ML17209A655: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO.       50     250 Turkey Point DATE     Feb. 7 1981 COMPLETED IIY         V. T . Chilson MONTH         JANUARY           1 98 1 DAY       AVERAGE DAILYPOWER LEVEL                            DAY        AVERAGE DAILYPOWER LEVEL (MWe.Net)                                                     (MWe.Net) 679                                                          67 676                                I8                      684 441                                  19                      684 20                      682 646                                21                      681 673                                22                      682 675                                23                        684 675                                24                      683 681                                25                      687 10                         684                                 26 683                                                         684 684                                 28                       682 13 685                                '79                     681 684                                30                       681 15                          680                                31                       679 16                          678                                NOTE:       Average       daily power level greater than 646 MNe due to cooler condenser         cooling water.
{{#Wiki_filter:AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.
INSTRUCTIONS On this format. list the average daily onit power Ie~q! in MWe-Net for each day in the rePorting Illonth. Compote to the nearest whole megawat t.
50 250 Turkey Point DATE Feb.
7 1981 COMPLETED IIY V. T. Chilson MONTH JANUARY 1 98 1 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 679 676 441 646 673 675 675 681 DAY I8 19 20 21 22 23 24 25 AVERAGE DAILYPOWER LEVEL (MWe.Net) 67 684 684 682 681 682 684 683 687 10 13 15 16 INSTRUCTIONS 684 683 684 685 684 680 678 26 28
'79 30 31 NOTE:
684 682 681 681 679 Average daily power level greater than 646 MNe due to cooler condenser cooling water.
On this format. list the average daily onit power Ie~q! in MWe-Net for each day in the rePorting Illonth. Compote to the nearest whole megawat t.
(o/77)
(o/77)


U OPERATING DATA REPORT DOCKET NO.
U
DATE   X~~1981 COMPLETED BY     ~Mhilson TELEPHONE     ~~-3824 OPERATING STATUS Turke     Point Unit No.                   Notes  - Unit No. 3 operated
 
: l. Unit Name:                                                 3 at approximately 100% R.P.,
OPERATING DATAREPORT DOCKET NO.
DATE X~~1981 COMPLETED BY ~Mhilson TELEPHONE ~~-3824 OPERATING STATUS Turke Point Unit No.
3 760 693 680 646
: l. Unit Name:
: 2. Reporting Period:
: 2. Reporting Period:
except for outage of Jan.3-4,
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):                                         1981..
: 4. Nameplate Rating (Gross tgIWe):
: 4. Nameplate Rating (Gross tgIWe):                   760
: 5. Design Electrical Rating (Net MWe):
: 5. Design Electrical Rating (Net MWe):               693
: 6. Maximum Dependable Capacity (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):                 680
: 7. Maximum Dependable Capacity (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):                   646
Notes - Unit No.
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
3 operated at approximately 100% R.P.,
: 9. Power Level To Which Restricted. If Any (Net MWe):             NONE
except for outage of Jan.3-4, 1981..
: 10. Reasons For Restrictions. If Any:
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
This Month             Yr.-to-Date         Cumulative
: 9. Power Level To Which Restricted. IfAny (Net MWe):
: 11. Hours ln Reporting Period                             744.0                 744.0             71  529.6
: 10. Reasons For Restrictions. IfAny:
: 12. Number Of Hours Reactor Was Critical             ~     720.4                720.4             55  021.2
NONE This Month Yr.-to-Date Cumulative 71 529.6 720.4 55 021.2 213.4 21.6 121.8 107 732 690 1 560 412 34 221 445 32 393 084 483 59 74.4 96.0 74.6 96.0 70.4 65.3 2.5
: 13. Reactor Reserve Shutdown Hours                                                                 213.4
: 11. Hours ln Reporting Period 744.0 744.0
: 14. Hours Generator On-Line                                                                           21 .6
: 12. Number Of Hours Reactor Was Critical
: 15. Unit Reserve Shutdown Hours                                                                   121.8
~
: 16. Gross Thermal Energy Generated (MWH)               1 560     412         1  560 412          107 732 690 la. Gross Electrical Energy Generated (MWH)                                       508 235           34 221 445 483 59                                  32 393 084
720.4
: 19. Unit Service Factor                                       96.0                 96.0                  74.4
: 13. Reactor Reserve Shutdown Hours
: 20. Unit Availability Factor                                 96.0                 96.0                  74.6 70.4
: 14. Hours Generator On-Line
: 22. Unit Capacity Factor (Using DER Net)                                           93.8                 65.3
: 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 1 560 412 la. Gross Electrical Energy Generated (MWH) 508 235
: 23. Unit Forced Outage Rate                                                                           2.5
: 19. Unit Service Factor 96.0
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration     of Each):
: 20. Unit Availability Factor 96.0
n   maintenance       and   ins ections       - Harch 1, 1981       gglay 8, 1981
: 22. Unit Capacity Factor (Using DER Net) 93.8
: 25. If Shut Down At End Of Report Period, Estimated Date     of Startup:
: 23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
: 26. Units In Test Status (Prior to Commercial Operation):                       Forecast           Achieved INITIAL CRITICAI.ITY INITIALELECTRICITY COMMERCIAL OPERATION
n maintenance and ins ections - Harch 1, 1981 gglay 8, 1981
: 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICAI.ITY INITIALELECTRICITY COMMERCIALOPERATION
('>/77)
('>/77)


Line 54: Line 64:
n
n


DOCKET NO           50 250 UNIT SHUTDOWNS AND.POWER REDUCTIONS                                                      Point Unit No.3 UNITNAMF Turke COMPLETED BY REPORThIONTH JANUARY          1981 rg Llccllscc                                     Cause A. Corrective No.          Dale                      ~ A j                Eve Ill                                            Action to .
UNITSHUTDOWNS AND.POWER REDUCTIONS REPORThIONTH JANUARY 1981 DOCKET NO 50 250 UNITNAMF Turke Point Unit No.3 COMPLETED BY No.
Report >                                      Prevent Recurrence 01     81-01-03     S     29.7   .                                    ZZ     ZZZZZZ     Unit No. 3 was removed from service to perform Integrated Engineered Safeguards Surveillance Test.
Dale rg
(Nuclear System) 3                                  4 F: Forced         Reason.                                            Method:                              Exhibit G - Instructions S: Schedu!cd     A-Equipmenl Failure (Explain)                     I -Manual                            lor Preparation of Data B-htaintenance nr Test   ~
~Aj Llccllscc Eve Ill Report >
2-hlanual Scram.                     I.'nlry Sheets I'or Licensee C-Refueling                                        3.Alllollmtlc Sera la.              Evclll Report (LLR) File (NUREG.
Cause A. Corrective Action to Prevent Recurrence 01 81-01-03 S
D-Regulatory Restriction                          4-Qtl+c (I.xplain)-Continuin g      OI61)
29.7 ZZ ZZZZZZ Unit No.
E-Operator Trainittg8c Uccnsc Examination          5-Load Reduction F-Administrative G.Operational Error (Explain)                       9-Other (Explain)                   Exhibit   I - Satnc Source
3 was removed from service to perform Integrated Engineered Safeguards Surveillance Test.
('t/17)              I I-Other (Explain)
(Nuclear System)
F: Forced S: Schedu!cd
('t/17)
Reason.
A-Equipmenl Failure (Explain)
B-htaintenance nr Test
~
C-Refueling D-Regulatory Restriction E-Operator Trainittg8c Uccnsc Examination F-Administrative G.Operational Error (Explain)
I I-Other (Explain) 3 Method:
I -Manual 2-hlanual Scram.
3.Alllollmtlc Sera la.
4-Qtl+c (I.xplain)-Continuin 5-Load Reduction 9-Other (Explain) 4 Exhibit G - Instructions lor Preparation of Data I.'nlry Sheets I'or Licensee Evclll Report (LLR) File (NUREG.
g OI61)
Exhibit I - Satnc Source


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. Turkey Point DATE COMPLETED BY MONTH JANUARY 1981 DAY AVERAGE DAILYPOWER LEVEL IMWe.Net) lo 12 l3 41 DAY l7 l8 I9 20 2I 23
Turkey Point DATE COMPLETED BY MONTH           JANUARY           1981 DAY       AVERAGE DAILYPOWER LEVEL                               DAY       AVERAGE DAlLYPOWER LEVEL IMWe.Net)                                                    (MWe.Net) l7                      662 l8                      668 I9                      664 20                      663 2I                      666 677 23                      682 681
'>5 26 28 30 AVERAGE DAlLYPOWER LEVEL (MWe.Net) 662 668 664 663 666 677 682 681 684 682 682 682 682 681 IS l6 INSTRUCTIONS 299 589 31 NOTE:
                                                                  '>5                      684 lo                                                                26                      682 682 12                                                                28                      682 l3                                                                                        682 41                                30                      681 IS                           299                                 31                       679 l6                          589                                  NOTE:       Average       daily power level greater than 646 MWe due to cooler condenser cooling water.
679 Average daily power level greater than 646 MWe due to cooler condenser cooling water.
INSTRUCTIONS Qn this fortnat. list the average daily unit p>>wer le> e! in MWe Net for each day in the rept>rting >n>>nth. Ci>ntpute to the nearest whole megawat t.
Qn this fortnat. list the average daily unit p>>wer le> e! in MWe Net for each day in the rept>rting >n>>nth. Ci>ntpute to the nearest whole megawat t.
Io/77 I
Io/77 I


OPERATING DATA REPORT DOCKET NO.
OPERATING DATAREPORT OPERATING STATUS Turke Point Unit No.
DATE    Jr~7~)1 COMPLETED BY        V.T. Chilson TELEPHONE      ~0 552-3824 OPERATING STATUS Turke     Point Unit      No. 4          Notes  Unit No. 4 operated at
4 2200 760 680 646
: 1. Unit Name:                                                           approximately 100% R.P.after
: 1. Unit Name:
: 2. Reporting Period:
: 2. Reporting Period:
2200 the    unit  was  returned to
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):                                         service on Jan. 14,          1981, MWe):                  760                            for  outages    of Jan.
: 4. Nameolate Rating (Gross MWe):
: 4. Nameolate Rating (Gross                                               except
: 5. Design Electrical Rating (Net MWe):
: 5. Design Electrical Rating (Net MWe):                                   14 and 15, 1981.
: 6. Maximum Dependable Capacity (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):                 680
: 7. Maximum Dependable Capacity (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):                   646
DOCKET NO.
DATE Jr~7~)1 COMPLETED BY V.T.Chilson TELEPHONE ~0 552-3824 Notes Unit No.
4 operated at approximately 100% R.P.after the unit was returned to service on Jan.
14, 1981, except for outages of Jan.
14 and 15, 1981.
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted. If Any (Net MWe):           NONE
: 9. Power Level To Which Restricted. IfAny (Net MWe):
: 10. Reasons For Restrictions, If Any:
: 10. Reasons For Restrictions, IfAny:
This Month          Yr.-to.Date          Cumulative I I. Hours In Reporting Period                             744.0              744.0              65 257.0
NONE I I. Hours In Reporting Period
: 12. Number Of Hours Reactor Was Critical                   468.5              468.5              47 481.3
: 12. Number Of Hours Reactor Was Critical
: 13. Reactor Reserve Shutdown Hours 166.6
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator On-Line                               414.0              414.0              45 693.0
: 14. Hours Generator On-Line
: 15. Unit Reserve Shutdown Hours                                                                   31.2
: 15. Unit Reserve Shutdown Hours
: 16. Gross Thermal Energy Generated (MWH)                   863 183            863 183            95 244 538 I'7. Gross Electrical Energy Generated (MWH)               279 600            279 600            30 252 773
: 16. Gross Thermal Energy Generated (MWH)
: 18. Net Electrical Energy Generated (MWH)                 263 180            263 180            28 647 200
I'7. Gross Electrical Energy Generated (MWH)
: 19. Unit Service Factor                                     55.6                55.6                    70.0
: 18. Net Electrical Energy Generated (MWH)
: 20. Unit Availability Factor                                55.6                55.6                    70.1
: 19. Unit Service Factor
: 21. Unit Capacity Factor (Using MDC Net)                     54.8                54.8                    68.2
: 20. Unit AvailabilityFactor
: 22. Unit Capacity Factor (Using DER Net)                     51.0                51.0                    63.3'.9
: 21. Unit Capacity Factor (Using MDC Net)
: 23. Unit Forced Outage   Rate                                 0.7                0.7
: 22. Unit Capacity Factor (Using DER Net)
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration   of Each):
: 23. Unit Forced Outage Rate
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:       N A
: 24. Shutdowns Scheduled Over Next 6 Months (Type, This Month 744.0 468.5 414.0 863 183 279 600 263 180 55.6 55.6 54.8 51.0 0.7 Yr.-to.Date 744.0 468.5 414.0 863 183 279 600 263 180 55.6 55.6 54.8 51.0 0.7 Date, and Duration of Each):
: 26. Units In Test Status (Prior to Commercial Operation):                     Forecast             Achieved I NITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
Cumulative 65 257.0 47 481.3 166.6 45 693.0 31.2 95 244 538 30 252 773 28 647 200 70.0 70.1 68.2 63.3'.9
: 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):
N A Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION


DOCKET NO.           50     251 UNIT SIIUTDOWNS AND POIVER REDUCTIONS                                            Turke     Point Unit No. 4 UNIT NAME REPORT MON fII      JANUARY, 1981 Page 1 of   2 Cl~
UNITSIIUTDOWNS AND POIVER REDUCTIONS DOCKET NO.
Llccnscc O
50 251 UNITNAME Turke Point Unit No. 4 REPORT MONfII JANUARY, 1981 Page 1 of 2 V>>.
Cause  & Corrective V>>.           Dale                         ~ A             F.vent                   e>                         Action t>>
Dale O
O                          Report                      O-                    Prevent Rccurrcnce 21       80-11-08         325.2.                                         RC     FUELXX     Unit No. 4 was removed from             service for scheduled refueling, maintenance, and inspections.         (Continued from previous month)         (Nuclear and Non-nuclear system)
~A Llccnscc F.vent Report Cl~
  '01       81-01-14             2.5         A                             HH     zzzzzz     Unit was tripped during a transient condition by steam .-generator No. 4A level protection system while in-creasing load after the unit was returned to service. (Non-nuclear system)
O e>
F: I orced       Reason:                                              Method:                            Exhibit C - Instructions S: Scheduled     A.Equipment Failure (Explain)                         I -Manual                          I'or Preparation of Data B.Maintenance or Test                                 2-hlanual Scram.                    Entry Sheets Ior Licensee C-Refueling                                           3-Autonlatic Scrant.                Event Report    (LLR) File (NUREC-D Regulatory Restriction                                               Continuing        016I )
O-Cause & Corrective Action t>>
E-Operator Training & License Examination             5-Load Reduction F-Administralivc G.Operational L'rror (Explain)                       9-Other (Explain)                   Exhibit   I - Sa>nc Source
Prevent Rccurrcnce 21 80-11-08 325.2.
('I/77)              I I.Other (Explair>)
RC FUELXX Unit No.
4 was removed from service for scheduled refueling, maintenance, and inspections.
(Continued from previous month)
(Nuclear and Non-nuclear system)
'01 81-01-14 2.5 A
HH zzzzzz Unit was tripped during a transient condition by steam.-generator No. 4A level protection system while in-creasing load after the unit was returned to service.
(Non-nuclear system)
F:
I orced S: Scheduled
('I/77)
Reason:
A.Equipment Failure (Explain)
B.Maintenance or Test C-Refueling D Regulatory Restriction E-Operator Training & License Examination F-Administralivc G.Operational L'rror (Explain)
I I.Other (Explair>)
Method:
I -Manual 2-hlanual Scram.
3-Autonlatic Scrant.
Continuing 5-Load Reduction 9-Other (Explain)
Exhibit C - Instructions I'or Preparation of Data Entry Sheets Ior Licensee Event Report (LLR) File (NUREC-016I )
Exhibit I - Sa>nc Source


DOCKET NO          50  251 UNIT SHUTDO'1VNS AND POIVER REDUCTIONS                                                 1 ke Po> nt Uni'o 4 Page 2 of   2 r
UNITSHUTDO'1VNS AND POIVER REDUCTIONS DOCKET NO 50 251 1 ke Po> nt Uni'o4 Page 2 of 2 NII.
I IA I
Date IA I
Llccltscc       Cl Cause & C>>rrect ive NI I.          Date                        MI Event          IA
I MI J
                                                                                    'o                                    Action l>>
r
J Report ~        cn'G                                Prevent Recurrcncc
~ C/)
                                                  ~ C/)
Llccltscc Event Report ~
HA      INSTRU      Unit  was removed from            service to 02           81-01-15 S protection (G)       test   turbine overspeed trip device.       (Non-nuclear) 03           81-01-15 P         0.6                                           HH     zzzzzz     Unit   was tripped by steam generator No. 4A level protection system while increasing load after the unit was returned to service. (Non-nuclear system) 3 I:   Forced         Reason:                                                Method:                                Exltibit G - Instructions S: Scltedulcd         A-Erluipntent Failure (Explain)                     ~ I-Manual                              for Preparation ot Data II-Maintenance or Test .                               2-hI anual Scram.                     Entry Sheets for Licensee C-Refueling                                            3 Auto<<tat lc Scfanl.                 Event Report (LER) File (NUREG-D Regulatory Restriction                              4-Otlter+Expianr}Cont: inu ing        OI 6 I )
Cl 'o IA cn'G Cause & C>>rrect ive Action l>>
E-Operal>>r Training & License Exantinalion            5-Load Reduction F-Administrative                                      9-Other (Explain)
Prevent Recurrcncc 02 81-01-15 S
G.Operational Error (Explain)                                                                 Exltibit I - Sante S>>urcc II}/77)                  I I.Other (Explai<<)
HA INSTRU (G)
Unit was removed from service to test turbine overspeed protection trip device.
(Non-nuclear) 03 81-01-15 P
0.6 HH zzzzzz Unit was tripped by steam generator No.
4A level protection system while increasing load after the unit was returned to service.
(Non-nuclear system)
I: Forced S: Scltedulcd II}/77)
Reason:
A-Erluipntent Failure (Explain)
II-Maintenance or Test.
C-Refueling D Regulatory Restriction E-Operal>>r Training & License Exantinalion F-Administrative G.Operational Error (Explain)
I I.Other (Explai<<)
3 Method:
~
I-Manual 2-hIanual Scram.
3 Auto<<tat lc Scfanl.
4-Otlter+Expianr}Cont:inuing 5-Load Reduction 9-Other (Explain)
Exltibit G - Instructions for Preparation ot Data Entry Sheets for Licensee Event Report (LER) File (NUREG-OI 6 I )
Exltibit I - Sante S>>urcc


0 h
0 h
l
l


AVERAGE DAlLY UNIT POWER LEVEL DOCKET Ng.
AVERAGE DAlLYUNIT POWER LEVEL DOCKET Ng. St. Lucre Feb.
St. Lucre Feb. 7     1981 COMPLETED IIY         V     T   C113.1 son TELEPHONE MONTH           JANUARY         1981 DAY       AVERAGE DAILYPOWER LEVEL                              DAY          AVERAGE DAILYPOWER LEVEL (MWe.Net)                                                       (>>>IWe-Net I l7                      578 799                                   l8                      799 797                                                            802 4                       798                                   20                       802 798                                  2I                       800 798                                  22                       797 799                                  23                       797 796                                  24                       796 798                                  '>5                       798 10                        801                                                            799 800                                    7'>                     801 800                                  28                       799 l3                        801                                    >9                     788 801                                  30                       786 IS                        802                                  3l                       785 l6                        614                                  NOTE:         Average       daily power level greateX than 777 NWe due           to cooler condenser cooling water.
7 1981 COMPLETED IIY V
INSTRUCTIONS On this format.list the average daily unit p>>wer le> el in MWe-Net   for each day in the rep<>rting lllonth. C>>inputc to the nearest whole megawatt.
T C113.1 son TELEPHONE MONTH JANUARY 1981 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 799 797 DAY l7 l8 AVERAGE DAILYPOWER LEVEL
(>>>IWe-Net I 578 799 802 4
10 l3 IS l6 INSTRUCTIONS 798 798 798 799 796 798 801 800 800 801 801 802 614 20 2I 22 23 24
'>5 7'>
28
>9 30 3l NOTE:
802 800 797 797 796 798 799 801 799 788 786 785 Average daily power level greateX than 777 NWe due to cooler condenser cooling water.
On this format.list the average daily unit p>>wer le> el in MWe-Net for each day in the rep<>rting lllonth. C>>inputc to the nearest whole megawatt.
('>/77)
('>/77)


a OPERATING DATA REPORT DOCKET NO.
a
DATE    +~7        1981 COMPLETED BY TELEPHONE
 
                                                                                                        ~~~on
OPERATING DATAREPORT OPERATING STATUS St. Lucie Unit No.
                                                                                                        ~~V=3824 OPERATING STATUS St. Lucie Unit No.         1             Notes  - Unit operated at ap-I. Unit Name:                                                           proximately 100% R.P.,
1 850 802 I. Unit Name:
: 2. Reporting Period:                                                     except for load reduction
: 2. Reporting Period:
: 3. Licensed Thermal Power (MWt):                                         of Jan. 16-17, 1981.
: 3. Licensed Thermal Power (MWt):
: 4. Nameplate Rating (Gross MWe):                     850
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):               802
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross hlWe):
: 6. Maximum Dependable Capacity (Gross hlWe):
: 7. Maximum Dependable Capacity (Net hIWe):
: 7. Maximum Dependable Capacity (Net hIWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
DOCKET NO.
: 9. Power Level To Which Restricted, If Any (Net MWe):             NONE
DATE +~7 1981 COMPLETED BY ~~~on TELEPHONE ~~V=3824 Notes - Unit operated at ap-proximately 100% R.P.,
: 10. Reasons For Restrictions, If Any:
except for load reduction of Jan.
Thls%onth           Yr..to-Date           Cumltiative
16-17, 1981.
: 11. Hours In Reporting Period                             744:0              744.0                36 072.0
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 12. Number   Of Hours Reactor Was Critical                                     744. 0  '44,0 29 169.3
: 9. Power Level To Which Restricted, IfAny (Net MWe):
: 13. Reactor Reserve   Shutdown Hours 129.5
: 10. Reasons For Restrictions, IfAny:
: 14. Hours Generator On-Line                               744.0              744.0                28  425.1 IS. Unit Reserve Shutdown Hours                                                                       39.3 1 873 725          1 873 725                69 121 873
NONE Thls%onth Yr..to-Date
                                                                        '83
: 11. Hours In Reporting Period
: 12. Number Of Hours Reactor Was Critical
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator On-Line IS. Unit Reserve Shutdown Hours
: 16. Gross Thermal Energy Generated (MWH)
: 16. Gross Thermal Energy Generated (MWH)
I7. Gross Electrical Energy Generated (MWH)               616    680          616 680              22 426 540 IS. Net Electrical Energy Generated (MWH)                 583'92                    892            21 111 378
I7. Gross Electrical Energy Generated (MWH)
: 19. Unit Service Factor                                   100. 0            100.0                      78.8
IS. Net Electrical Energy Generated (MWH)
: 20. Unit Availability Factor                               100.0              100.0                      78.9
: 19. Unit Service Factor
: 21. Unit Capacity Factor (Using MDC Net)                   101.0              101.0                      75.3
: 20. Unit Availability Factor
: 22. Unit Capacity Factor (Using DER Net)                     97.9              97.9                      73.0
: 21. Unit Capacity Factor (Using MDC Net)
: 23. Unit Forced Outage Rate                                                                       5.6
: 22. Unit Capacity Factor (Using DER Net)
: 24. Shutdowns Scheduled Over Next 6 Months {Type, Date. and Duration of Each):
: 23. Unit Forced Outage Rate
: 25. If Shut Down At End Of Report Period. Estimated Date     of Startup:   N/A
: 24. Shutdowns Scheduled Over Next 6 Months 744:0 744.0 744. 0 '44,0 744.0 744.0 1 873 725 1 873 725 616 680 616 680 583'92 '83 892 100.0 100.0 100. 0 100.0 101.0 101.0 97.9 97.9 {Type, Date. and Duration of Each):
: 26. Units In Test Status (Prior to Commercial Operation):                     Forecast               Achieved IN ITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION I'>/77 )
Cumltiative 36 072.0 29 169.3 129.5 28 425.1 39.3 69 121 873 22 426 540 21 111 378 78.8 78.9 75.3 73.0 5.6
: 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):
N/A Forecast Achieved IN ITIAL CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION I'>/77 )


DOCKET NO.
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS                                            St. Lul''Ie   U   No.l UNIT NAhjE REPORT MON fll JANUARY       1981 n      Licensee                                      Cause  & C<lrrectivc Nii.         Date                       ~ A                 Event                                              Action lu Q
UNITNAhjE St. Lul''Ie U No.l REPORT MONfll JANUARY 1981 Nii.
                                                ~
Date
qp r/l       Report =                                     Prevent Rccurrcnce 01       81-01-16                       B                               HH     PUIIPXX     Load reduction to repair upin-hole" size leak in the discharge nozzle of steam generator 'feedwater pump No. 1A. Corrective actions included repair by welding. (Non-nuclear system)
~A Q
I F: Forced         Reason:                                              Method:                            Exhibit G Instructions
n qp~ r/l Licensee Event Report =
                                                                                                                            ~
Cause & C<lrrectivc Action lu Prevent Rccurrcnce 01 81-01-16 B
S: Schcdu!ed     A.Equipmenl Failure (Explain)                       I-Manual                            I'or Preparation of Data B.Maintenance oi Test                               2.Manual Scram.                    Entry Sheets I'or Licensee
HH PUIIPXX Load reduction to repair upin-hole" size leak in the discharge nozzle of steam generator 'feedwater pump No. 1A.
( -Refueling                                         3-Autotnatic Scraln.                Event Report    (I.I R) File (NUREG-D.Regulalury Restriction                             4.Other<k~p4!n) Continuing          OI6I)
Corrective actions included repair by welding.
I'..Operator Training & Liccnsc Fxamination         5-Load Reduction F-Administ rat ive G.Operational Errur (Explain) 9-Other (Explain)                   Exhibit   I - Scone Source
(Non-nuclear system)
(']/77)              I I.Other (Explahr)
I F: Forced S: Schcdu!ed
(']/77)
Reason:
A.Equipmenl Failure (Explain)
B.Maintenance oi Test
( -Refueling D.Regulalury Restriction I'..Operator Training & Liccnsc Fxamination F-Administ rat ive G.Operational Errur (Explain)
I I.Other (Explahr)
Method:
I-Manual 2.Manual Scram.
3-Autotnatic Scraln.
4.Other<k~p4!n) Continuing 5-Load Reduction 9-Other (Explain)
Exhibit G
~ Instructions I'or Preparation of Data Entry Sheets I'or Licensee Event Report (I.I R) File (NUREG-OI6I)
Exhibit I - Scone Source


February 7, 1981 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
February 7,
Attached are the January, 1981, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
1981 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.
Very truly yours, D. Schmidt Vice President Power Resources VTC/ddc cc:   Mr. James P. O'Reilly Robert. Lowenstein, Esquire
20555 Gentlemen:
Attached are the January, 1981, Operating Summary Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. l.
Very truly yours, D. Schmidt Vice President Power Resources VTC/ddc cc:
Mr. James P. O'Reilly Robert. Lowenstein, Esquire


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERiENCE DOCKET NO.       50 250 Turkey Point Unit No. 3 DATE     February 7, 1981 COi41P LETE D BY     V. T. Chilson TELEPHONE       305 552-3824 REPORT MONTH      JANUARY, 1981 Unit No..3 operated at approximately 100% R.P., except for outage of January 3-4, 1981. Refer to "Unit Shutdowns and Power Reductions" section of January, 1981, Operating Status Report for additional infor-mation.
OF OPERATING EXPERiENCE DOCKET NO.
. Major Safety-related maintenance     activities     performed during the month included:
50 250 Turkey Point Unit No.
Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
3 DATE February 7,
Florida Power & Light Company commitments       for NUREG-0578 implementation are continuing.         Refer to correspondence   between FPL and     NRC for ad-ditional information.
1981 COi41P LETE D BY V. T. Chilson REPORT MONTH JANUARY, 1981 TELEPHONE 305 552-3824 Unit No..3 operated at approximately 100% R.P.,
except for outage of January 3-4, 1981.
Refer to "Unit Shutdowns and Power Reductions" section of January, 1981, Operating Status Report for additional infor-mation.
. Major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power
& Light Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC for ad-ditional information.
Performed Integrated Engineered Safeguards Surveillance Test.
Performed Integrated Engineered Safeguards Surveillance Test.


S UMHARY OF OPERATING - XPERIENCE DOCKET NO.
S UMHARY OF OPERATING
Turkey Point UNIT            4 DATE   Februar 7, 1981 COi~1PLETED BY   V. T. Chilson TELEPHONE   (305) 552-3824 REPORT MONTH   . JANUARY, 1981 Unit'o. 4 operated at approximately 100% R.P. after the unit was re-turned to service on January 14, 1981, except for outages of January 14 and 15, 1981. Refer to "Unit Shutdowns and Power Reductions" section of the January, 1981, Operating Status Report for additional information.
- XPERIENCE DOCKET NO.
UNIT Turkey Point 4
DATE Februar 7,
1981 COi~1PLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH
. JANUARY, 1981 Unit'o.
4 operated at approximately 100% R.P. after the unit was re-turned to service on January 14,
: 1981, except for outages of January 14 and 15, 1981.
Refer to "Unit Shutdowns and Power Reductions" section of the January, 1981, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 in progress.
Inspections and requirements of IE Bulletins and NUREG-0578 in progress.
Line 185: Line 296:
Performed Integrated Engineered Safeguards Surveillance Test.
Performed Integrated Engineered Safeguards Surveillance Test.


i SUi>~DIARY OF OPERATING EXPERIENCE t
i t
DOCKET NO. 50 335 St. Lucie UNIT    Unit No. 1 DATE     Februar   7   1981 COMPLETED BY     V. T. Chilson TELEPHONE       305   552-3824 REPORT MONTH     JANUARYg 1 98 1 Unit operated at approximately 100% R.P., except for load reduction of January 16-17, 1981. Refer to "Unit Shutdowns and Power Reductions" section of the January, 1981, Operating Status Report for additional information.
SUi>~DIARY OF OPERATING EXPERIENCE DOCKET NO.
Major Safety-related maintenance     activities performed during the month included:
50 335 UNIT St. Lucie Unit No.
Inspections and requirements of IE     Bulletins and NUREG-0578 are continuing.
1 DATE Februar 7
Florida Power & Light Company commitments for NUREG-0578 implementation are continuing.
1981 COMPLETED BY V. T. Chilson TELEPHONE 305 552-3824 REPORT MONTH JANUARYg 1 98 1 Unit operated at approximately 100% R.P.,
except for load reduction of January 16-17, 1981.
Refer to "Unit Shutdowns and Power Reductions" section of the January, 1981, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power
& Light Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC for additional information.
Refer to correspondence between FPL and NRC for additional information.


/}}
/}}

Latest revision as of 16:04, 8 January 2025

Monthly Operating Repts for Jan 1981
ML17209A655
Person / Time
Site: Saint Lucie, Turkey Point  
Issue date: 02/07/1981
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17209A654 List:
References
NUDOCS 8102200503
Download: ML17209A655 (21)


Text

AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.

50 250 Turkey Point DATE Feb.

7 1981 COMPLETED IIY V. T. Chilson MONTH JANUARY 1 98 1 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 679 676 441 646 673 675 675 681 DAY I8 19 20 21 22 23 24 25 AVERAGE DAILYPOWER LEVEL (MWe.Net) 67 684 684 682 681 682 684 683 687 10 13 15 16 INSTRUCTIONS 684 683 684 685 684 680 678 26 28

'79 30 31 NOTE:

684 682 681 681 679 Average daily power level greater than 646 MNe due to cooler condenser cooling water.

On this format. list the average daily onit power Ie~q! in MWe-Net for each day in the rePorting Illonth. Compote to the nearest whole megawat t.

(o/77)

U

OPERATING DATAREPORT DOCKET NO.

DATE X~~1981 COMPLETED BY ~Mhilson TELEPHONE ~~-3824 OPERATING STATUS Turke Point Unit No.

3 760 693 680 646

l. Unit Name:
2. Reporting Period:
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross tgIWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

Notes - Unit No.

3 operated at approximately 100% R.P.,

except for outage of Jan.3-4, 1981..

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. IfAny (Net MWe):
10. Reasons For Restrictions. IfAny:

NONE This Month Yr.-to-Date Cumulative 71 529.6 720.4 55 021.2 213.4 21.6 121.8 107 732 690 1 560 412 34 221 445 32 393 084 483 59 74.4 96.0 74.6 96.0 70.4 65.3 2.5

11. Hours ln Reporting Period 744.0 744.0
12. Number Of Hours Reactor Was Critical

~

720.4

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 1 560 412 la. Gross Electrical Energy Generated (MWH) 508 235
19. Unit Service Factor 96.0
20. Unit Availability Factor 96.0
22. Unit Capacity Factor (Using DER Net) 93.8
23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

n maintenance and ins ections - Harch 1, 1981 gglay 8, 1981

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICAI.ITY INITIALELECTRICITY COMMERCIALOPERATION

('>/77)

U h

n

UNITSHUTDOWNS AND.POWER REDUCTIONS REPORThIONTH JANUARY 1981 DOCKET NO 50 250 UNITNAMF Turke Point Unit No.3 COMPLETED BY No.

Dale rg

~Aj Llccllscc Eve Ill Report >

Cause A. Corrective Action to Prevent Recurrence 01 81-01-03 S

29.7 ZZ ZZZZZZ Unit No.

3 was removed from service to perform Integrated Engineered Safeguards Surveillance Test.

(Nuclear System)

F: Forced S: Schedu!cd

('t/17)

Reason.

A-Equipmenl Failure (Explain)

B-htaintenance nr Test

~

C-Refueling D-Regulatory Restriction E-Operator Trainittg8c Uccnsc Examination F-Administrative G.Operational Error (Explain)

I I-Other (Explain) 3 Method:

I -Manual 2-hlanual Scram.

3.Alllollmtlc Sera la.

4-Qtl+c (I.xplain)-Continuin 5-Load Reduction 9-Other (Explain) 4 Exhibit G - Instructions lor Preparation of Data I.'nlry Sheets I'or Licensee Evclll Report (LLR) File (NUREG.

g OI61)

Exhibit I - Satnc Source

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. Turkey Point DATE COMPLETED BY MONTH JANUARY 1981 DAY AVERAGE DAILYPOWER LEVEL IMWe.Net) lo 12 l3 41 DAY l7 l8 I9 20 2I 23

'>5 26 28 30 AVERAGE DAlLYPOWER LEVEL (MWe.Net) 662 668 664 663 666 677 682 681 684 682 682 682 682 681 IS l6 INSTRUCTIONS 299 589 31 NOTE:

679 Average daily power level greater than 646 MWe due to cooler condenser cooling water.

Qn this fortnat. list the average daily unit p>>wer le> e! in MWe Net for each day in the rept>rting >n>>nth. Ci>ntpute to the nearest whole megawat t.

Io/77 I

OPERATING DATAREPORT OPERATING STATUS Turke Point Unit No.

4 2200 760 680 646

1. Unit Name:
2. Reporting Period:
3. Licensed Thermal Power (MWt):
4. Nameolate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

DOCKET NO.

DATE Jr~7~)1 COMPLETED BY V.T.Chilson TELEPHONE ~0 552-3824 Notes Unit No.

4 operated at approximately 100% R.P.after the unit was returned to service on Jan.

14, 1981, except for outages of Jan.

14 and 15, 1981.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

NONE I I. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)

I'7. Gross Electrical Energy Generated (MWH)

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, This Month 744.0 468.5 414.0 863 183 279 600 263 180 55.6 55.6 54.8 51.0 0.7 Yr.-to.Date 744.0 468.5 414.0 863 183 279 600 263 180 55.6 55.6 54.8 51.0 0.7 Date, and Duration of Each):

Cumulative 65 257.0 47 481.3 166.6 45 693.0 31.2 95 244 538 30 252 773 28 647 200 70.0 70.1 68.2 63.3'.9

25. IfShut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

N A Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

UNITSIIUTDOWNS AND POIVER REDUCTIONS DOCKET NO.

50 251 UNITNAME Turke Point Unit No. 4 REPORT MONfII JANUARY, 1981 Page 1 of 2 V>>.

Dale O

~A Llccnscc F.vent Report Cl~

O e>

O-Cause & Corrective Action t>>

Prevent Rccurrcnce 21 80-11-08 325.2.

RC FUELXX Unit No.

4 was removed from service for scheduled refueling, maintenance, and inspections.

(Continued from previous month)

(Nuclear and Non-nuclear system)

'01 81-01-14 2.5 A

HH zzzzzz Unit was tripped during a transient condition by steam.-generator No. 4A level protection system while in-creasing load after the unit was returned to service.

(Non-nuclear system)

F:

I orced S: Scheduled

('I/77)

Reason:

A.Equipment Failure (Explain)

B.Maintenance or Test C-Refueling D Regulatory Restriction E-Operator Training & License Examination F-Administralivc G.Operational L'rror (Explain)

I I.Other (Explair>)

Method:

I -Manual 2-hlanual Scram.

3-Autonlatic Scrant.

Continuing 5-Load Reduction 9-Other (Explain)

Exhibit C - Instructions I'or Preparation of Data Entry Sheets Ior Licensee Event Report (LLR) File (NUREC-016I )

Exhibit I - Sa>nc Source

UNITSHUTDO'1VNS AND POIVER REDUCTIONS DOCKET NO 50 251 1 ke Po> nt Uni'o4 Page 2 of 2 NII.

Date IA I

I MI J

r

~ C/)

Llccltscc Event Report ~

Cl 'o IA cn'G Cause & C>>rrect ive Action l>>

Prevent Recurrcncc 02 81-01-15 S

HA INSTRU (G)

Unit was removed from service to test turbine overspeed protection trip device.

(Non-nuclear) 03 81-01-15 P

0.6 HH zzzzzz Unit was tripped by steam generator No.

4A level protection system while increasing load after the unit was returned to service.

(Non-nuclear system)

I: Forced S: Scltedulcd II}/77)

Reason:

A-Erluipntent Failure (Explain)

II-Maintenance or Test.

C-Refueling D Regulatory Restriction E-Operal>>r Training & License Exantinalion F-Administrative G.Operational Error (Explain)

I I.Other (Explai<<)

3 Method:

~

I-Manual 2-hIanual Scram.

3 Auto<<tat lc Scfanl.

4-Otlter+Expianr}Cont:inuing 5-Load Reduction 9-Other (Explain)

Exltibit G - Instructions for Preparation ot Data Entry Sheets for Licensee Event Report (LER) File (NUREG-OI 6 I )

Exltibit I - Sante S>>urcc

0 h

l

AVERAGE DAlLYUNIT POWER LEVEL DOCKET Ng. St. Lucre Feb.

7 1981 COMPLETED IIY V

T C113.1 son TELEPHONE MONTH JANUARY 1981 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 799 797 DAY l7 l8 AVERAGE DAILYPOWER LEVEL

(>>>IWe-Net I 578 799 802 4

10 l3 IS l6 INSTRUCTIONS 798 798 798 799 796 798 801 800 800 801 801 802 614 20 2I 22 23 24

'>5 7'>

28

>9 30 3l NOTE:

802 800 797 797 796 798 799 801 799 788 786 785 Average daily power level greateX than 777 NWe due to cooler condenser cooling water.

On this format.list the average daily unit p>>wer le> el in MWe-Net for each day in the rep<>rting lllonth. C>>inputc to the nearest whole megawatt.

('>/77)

a

OPERATING DATAREPORT OPERATING STATUS St. Lucie Unit No.

1 850 802 I. Unit Name:

2. Reporting Period:
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross hlWe):
7. Maximum Dependable Capacity (Net hIWe):

DOCKET NO.

DATE +~7 1981 COMPLETED BY ~~~on TELEPHONE ~~V=3824 Notes - Unit operated at ap-proximately 100% R.P.,

except for load reduction of Jan.

16-17, 1981.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

NONE Thls%onth Yr..to-Date

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line IS. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)

I7. Gross Electrical Energy Generated (MWH)

IS. Net Electrical Energy Generated (MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months 744:0 744.0 744. 0 '44,0 744.0 744.0 1 873 725 1 873 725 616 680 616 680 583'92 '83 892 100.0 100.0 100. 0 100.0 101.0 101.0 97.9 97.9 {Type, Date. and Duration of Each):

Cumltiative 36 072.0 29 169.3 129.5 28 425.1 39.3 69 121 873 22 426 540 21 111 378 78.8 78.9 75.3 73.0 5.6

25. IfShut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

N/A Forecast Achieved IN ITIAL CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION I'>/77 )

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNITNAhjE St. LulIe U No.l REPORT MONfll JANUARY 1981 Nii.

Date

~A Q

n qp~ r/l Licensee Event Report =

Cause & C<lrrectivc Action lu Prevent Rccurrcnce 01 81-01-16 B

HH PUIIPXX Load reduction to repair upin-hole" size leak in the discharge nozzle of steam generator 'feedwater pump No. 1A.

Corrective actions included repair by welding.

(Non-nuclear system)

I F: Forced S: Schcdu!ed

(']/77)

Reason:

A.Equipmenl Failure (Explain)

B.Maintenance oi Test

( -Refueling D.Regulalury Restriction I'..Operator Training & Liccnsc Fxamination F-Administ rat ive G.Operational Errur (Explain)

I I.Other (Explahr)

Method:

I-Manual 2.Manual Scram.

3-Autotnatic Scraln.

4.Other<k~p4!n) Continuing 5-Load Reduction 9-Other (Explain)

Exhibit G

~ Instructions I'or Preparation of Data Entry Sheets I'or Licensee Event Report (I.I R) File (NUREG-OI6I)

Exhibit I - Scone Source

February 7,

1981 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Attached are the January, 1981, Operating Summary Reports for Turkey Point Unit Nos.

3 and 4 and St. Lucie Unit No. l.

Very truly yours, D. Schmidt Vice President Power Resources VTC/ddc cc:

Mr. James P. O'Reilly Robert. Lowenstein, Esquire

SUMMARY

OF OPERATING EXPERiENCE DOCKET NO.

50 250 Turkey Point Unit No.

3 DATE February 7,

1981 COi41P LETE D BY V. T. Chilson REPORT MONTH JANUARY, 1981 TELEPHONE 305 552-3824 Unit No..3 operated at approximately 100% R.P.,

except for outage of January 3-4, 1981.

Refer to "Unit Shutdowns and Power Reductions" section of January, 1981, Operating Status Report for additional infor-mation.

. Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power

& Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for ad-ditional information.

Performed Integrated Engineered Safeguards Surveillance Test.

S UMHARY OF OPERATING

- XPERIENCE DOCKET NO.

UNIT Turkey Point 4

DATE Februar 7,

1981 COi~1PLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH

. JANUARY, 1981 Unit'o.

4 operated at approximately 100% R.P. after the unit was re-turned to service on January 14,

1981, except for outages of January 14 and 15, 1981.

Refer to "Unit Shutdowns and Power Reductions" section of the January, 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Florida Power a Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

Completed Containment Integrated Leak Rate Test (ILRT).

Performed Integrated Engineered Safeguards Surveillance Test.

i t

SUi>~DIARY OF OPERATING EXPERIENCE DOCKET NO.

50 335 UNIT St. Lucie Unit No.

1 DATE Februar 7

1981 COMPLETED BY V. T. Chilson TELEPHONE 305 552-3824 REPORT MONTH JANUARYg 1 98 1 Unit operated at approximately 100% R.P.,

except for load reduction of January 16-17, 1981.

Refer to "Unit Shutdowns and Power Reductions" section of the January, 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power

& Light Company commitments for NUREG-0578 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

/