lnstrumentation, Revision 0, dated August 29, 2412.
: 3.
NEI 1 2-02,Industry Guidance for Compliance with NRC Order EA-12-A51, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,"
Revision 1, dated August 2012.
FirstEnergy Nuclear Operating Company's (FENOC's)
Initial Status Report in Response to March 12,2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool lnstrumentation (Order Number EA-1 2-051), dated October 26, 2012.
FirstEnergy Nuclear Operating Company's (FENOC's)
Overall Integrated Plan in Response to March 12,2012 Commission Order lssuance of Order to Modify 4.
5.


==References:==
Davis-Besse Nuclear Power Station L-16-003 Page 3 cc:
: 1. NRCOrderNumberEA-12-051         , OrderModifoing  Licenses withRegardto Reliable SpentFuelPoolInstrumentation,   datedMarch12,2012.
6.
: 2. NRCInterimStaffGuidanceJLD-ISG          -2012-A3,Compliance  withOrderEA-12-051, OrderModifyingLicenseswith Regardto ReliableSpent      Fuel Pool lnstrumentation, Revision0, datedAugust29, 2412.
7.
: 3. NEI  12-02,Industry Guidance  for Compliance withNRCOrderEA-12-A51,       "To ModifyLicenses  withRegardto ReliableSpentFuelPoolInstrumentation,"
Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-1 2-051), dated February 27, 2013.
Revision 1, datedAugust2012.
Davis-Besse Nuclear Power Plant Unit No. 1 - Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for f mpfementation of Order EA-1 2-051, Reliable Spent Fuel Pool Instrumentation, dated December 11,2013.
: 4. FirstEnergy    NuclearOperating  Company's  (FENOC's)  InitialStatusReportin Responseto March12,2012,Commission        OrderModifyingLicenseswithRegard to Requirements  for ReliableSpentFuelPoollnstrumentation    (OrderNumber EA-12-051),datedOctober26, 2012.
NRC Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051, dated March 26,2014,
5 . FirstEnergy  NuclearOperating  Company's  (FENOC's)   OverallIntegrated  Planin Responseto March12,2012Commission        Orderlssuanceof Orderto Modify
: Director, Office of Nuclear Reactor Regulation (NRR)
NRC Region lll Administrator NRC Resident Inspector NRC Project Manager Ms. Lisa M. Regner, NRR/JLD/PMB, NRC Mr. Blake A. Purnell, NRR/JLD/PMB, NRC Utility Radiological Safety Board (without Attachment)


Davis-Besse NuclearPowerStation L-16-003 Page3 Licenses withRegardto Reliable SpentFuelPoolInstrumentation(OrderNumber EA-12-051),datedFebruary  27, 2013.
Attachment L-16-003 Davis-Besse Nuclear Power Station Sixth Six-Month Status Report for the lmplementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation Page 1 of 6 Introduction FirstEnergy Nuclear Operating Company (FENOC) developed an Overall Integrated Plan (OlP) for Davis-Besse Nuclear Power Station (Reference 1 in Section 8),
: 6. Davis-Besse NuclearPowerPlantUnitNo.1 - InterimStaffEvaluationand Requestfor AdditionalInformationRegarding                    Planfor the OverallIntegrated fmpfementation of OrderEA-12-051,ReliableSpent FuelPool Instrumentation, datedDecember  11,2013.
documenting the requirements to install reliable spent fuel pool (SFP) level instrumentation (Ll), in response to Reference2. This attachment provides an update of milestone accomplishments since the last status report, including any changes to the compfiance method, schedule, or need for relieflrelaxation and the basis, if any.
: 7. NRCAuditsof LicenseeResponses    to ReliableSpentFuelPoolInstrumentation OrderEA-12-051,   datedMarch26,2014, cc: Director,Officeof NuclearReactorRegulation(NRR)
2 Milestone Accomplishments The following milestone(s) have been completed since July 31,2015 and are current as of January 31,2016.
NRCRegionlll Administrator NRCResidentInspector NRCProjectManager Ms.LisaM. Regner,NRR/JLD/PMB,    NRC Mr.BlakeA. Purnell, NRR/JLD/PMB,  NRC SafetyBoard(withoutAttachment)
o Update 5 was submitted
UtilityRadiological
. Commissioning of SFP Instrumentation 3 Milestone Schedule Status The following provides an update to the milestone schedule to support the OlP. This section provides the activity status of each item and the expected completion
: date, noting any change. The dates are planning dates subject to change as design and implementation details are developed.
The milestones indicate the number assigned in the interim staff evaluation (lSE)
(Reference
: 3) to each request for additional information (RAl). Updates to RAI responses were posted on the ePortal as indicated in Reference 4.
There are no revised milestone target completion dates.


Attachment L-16-003 Davis-Besse  NuclearPowerStationSixthSix-Month    StatusReportfor the lmplementation  of OrderEA-12-051,  OrderModifyingLicenses  withRegardto ReliableSpentFuelPoolInstrumentation Page1 of 6 Introduction FirstEnergy NuclearOperating  Company(FENOC)developed      an OverallIntegrated Plan(OlP)for Davis-Besse    NuclearPowerStation(Reference   1 in Section8),
Attachment L-16-003 Page 2 of 6
documenting  the requirements                  spentfuelpool(SFP)level to installreliable instrumentation  (Ll),in responseto Reference2.Thisattachment    providesan update of milestone accomplishments  sincethe laststatusreport,including anychangesto the compfiance  method,schedule,                             andthe basis,if any.
*lnstrumentation has been installed. Connection of backup power source is to be completed during the spring 2016 refueling outage.
or needfor relieflrelaxation 2    MilestoneAccomplishments Thefollowingmilestone(s)   havebeencompleted    sinceJuly 31,2015andare currentas of January 31,2016.
4 Ghanges to Compliance Method There are no changes to the compliance method as documented in the OIP (Reference 1).
o Update5 wassubmitted
5 Need for Relief/Relaxation and Basis for the Relief/Relaxation FENOC expects to comply with the order implementation date. Relief/relaxation is not required at this time.
    . Commissioning    of SFPInstrumentation 3   MilestoneScheduleStatus Thefollowingprovidesan updateto the milestone    scheduleto supportthe OlP. This sectionprovidesthe activitystatusof eachitemandthe expectedcompletion      date, notinganychange.Thedatesare planningdatessubjectto changeas designand implementation  detailsaredeveloped.
6 Open ltems from Overall Integrated Plan and Interim Staff Evaluation The following tables provide a summary of the open items documented in the OIP or the ISE and the status of each item.
The milestones  indicatethe numberassignedin the interimstaffevaluation (lSE)
Overall Integrated Plan Open ltem Status None Not Applicable Milestone Target Completion Date Activity Status (as of 71311151 Revised Target Completion Date Submit Six-Month Status Updates Update I Auqust 2013 Complete Update 2, including response fo /SE RAI-I, RAI-2, RAI-3, RAI-4 (except 4b schematic),
(Reference  3) to eachrequestfor additional            (RAl).
RAI-6, RAI-9, and RALI0a February 2014 Complete Update 3 Auoust 2014 Complete Update 4 February 2015 Complete Update 5 Ausust 2015 Complete Posf response fo /SE RAI-4b schematic, RAI.s, RAI-7, RAI.8, RAI-10b, RAI-I1, RAI-I2, RAI-13, RAI-14, and RAI-I5 on ePortal September 2015 Complete Update 6 February 2016 Started Commence SFP Instrumentation Desiqn 4Q12 Complete Commence SFP Instrumentation Procurement 2Q13 Complete Complete SFP Instrumentation Desion 1Q15 Complete SFP Instrumentation Delivery 4Q14 Complete Besin SFP Instrumentation Installation 2Q15 Complete Commissioninq of SFP Instrumentation 3Q15 Complete*
information      Updates to RAI responseswerepostedon the ePortalas indicatedin Reference      4.
NRC Order lmplementation Date (based on the scheduled end of the second refueling outage after implementation plan submittal)
Thereare no revisedmilestone    targetcompletion  dates.
Sprinq 2016 Not Started Interim Staff Evaluation Open ltem Status RAI-1: Please specifv for Level t how the identified location Complete. (Provided in


Attachment L-16-003 Page2 of 6 Target          Activity        RevisedTarget Milestone                    Completion        Status           Completion Date        (as of 71311151        Date SubmitSix-Month StatusUpdates Update I                                  Auqust2013        Complete Update2, includingresponsefo /SE RAI-I,RAI-2,RAI-3,RAI-4(except4b schematic),RAI-6,RAI-9,andRALI0a        February2014      Complete Update3                                  Auoust2014        Complete Update 4                                February 2015    Complete Update 5                                  Ausust2015        Complete Posfresponsefo /SE RAI-4bschematic, RAI.s,RAI-7,RAI.8,RAI-10b,RAI-I1, RAI-I2,RAI-13,RAI-14,andRAI-I5on ePortal                                September  2015    Complete Update 6                                February2016        Started Commence  SFPInstrumentation Desiqn            4Q12          Complete Commence  SFPInstrumentation Procurement                                    2Q13          Complete Complete SFPInstrumentation Desion              1Q15          Complete SFPInstrumentation Delivery                    4Q14          Complete BesinSFPInstrumentation  Installation          2Q15          Complete Commissioninq of SFPInstrumentation            3Q15          Complete*
Attachment L-16-003 Page 3 of 6 Interim Staff Evaluation Open ltem Status represents the higher of the two points described in the NEI 12-02 guidance for this level.
NRCOrderlmplementation  Date(basedon the scheduledendof the secondrefueling outageafterimplementation plansubmittal)     Sprinq 2016      NotStarted
February 2014 status report.)
  *lnstrumentation                        of backuppowersourceis to be completed hasbeeninstalled.Connection                                      duringthe spring2016refueling outage.
RAI-2: Please provide a clearly labeled sketch depicting the elevation view of the proposed typical mounting arrangement for the portions of the instrument channel consisting of permanent measurement channel equipment (e.9., fixed level sensors and/or stilling wells, and mounting brackets). Indicate on this sketch the datum values representing Level 1, Level 2, and Level 3, as well as the top of the fuel racks. Indicate on this sketch the portion of the level sensor measurement range that is sensitive to measurement of the fuel pool level, with respect to the Level 1, Level 2, and Level 3, datum points.
4   Ghangesto ComplianceMethod Thereare no changesto the compliance    methodas documented      in the OIP (Reference  1).
Complete. (Provided in February 2014 status report.)
5  Needfor Relief/Relaxation    and Basisfor the Relief/Relaxation FENOCexpectsto complywiththe orderimplementation        date. Relief/relaxation  is not requiredat thistime.
RAI-3: Please provide a clearly labeled sketch or marked-up plant drawing of the plan view of the SFP area, depicting the SFP inside dimensions, the planned locations/placement of the primary and back-up SFP level sensor, and the proposed routing of the cables that will extend from these sensors toward the location of the read-ouVdisplay device.
6   Openltemsfrom OverallIntegratedPlanand InterimStaff Evaluation Thefollowing  tablesprovidea summaryof the openitemsdocumented          in the OIPor the ISEandthe statusof eachitem.
Complete. (Provided in February 2014 status report.)
OverallIntegratedPlanOpenltem                                Status None                                                              Not Applicable InterimStaff EvaluationOpenltem                              Status RAI-1:Pleasespecifvfor Levelt howthe identifiedlocation          Complete. (Providedin
RAI-4: Please provide the following:
(a) The design criteria that will be used to estimate the total loading on the mounting device(s),
including static weight loads and dynamic loads. Describe the methodology that will be used to estimate the total loading, inclusive of design basis maximum seismic loads and the hydrodynamic loads that could result from pool sloshing or other etfects that could accompany such seismic forces.
(b) A description of the manner in which the level sensor (and stilling well, if appropriate) will be attached to the refueling floor and/or other support structures for each planned point of attachment of the probe assembly. Indicate in a schematic the portions of the level sensor that will serve as points of attachment for mechanical/mounting or electrical connections.
(c) A description of the manner by which the mechanical connections will attach the level instrument to permanent SFP structures so as to support the level sensor assemblv.
Complete. (Provided in February 2014 status report with exception of 4b schematic.
4b schematic posted on ePortal.)
RAI-S: For RAI 4(a) above, please provide the results of the analyses used to verify the design criteria and methodology for seismic testing of the SFP instrumentation and the electronics
: units, including, design basis maximum seismic loads and the hydrodynamic loads that could result from pool sloshing or other effects that could accompanv such seismic forces.
Complete. (Response posted on ePortal.)
RAI-6: For each of the mounting attachments required to attach SFP Level equipment to plant structures, please describe the design inputs, and the methodology that was used to qualify the structural integrity of the affected structures/equipment.
Complete. (Provided in February 2014 status report.)
RAI-7: Please provide the following:
(a) A description of the specific method or combination of methods that will be applied to demonstrate the reliability of the permanently installed equipment under BDB ambient temperature,
: humidity, shock, vibration, and radiation conditions.
(b) A description of the testinq and/or analvses that will be Complete. (Response posted on ePortal.)


Attachment L-16-003 Page3 of 6 InterimStaff EvaluationOpenltem                                      Status represents  the higherof thetwo pointsdescribed        in the NEI12-02        February2014status guidance  for thislevel.                                                      report.)
Attachment L-16-003 Page 4 of 6 Interim Staff Evaluation Open ltem Status conducted to provide assurance that the equipment will perform reliably under the worst-case credible design basis loading at the location where the equipment will be mounted. Include a discussion of this seismic reliability demonstration as it applies to (a) the level sensor mounted in the SFP area, and (b) any control boxes, electronics, or read-out and re-transmitting devices that will be employed to convey the level information from the level sensor to the plant operators or emergency responders.
RAI-2:Pleaseprovidea clearlylabeledsketchdepicting              the           Complete.(Provided in elevation viewof the     proposed  typicalmounting    arrangement    for the February2014status portionsof the instrument    channelconsisting    of permanent              report.)
(c) A description of the specific method or combination of methods that will be used to confirm the reliability of the permanently installed equipment such that following a seismic event the instrument will maintain its required accuracv.
measurement    channelequipment      (e.9.,fixedlevelsensorsand/or stillingwells,andmounting      brackets).Indicate    on thissketchthe datumvaluesrepresenting        Level1, Level2, andLevel3, as wellas thetop of thefuelracks.Indicate      on thissketchthe portionof the levelsensormeasurement        rangethatis sensitive  to measurement      of thefuelpoollevel,withrespectto the Level1, Level2, andLevel3, datumpoints.
RAI-8: For RAI 7 above, please provide the results from the selected
RAI-3:Pleaseprovidea clearlylabeledsketchor marked-up                plant    Complete.(Provided in drawingof the   plan  viewof the SFP area,depicting      the SFPinside      February 2014status dimensions,  the plannedlocations/placement        of the primaryand          report.)
: methods, tests and analyses used to demonstrate the qualification and reliability of the installed equipment in accordance with the Order requirements.
back-upSFPlevelsensor,andthe proposed              routingof the cables thatwillextendfromthesesensorstowardthe locationof the read-ouVdisplay  device.
Complete. (Response posted on ePortal.)
RAI-4:Pleaseprovidethefollowing:                                             Complete.(Provided in (a)Thedesigncriteriathatwillbe usedto estimate          thetotalloading February2014status on the mounting    device(s), including  staticweightloadsanddynamic reportwithexceptionof loads.Describe    the methodology    thatwillbe usedto estimatethe          4b schematic.4b totalloading,  inclusive  of designbasismaximum        seismicloadsand        schematicpostedon the hydrodynamic      loadsthatcouldresultfrompoolsloshingor other ePortal.)
RAI-9: Please provide the following:
etfectsthatcouldaccompany        suchseismicforces.
(a) A description of the manner the two channels of the proposed level measurement system meet the independence requirement to
(b) A description   of the mannerin whichthe levelsensor(andstilling well,if appropriate)   willbe attached  to the refueling floorand/orother supportstructures    for eachplannedpointof attachment        of the probe assembly.Indicatein a schematic        the portionsof the levelsensor thatwillserveas pointsof attachment        for mechanical/mounting    or electricalconnections.
: minimize, to the extent pacticable, the potential for a common cause event to adversely affect both channels.
(c)A description  of the mannerby whichthe mechanical          connections willattachthe levelinstrument      to permanent  SFPstructures    so as to supportthe levelsensorassemblv.
(b) Further information describing the design and installation of each level measurement system, consisting of level sensor electronics, cabling, and readout devices. Please address how independence of these components of the primary and back-up channels is achieved through the application of independent power sources, physical and spatial separation, independence of signals sent to the location(s) of the readout devices.
RAI-S:ForRAI4(a)above,pleaseprovidethe resultsof the                         Complete.(Response analysesusedto verifythe designcriteriaandmethodology              for        postedon ePortal.)
and the independence of the displavs.
seismictestingof the SFPinstrumentation          andthe electronics  units, including, designbasismaximum        seismicloadsandthe hydrodynamic    loadsthatcouldresultfrompoolsloshingor other effectsthatcouldaccompanv        suchseismicforces.
Complete. (Provided in February 2014 status report.)
RAI-6:Foreachof the mounting          attachments  required  to attachSFP Complete.(Provided    in Levelequipment      to plantstructures,  pleasedescribe    the design       February2014status inputs,andthe methodology        thatwasusedto qualifythe structural report.)
RAI-10: Please provide the following:
integrityof the affectedstructures/equipment.
(a) A description of the electrical ac power sources and capabilities for the primary and backup channels.
RAI-7:Pleaseprovidethefollowing:                                             Complete.(Response (a)A description   of the specificmethodor combination      of methods postedon ePortal.)
(b) Please provide the results of the calculation depicting the battery backup duty cycle requirements demonstrating that its capacity is sufficient to maintain the level indication function until offsite resource availabilitv is reasonably assured.
thatwillbe appliedto demonstrate                      of the permanently the reliability installedequipment      underBDBambienttemperature,          humidity, shock,vibration,  andradiation    conditions.
Complete. (Provided RAI-10a response in February 2014 status report. Response to RAI-10b posted on ePortal.)
(b) A description    of thetestinqand/oranalvses      thatwillbe
RAI-1 1. Please provide the following:
(a) An estimate of the expected instrument channel accuracy performance (e.9., in percent of span) under both (a) normal SFP level conditions (approximately Level 1 or higher) and (b) at the BDB conditions (i.e., radiation, temperature,
: humidity, post-seismic and post-shock conditions) that would be present if the SFP level were at the Level 2 and Level 3 datum points.
(b) A description of the methodology that will be used for determining the maximum allowed deviation from the instrument channel design accuracy that will be employed under normal operating conditions as an acceptance criterion for a calibration procedure to flag to operators and to technicians that the channel requires adjustment to within the normal condition design accuracy.
Complete. (Response posted on ePortal.)
RAI-12: Please provide the following:
(a) A description of the capability and provisions the proposed level Complete. (Response posted on ePortal.)


Attachment L-16-003 Page4 of 6 InterimStaffEvaluationOpen ltem                                       Status conducted  to provideassurance    thatthe equipment     willperform reliablyundertheworst-case      credibledesignbasisloadingat the location wheretheequipment      willbe mounted.Includea discussion of thisseismicreliability  demonstration  as it appliesto (a)the level sensormountedin the SFParea,and(b)anycontrolboxes, electronics, or read-out  andre-transmitting  devicesthatwillbe employed  to conveythe levelinformation      fromthe levelsensorto the plantoperators  or emergency    responders.
Attachment L-16-003 Page 5 of 6 7 Potential Interim Staff Evaluation lmpacts There are no potential impacts to the ISE identified forthis reporting period.
(c)A description   of thespecificmethodor combination          of methods thatwillbe usedto confirmthe reliability    of the permanently    installed equipment  suchthatfollowing    a seismiceventthe instrument        will maintainits required    accuracv.
Interim Staff Evaluation Open ltem Status sensing equipment will have to enable periodic testing and calibration, including how this capability enables the equipment to be tested in-situ.
RAI-8:ForRAI7 above,pleaseprovidethe resultsfromthe selected Complete.(Response methods,  testsandanalysesusedto demonstrate            thequalification postedon ePortal.)
(b) A description of the testing and calibration necessary to enable the conduct of regular channel checks of each independent channel against the other, and against any other permanently-installed SFP level instrumentation.
andreliability of the installed equipment    in accordance    withtheOrder requirements.
(c) A description of the calibration tests and functional checks processes to be performed, and their frequency. Discuss the steps to be taken to ensure these surveillances will be incorporated into the plant surveillance program.
RAI-9:Pleaseprovidethefollowing:                                              Complete.(Provided in (a)A description   of the mannerthetwo channels        of the proposed      February2014status levelmeasurement      systemmeetthe independence          requirement  to   report.)
(d) A description of the preventive maintenance tasks are required to be performed during normal operation, and the planned maximum surveillance interval necessary to ensure that the channels are fully conditioned to accurately and reliably perform their functions when needed.
minimize, to the extent  pacticable,  the potential for a commoncause eventto adverselyaffectbothchannels.
RAI-13: Please provide a list of the procedures addressing operation (both normal and abnormal response), calibration, test, maintenance, and inspection procedures that will be developed for use of the SFP instrumentation.
(b) Furtherinformation    describing  the designandinstallation      of each levelmeasurement      system,consisting    of levelsensorelectronics, cabling,andreadoutdevices.Pleaseaddresshowindependence                    of thesecomponents      of the  primary  andback-upchannelsis achieved throughthe application    of independent  powersources,physical        and spatialseparation,  independence    of signalssentto the location(s)    of the readoutdevices.andthe independence          of the displavs.
The licensee is requested to include a brief description of the specific technical objectives to be achieved within each procedure.
RAI-10:Pleaseprovidethefollowing:                                            Complete.(Provided (a)A description  of the electrical ac power  sourcesandcapabilities RAI-10a                in response for the primaryandbackupchannels.                                            February2014status (b) Pleaseprovidethe resultsof the calculation        depicting  the battery report.Response to backupdutycyclerequirements        demonstrating    thatits capacityis      RAI-10bpostedon sufficientto maintain  the levelindication  functionuntiloffsite            ePortal.)
Complete. (Response posted on ePortal.)
resource  availabilitv is reasonably  assured.
RAI-14: Please provide the following:
RAI-11. Pleaseprovidethefollowing:                                           Complete.(Response (a)An estimateof the expectedinstrument        channelaccuracy              postedon ePortal.)
(a) Further information describing the maintenance and testing program the licensee will establish and implement to ensure that regular testing and calibration is performed and verified by inspection and audit to demonstrate conformance with design and system readiness requirements.
performance    (e.9.,in percentof span)underboth(a) normalSFP levelconditions  (approximately  Level1 or higher)and(b)at the BDB conditions  (i.e.,radiation, temperature,   humidity,  post-seismic  and post-shock  conditions) thatwouldbe    present if the SFPlevelwereat the Level2 andLevel3 datumpoints.
Include a description of your plans for ensuring that necessary channel checks, functional tests, periodic calibration, and maintenance will be conducted for the level measurement system and its supporting equipment.
(b)A description   of the methodology    thatwillbe usedfor determining the maximumalloweddeviation        fromthe instrument     channeldesign accuracy  thatwillbe employed      undernormaloperating        conditions  as an acceptance    criterionfor a calibration  procedure    to flag to operators  andto technicians    thatthe channelrequiresadjustment          to withinthe normalcondition      designaccuracy.
(b) A description of the approach and process to be used by the licensee to follow guidance in NEI 12-02 Section 4.3 regarding compensatory actions for one or both non-functioning channels.
RAI-12:Pleaseprovide        thefollowing:                                    Complete.(Response (a)A description   of the capability  andprovisions    the proposed    level postedon ePortal.)
(c) A description of the compensatory actions to be taken in the event that one of the instrument channels cannot be restored to functional status within 90 davs.
Complete. (Response posted on ePortal.)
RAI-15: Please provide a description of the in-situ calibration process at the SFP location that will result in the channel calibration beinq maintained at its desiqn accuracv.
Complete. (Response posted on ePortal.)


Attachment L-16-003 Page5 of 6 InterimStaff EvaluationOpenltem                                  Status sensingequipment    willhaveto enableperiodic    testingand calibration,including  howthiscapability  enables  theequipment    to be testedin-situ.
Attachment L-16-003 Page 6 of 6 I
(b)A description  of thetestingandcalibration    necessary  to enable the conductof regularchannelchecksof eachindependent            channel againstthe other,andagainstanyotherpermanently-installed          SFP levelinstrumentation.
References The following references support the updates to the OIP described in this attachment.
(c)A description  of the calibrationtestsandfunctional    checks processes  to be performed,  andtheirfrequency.Discussthesteps to be takento ensurethesesurveillances      willbe incorporated  into the plantsurveillance  program.
FirstEnergy Nuclear Operating Company's (FENOC's)
(d)A description  of the preventive  maintenance  tasksarerequired    to be performed    duringnormaloperation,  andthe plannedmaximum surveillance  intervalnecessary  to ensurethatthe channels      arefully conditioned  to accurately  andreliablyperformtheirfunctions    when needed.
Overall Integrated Plan in
RAI-13: Pleaseprovidea list of the proceduresaddressingoperation Complete.(Response (bothnormaland abnormalresponse),calibration,        test, maintenance, postedon ePortal.)
and inspectionproceduresthat will be developedfor use of the SFP instrumentation. The licenseeis requestedto includea brief descriptionof the specifictechnicalobjectivesto be achievedwithin each procedure.
RAI-14:Pleaseprovidethefollowing:                                        Complete.(Response (a) Furtherinformation  describing the maintenance    andtesting        postedon ePortal.)
programthe licensee    willestablishandimplement    to ensurethat regulartestingandcalibration    is performed  andverifiedby inspection andauditto demonstrate      conformance  withdesignandsystem readiness  requirements. Includea description  of yourplansfor ensuring thatnecessary    channelchecks,functional    tests,periodic calibration,andmaintenance    willbe conducted  forthe level measurement    systemandits supporting    equipment.
(b) A description  of the approachandprocessto be usedby the licensee to followguidancein NEI 12-02Section4.3 regarding compensatory    actionsfor oneor bothnon-functioning    channels.
(c)A description  of the compensatory  actionsto be takenin the eventthatoneof the instrument      channels  cannotbe restored    to functionalstatuswithin90 davs.
RAI-15:Pleaseprovidea description      of the in-situcalibration        Complete.(Response processat the SFPlocation    thatwillresultin the channelcalibration postedon ePortal.)
beinqmaintained    at itsdesiqnaccuracv.
7    PotentialInterimStaff Evaluationlmpacts Thereare no potentialimpactsto the ISEidentified                            period.
forthis reporting


Attachment L-16-003 Page6 of 6 I  References Thefollowingreferences supportthe updatesto the OIPdescribedin thisattachment.
===Response===
1 . FirstEnergyNuclearOperatingCompany's  (FENOC's)OverallIntegrated Planin Response to March12,2012Commission    Orderlssuanceof Orderto Modify LicenseswithRegardto ReliableSpentFuelPoollnstrumentation  (Order NumberEA-12-051),datedFebruary27, 2013.
to March 12, 2012 Commission Order lssuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool lnstrumentation (Order Number EA-1 2-051), dated Febru ary 27, 2013.
2 . NucfearRegulatory Commission (NRC)OrderNumberEA-12-051,     Order Modifying Licenses withRegardto ReliableSpentFuelPool    Instrumentation, datedMarch12,2012.
Nucfear Regulatory Commission (NRC) Order Number EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated March 12,2012.
3 . Davis-Besse NuclearPowerPlantUnitNo. 1 - InterimStaffEvaluation and Requestfor Additional Information Regarding the OverallIntegratedPlanfor lmplementation of OrderEA-12-051, Reliable SpentFuelPoolInstrumentation, datedDecember  11,2013.
Davis-Besse Nuclear Power Plant Unit No. 1 - Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for lmplementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, dated December 11, 2013.
4 . NRCAuditsof LicenseeResponses  to ReliableSpentFuelPoolInstrumentation OrderEA-12-051, datedMarch26,2014.
NRC Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051, dated March 26,2014.
1.
2.
3.
4.


FENOC^           \                                                                       5501 North StateRoute2 Oak Harbon Ohio 43449 FirstEnergy  Nuclear
FENOC^
                  @eratingCompany Brirn D. fules                                                                                      419-321-7676 WcePresident,Nuelear February     9, 2016 L-16-003                                                               10 cFR 2.2A2 ATTN: Document       ControlDesk U.S.NuclearRegulatory      Commission Washington,     DC 20555-001
\\
Fi rstEnergy Nuclear
@erating Company 5501 North State Route 2 Oak Harbon Ohio 43449 419-321-7676 Brirn D. fules Wce President, Nuelear February 9, 2016 L-16-003 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-001 10 cFR 2.2A2


==SUBJECT:==
==SUBJECT:==
Davis-Besse Nuclear Power Station Docket No. 50-346, License No. NPF-3 FirstEnerqy_Nyclear Operating Company's (FENOC's\\ S.ixth Six-Month Status Report in


Davis-Besse    NuclearPowerStation DocketNo.50-346,LicenseNo. NPF-3 FirstEnerqy_Nyclear  OperatingCompany's(FENOC's\S.ixthSix-MonthStatusReportin Response     to March12.2012Commission        OrderModilyino  LicenseswithReoardto ReliableSpent-F-uel   PoolInstrumentation  (OrderNumberEA-12-051)
===Response===
(CACNo.MF0960)
to March 12. 2012 Commission Order Modilyino Licenses with Reoard to Reliable Spent-F-uel Pool Instrumentation (Order Number EA-12-051)
On March12,2A12,the NuclearRegulatory          Commission   (NRCor Commission)   issued an order(Reference   1) to FENOC.Reference1 was immediately         effectiveanddirects FENOCto havea reliableindicationof the waterlevelin associated         spentfuelstorage pools. Specificrequirements    are outlinedin Attachment 2 of Reference1.
(CAC No. MF0960)
Reference1 requiredsubmission      of an initialstatusreport60 daysfollowingissuanceof the finalinterimstaff guidance   (Reference 2) and an overallintegratedplanpursuantto SectionlV, ConditionC. Referen     ce 2 endorsesindustryguidancedocumentNuclear Energy           (NEI)
On March 1 2,2A12, the Nuclear Regulatory Commission (NRC or Commission) issued an order (Reference
Institute    12-A2,Revision1 (Reference                         andexeeptions
: 1) to FENOC. Reference 1 was immediately effective and directs FENOC to have a reliable indication of the water level in associated spent fuel storage pools. Specific requirements are outlined in Attachment 2 of Reference 1.
: 3) withclarifications identifiedin Reference   2. Referen e 4 providedthe FENOCinitialstatusreport regardingrequirements    for reliablespentfuelpoolinstrumentation. Reference5 providedthe FENOCoverallintegratedplanfor BeaverValleyPowerStation(BVPS),
Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance (Reference
UnitNos.1 and2, Davis-Besse       NuclearPowerStation(DBNPS),       and PerryNuclear PowerPlant(PNPP).
: 2) and an overall integrated plan pursuant to Section lV, Condition C. Referen ce 2 endorses industry guidance document Nuclear Energy Institute (NEI) 12-A2, Revision 1 (Reference
Reference1 requiressubmissionof a statusreportat six-monthintervalsfollowing submittalof the overallintegratedplan. Reference     3 providesdirectionregardingthe contentof the statusreports.The purposeof this letteris to providethe sixth
: 3) with clarifications and exeeptions identified in Reference
: 2. Referen e 4 provided the FENOC initial status report regarding requirements for reliable spent fuel pool instrumentation.
Reference 5 provided the FENOC overall integrated plan for Beaver Valley Power Station (BVPS),
Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station (DBNPS),
and Perry Nuclear Power Plant (PNPP).
Reference 1 requires submission of a status report at six-month intervals following submittal of the overall integrated plan. Reference 3 provides direction regarding the content of the status reports. The purpose of this letter is to provide the sixth


Davis-Besse   NuclearPowerStation L-16-003 Page2 six-monthstatusreportpursuantto SectionlV, ConditionC.2,of Reference1,that delineates progressmadein implementing   the requirements of Reference   1. The attachedreportfor DBNPSprovidesan updateof milestoneaccomplishments            sincethe laststatusreport,including anychangesto the compliance   method,schedule,   or need for relief/relaxation andthe basis,if any.
Davis-Besse Nuclear Power Station L-16-003 Page 2 six-month status report pursuant to Section lV, Condition C.2, of Reference 1, that delineates progress made in implementing the requirements of Reference
The NRCstaffalsoissuedan interimstaffevaluation(Reference       6) that included requestsfor additionalinformation  (RAls). The NRCstaffsubsequently    indicatedthe intentionto completethe ongoingreviewof the responses     to Reference1 by conducting auditsand utilizingthe ePortalsystemfor reviewof RAl responses(Reference       7). The attachedreporthasbeenupdatedto reflectthis      process change.
: 1. The attached report for DBNPS provides an update of milestone accomplishments since the last status report, including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.
This lettercontainsno newregulatorycommitments.lf you haveanyquestions regardingthis report,pleasecontactMr.ThomasA. Lentz,Manager- FleetLicensing, at 330-315-0810.
The NRC staff also issued an interim staff evaluation (Reference
I declareun{er penalty
: 6) that included requests for additional information (RAls). The NRC staff subsequently indicated the intention to complete the ongoing review of the responses to Reference 1 by conducting audits and utilizing the ePortal system for review of RAl responses (Reference 7). The attached report has been updated to reflect this process change.
                ',      of perjurythatthe foregoingis trueand correct.Executedon February _q       zo1o.
This letter contains no new regulatory commitments. lf you have any questions regarding this report, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at 330-315-0810.
I declare un{er penalty of perjury that the foregoing is true and correct. Executed on February
_q  
', zo1o.
Respectfully,
Respectfully,
#*/#e^
#*/#e^
BrianD. Boles
Brian D. Boles


==Attachment:==
==Attachment:==
Davis-Besse Nuclear Power Station Six'th Six-Month Status Report for the lmplementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation


Davis-Besse  NuclearPowerStationSix'thSix-MonthStatusReportfor the lmplementation  of OrderEA-12-051,   OrderModifyingLicenseswith Regardto ReliableSpentFuelPoolInstrumentation
==References:==
: 1.
NRC Order Number EA-12-051
, Order Modifoing Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated March 12,2012.
: 2.
NRC Interim Staff Guidance JLD-ISG
-2012-A3, Compliance with Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool lnstrumentation, Revision 0, dated August 29, 2412.
: 3.
NEI 1 2-02,Industry Guidance for Compliance with NRC Order EA-12-A51, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,"
Revision 1, dated August 2012.
FirstEnergy Nuclear Operating Company's (FENOC's)
Initial Status Report in Response to March 12,2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool lnstrumentation (Order Number EA-1 2-051), dated October 26, 2012.
FirstEnergy Nuclear Operating Company's (FENOC's)
Overall Integrated Plan in Response to March 12,2012 Commission Order lssuance of Order to Modify 4.
5.


==References:==
Davis-Besse Nuclear Power Station L-16-003 Page 3 cc:
: 1. NRCOrderNumberEA-12-051         , OrderModifoing  Licenses withRegardto Reliable SpentFuelPoolInstrumentation,   datedMarch12,2012.
6.
: 2. NRCInterimStaffGuidanceJLD-ISG          -2012-A3,Compliance  withOrderEA-12-051, OrderModifyingLicenseswith Regardto ReliableSpent      Fuel Pool lnstrumentation, Revision0, datedAugust29, 2412.
7.
: 3. NEI  12-02,Industry Guidance  for Compliance withNRCOrderEA-12-A51,       "To ModifyLicenses  withRegardto ReliableSpentFuelPoolInstrumentation,"
Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-1 2-051), dated February 27, 2013.
Revision 1, datedAugust2012.
Davis-Besse Nuclear Power Plant Unit No. 1 - Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for f mpfementation of Order EA-1 2-051, Reliable Spent Fuel Pool Instrumentation, dated December 11,2013.
: 4. FirstEnergy    NuclearOperating  Company's  (FENOC's)  InitialStatusReportin Responseto March12,2012,Commission        OrderModifyingLicenseswithRegard to Requirements  for ReliableSpentFuelPoollnstrumentation    (OrderNumber EA-12-051),datedOctober26, 2012.
NRC Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051, dated March 26,2014,
5 . FirstEnergy  NuclearOperating  Company's  (FENOC's)   OverallIntegrated  Planin Responseto March12,2012Commission        Orderlssuanceof Orderto Modify
: Director, Office of Nuclear Reactor Regulation (NRR)
NRC Region lll Administrator NRC Resident Inspector NRC Project Manager Ms. Lisa M. Regner, NRR/JLD/PMB, NRC Mr. Blake A. Purnell, NRR/JLD/PMB, NRC Utility Radiological Safety Board (without Attachment)


Davis-Besse NuclearPowerStation L-16-003 Page3 Licenses withRegardto Reliable SpentFuelPoolInstrumentation(OrderNumber EA-12-051),datedFebruary  27, 2013.
Attachment L-16-003 Davis-Besse Nuclear Power Station Sixth Six-Month Status Report for the lmplementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation Page 1 of 6 Introduction FirstEnergy Nuclear Operating Company (FENOC) developed an Overall Integrated Plan (OlP) for Davis-Besse Nuclear Power Station (Reference 1 in Section 8),
: 6. Davis-Besse NuclearPowerPlantUnitNo.1 - InterimStaffEvaluationand Requestfor AdditionalInformationRegarding                    Planfor the OverallIntegrated fmpfementation of OrderEA-12-051,ReliableSpent FuelPool Instrumentation, datedDecember  11,2013.
documenting the requirements to install reliable spent fuel pool (SFP) level instrumentation (Ll), in response to Reference2. This attachment provides an update of milestone accomplishments since the last status report, including any changes to the compfiance method, schedule, or need for relieflrelaxation and the basis, if any.
: 7. NRCAuditsof LicenseeResponses    to ReliableSpentFuelPoolInstrumentation OrderEA-12-051,   datedMarch26,2014, cc: Director,Officeof NuclearReactorRegulation(NRR)
2 Milestone Accomplishments The following milestone(s) have been completed since July 31,2015 and are current as of January 31,2016.
NRCRegionlll Administrator NRCResidentInspector NRCProjectManager Ms.LisaM. Regner,NRR/JLD/PMB,    NRC Mr.BlakeA. Purnell, NRR/JLD/PMB,  NRC SafetyBoard(withoutAttachment)
o Update 5 was submitted
UtilityRadiological
. Commissioning of SFP Instrumentation 3 Milestone Schedule Status The following provides an update to the milestone schedule to support the OlP. This section provides the activity status of each item and the expected completion
: date, noting any change. The dates are planning dates subject to change as design and implementation details are developed.
The milestones indicate the number assigned in the interim staff evaluation (lSE)
(Reference
: 3) to each request for additional information (RAl). Updates to RAI responses were posted on the ePortal as indicated in Reference 4.
There are no revised milestone target completion dates.


Attachment L-16-003 Davis-Besse  NuclearPowerStationSixthSix-Month    StatusReportfor the lmplementation  of OrderEA-12-051,  OrderModifyingLicenses  withRegardto ReliableSpentFuelPoolInstrumentation Page1 of 6 Introduction FirstEnergy NuclearOperating  Company(FENOC)developed      an OverallIntegrated Plan(OlP)for Davis-Besse    NuclearPowerStation(Reference   1 in Section8),
Attachment L-16-003 Page 2 of 6
documenting  the requirements                  spentfuelpool(SFP)level to installreliable instrumentation  (Ll),in responseto Reference2.Thisattachment    providesan update of milestone accomplishments  sincethe laststatusreport,including anychangesto the compfiance  method,schedule,                             andthe basis,if any.
*lnstrumentation has been installed. Connection of backup power source is to be completed during the spring 2016 refueling outage.
or needfor relieflrelaxation 2    MilestoneAccomplishments Thefollowingmilestone(s)   havebeencompleted    sinceJuly 31,2015andare currentas of January 31,2016.
4 Ghanges to Compliance Method There are no changes to the compliance method as documented in the OIP (Reference 1).
o Update5 wassubmitted
5 Need for Relief/Relaxation and Basis for the Relief/Relaxation FENOC expects to comply with the order implementation date. Relief/relaxation is not required at this time.
    . Commissioning    of SFPInstrumentation 3   MilestoneScheduleStatus Thefollowingprovidesan updateto the milestone    scheduleto supportthe OlP. This sectionprovidesthe activitystatusof eachitemandthe expectedcompletion      date, notinganychange.Thedatesare planningdatessubjectto changeas designand implementation  detailsaredeveloped.
6 Open ltems from Overall Integrated Plan and Interim Staff Evaluation The following tables provide a summary of the open items documented in the OIP or the ISE and the status of each item.
The milestones  indicatethe numberassignedin the interimstaffevaluation (lSE)
Overall Integrated Plan Open ltem Status None Not Applicable Milestone Target Completion Date Activity Status (as of 71311151 Revised Target Completion Date Submit Six-Month Status Updates Update I Auqust 2013 Complete Update 2, including response fo /SE RAI-I, RAI-2, RAI-3, RAI-4 (except 4b schematic),
(Reference  3) to eachrequestfor additional            (RAl).
RAI-6, RAI-9, and RALI0a February 2014 Complete Update 3 Auoust 2014 Complete Update 4 February 2015 Complete Update 5 Ausust 2015 Complete Posf response fo /SE RAI-4b schematic, RAI.s, RAI-7, RAI.8, RAI-10b, RAI-I1, RAI-I2, RAI-13, RAI-14, and RAI-I5 on ePortal September 2015 Complete Update 6 February 2016 Started Commence SFP Instrumentation Desiqn 4Q12 Complete Commence SFP Instrumentation Procurement 2Q13 Complete Complete SFP Instrumentation Desion 1Q15 Complete SFP Instrumentation Delivery 4Q14 Complete Besin SFP Instrumentation Installation 2Q15 Complete Commissioninq of SFP Instrumentation 3Q15 Complete*
information      Updates to RAI responseswerepostedon the ePortalas indicatedin Reference      4.
NRC Order lmplementation Date (based on the scheduled end of the second refueling outage after implementation plan submittal)
Thereare no revisedmilestone    targetcompletion  dates.
Sprinq 2016 Not Started Interim Staff Evaluation Open ltem Status RAI-1: Please specifv for Level t how the identified location Complete. (Provided in


Attachment L-16-003 Page2 of 6 Target          Activity        RevisedTarget Milestone                    Completion        Status           Completion Date        (as of 71311151        Date SubmitSix-Month StatusUpdates Update I                                  Auqust2013        Complete Update2, includingresponsefo /SE RAI-I,RAI-2,RAI-3,RAI-4(except4b schematic),RAI-6,RAI-9,andRALI0a        February2014      Complete Update3                                  Auoust2014        Complete Update 4                                February 2015    Complete Update 5                                  Ausust2015        Complete Posfresponsefo /SE RAI-4bschematic, RAI.s,RAI-7,RAI.8,RAI-10b,RAI-I1, RAI-I2,RAI-13,RAI-14,andRAI-I5on ePortal                                September  2015    Complete Update 6                                February2016        Started Commence  SFPInstrumentation Desiqn            4Q12          Complete Commence  SFPInstrumentation Procurement                                    2Q13          Complete Complete SFPInstrumentation Desion              1Q15          Complete SFPInstrumentation Delivery                    4Q14          Complete BesinSFPInstrumentation  Installation          2Q15          Complete Commissioninq of SFPInstrumentation            3Q15          Complete*
Attachment L-16-003 Page 3 of 6 Interim Staff Evaluation Open ltem Status represents the higher of the two points described in the NEI 12-02 guidance for this level.
NRCOrderlmplementation  Date(basedon the scheduledendof the secondrefueling outageafterimplementation plansubmittal)     Sprinq 2016      NotStarted
February 2014 status report.)
  *lnstrumentation                        of backuppowersourceis to be completed hasbeeninstalled.Connection                                      duringthe spring2016refueling outage.
RAI-2: Please provide a clearly labeled sketch depicting the elevation view of the proposed typical mounting arrangement for the portions of the instrument channel consisting of permanent measurement channel equipment (e.9., fixed level sensors and/or stilling wells, and mounting brackets). Indicate on this sketch the datum values representing Level 1, Level 2, and Level 3, as well as the top of the fuel racks. Indicate on this sketch the portion of the level sensor measurement range that is sensitive to measurement of the fuel pool level, with respect to the Level 1, Level 2, and Level 3, datum points.
4   Ghangesto ComplianceMethod Thereare no changesto the compliance    methodas documented      in the OIP (Reference  1).
Complete. (Provided in February 2014 status report.)
5  Needfor Relief/Relaxation    and Basisfor the Relief/Relaxation FENOCexpectsto complywiththe orderimplementation        date. Relief/relaxation  is not requiredat thistime.
RAI-3: Please provide a clearly labeled sketch or marked-up plant drawing of the plan view of the SFP area, depicting the SFP inside dimensions, the planned locations/placement of the primary and back-up SFP level sensor, and the proposed routing of the cables that will extend from these sensors toward the location of the read-ouVdisplay device.
6   Openltemsfrom OverallIntegratedPlanand InterimStaff Evaluation Thefollowing  tablesprovidea summaryof the openitemsdocumented          in the OIPor the ISEandthe statusof eachitem.
Complete. (Provided in February 2014 status report.)
OverallIntegratedPlanOpenltem                                Status None                                                              Not Applicable InterimStaff EvaluationOpenltem                              Status RAI-1:Pleasespecifvfor Levelt howthe identifiedlocation          Complete. (Providedin
RAI-4: Please provide the following:
(a) The design criteria that will be used to estimate the total loading on the mounting device(s),
including static weight loads and dynamic loads. Describe the methodology that will be used to estimate the total loading, inclusive of design basis maximum seismic loads and the hydrodynamic loads that could result from pool sloshing or other etfects that could accompany such seismic forces.
(b) A description of the manner in which the level sensor (and stilling well, if appropriate) will be attached to the refueling floor and/or other support structures for each planned point of attachment of the probe assembly. Indicate in a schematic the portions of the level sensor that will serve as points of attachment for mechanical/mounting or electrical connections.
(c) A description of the manner by which the mechanical connections will attach the level instrument to permanent SFP structures so as to support the level sensor assemblv.
Complete. (Provided in February 2014 status report with exception of 4b schematic.
4b schematic posted on ePortal.)
RAI-S: For RAI 4(a) above, please provide the results of the analyses used to verify the design criteria and methodology for seismic testing of the SFP instrumentation and the electronics
: units, including, design basis maximum seismic loads and the hydrodynamic loads that could result from pool sloshing or other effects that could accompanv such seismic forces.
Complete. (Response posted on ePortal.)
RAI-6: For each of the mounting attachments required to attach SFP Level equipment to plant structures, please describe the design inputs, and the methodology that was used to qualify the structural integrity of the affected structures/equipment.
Complete. (Provided in February 2014 status report.)
RAI-7: Please provide the following:
(a) A description of the specific method or combination of methods that will be applied to demonstrate the reliability of the permanently installed equipment under BDB ambient temperature,
: humidity, shock, vibration, and radiation conditions.
(b) A description of the testinq and/or analvses that will be Complete. (Response posted on ePortal.)


Attachment L-16-003 Page3 of 6 InterimStaff EvaluationOpenltem                                      Status represents  the higherof thetwo pointsdescribed        in the NEI12-02        February2014status guidance  for thislevel.                                                      report.)
Attachment L-16-003 Page 4 of 6 Interim Staff Evaluation Open ltem Status conducted to provide assurance that the equipment will perform reliably under the worst-case credible design basis loading at the location where the equipment will be mounted. Include a discussion of this seismic reliability demonstration as it applies to (a) the level sensor mounted in the SFP area, and (b) any control boxes, electronics, or read-out and re-transmitting devices that will be employed to convey the level information from the level sensor to the plant operators or emergency responders.
RAI-2:Pleaseprovidea clearlylabeledsketchdepicting              the           Complete.(Provided in elevation viewof the     proposed  typicalmounting    arrangement    for the February2014status portionsof the instrument    channelconsisting    of permanent              report.)
(c) A description of the specific method or combination of methods that will be used to confirm the reliability of the permanently installed equipment such that following a seismic event the instrument will maintain its required accuracv.
measurement    channelequipment      (e.9.,fixedlevelsensorsand/or stillingwells,andmounting      brackets).Indicate    on thissketchthe datumvaluesrepresenting        Level1, Level2, andLevel3, as wellas thetop of thefuelracks.Indicate      on thissketchthe portionof the levelsensormeasurement        rangethatis sensitive  to measurement      of thefuelpoollevel,withrespectto the Level1, Level2, andLevel3, datumpoints.
RAI-8: For RAI 7 above, please provide the results from the selected
RAI-3:Pleaseprovidea clearlylabeledsketchor marked-up                plant    Complete.(Provided in drawingof the   plan  viewof the SFP area,depicting      the SFPinside      February 2014status dimensions,  the plannedlocations/placement        of the primaryand          report.)
: methods, tests and analyses used to demonstrate the qualification and reliability of the installed equipment in accordance with the Order requirements.
back-upSFPlevelsensor,andthe proposed              routingof the cables thatwillextendfromthesesensorstowardthe locationof the read-ouVdisplay  device.
Complete. (Response posted on ePortal.)
RAI-4:Pleaseprovidethefollowing:                                             Complete.(Provided in (a)Thedesigncriteriathatwillbe usedto estimate          thetotalloading February2014status on the mounting    device(s), including  staticweightloadsanddynamic reportwithexceptionof loads.Describe    the methodology    thatwillbe usedto estimatethe          4b schematic.4b totalloading,  inclusive  of designbasismaximum        seismicloadsand        schematicpostedon the hydrodynamic      loadsthatcouldresultfrompoolsloshingor other ePortal.)
RAI-9: Please provide the following:
etfectsthatcouldaccompany        suchseismicforces.
(a) A description of the manner the two channels of the proposed level measurement system meet the independence requirement to
(b) A description   of the mannerin whichthe levelsensor(andstilling well,if appropriate)   willbe attached  to the refueling floorand/orother supportstructures    for eachplannedpointof attachment        of the probe assembly.Indicatein a schematic        the portionsof the levelsensor thatwillserveas pointsof attachment        for mechanical/mounting    or electricalconnections.
: minimize, to the extent pacticable, the potential for a common cause event to adversely affect both channels.
(c)A description  of the mannerby whichthe mechanical          connections willattachthe levelinstrument      to permanent  SFPstructures    so as to supportthe levelsensorassemblv.
(b) Further information describing the design and installation of each level measurement system, consisting of level sensor electronics, cabling, and readout devices. Please address how independence of these components of the primary and back-up channels is achieved through the application of independent power sources, physical and spatial separation, independence of signals sent to the location(s) of the readout devices.
RAI-S:ForRAI4(a)above,pleaseprovidethe resultsof the                         Complete.(Response analysesusedto verifythe designcriteriaandmethodology              for        postedon ePortal.)
and the independence of the displavs.
seismictestingof the SFPinstrumentation          andthe electronics  units, including, designbasismaximum        seismicloadsandthe hydrodynamic    loadsthatcouldresultfrompoolsloshingor other effectsthatcouldaccompanv        suchseismicforces.
Complete. (Provided in February 2014 status report.)
RAI-6:Foreachof the mounting          attachments  required  to attachSFP Complete.(Provided    in Levelequipment      to plantstructures,  pleasedescribe    the design       February2014status inputs,andthe methodology        thatwasusedto qualifythe structural report.)
RAI-10: Please provide the following:
integrityof the affectedstructures/equipment.
(a) A description of the electrical ac power sources and capabilities for the primary and backup channels.
RAI-7:Pleaseprovidethefollowing:                                             Complete.(Response (a)A description   of the specificmethodor combination      of methods postedon ePortal.)
(b) Please provide the results of the calculation depicting the battery backup duty cycle requirements demonstrating that its capacity is sufficient to maintain the level indication function until offsite resource availabilitv is reasonably assured.
thatwillbe appliedto demonstrate                      of the permanently the reliability installedequipment      underBDBambienttemperature,          humidity, shock,vibration,  andradiation    conditions.
Complete. (Provided RAI-10a response in February 2014 status report. Response to RAI-10b posted on ePortal.)
(b) A description    of thetestinqand/oranalvses      thatwillbe
RAI-1 1. Please provide the following:
(a) An estimate of the expected instrument channel accuracy performance (e.9., in percent of span) under both (a) normal SFP level conditions (approximately Level 1 or higher) and (b) at the BDB conditions (i.e., radiation, temperature,
: humidity, post-seismic and post-shock conditions) that would be present if the SFP level were at the Level 2 and Level 3 datum points.
(b) A description of the methodology that will be used for determining the maximum allowed deviation from the instrument channel design accuracy that will be employed under normal operating conditions as an acceptance criterion for a calibration procedure to flag to operators and to technicians that the channel requires adjustment to within the normal condition design accuracy.
Complete. (Response posted on ePortal.)
RAI-12: Please provide the following:
(a) A description of the capability and provisions the proposed level Complete. (Response posted on ePortal.)


Attachment L-16-003 Page4 of 6 InterimStaffEvaluationOpen ltem                                       Status conducted  to provideassurance    thatthe equipment     willperform reliablyundertheworst-case      credibledesignbasisloadingat the location wheretheequipment      willbe mounted.Includea discussion of thisseismicreliability  demonstration  as it appliesto (a)the level sensormountedin the SFParea,and(b)anycontrolboxes, electronics, or read-out  andre-transmitting  devicesthatwillbe employed  to conveythe levelinformation      fromthe levelsensorto the plantoperators  or emergency    responders.
Attachment L-16-003 Page 5 of 6 7 Potential Interim Staff Evaluation lmpacts There are no potential impacts to the ISE identified forthis reporting period.
(c)A description   of thespecificmethodor combination          of methods thatwillbe usedto confirmthe reliability    of the permanently    installed equipment  suchthatfollowing    a seismiceventthe instrument        will maintainits required    accuracv.
Interim Staff Evaluation Open ltem Status sensing equipment will have to enable periodic testing and calibration, including how this capability enables the equipment to be tested in-situ.
RAI-8:ForRAI7 above,pleaseprovidethe resultsfromthe selected Complete.(Response methods,  testsandanalysesusedto demonstrate            thequalification postedon ePortal.)
(b) A description of the testing and calibration necessary to enable the conduct of regular channel checks of each independent channel against the other, and against any other permanently-installed SFP level instrumentation.
andreliability of the installed equipment    in accordance    withtheOrder requirements.
(c) A description of the calibration tests and functional checks processes to be performed, and their frequency. Discuss the steps to be taken to ensure these surveillances will be incorporated into the plant surveillance program.
RAI-9:Pleaseprovidethefollowing:                                              Complete.(Provided in (a)A description   of the mannerthetwo channels        of the proposed      February2014status levelmeasurement      systemmeetthe independence          requirement  to   report.)
(d) A description of the preventive maintenance tasks are required to be performed during normal operation, and the planned maximum surveillance interval necessary to ensure that the channels are fully conditioned to accurately and reliably perform their functions when needed.
minimize, to the extent  pacticable,  the potential for a commoncause eventto adverselyaffectbothchannels.
RAI-13: Please provide a list of the procedures addressing operation (both normal and abnormal response), calibration, test, maintenance, and inspection procedures that will be developed for use of the SFP instrumentation.
(b) Furtherinformation    describing  the designandinstallation      of each levelmeasurement      system,consisting    of levelsensorelectronics, cabling,andreadoutdevices.Pleaseaddresshowindependence                    of thesecomponents      of the  primary  andback-upchannelsis achieved throughthe application    of independent  powersources,physical        and spatialseparation,  independence    of signalssentto the location(s)    of the readoutdevices.andthe independence          of the displavs.
The licensee is requested to include a brief description of the specific technical objectives to be achieved within each procedure.
RAI-10:Pleaseprovidethefollowing:                                            Complete.(Provided (a)A description  of the electrical ac power  sourcesandcapabilities RAI-10a                in response for the primaryandbackupchannels.                                            February2014status (b) Pleaseprovidethe resultsof the calculation        depicting  the battery report.Response to backupdutycyclerequirements        demonstrating    thatits capacityis      RAI-10bpostedon sufficientto maintain  the levelindication  functionuntiloffsite            ePortal.)
Complete. (Response posted on ePortal.)
resource  availabilitv is reasonably  assured.
RAI-14: Please provide the following:
RAI-11. Pleaseprovidethefollowing:                                           Complete.(Response (a)An estimateof the expectedinstrument        channelaccuracy              postedon ePortal.)
(a) Further information describing the maintenance and testing program the licensee will establish and implement to ensure that regular testing and calibration is performed and verified by inspection and audit to demonstrate conformance with design and system readiness requirements.
performance    (e.9.,in percentof span)underboth(a) normalSFP levelconditions  (approximately  Level1 or higher)and(b)at the BDB conditions  (i.e.,radiation, temperature,   humidity,  post-seismic  and post-shock  conditions) thatwouldbe    present if the SFPlevelwereat the Level2 andLevel3 datumpoints.
Include a description of your plans for ensuring that necessary channel checks, functional tests, periodic calibration, and maintenance will be conducted for the level measurement system and its supporting equipment.
(b)A description   of the methodology    thatwillbe usedfor determining the maximumalloweddeviation        fromthe instrument     channeldesign accuracy  thatwillbe employed      undernormaloperating        conditions  as an acceptance    criterionfor a calibration  procedure    to flag to operators  andto technicians    thatthe channelrequiresadjustment          to withinthe normalcondition      designaccuracy.
(b) A description of the approach and process to be used by the licensee to follow guidance in NEI 12-02 Section 4.3 regarding compensatory actions for one or both non-functioning channels.
RAI-12:Pleaseprovide        thefollowing:                                    Complete.(Response (a)A description   of the capability  andprovisions    the proposed    level postedon ePortal.)
(c) A description of the compensatory actions to be taken in the event that one of the instrument channels cannot be restored to functional status within 90 davs.
Complete. (Response posted on ePortal.)
RAI-15: Please provide a description of the in-situ calibration process at the SFP location that will result in the channel calibration beinq maintained at its desiqn accuracv.
Complete. (Response posted on ePortal.)


Attachment L-16-003 Page5 of 6 InterimStaff EvaluationOpenltem                                  Status sensingequipment    willhaveto enableperiodic    testingand calibration,including  howthiscapability  enables  theequipment    to be testedin-situ.
Attachment L-16-003 Page 6 of 6 I
(b)A description  of thetestingandcalibration    necessary  to enable the conductof regularchannelchecksof eachindependent            channel againstthe other,andagainstanyotherpermanently-installed          SFP levelinstrumentation.
References The following references support the updates to the OIP described in this attachment.
(c)A description  of the calibrationtestsandfunctional    checks processes  to be performed,  andtheirfrequency.Discussthesteps to be takento ensurethesesurveillances      willbe incorporated  into the plantsurveillance  program.
FirstEnergy Nuclear Operating Company's (FENOC's)
(d)A description  of the preventive  maintenance  tasksarerequired    to be performed    duringnormaloperation,  andthe plannedmaximum surveillance  intervalnecessary  to ensurethatthe channels      arefully conditioned  to accurately  andreliablyperformtheirfunctions    when needed.
Overall Integrated Plan in
RAI-13: Pleaseprovidea list of the proceduresaddressingoperation Complete.(Response (bothnormaland abnormalresponse),calibration,        test, maintenance, postedon ePortal.)
and inspectionproceduresthat will be developedfor use of the SFP instrumentation. The licenseeis requestedto includea brief descriptionof the specifictechnicalobjectivesto be achievedwithin each procedure.
RAI-14:Pleaseprovidethefollowing:                                        Complete.(Response (a) Furtherinformation  describing the maintenance    andtesting        postedon ePortal.)
programthe licensee    willestablishandimplement    to ensurethat regulartestingandcalibration    is performed  andverifiedby inspection andauditto demonstrate      conformance  withdesignandsystem readiness  requirements. Includea description  of yourplansfor ensuring thatnecessary    channelchecks,functional    tests,periodic calibration,andmaintenance    willbe conducted  forthe level measurement    systemandits supporting    equipment.
(b) A description  of the approachandprocessto be usedby the licensee to followguidancein NEI 12-02Section4.3 regarding compensatory    actionsfor oneor bothnon-functioning    channels.
(c)A description  of the compensatory  actionsto be takenin the eventthatoneof the instrument      channels  cannotbe restored    to functionalstatuswithin90 davs.
RAI-15:Pleaseprovidea description      of the in-situcalibration        Complete.(Response processat the SFPlocation    thatwillresultin the channelcalibration postedon ePortal.)
beinqmaintained    at itsdesiqnaccuracv.
7    PotentialInterimStaff Evaluationlmpacts Thereare no potentialimpactsto the ISEidentified                            period.
forthis reporting


Attachment L-16-003 Page6 of 6 I  References Thefollowingreferences supportthe updatesto the OIPdescribedin thisattachment.
===Response===
1 . FirstEnergyNuclearOperatingCompany's  (FENOC's)OverallIntegrated Planin Response to March12,2012Commission    Orderlssuanceof Orderto Modify LicenseswithRegardto ReliableSpentFuelPoollnstrumentation  (Order NumberEA-12-051),datedFebruary27, 2013.
to March 12, 2012 Commission Order lssuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool lnstrumentation (Order Number EA-1 2-051), dated Febru ary 27, 2013.
2 . NucfearRegulatory Commission (NRC)OrderNumberEA-12-051,     Order Modifying Licenses withRegardto ReliableSpentFuelPool    Instrumentation, datedMarch12,2012.
Nucfear Regulatory Commission (NRC) Order Number EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated March 12,2012.
3 . Davis-Besse NuclearPowerPlantUnitNo. 1 - InterimStaffEvaluation and Requestfor Additional Information Regarding the OverallIntegratedPlanfor lmplementation of OrderEA-12-051, Reliable SpentFuelPoolInstrumentation, datedDecember  11,2013.
Davis-Besse Nuclear Power Plant Unit No. 1 - Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for lmplementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, dated December 11, 2013.
4 . NRCAuditsof LicenseeResponses  to ReliableSpentFuelPoolInstrumentation OrderEA-12-051, datedMarch26,2014.}}
NRC Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051, dated March 26,2014.
1.
2.
3.
4.}}

Latest revision as of 04:09, 10 January 2025

Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)
ML16041A070
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/09/2016
From: Boles B
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-051, L-16-003
Download: ML16041A070 (9)


Text

FENOC^

\\

Fi rstEnergy Nuclear

@erating Company 5501 North State Route 2 Oak Harbon Ohio 43449 419-321-7676 Brirn D. fules Wce President, Nuelear February 9, 2016 L-16-003 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-001 10 cFR 2.2A2

SUBJECT:

Davis-Besse Nuclear Power Station Docket No. 50-346, License No. NPF-3 FirstEnerqy_Nyclear Operating Company's (FENOC's\\ S.ixth Six-Month Status Report in

Response

to March 12. 2012 Commission Order Modilyino Licenses with Reoard to Reliable Spent-F-uel Pool Instrumentation (Order Number EA-12-051)

(CAC No. MF0960)

On March 1 2,2A12, the Nuclear Regulatory Commission (NRC or Commission) issued an order (Reference

1) to FENOC. Reference 1 was immediately effective and directs FENOC to have a reliable indication of the water level in associated spent fuel storage pools. Specific requirements are outlined in Attachment 2 of Reference 1.

Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance (Reference

2) and an overall integrated plan pursuant to Section lV, Condition C. Referen ce 2 endorses industry guidance document Nuclear Energy Institute (NEI) 12-A2, Revision 1 (Reference
3) with clarifications and exeeptions identified in Reference
2. Referen e 4 provided the FENOC initial status report regarding requirements for reliable spent fuel pool instrumentation.

Reference 5 provided the FENOC overall integrated plan for Beaver Valley Power Station (BVPS),

Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station (DBNPS),

and Perry Nuclear Power Plant (PNPP).

Reference 1 requires submission of a status report at six-month intervals following submittal of the overall integrated plan. Reference 3 provides direction regarding the content of the status reports. The purpose of this letter is to provide the sixth

Davis-Besse Nuclear Power Station L-16-003 Page 2 six-month status report pursuant to Section lV, Condition C.2, of Reference 1, that delineates progress made in implementing the requirements of Reference

1. The attached report for DBNPS provides an update of milestone accomplishments since the last status report, including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.

The NRC staff also issued an interim staff evaluation (Reference

6) that included requests for additional information (RAls). The NRC staff subsequently indicated the intention to complete the ongoing review of the responses to Reference 1 by conducting audits and utilizing the ePortal system for review of RAl responses (Reference 7). The attached report has been updated to reflect this process change.

This letter contains no new regulatory commitments. lf you have any questions regarding this report, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at 330-315-0810.

I declare un{er penalty of perjury that the foregoing is true and correct. Executed on February

_q

', zo1o.

Respectfully,

    • /#e^

Brian D. Boles

Attachment:

Davis-Besse Nuclear Power Station Six'th Six-Month Status Report for the lmplementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation

References:

1.

NRC Order Number EA-12-051

, Order Modifoing Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated March 12,2012.

2.

NRC Interim Staff Guidance JLD-ISG

-2012-A3, Compliance with Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool lnstrumentation, Revision 0, dated August 29, 2412.

3.

NEI 1 2-02,Industry Guidance for Compliance with NRC Order EA-12-A51, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,"

Revision 1, dated August 2012.

FirstEnergy Nuclear Operating Company's (FENOC's)

Initial Status Report in Response to March 12,2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool lnstrumentation (Order Number EA-1 2-051), dated October 26, 2012.

FirstEnergy Nuclear Operating Company's (FENOC's)

Overall Integrated Plan in Response to March 12,2012 Commission Order lssuance of Order to Modify 4.

5.

Davis-Besse Nuclear Power Station L-16-003 Page 3 cc:

6.

7.

Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-1 2-051), dated February 27, 2013.

Davis-Besse Nuclear Power Plant Unit No. 1 - Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for f mpfementation of Order EA-1 2-051, Reliable Spent Fuel Pool Instrumentation, dated December 11,2013.

NRC Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051, dated March 26,2014,

Director, Office of Nuclear Reactor Regulation (NRR)

NRC Region lll Administrator NRC Resident Inspector NRC Project Manager Ms. Lisa M. Regner, NRR/JLD/PMB, NRC Mr. Blake A. Purnell, NRR/JLD/PMB, NRC Utility Radiological Safety Board (without Attachment)

Attachment L-16-003 Davis-Besse Nuclear Power Station Sixth Six-Month Status Report for the lmplementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation Page 1 of 6 Introduction FirstEnergy Nuclear Operating Company (FENOC) developed an Overall Integrated Plan (OlP) for Davis-Besse Nuclear Power Station (Reference 1 in Section 8),

documenting the requirements to install reliable spent fuel pool (SFP) level instrumentation (Ll), in response to Reference2. This attachment provides an update of milestone accomplishments since the last status report, including any changes to the compfiance method, schedule, or need for relieflrelaxation and the basis, if any.

2 Milestone Accomplishments The following milestone(s) have been completed since July 31,2015 and are current as of January 31,2016.

o Update 5 was submitted

. Commissioning of SFP Instrumentation 3 Milestone Schedule Status The following provides an update to the milestone schedule to support the OlP. This section provides the activity status of each item and the expected completion

date, noting any change. The dates are planning dates subject to change as design and implementation details are developed.

The milestones indicate the number assigned in the interim staff evaluation (lSE)

(Reference

3) to each request for additional information (RAl). Updates to RAI responses were posted on the ePortal as indicated in Reference 4.

There are no revised milestone target completion dates.

Attachment L-16-003 Page 2 of 6

  • lnstrumentation has been installed. Connection of backup power source is to be completed during the spring 2016 refueling outage.

4 Ghanges to Compliance Method There are no changes to the compliance method as documented in the OIP (Reference 1).

5 Need for Relief/Relaxation and Basis for the Relief/Relaxation FENOC expects to comply with the order implementation date. Relief/relaxation is not required at this time.

6 Open ltems from Overall Integrated Plan and Interim Staff Evaluation The following tables provide a summary of the open items documented in the OIP or the ISE and the status of each item.

Overall Integrated Plan Open ltem Status None Not Applicable Milestone Target Completion Date Activity Status (as of 71311151 Revised Target Completion Date Submit Six-Month Status Updates Update I Auqust 2013 Complete Update 2, including response fo /SE RAI-I, RAI-2, RAI-3, RAI-4 (except 4b schematic),

RAI-6, RAI-9, and RALI0a February 2014 Complete Update 3 Auoust 2014 Complete Update 4 February 2015 Complete Update 5 Ausust 2015 Complete Posf response fo /SE RAI-4b schematic, RAI.s, RAI-7, RAI.8, RAI-10b, RAI-I1, RAI-I2, RAI-13, RAI-14, and RAI-I5 on ePortal September 2015 Complete Update 6 February 2016 Started Commence SFP Instrumentation Desiqn 4Q12 Complete Commence SFP Instrumentation Procurement 2Q13 Complete Complete SFP Instrumentation Desion 1Q15 Complete SFP Instrumentation Delivery 4Q14 Complete Besin SFP Instrumentation Installation 2Q15 Complete Commissioninq of SFP Instrumentation 3Q15 Complete*

NRC Order lmplementation Date (based on the scheduled end of the second refueling outage after implementation plan submittal)

Sprinq 2016 Not Started Interim Staff Evaluation Open ltem Status RAI-1: Please specifv for Level t how the identified location Complete. (Provided in

Attachment L-16-003 Page 3 of 6 Interim Staff Evaluation Open ltem Status represents the higher of the two points described in the NEI 12-02 guidance for this level.

February 2014 status report.)

RAI-2: Please provide a clearly labeled sketch depicting the elevation view of the proposed typical mounting arrangement for the portions of the instrument channel consisting of permanent measurement channel equipment (e.9., fixed level sensors and/or stilling wells, and mounting brackets). Indicate on this sketch the datum values representing Level 1, Level 2, and Level 3, as well as the top of the fuel racks. Indicate on this sketch the portion of the level sensor measurement range that is sensitive to measurement of the fuel pool level, with respect to the Level 1, Level 2, and Level 3, datum points.

Complete. (Provided in February 2014 status report.)

RAI-3: Please provide a clearly labeled sketch or marked-up plant drawing of the plan view of the SFP area, depicting the SFP inside dimensions, the planned locations/placement of the primary and back-up SFP level sensor, and the proposed routing of the cables that will extend from these sensors toward the location of the read-ouVdisplay device.

Complete. (Provided in February 2014 status report.)

RAI-4: Please provide the following:

(a) The design criteria that will be used to estimate the total loading on the mounting device(s),

including static weight loads and dynamic loads. Describe the methodology that will be used to estimate the total loading, inclusive of design basis maximum seismic loads and the hydrodynamic loads that could result from pool sloshing or other etfects that could accompany such seismic forces.

(b) A description of the manner in which the level sensor (and stilling well, if appropriate) will be attached to the refueling floor and/or other support structures for each planned point of attachment of the probe assembly. Indicate in a schematic the portions of the level sensor that will serve as points of attachment for mechanical/mounting or electrical connections.

(c) A description of the manner by which the mechanical connections will attach the level instrument to permanent SFP structures so as to support the level sensor assemblv.

Complete. (Provided in February 2014 status report with exception of 4b schematic.

4b schematic posted on ePortal.)

RAI-S: For RAI 4(a) above, please provide the results of the analyses used to verify the design criteria and methodology for seismic testing of the SFP instrumentation and the electronics

units, including, design basis maximum seismic loads and the hydrodynamic loads that could result from pool sloshing or other effects that could accompanv such seismic forces.

Complete. (Response posted on ePortal.)

RAI-6: For each of the mounting attachments required to attach SFP Level equipment to plant structures, please describe the design inputs, and the methodology that was used to qualify the structural integrity of the affected structures/equipment.

Complete. (Provided in February 2014 status report.)

RAI-7: Please provide the following:

(a) A description of the specific method or combination of methods that will be applied to demonstrate the reliability of the permanently installed equipment under BDB ambient temperature,

humidity, shock, vibration, and radiation conditions.

(b) A description of the testinq and/or analvses that will be Complete. (Response posted on ePortal.)

Attachment L-16-003 Page 4 of 6 Interim Staff Evaluation Open ltem Status conducted to provide assurance that the equipment will perform reliably under the worst-case credible design basis loading at the location where the equipment will be mounted. Include a discussion of this seismic reliability demonstration as it applies to (a) the level sensor mounted in the SFP area, and (b) any control boxes, electronics, or read-out and re-transmitting devices that will be employed to convey the level information from the level sensor to the plant operators or emergency responders.

(c) A description of the specific method or combination of methods that will be used to confirm the reliability of the permanently installed equipment such that following a seismic event the instrument will maintain its required accuracv.

RAI-8: For RAI 7 above, please provide the results from the selected

methods, tests and analyses used to demonstrate the qualification and reliability of the installed equipment in accordance with the Order requirements.

Complete. (Response posted on ePortal.)

RAI-9: Please provide the following:

(a) A description of the manner the two channels of the proposed level measurement system meet the independence requirement to

minimize, to the extent pacticable, the potential for a common cause event to adversely affect both channels.

(b) Further information describing the design and installation of each level measurement system, consisting of level sensor electronics, cabling, and readout devices. Please address how independence of these components of the primary and back-up channels is achieved through the application of independent power sources, physical and spatial separation, independence of signals sent to the location(s) of the readout devices.

and the independence of the displavs.

Complete. (Provided in February 2014 status report.)

RAI-10: Please provide the following:

(a) A description of the electrical ac power sources and capabilities for the primary and backup channels.

(b) Please provide the results of the calculation depicting the battery backup duty cycle requirements demonstrating that its capacity is sufficient to maintain the level indication function until offsite resource availabilitv is reasonably assured.

Complete. (Provided RAI-10a response in February 2014 status report. Response to RAI-10b posted on ePortal.)

RAI-1 1. Please provide the following:

(a) An estimate of the expected instrument channel accuracy performance (e.9., in percent of span) under both (a) normal SFP level conditions (approximately Level 1 or higher) and (b) at the BDB conditions (i.e., radiation, temperature,

humidity, post-seismic and post-shock conditions) that would be present if the SFP level were at the Level 2 and Level 3 datum points.

(b) A description of the methodology that will be used for determining the maximum allowed deviation from the instrument channel design accuracy that will be employed under normal operating conditions as an acceptance criterion for a calibration procedure to flag to operators and to technicians that the channel requires adjustment to within the normal condition design accuracy.

Complete. (Response posted on ePortal.)

RAI-12: Please provide the following:

(a) A description of the capability and provisions the proposed level Complete. (Response posted on ePortal.)

Attachment L-16-003 Page 5 of 6 7 Potential Interim Staff Evaluation lmpacts There are no potential impacts to the ISE identified forthis reporting period.

Interim Staff Evaluation Open ltem Status sensing equipment will have to enable periodic testing and calibration, including how this capability enables the equipment to be tested in-situ.

(b) A description of the testing and calibration necessary to enable the conduct of regular channel checks of each independent channel against the other, and against any other permanently-installed SFP level instrumentation.

(c) A description of the calibration tests and functional checks processes to be performed, and their frequency. Discuss the steps to be taken to ensure these surveillances will be incorporated into the plant surveillance program.

(d) A description of the preventive maintenance tasks are required to be performed during normal operation, and the planned maximum surveillance interval necessary to ensure that the channels are fully conditioned to accurately and reliably perform their functions when needed.

RAI-13: Please provide a list of the procedures addressing operation (both normal and abnormal response), calibration, test, maintenance, and inspection procedures that will be developed for use of the SFP instrumentation.

The licensee is requested to include a brief description of the specific technical objectives to be achieved within each procedure.

Complete. (Response posted on ePortal.)

RAI-14: Please provide the following:

(a) Further information describing the maintenance and testing program the licensee will establish and implement to ensure that regular testing and calibration is performed and verified by inspection and audit to demonstrate conformance with design and system readiness requirements.

Include a description of your plans for ensuring that necessary channel checks, functional tests, periodic calibration, and maintenance will be conducted for the level measurement system and its supporting equipment.

(b) A description of the approach and process to be used by the licensee to follow guidance in NEI 12-02 Section 4.3 regarding compensatory actions for one or both non-functioning channels.

(c) A description of the compensatory actions to be taken in the event that one of the instrument channels cannot be restored to functional status within 90 davs.

Complete. (Response posted on ePortal.)

RAI-15: Please provide a description of the in-situ calibration process at the SFP location that will result in the channel calibration beinq maintained at its desiqn accuracv.

Complete. (Response posted on ePortal.)

Attachment L-16-003 Page 6 of 6 I

References The following references support the updates to the OIP described in this attachment.

FirstEnergy Nuclear Operating Company's (FENOC's)

Overall Integrated Plan in

Response

to March 12, 2012 Commission Order lssuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool lnstrumentation (Order Number EA-1 2-051), dated Febru ary 27, 2013.

Nucfear Regulatory Commission (NRC) Order Number EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated March 12,2012.

Davis-Besse Nuclear Power Plant Unit No. 1 - Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for lmplementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, dated December 11, 2013.

NRC Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051, dated March 26,2014.

1.

2.

3.

4.

FENOC^

\\

Fi rstEnergy Nuclear

@erating Company 5501 North State Route 2 Oak Harbon Ohio 43449 419-321-7676 Brirn D. fules Wce President, Nuelear February 9, 2016 L-16-003 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-001 10 cFR 2.2A2

SUBJECT:

Davis-Besse Nuclear Power Station Docket No. 50-346, License No. NPF-3 FirstEnerqy_Nyclear Operating Company's (FENOC's\\ S.ixth Six-Month Status Report in

Response

to March 12. 2012 Commission Order Modilyino Licenses with Reoard to Reliable Spent-F-uel Pool Instrumentation (Order Number EA-12-051)

(CAC No. MF0960)

On March 1 2,2A12, the Nuclear Regulatory Commission (NRC or Commission) issued an order (Reference

1) to FENOC. Reference 1 was immediately effective and directs FENOC to have a reliable indication of the water level in associated spent fuel storage pools. Specific requirements are outlined in Attachment 2 of Reference 1.

Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance (Reference

2) and an overall integrated plan pursuant to Section lV, Condition C. Referen ce 2 endorses industry guidance document Nuclear Energy Institute (NEI) 12-A2, Revision 1 (Reference
3) with clarifications and exeeptions identified in Reference
2. Referen e 4 provided the FENOC initial status report regarding requirements for reliable spent fuel pool instrumentation.

Reference 5 provided the FENOC overall integrated plan for Beaver Valley Power Station (BVPS),

Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station (DBNPS),

and Perry Nuclear Power Plant (PNPP).

Reference 1 requires submission of a status report at six-month intervals following submittal of the overall integrated plan. Reference 3 provides direction regarding the content of the status reports. The purpose of this letter is to provide the sixth

Davis-Besse Nuclear Power Station L-16-003 Page 2 six-month status report pursuant to Section lV, Condition C.2, of Reference 1, that delineates progress made in implementing the requirements of Reference

1. The attached report for DBNPS provides an update of milestone accomplishments since the last status report, including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.

The NRC staff also issued an interim staff evaluation (Reference

6) that included requests for additional information (RAls). The NRC staff subsequently indicated the intention to complete the ongoing review of the responses to Reference 1 by conducting audits and utilizing the ePortal system for review of RAl responses (Reference 7). The attached report has been updated to reflect this process change.

This letter contains no new regulatory commitments. lf you have any questions regarding this report, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at 330-315-0810.

I declare un{er penalty of perjury that the foregoing is true and correct. Executed on February

_q

', zo1o.

Respectfully,

    • /#e^

Brian D. Boles

Attachment:

Davis-Besse Nuclear Power Station Six'th Six-Month Status Report for the lmplementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation

References:

1.

NRC Order Number EA-12-051

, Order Modifoing Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated March 12,2012.

2.

NRC Interim Staff Guidance JLD-ISG

-2012-A3, Compliance with Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool lnstrumentation, Revision 0, dated August 29, 2412.

3.

NEI 1 2-02,Industry Guidance for Compliance with NRC Order EA-12-A51, "To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,"

Revision 1, dated August 2012.

FirstEnergy Nuclear Operating Company's (FENOC's)

Initial Status Report in Response to March 12,2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool lnstrumentation (Order Number EA-1 2-051), dated October 26, 2012.

FirstEnergy Nuclear Operating Company's (FENOC's)

Overall Integrated Plan in Response to March 12,2012 Commission Order lssuance of Order to Modify 4.

5.

Davis-Besse Nuclear Power Station L-16-003 Page 3 cc:

6.

7.

Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-1 2-051), dated February 27, 2013.

Davis-Besse Nuclear Power Plant Unit No. 1 - Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for f mpfementation of Order EA-1 2-051, Reliable Spent Fuel Pool Instrumentation, dated December 11,2013.

NRC Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051, dated March 26,2014,

Director, Office of Nuclear Reactor Regulation (NRR)

NRC Region lll Administrator NRC Resident Inspector NRC Project Manager Ms. Lisa M. Regner, NRR/JLD/PMB, NRC Mr. Blake A. Purnell, NRR/JLD/PMB, NRC Utility Radiological Safety Board (without Attachment)

Attachment L-16-003 Davis-Besse Nuclear Power Station Sixth Six-Month Status Report for the lmplementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation Page 1 of 6 Introduction FirstEnergy Nuclear Operating Company (FENOC) developed an Overall Integrated Plan (OlP) for Davis-Besse Nuclear Power Station (Reference 1 in Section 8),

documenting the requirements to install reliable spent fuel pool (SFP) level instrumentation (Ll), in response to Reference2. This attachment provides an update of milestone accomplishments since the last status report, including any changes to the compfiance method, schedule, or need for relieflrelaxation and the basis, if any.

2 Milestone Accomplishments The following milestone(s) have been completed since July 31,2015 and are current as of January 31,2016.

o Update 5 was submitted

. Commissioning of SFP Instrumentation 3 Milestone Schedule Status The following provides an update to the milestone schedule to support the OlP. This section provides the activity status of each item and the expected completion

date, noting any change. The dates are planning dates subject to change as design and implementation details are developed.

The milestones indicate the number assigned in the interim staff evaluation (lSE)

(Reference

3) to each request for additional information (RAl). Updates to RAI responses were posted on the ePortal as indicated in Reference 4.

There are no revised milestone target completion dates.

Attachment L-16-003 Page 2 of 6

  • lnstrumentation has been installed. Connection of backup power source is to be completed during the spring 2016 refueling outage.

4 Ghanges to Compliance Method There are no changes to the compliance method as documented in the OIP (Reference 1).

5 Need for Relief/Relaxation and Basis for the Relief/Relaxation FENOC expects to comply with the order implementation date. Relief/relaxation is not required at this time.

6 Open ltems from Overall Integrated Plan and Interim Staff Evaluation The following tables provide a summary of the open items documented in the OIP or the ISE and the status of each item.

Overall Integrated Plan Open ltem Status None Not Applicable Milestone Target Completion Date Activity Status (as of 71311151 Revised Target Completion Date Submit Six-Month Status Updates Update I Auqust 2013 Complete Update 2, including response fo /SE RAI-I, RAI-2, RAI-3, RAI-4 (except 4b schematic),

RAI-6, RAI-9, and RALI0a February 2014 Complete Update 3 Auoust 2014 Complete Update 4 February 2015 Complete Update 5 Ausust 2015 Complete Posf response fo /SE RAI-4b schematic, RAI.s, RAI-7, RAI.8, RAI-10b, RAI-I1, RAI-I2, RAI-13, RAI-14, and RAI-I5 on ePortal September 2015 Complete Update 6 February 2016 Started Commence SFP Instrumentation Desiqn 4Q12 Complete Commence SFP Instrumentation Procurement 2Q13 Complete Complete SFP Instrumentation Desion 1Q15 Complete SFP Instrumentation Delivery 4Q14 Complete Besin SFP Instrumentation Installation 2Q15 Complete Commissioninq of SFP Instrumentation 3Q15 Complete*

NRC Order lmplementation Date (based on the scheduled end of the second refueling outage after implementation plan submittal)

Sprinq 2016 Not Started Interim Staff Evaluation Open ltem Status RAI-1: Please specifv for Level t how the identified location Complete. (Provided in

Attachment L-16-003 Page 3 of 6 Interim Staff Evaluation Open ltem Status represents the higher of the two points described in the NEI 12-02 guidance for this level.

February 2014 status report.)

RAI-2: Please provide a clearly labeled sketch depicting the elevation view of the proposed typical mounting arrangement for the portions of the instrument channel consisting of permanent measurement channel equipment (e.9., fixed level sensors and/or stilling wells, and mounting brackets). Indicate on this sketch the datum values representing Level 1, Level 2, and Level 3, as well as the top of the fuel racks. Indicate on this sketch the portion of the level sensor measurement range that is sensitive to measurement of the fuel pool level, with respect to the Level 1, Level 2, and Level 3, datum points.

Complete. (Provided in February 2014 status report.)

RAI-3: Please provide a clearly labeled sketch or marked-up plant drawing of the plan view of the SFP area, depicting the SFP inside dimensions, the planned locations/placement of the primary and back-up SFP level sensor, and the proposed routing of the cables that will extend from these sensors toward the location of the read-ouVdisplay device.

Complete. (Provided in February 2014 status report.)

RAI-4: Please provide the following:

(a) The design criteria that will be used to estimate the total loading on the mounting device(s),

including static weight loads and dynamic loads. Describe the methodology that will be used to estimate the total loading, inclusive of design basis maximum seismic loads and the hydrodynamic loads that could result from pool sloshing or other etfects that could accompany such seismic forces.

(b) A description of the manner in which the level sensor (and stilling well, if appropriate) will be attached to the refueling floor and/or other support structures for each planned point of attachment of the probe assembly. Indicate in a schematic the portions of the level sensor that will serve as points of attachment for mechanical/mounting or electrical connections.

(c) A description of the manner by which the mechanical connections will attach the level instrument to permanent SFP structures so as to support the level sensor assemblv.

Complete. (Provided in February 2014 status report with exception of 4b schematic.

4b schematic posted on ePortal.)

RAI-S: For RAI 4(a) above, please provide the results of the analyses used to verify the design criteria and methodology for seismic testing of the SFP instrumentation and the electronics

units, including, design basis maximum seismic loads and the hydrodynamic loads that could result from pool sloshing or other effects that could accompanv such seismic forces.

Complete. (Response posted on ePortal.)

RAI-6: For each of the mounting attachments required to attach SFP Level equipment to plant structures, please describe the design inputs, and the methodology that was used to qualify the structural integrity of the affected structures/equipment.

Complete. (Provided in February 2014 status report.)

RAI-7: Please provide the following:

(a) A description of the specific method or combination of methods that will be applied to demonstrate the reliability of the permanently installed equipment under BDB ambient temperature,

humidity, shock, vibration, and radiation conditions.

(b) A description of the testinq and/or analvses that will be Complete. (Response posted on ePortal.)

Attachment L-16-003 Page 4 of 6 Interim Staff Evaluation Open ltem Status conducted to provide assurance that the equipment will perform reliably under the worst-case credible design basis loading at the location where the equipment will be mounted. Include a discussion of this seismic reliability demonstration as it applies to (a) the level sensor mounted in the SFP area, and (b) any control boxes, electronics, or read-out and re-transmitting devices that will be employed to convey the level information from the level sensor to the plant operators or emergency responders.

(c) A description of the specific method or combination of methods that will be used to confirm the reliability of the permanently installed equipment such that following a seismic event the instrument will maintain its required accuracv.

RAI-8: For RAI 7 above, please provide the results from the selected

methods, tests and analyses used to demonstrate the qualification and reliability of the installed equipment in accordance with the Order requirements.

Complete. (Response posted on ePortal.)

RAI-9: Please provide the following:

(a) A description of the manner the two channels of the proposed level measurement system meet the independence requirement to

minimize, to the extent pacticable, the potential for a common cause event to adversely affect both channels.

(b) Further information describing the design and installation of each level measurement system, consisting of level sensor electronics, cabling, and readout devices. Please address how independence of these components of the primary and back-up channels is achieved through the application of independent power sources, physical and spatial separation, independence of signals sent to the location(s) of the readout devices.

and the independence of the displavs.

Complete. (Provided in February 2014 status report.)

RAI-10: Please provide the following:

(a) A description of the electrical ac power sources and capabilities for the primary and backup channels.

(b) Please provide the results of the calculation depicting the battery backup duty cycle requirements demonstrating that its capacity is sufficient to maintain the level indication function until offsite resource availabilitv is reasonably assured.

Complete. (Provided RAI-10a response in February 2014 status report. Response to RAI-10b posted on ePortal.)

RAI-1 1. Please provide the following:

(a) An estimate of the expected instrument channel accuracy performance (e.9., in percent of span) under both (a) normal SFP level conditions (approximately Level 1 or higher) and (b) at the BDB conditions (i.e., radiation, temperature,

humidity, post-seismic and post-shock conditions) that would be present if the SFP level were at the Level 2 and Level 3 datum points.

(b) A description of the methodology that will be used for determining the maximum allowed deviation from the instrument channel design accuracy that will be employed under normal operating conditions as an acceptance criterion for a calibration procedure to flag to operators and to technicians that the channel requires adjustment to within the normal condition design accuracy.

Complete. (Response posted on ePortal.)

RAI-12: Please provide the following:

(a) A description of the capability and provisions the proposed level Complete. (Response posted on ePortal.)

Attachment L-16-003 Page 5 of 6 7 Potential Interim Staff Evaluation lmpacts There are no potential impacts to the ISE identified forthis reporting period.

Interim Staff Evaluation Open ltem Status sensing equipment will have to enable periodic testing and calibration, including how this capability enables the equipment to be tested in-situ.

(b) A description of the testing and calibration necessary to enable the conduct of regular channel checks of each independent channel against the other, and against any other permanently-installed SFP level instrumentation.

(c) A description of the calibration tests and functional checks processes to be performed, and their frequency. Discuss the steps to be taken to ensure these surveillances will be incorporated into the plant surveillance program.

(d) A description of the preventive maintenance tasks are required to be performed during normal operation, and the planned maximum surveillance interval necessary to ensure that the channels are fully conditioned to accurately and reliably perform their functions when needed.

RAI-13: Please provide a list of the procedures addressing operation (both normal and abnormal response), calibration, test, maintenance, and inspection procedures that will be developed for use of the SFP instrumentation.

The licensee is requested to include a brief description of the specific technical objectives to be achieved within each procedure.

Complete. (Response posted on ePortal.)

RAI-14: Please provide the following:

(a) Further information describing the maintenance and testing program the licensee will establish and implement to ensure that regular testing and calibration is performed and verified by inspection and audit to demonstrate conformance with design and system readiness requirements.

Include a description of your plans for ensuring that necessary channel checks, functional tests, periodic calibration, and maintenance will be conducted for the level measurement system and its supporting equipment.

(b) A description of the approach and process to be used by the licensee to follow guidance in NEI 12-02 Section 4.3 regarding compensatory actions for one or both non-functioning channels.

(c) A description of the compensatory actions to be taken in the event that one of the instrument channels cannot be restored to functional status within 90 davs.

Complete. (Response posted on ePortal.)

RAI-15: Please provide a description of the in-situ calibration process at the SFP location that will result in the channel calibration beinq maintained at its desiqn accuracv.

Complete. (Response posted on ePortal.)

Attachment L-16-003 Page 6 of 6 I

References The following references support the updates to the OIP described in this attachment.

FirstEnergy Nuclear Operating Company's (FENOC's)

Overall Integrated Plan in

Response

to March 12, 2012 Commission Order lssuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool lnstrumentation (Order Number EA-1 2-051), dated Febru ary 27, 2013.

Nucfear Regulatory Commission (NRC) Order Number EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated March 12,2012.

Davis-Besse Nuclear Power Plant Unit No. 1 - Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for lmplementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, dated December 11, 2013.

NRC Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051, dated March 26,2014.

1.

2.

3.

4.