{{#Wiki_filter:RFGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS             >
{{#Wiki_filter:RFGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS >
DISTRIBUTION FOR INCOMING MATERIAL                                 50-220 REC: CASE E G                           QRG:   DISE D P                     DOCDATE: 01/30/78 NRC                                      NIAGARA MOHAWK PWR                DATE RCVD: 02/02/78 DOCTYPE: OTHER     NOTARIZED: NO                                             COPIES RECEIVED
DISTRIBUTION FOR INCOMING MATERIAL 50-220 REC:
CASE E
G NRC QRG:
DISE D P NIAGARA MOHAWK PWR DOCDATE: 01/30/78 DATE RCVD: 02/02/78 DOCTYPE:
OTHER NOTARIZED:
NO


==SUBJECT:==
==SUBJECT:==
LTR 1    ENCL 1 FORWARDING FINAL REPT DESCRIBING QUALIFICATION TFST PROGRAM FOR UNIT 1,ELECT CONNECTOR/ ENTITLED: "LOCA SIMULATION TEST OF ELECTRICAL PENETRATION CONNECTOR ASSEMBLIES" DTD DEC 1977.
FORWARDING FINAL REPT DESCRIBING QUALIFICATION TFST PROGRAM FOR UNIT 1,ELECT CONNECTOR/ ENTITLED:
PLANT NAMF: NINE MILE PT UNIT             1                     REV IEIJER  INIT I AL: X JM DISTRIBUTOR     INITIAL:
"LOCA SIMULATION TEST OF ELECTRICAL PENETRATION CONNECTOR ASSEMBLIES"DTD DEC 1977.
DISTRIBUTIQN OF THIS MATERIAL IS AS FOLLOWS GENFRAL DISTRIBUTION FOR AFTER ISSUANCE QF OPERATING LICENSE.
COPIES RECEIVED LTR 1
    <DISTRIBUTION CODE A001)
ENCL 1
FOR ACTION      BRANCH CH                   R~~W/7 ENCL INTERNAL:       REG     FILE+4W/ENC                       NRC PDR~+W/ENCL    "
PLANT NAMF: NINE MILE PT UNIT 1
OELD+4ILTR ONLY HANAUER+4W/ENCL                           CHECK++W/ENCL E I SENHUT++W/ENCL                        SHAO+~W/ENCL BAER4+W/ENCL'RIMES++W/ENCL BUTLER+4W/ENCL J. COLLINS'W/ENCL J. MCGOUGH)+W/ENCL f(
REVIEIJER INITIAL:
EXTERNAL:        LPDR S OSWEGO, fNY+%W/ENCL TIC44W/ENCL'SIC4+W/ENCL ACRS       CAT B+4W/16 ENCL DISTRIBUTION:   LTR 40           ENCL 39                         CONTROL NBR:      780330047 SIZE: 1P+19P THE END
XJM DISTRIBUTOR INITIAL:
DISTRIBUTIQN OF THIS MATERIAL IS AS FOLLOWS R~~W/7 ENCL FOR ACTION GENFRAL DISTRIBUTION FOR AFTER ISSUANCE QF OPERATING LICENSE.
<DISTRIBUTION CODE A001)
BRANCH CH INTERNAL:
EXTERNAL:
REG FILE+4W/ENC HANAUER+4W/ENCL EISENHUT++W/ENCL BAER4+W/ENCL'RIMES++W/ENCL J.
MCGOUGH)+W/ENCL f(
LPDR S
: OSWEGO, fNY+%W/ENCL TIC44W/ENCL'SIC4+W/ENCL ACRS CAT B+4W/16 ENCL NRC PDR~+W/ENCL OELD+4ILTR ONLY CHECK++W/ENCL SHAO+~W/ENCL BUTLER+4W/ENCL J.
COLLINS'W/ENCL DISTRIBUTION:
LTR 40 ENCL 39 SIZE:
1P+19P THE END CONTROL NBR:
780330047


I
I
                                                          ),, ',>i,,"',,)IiV, It(')ii~,Pi i'i'fltI I  ti>>/f1 MOHAWK POWER CORPORATION l,'l[)I'IAGARA NIAGARA   '~
 
                                      >IilUaii MOHAWK Mk.
),, ',>i,,"',,)IiV, It(')ii~,Pi i'i'fltII ti>>/f1 l,'l[)I'IAGARA MOHAWKPOWER CORPORATION
P] g 300 ERIE BOULEVARD, WEST SYRACUSE, N. Y. 13202                                                   y                          I*
>IilUaii NIAGARA '~
January 30, 1978
MOHAWK 300 ERIE BOULEVARD, WEST SYRACUSE, N. Y. 13202 January 30, 1978 Mr. Edson G.
                                                                                                ~l4'~IO A H              'O4t Mr. Edson G. Case, Acting   Director                                                         Cy P
: Case, Acting Director Office of Nuclear Reactor Regulation U.
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re:   Nine Mile Point Unit 1 Docket No. 50-220 DPR-63
S. Nuclear Regulatory Commission Washington, D.
C.
20555 Mk.
P]
g y
I*
~
'~IO
'O4t l4 A
H Cy P
Re:
Nine Mile Point Unit 1 Docket No. 50-220 DPR-63


==Dear Mr. Case:==
==Dear Mr. Case:==
Enclosed is the final report describing the qualification test program for the Nine Mile Point Unit 1 electrical connectors.
Enclosed is the final report describing the qualification test program for the Nine Mile Point Unit 1 electrical connectors.
The electrical connectors   satisfactorily       passed     the simulated loss of coolant accident environment test.
The electrical connectors satisfactorily passed the simulated loss of coolant accident environment test.
My November 30, 1977 letter indicated that an additional test of the electrical connectors would be performed simulating a loss of coolant environment with radiation effects.                         This test is scheduled to be completed in March, 1978, and the test report will be submitted by April 1, 1978.
My {{letter dated|date=November 30, 1977|text=November 30, 1977 letter}} indicated that an additional test of the electrical connectors would be performed simulating a loss of coolant environment with radiation effects.
Very     truly yours, NIAGARA MOHAWK POWER CORPORATION 7gQ33QQ47 Donald P. Disc Vice President-Engineering
This test is scheduled to be completed in March,
: 1978, and the test report will be submitted by April 1, 1978.
Very truly yours, NIAGARA MOHAWK POWER CORPORATION Donald P. Disc Vice President-Engineering 7gQ33QQ47
/szd Enclosure
/szd Enclosure


I}}
I}}

Latest revision as of 15:00, 9 January 2025

Letter Regarding the Final Report Describing the Qualification Test Program for Electrical Connectors and Additional Test of the Electrical Connectors Performed Simulating a Loss of Coolant Environment with Radiation Effects
ML17037B581
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 01/30/1978
From: Dise D
Niagara Mohawk Power Corp
To: Case E
Office of Nuclear Reactor Regulation
References
Download: ML17037B581 (4)


Text

RFGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS >

DISTRIBUTION FOR INCOMING MATERIAL 50-220 REC:

CASE E

G NRC QRG:

DISE D P NIAGARA MOHAWK PWR DOCDATE: 01/30/78 DATE RCVD: 02/02/78 DOCTYPE:

OTHER NOTARIZED:

NO

SUBJECT:

FORWARDING FINAL REPT DESCRIBING QUALIFICATION TFST PROGRAM FOR UNIT 1,ELECT CONNECTOR/ ENTITLED:

"LOCA SIMULATION TEST OF ELECTRICAL PENETRATION CONNECTOR ASSEMBLIES"DTD DEC 1977.

COPIES RECEIVED LTR 1

ENCL 1

PLANT NAMF: NINE MILE PT UNIT 1

REVIEIJER INITIAL:

XJM DISTRIBUTOR INITIAL:

DISTRIBUTIQN OF THIS MATERIAL IS AS FOLLOWS R~~W/7 ENCL FOR ACTION GENFRAL DISTRIBUTION FOR AFTER ISSUANCE QF OPERATING LICENSE.

<DISTRIBUTION CODE A001)

BRANCH CH INTERNAL:

EXTERNAL:

REG FILE+4W/ENC HANAUER+4W/ENCL EISENHUT++W/ENCL BAER4+W/ENCL'RIMES++W/ENCL J.

MCGOUGH)+W/ENCL f(

LPDR S

OSWEGO, fNY+%W/ENCL TIC44W/ENCL'SIC4+W/ENCL ACRS CAT B+4W/16 ENCL NRC PDR~+W/ENCL OELD+4ILTR ONLY CHECK++W/ENCL SHAO+~W/ENCL BUTLER+4W/ENCL J.

COLLINS'W/ENCL DISTRIBUTION:

LTR 40 ENCL 39 SIZE:

1P+19P THE END CONTROL NBR:

780330047

I

),, ',>i,,"',,)IiV, It(')ii~,Pi i'i'fltII ti>>/f1 l,'l[)I'IAGARA MOHAWKPOWER CORPORATION

>IilUaii NIAGARA '~

MOHAWK 300 ERIE BOULEVARD, WEST SYRACUSE, N. Y. 13202 January 30, 1978 Mr. Edson G.

Case, Acting Director Office of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555 Mk.

P]

g y

I*

~

'~IO

'O4t l4 A

H Cy P

Re:

Nine Mile Point Unit 1 Docket No. 50-220 DPR-63

Dear Mr. Case:

Enclosed is the final report describing the qualification test program for the Nine Mile Point Unit 1 electrical connectors.

The electrical connectors satisfactorily passed the simulated loss of coolant accident environment test.

My November 30, 1977 letter indicated that an additional test of the electrical connectors would be performed simulating a loss of coolant environment with radiation effects.

This test is scheduled to be completed in March,

1978, and the test report will be submitted by April 1, 1978.

Very truly yours, NIAGARA MOHAWK POWER CORPORATION Donald P. Disc Vice President-Engineering 7gQ33QQ47

/szd Enclosure

I