{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                            NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                                  REGION III
REGION III  
                                      2443 WARRENVILLE RD. SUITE 210
2443 WARRENVILLE RD. SUITE 210  
                                          LISLE, ILLINOIS 60532-4352
LISLE, ILLINOIS 60532-4352  
                                            November 28, 2017
Mr. Bryan C. Hanson
November 28, 2017  
Senior VP, Exelon Generation Company, LLC
Mr. Bryan C. Hanson  
President and CNO, Exelon Nuclear
Senior VP, Exelon Generation Company, LLC  
4300 Winfield Road
President and CNO, Exelon Nuclear  
Warrenville, IL 60555
4300 Winfield Road  
SUBJECT: LASALLE NUCLEAR PLANT, UNIT 1NOTIFICATION OF NRC
Warrenville, IL 60555  
              BASELINE INSPECTION AND REQUEST FOR INFORMATION;
SUBJECT: LASALLE NUCLEAR PLANT, UNIT 1NOTIFICATION OF NRC  
              INSPECTION REPORT 05000373/2018001
BASELINE INSPECTION AND REQUEST FOR INFORMATION;  
Dear Mr. Hanson:
INSPECTION REPORT 05000373/2018001  
On February 19, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline
Dear Mr. Hanson:  
Inservice Inspection Procedure 71111.08. This onsite inspection is scheduled to be performed
On February 19, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline  
February 19, 2018, through February 23, 2018.
Inservice Inspection Procedure 71111.08. This onsite inspection is scheduled to be performed  
Experience has shown that this inspection is resource intensive both for the NRC inspector and
February 19, 2018, through February 23, 2018.  
your staff. In order to minimize the impact to your onsite resources, and to ensure a productive
Experience has shown that this inspection is resource intensive both for the NRC inspector and  
inspection for both sides, we have enclosed a request for documents needed for this inspection.
your staff. In order to minimize the impact to your onsite resources, and to ensure a productive  
These documents have been divided into two groups.
inspection for both sides, we have enclosed a request for documents needed for this inspection.
The first group identifies information necessary to ensure that the inspector is adequately
These documents have been divided into two groups.  
prepared. The second group identifies the information the inspector will need upon arrival at
The first group identifies information necessary to ensure that the inspector is adequately  
the site. It is important that all of these documents are up-to-date, and complete, in order to
prepared. The second group identifies the information the inspector will need upon arrival at  
minimize the number of additional documents requested during the preparation and/or the
the site. It is important that all of these documents are up-to-date, and complete, in order to  
onsite portions of the inspection.
minimize the number of additional documents requested during the preparation and/or the  
We have discussed the schedule for inspection activities with your staff and understand that our
onsite portions of the inspection.  
regulatory contact for this inspection will be Ms. Putri Kusumawatimurray, of your organization.
We have discussed the schedule for inspection activities with your staff and understand that our  
If there are any questions about this inspection or the material requested, please contact the
regulatory contact for this inspection will be Ms. Putri Kusumawatimurray, of your organization.
lead inspector Mr. Matt Domke at 630-829-9562, or via e-mail at Matthew.Domke@nrc.gov.
If there are any questions about this inspection or the material requested, please contact the  
This letter does not contain new or amended information collection requirements subject
lead inspector Mr. Matt Domke at 630-829-9562, or via e-mail at Matthew.Domke@nrc.gov.  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
This letter does not contain new or amended information collection requirements subject  
collection requirements were approved by the Office of Management and Budget, Control
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
collection requirements were approved by the Office of Management and Budget, Control  
respond to, a request for information or an information collection requirement unless the
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
requesting document displays a currently valid Office of Management and Budget Control
respond to, a request for information or an information collection requirement unless the  
Number.
requesting document displays a currently valid Office of Management and Budget Control  
Number.  


This letter and its enclosure will be made available for public inspection and copying at
This letter and its enclosure will be made available for public inspection and copying at  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.  
                                            Sincerely,
Sincerely,  
                                            /RA/
                                            Matt Domke, Reactor Inspector
/RA/  
                                            Engineering Branch 1
                                            Division of Reactor Safety
Docket Nos. 50-373; 50-374
Matt Domke, Reactor Inspector  
License Nos. NPF-11; NPF-18
Engineering Branch 1  
Enclosure:
Division of Reactor Safety
Baseline Inservice Inspection Document Request
Docket Nos. 50-373; 50-374  
cc: Distribution via LISTSERV
License Nos. NPF-11; NPF-18  
Enclosure:  
Baseline Inservice Inspection Document Request  
cc: Distribution via LISTSERV  


Letter to Bryan C. Hanson from Matt Domke dated November 27, 2017
Letter to Bryan C. Hanson from Matt Domke dated November 27, 2017  
SUBJECT: LASALLE NUCLEAR PLANT, UNIT 1NOTIFICATION OF NRC
SUBJECT: LASALLE NUCLEAR PLANT, UNIT 1NOTIFICATION OF NRC  
            BASELINE INSPECTION AND REQUEST FOR INFORMATION;
BASELINE INSPECTION AND REQUEST FOR INFORMATION;  
            INSPECTION REPORT 05000373/2018001
INSPECTION REPORT 05000373/2018001  
DISTRIBUTION:
DISTRIBUTION:  
Jeremy Bowen
Jeremy Bowen  
RidsNrrDorlLpl3
RidsNrrDorlLpl3  
RidsNrrPMLaSalle
RidsNrrPMLaSalle  
RidsNrrDirsIrib Resource
RidsNrrDirsIrib Resource  
Cynthia Pederson
Cynthia Pederson  
Kenneth OBrien
Kenneth OBrien  
Richard Skokowski
Richard Skokowski  
Allan Barker
Allan Barker  
Carole Ariano
Carole Ariano  
Linda Linn
Linda Linn  
DRPIII
DRPIII  
DRSIII
DRSIII  
ADAMS Accession Number ML17333A087
  OFFICE RIII                   RIII             RIII           RIII
  NAME       MDomke:cl
  DATE       11/27/17
                                OFFICIAL RECORD COPY
ADAMS Accession Number ML17333A087  
OFFICE  
RIII  
RIII  
RIII  
RIII  
NAME  
MDomke:cl  
DATE  
11/27/17  
OFFICIAL RECORD COPY  


                BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST  
Inspection Dates:               February 19-23, 2018
Enclosure
Inspection Procedures:         Inspection Procedure 71111-08, Inservice Inspection
Inspection Dates:  
Lead Inspector:                 Matt Domke, DRS
February 19-23, 2018  
                                630-829-9562
Inspection Procedures:  
                                Matthew.Domke@nrc.gov
Inspection Procedure 71111-08, Inservice Inspection  
A.     Information for the In-Office Preparation Week
Lead Inspector:  
      The following information (electronic copy CD ROM if possible) is requested by
Matt Domke, DRS  
      January 29, 2018, to facilitate the selection of specific items that will be reviewed during
630-829-9562  
      the onsite inspection week. The inspector will select specific items from the information
Matthew.Domke@nrc.gov  
      requested below and request a list of additional documents needed onsite to your staff.
A.  
      We request that the specific items selected from the lists be available and ready for
Information for the In-Office Preparation Week  
      review on the first day of inspection. If you have any questions regarding this
The following information (electronic copy CD ROM if possible) is requested by  
      information, please call the inspector as soon as possible.
January 29, 2018, to facilitate the selection of specific items that will be reviewed during  
      1.     For the upcoming outage, a detailed schedule and description of:
the onsite inspection week. The inspector will select specific items from the information  
              a. Non-Destructive Examinations (NDE) planned for Class 1 and 2 systems
requested below and request a list of additional documents needed onsite to your staff.
                    and containment, performed as part of your American Society of Mechanical
We request that the specific items selected from the lists be available and ready for  
                    Engineers (ASME) Code Inservice Inspection (ISI) Program (include edition
review on the first day of inspection. If you have any questions regarding this  
                    and addenda of Code committed to), and NDE planned for other systems
information, please call the inspector as soon as possible.  
                    performed as part of a Risk-Informed ISI Program, or other augmented
1.  
                    inspection programs commitments, as part of an industry initiative. For each
For the upcoming outage, a detailed schedule and description of:  
                    weld examination, include the weld identification number, description of weld
a. Non-Destructive Examinations (NDE) planned for Class 1 and 2 systems  
                    (component name), category, class, type of exam and procedure number,
and containment, performed as part of your American Society of Mechanical  
                    and date of examination; and
Engineers (ASME) Code Inservice Inspection (ISI) Program (include edition  
              b. Welding on Code Class 1, 2, or 3 components
and addenda of Code committed to), and NDE planned for other systems  
      2.     A copy of the NDE procedures and welding procedures used to perform the
performed as part of a Risk-Informed ISI Program, or other augmented  
              activities identified in A.1 (including NDE calibration and flaw characterization/
inspection programs commitments, as part of an industry initiative. For each  
              sizing procedures and Welding Procedure Qualification Records). For ultrasonic
weld examination, include the weld identification number, description of weld  
              examination procedures qualified in accordance with Appendix VIII, of Section XI
(component name), category, class, type of exam and procedure number,  
              of the ASME Code, provide documentation supporting the procedure qualification
and date of examination; and  
              (e.g., the Electric Power Research Institute performance demonstration
b. Welding on Code Class 1, 2, or 3 components  
              qualification summary sheets).
2.  
      3.     A copy of ASME Section XI, Code Relief Requests applicable to the
A copy of the NDE procedures and welding procedures used to perform the  
              examinations identified in A.1.
activities identified in A.1 (including NDE calibration and flaw characterization/  
      4.     A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye
sizing procedures and Welding Procedure Qualification Records). For ultrasonic  
              penetrant), which have identified relevant indications on Code Class 1 and 2
examination procedures qualified in accordance with Appendix VIII, of Section XI  
              systems since the beginning of the last refueling outage.
of the ASME Code, provide documentation supporting the procedure qualification  
                                                                                          Enclosure
(e.g., the Electric Power Research Institute performance demonstration  
qualification summary sheets).  
3.  
A copy of ASME Section XI, Code Relief Requests applicable to the  
examinations identified in A.1.  
4.  
A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye  
penetrant), which have identified relevant indications on Code Class 1 and 2  
systems since the beginning of the last refueling outage.  


              BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST  
  5.     List with short description of the welds in Code Class 1 and 2 systems, which
2
          have been fabricated due to component repair/replacement activities since the
5.  
          beginning of the last refueling outage and identify the system, weld number, and
List with short description of the welds in Code Class 1 and 2 systems, which  
          reference applicable documentation (e.g., NIS-2 forms with definitions of system
have been fabricated due to component repair/replacement activities since the  
          and component acronyms).
beginning of the last refueling outage and identify the system, weld number, and  
  6.     If reactor vessel weld examinations required by the ASME Code are scheduled to
reference applicable documentation (e.g., NIS-2 forms with definitions of system  
          occur during the inspection period, provide a detailed description of the welds to
and component acronyms).  
          be examined, and the extent of the planned examination.
6.  
  7.     List with description of ISI-related issues such as piping degradation or damage
If reactor vessel weld examinations required by the ASME Code are scheduled to  
          (e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors
occur during the inspection period, provide a detailed description of the welds to  
          identified in piping examinations that have been entered into your corrective
be examined, and the extent of the planned examination.  
          action system since the beginning of the last refueling outage. Also, include a list
7.  
          of corrective action records associated with foreign material introduced/identified
List with description of ISI-related issues such as piping degradation or damage  
          in the reactor vessel or reactor coolant system since the beginning of the last
(e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors  
          refueling outage.
identified in piping examinations that have been entered into your corrective  
  8.     Copy of any Title 10 of the Code of Federal Regulations, Part 21 reports
action system since the beginning of the last refueling outage. Also, include a list  
          applicable to your structures, systems, or components within the scope of
of corrective action records associated with foreign material introduced/identified  
          Section XI of the ASME Code that have been identified since the beginning of the
in the reactor vessel or reactor coolant system since the beginning of the last  
          last refueling outage.
refueling outage.  
  9.     A copy of the 10-year ISI Program showing those required exams scheduled to
8.  
          be performed this outage, and those which have been completed.
Copy of any Title 10 of the Code of Federal Regulations, Part 21 reports  
  10.     Point of contact information (name and site number) for the ISI Program and
applicable to your structures, systems, or components within the scope of  
          Reactor Internals Inspection ProgramsSite and vendor leads.
Section XI of the ASME Code that have been identified since the beginning of the  
B. Onsite information to be provided to the inspector on the first day of the
last refueling outage.  
  inspection (e.g., following the entrance meeting). Please provide hard copies
9.  
  (e.g., paper records) of the following documents.
A copy of the 10-year ISI Program showing those required exams scheduled to  
  1.     For welds selected by the inspector from A.1.b and A.5 above, provide copies of
be performed this outage, and those which have been completed.  
          the following documents:
10.  
          a. Document of the weld number and location (e.g., system, train, branch);
Point of contact information (name and site number) for the ISI Program and  
          b. Document with a detail of the weld construction (e.g., drawing);
Reactor Internals Inspection ProgramsSite and vendor leads.  
          c. Applicable portions of the Design Specification and applicable Code of
B.  
                construction for the weldment (e.g., B31.1 or ASME Section III);
Onsite information to be provided to the inspector on the first day of the  
          d. Applicable Code Edition and Addenda for weld procedure qualification;
inspection (e.g., following the entrance meeting). Please provide hard copies  
          e. Applicable weld procedure specifications and completed weld data sheets
(e.g., paper records) of the following documents.  
                used to fabricate the welds;
1.  
          f.   Copies of procedure qualification records supporting the weld procedure
For welds selected by the inspector from A.1.b and A.5 above, provide copies of  
                specifications;
the following documents:  
          g. Copies of welders performance qualification records;
a. Document of the weld number and location (e.g., system, train, branch);  
                                              2
b. Document with a detail of the weld construction (e.g., drawing);  
c. Applicable portions of the Design Specification and applicable Code of  
construction for the weldment (e.g., B31.1 or ASME Section III);  
d. Applicable Code Edition and Addenda for weld procedure qualification;  
e. Applicable weld procedure specifications and completed weld data sheets  
used to fabricate the welds;  
f. Copies of procedure qualification records supporting the weld procedure  
specifications;  
g. Copies of welders performance qualification records;  


                BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST  
              h. Copies of mechanical test reports identified in the procedure qualification
3
                  records above;
h. Copies of mechanical test reports identified in the procedure qualification  
              i.   Copies of the non-conformance reports for the selected welds;
records above;  
              j.   Access to radiographs and equipment to view radiographs of the selected
i.  
                  welds;
Copies of the non-conformance reports for the selected welds;  
              k. ASME Code Section XI repair replacement plan and reconciliation for
j.  
                  replacement components/materials;
Access to radiographs and equipment to view radiographs of the selected  
              l.   Certified Material Test Reports for replacement pressure boundary materials;
welds;  
                  and
k. ASME Code Section XI repair replacement plan and reconciliation for  
              m. Copies of the NDE required by the construction Code and the pre-service
replacement components/materials;  
                  examination records required by the ASME Code Section XI for the selected
l.  
                  welds.
Certified Material Test Reports for replacement pressure boundary materials;  
        2.   For the ISI-related corrective action issues selected by the inspector from Item
and  
              A.7 above, provide a copy of the corrective actions and supporting
m. Copies of the NDE required by the construction Code and the pre-service  
              documentation.
examination records required by the ASME Code Section XI for the selected  
        3.   For the NDE reports with relevant indications on Code Class 1 and 2 Systems
welds.  
              selected by the inspector from Item A.4 above, provide a copy of the examination
2.  
              records and associated corrective action documents.
For the ISI-related corrective action issues selected by the inspector from Item  
        4.   Updated schedules for Item A.1 (including schedule showing contingency repair
A.7 above, provide a copy of the corrective actions and supporting  
              plans if available).
documentation.  
        5.   Fabrication Drawings (D size) of the reactor vessel welds if any are to be
3.  
              examined during the outage. Also provide any drawings used by NDE vendors
For the NDE reports with relevant indications on Code Class 1 and 2 Systems  
              to locate these welds.
selected by the inspector from Item A.4 above, provide a copy of the examination  
        6.   Provide copies of the following standards at the onsite U.S. Nuclear Regulatory
records and associated corrective action documents.  
              Commission inspection location for the duration of the inspection:
4.  
              a. Sections V, IX, and XI of the ASME Code with Editions applicable to the
Updated schedules for Item A.1 (including schedule showing contingency repair  
                  ISI Program and the Repair/Replacement Program; and
plans if available).  
              b. Copy of the performance demonstration initiative (PDI) generic procedures
5.  
                  with the latest applicable Revisions that support site qualified ultrasonic
Fabrication Drawings (D size) of the reactor vessel welds if any are to be  
                  examination of piping welds and components (e.g., PDI-UT-1, PDI-UT-2,
examined during the outage. Also provide any drawings used by NDE vendors  
                  PDI-UT-3, PDI-UT-10 etc.).
to locate these welds.
        7.   Provide training (e.g., Scaffolding, Fall Protection, Foreign Material Exclusion) if
6.  
              required to access the NDE selected by the inspector for observation.
Provide copies of the following standards at the onsite U.S. Nuclear Regulatory  
Commission inspection location for the duration of the inspection:  
a. Sections V, IX, and XI of the ASME Code with Editions applicable to the  
ISI Program and the Repair/Replacement Program; and  
b. Copy of the performance demonstration initiative (PDI) generic procedures  
with the latest applicable Revisions that support site qualified ultrasonic  
examination of piping welds and components (e.g., PDI-UT-1, PDI-UT-2,  
PDI-UT-3, PDI-UT-10 etc.).
7.  
Provide training (e.g., Scaffolding, Fall Protection, Foreign Material Exclusion) if  
required to access the NDE selected by the inspector for observation.
If you have questions regarding the information requested, please contact the lead inspector.
If you have questions regarding the information requested, please contact the lead inspector.
                                                3
}}
}}

Latest revision as of 14:03, 7 January 2025

17 LaSalle Nuclear Plant, Unit 1 - Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000373/2018001 (DRS-M.Domke)
ML17333A087
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 11/28/2017
From: Matthew Domke
NRC/RGN-III/DRS/EB1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2018001
Download: ML17333A087 (6)


See also: IR 05000373/2018001

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, ILLINOIS 60532-4352

November 28, 2017

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: LASALLE NUCLEAR PLANT, UNIT 1NOTIFICATION OF NRC

BASELINE INSPECTION AND REQUEST FOR INFORMATION;

INSPECTION REPORT 05000373/2018001

Dear Mr. Hanson:

On February 19, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline

Inservice Inspection Procedure 71111.08. This onsite inspection is scheduled to be performed

February 19, 2018, through February 23, 2018.

Experience has shown that this inspection is resource intensive both for the NRC inspector and

your staff. In order to minimize the impact to your onsite resources, and to ensure a productive

inspection for both sides, we have enclosed a request for documents needed for this inspection.

These documents have been divided into two groups.

The first group identifies information necessary to ensure that the inspector is adequately

prepared. The second group identifies the information the inspector will need upon arrival at

the site. It is important that all of these documents are up-to-date, and complete, in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for inspection activities with your staff and understand that our

regulatory contact for this inspection will be Ms. Putri Kusumawatimurray, of your organization.

If there are any questions about this inspection or the material requested, please contact the

lead inspector Mr. Matt Domke at 630-829-9562, or via e-mail at Matthew.Domke@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Matt Domke, Reactor Inspector

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-373; 50-374

License Nos. NPF-11; NPF-18

Enclosure:

Baseline Inservice Inspection Document Request

cc: Distribution via LISTSERV

Letter to Bryan C. Hanson from Matt Domke dated November 27, 2017

SUBJECT: LASALLE NUCLEAR PLANT, UNIT 1NOTIFICATION OF NRC

BASELINE INSPECTION AND REQUEST FOR INFORMATION;

INSPECTION REPORT 05000373/2018001

DISTRIBUTION:

Jeremy Bowen

RidsNrrDorlLpl3

RidsNrrPMLaSalle

RidsNrrDirsIrib Resource

Cynthia Pederson

Kenneth OBrien

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

ADAMS Accession Number ML17333A087

OFFICE

RIII

RIII

RIII

RIII

NAME

MDomke:cl

DATE

11/27/17

OFFICIAL RECORD COPY

BASELINE INSERVICE INSPECTION DOCUMENT REQUEST

Enclosure

Inspection Dates:

February 19-23, 2018

Inspection Procedures:

Inspection Procedure 71111-08, Inservice Inspection

Lead Inspector:

Matt Domke, DRS

630-829-9562

Matthew.Domke@nrc.gov

A.

Information for the In-Office Preparation Week

The following information (electronic copy CD ROM if possible) is requested by

January 29, 2018, to facilitate the selection of specific items that will be reviewed during

the onsite inspection week. The inspector will select specific items from the information

requested below and request a list of additional documents needed onsite to your staff.

We request that the specific items selected from the lists be available and ready for

review on the first day of inspection. If you have any questions regarding this

information, please call the inspector as soon as possible.

1.

For the upcoming outage, a detailed schedule and description of:

a. Non-Destructive Examinations (NDE) planned for Class 1 and 2 systems

and containment, performed as part of your American Society of Mechanical

Engineers (ASME) Code Inservice Inspection (ISI) Program (include edition

and addenda of Code committed to), and NDE planned for other systems

performed as part of a Risk-Informed ISI Program, or other augmented

inspection programs commitments, as part of an industry initiative. For each

weld examination, include the weld identification number, description of weld

(component name), category, class, type of exam and procedure number,

and date of examination; and

b. Welding on Code Class 1, 2, or 3 components

2.

A copy of the NDE procedures and welding procedures used to perform the

activities identified in A.1 (including NDE calibration and flaw characterization/

sizing procedures and Welding Procedure Qualification Records). For ultrasonic

examination procedures qualified in accordance with Appendix VIII, of Section XI

of the ASME Code, provide documentation supporting the procedure qualification

(e.g., the Electric Power Research Institute performance demonstration

qualification summary sheets).

3.

A copy of ASME Section XI, Code Relief Requests applicable to the

examinations identified in A.1.

4.

A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye

penetrant), which have identified relevant indications on Code Class 1 and 2

systems since the beginning of the last refueling outage.

BASELINE INSERVICE INSPECTION DOCUMENT REQUEST

2

5.

List with short description of the welds in Code Class 1 and 2 systems, which

have been fabricated due to component repair/replacement activities since the

beginning of the last refueling outage and identify the system, weld number, and

reference applicable documentation (e.g., NIS-2 forms with definitions of system

and component acronyms).

6.

If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the inspection period, provide a detailed description of the welds to

be examined, and the extent of the planned examination.

7.

List with description of ISI-related issues such as piping degradation or damage

(e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors

identified in piping examinations that have been entered into your corrective

action system since the beginning of the last refueling outage. Also, include a list

of corrective action records associated with foreign material introduced/identified

in the reactor vessel or reactor coolant system since the beginning of the last

refueling outage.

8.

Copy of any Title 10 of the Code of Federal Regulations, Part 21 reports

applicable to your structures, systems, or components within the scope of

Section XI of the ASME Code that have been identified since the beginning of the

last refueling outage.

9.

A copy of the 10-year ISI Program showing those required exams scheduled to

be performed this outage, and those which have been completed.

10.

Point of contact information (name and site number) for the ISI Program and

Reactor Internals Inspection ProgramsSite and vendor leads.

B.

Onsite information to be provided to the inspector on the first day of the

inspection (e.g., following the entrance meeting). Please provide hard copies

(e.g., paper records) of the following documents.

1.

For welds selected by the inspector from A.1.b and A.5 above, provide copies of

the following documents:

a. Document of the weld number and location (e.g., system, train, branch);

b. Document with a detail of the weld construction (e.g., drawing);

c. Applicable portions of the Design Specification and applicable Code of

construction for the weldment (e.g., B31.1 or ASME Section III);

d. Applicable Code Edition and Addenda for weld procedure qualification;

e. Applicable weld procedure specifications and completed weld data sheets

used to fabricate the welds;

f. Copies of procedure qualification records supporting the weld procedure

specifications;

g. Copies of welders performance qualification records;

BASELINE INSERVICE INSPECTION DOCUMENT REQUEST

3

h. Copies of mechanical test reports identified in the procedure qualification

records above;

i.

Copies of the non-conformance reports for the selected welds;

j.

Access to radiographs and equipment to view radiographs of the selected

welds;

k. ASME Code Section XI repair replacement plan and reconciliation for

replacement components/materials;

l.

Certified Material Test Reports for replacement pressure boundary materials;

and

m. Copies of the NDE required by the construction Code and the pre-service

examination records required by the ASME Code Section XI for the selected

welds.

2.

For the ISI-related corrective action issues selected by the inspector from Item

A.7 above, provide a copy of the corrective actions and supporting

documentation.

3.

For the NDE reports with relevant indications on Code Class 1 and 2 Systems

selected by the inspector from Item A.4 above, provide a copy of the examination

records and associated corrective action documents.

4.

Updated schedules for Item A.1 (including schedule showing contingency repair

plans if available).

5.

Fabrication Drawings (D size) of the reactor vessel welds if any are to be

examined during the outage. Also provide any drawings used by NDE vendors

to locate these welds.

6.

Provide copies of the following standards at the onsite U.S. Nuclear Regulatory

Commission inspection location for the duration of the inspection:

a. Sections V, IX, and XI of the ASME Code with Editions applicable to the

ISI Program and the Repair/Replacement Program; and

b. Copy of the performance demonstration initiative (PDI) generic procedures

with the latest applicable Revisions that support site qualified ultrasonic

examination of piping welds and components (e.g., PDI-UT-1, PDI-UT-2,

PDI-UT-3, PDI-UT-10 etc.).

7.

Provide training (e.g., Scaffolding, Fall Protection, Foreign Material Exclusion) if

required to access the NDE selected by the inspector for observation.

If you have questions regarding the information requested, please contact the lead inspector.