{{#Wiki_filter:4300 Winfield Road Warrenville, IL 60555 IAMIMMIK Amop-   ExeLon G                                                             630 657 2000 Office RS-17-173 10 CFR 50.90 December 20, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249
{{#Wiki_filter:4300 Winfield Road IAMIMMIK
Warrenville, IL 60555 Amop-ExeLon G 630 657 2000 Office RS-17-173 10 CFR 50.90 December 20, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249  


==Subject:==
==Subject:==
Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, "Reactor Pressure Vessel Water Inventory Control"
Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, "Reactor Pressure Vessel Water Inventory Control"  


==References:==
==References:==
(1) Letter from P. R. Simpson (Exelon Generation Company, LLC (EGC)) to NRC, "Application to Revise Technical Specifications to Adopt TSTF-542,
(1) Letter from P. R. Simpson (Exelon Generation Company, LLC (EGC)) to NRC, "Application to Revise Technical Specifications to Adopt TSTF-542,  
                              'Reactor Pressure Vessel Water Inventory Control,"' dated February 10 2017 (2)   Letter from R. S. Haskell (NRC) to B. C. Hanson (EGC), "Dresden Nuclear Power Station, Units 2 and 3 - Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler-542, Revision 2,
'Reactor Pressure Vessel Water Inventory Control,"' dated February 10 2017 (2)
                              'Reactor Pressure Vessel Water Inventory Control' (CAC Nos. MF9295 and MF9296)," dated July 11, 2017 (3)   Letter from P. R. Simpson (EGC) to NRC, "Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, 'Reactor Pressure Vessel Water Inventory Control,"' dated July 13, 2017 In Reference 1, Exelon Generation Company, LLC (EGC) submitted a request for amendments to the Technical Specifications (TS) for Dresden Nuclear Power Station (DNPS), Units 2 and 3.
Letter from R. S. Haskell (NRC) to B. C. Hanson (EGC), "Dresden Nuclear Power Station, Units 2 and 3 - Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler-542, Revision 2,  
'Reactor Pressure Vessel Water Inventory Control' (CAC Nos. MF9295 and MF9296)," dated July 11, 2017 (3)
Letter from P. R. Simpson (EGC) to NRC, "Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, 'Reactor Pressure Vessel Water Inventory Control,"' dated July 13, 2017 In Reference 1, Exelon Generation Company, LLC (EGC) submitted a request for amendments to the Technical Specifications (TS) for Dresden Nuclear Power Station (DNPS), Units 2 and 3.
Specifically, EGC requested that the NRC complete its review and approval of a request to adopt TSTF-542.
Specifically, EGC requested that the NRC complete its review and approval of a request to adopt TSTF-542.
In Reference 2, the NRC determined that additional information was required to complete the evaluation of the Reference 1 request. The response to Reference 2 was provided in Reference 3.
In Reference 2, the NRC determined that additional information was required to complete the evaluation of the Reference 1 request. The response to Reference 2 was provided in Reference 3.  


December 20, 2017 U.S. Nuclear Regulatory Commission Page 2 EGC recently identified that an issue related to TSTF-542 applies to its request to adopt the TSTF for DNPS, Units 2 and 3. Specifically, in accordance with TSTF-542, TS Table 3.3.5.2-1, Function 1.a (Core Spray System Reactor Steam Dome Pressure Low (Injection Permissive),
December 20, 2017 U.S. Nuclear Regulatory Commission Page 2 EGC recently identified that an issue related to TSTF-542 applies to its request to adopt the TSTF for DNPS, Units 2 and 3. Specifically, in accordance with TSTF-542, TS Table 3.3.5.2-1, Function 1.a (Core Spray System Reactor Steam Dome Pressure Low (Injection Permissive),
and Function 2.a (Low Pressure Coolant Injection (LPCI) Reactor Steam Dome Pressure Low (Injection Permissive) are required in Modes 4 and 5. Prior to TSTF-542, the analogous Functions 1.c and 2.c in TS Table 3.3.5.1-1 had a Mode 4 and 5 applicability modified by a footnote specifying that these functions were only required when the associated emergency core cooling system (ECCS) subsystem(s) were required to be operable per limiting condition for operation (LCO) 3.5.2, "ECCS Shutdown." The footnote was inadvertently omitted from Table 3.3.5.2-1 Functions 1.a and 2.a in TSTF-542. Without the footnote, the Reactor Steam Dome Pressure Low functions would be required to be operable for all low pressure ECCS subsystems, regardless of whether they are credited for meeting LCO 3.5.2. Requiring the functions for all ECCS subsystems is unnecessary. In Modes 4 and 5 with the reactor steam dome at atmospheric pressure, these functions only serve to satisfy permissives for opening low pressure ECCS injection valves for manual actuation. Accordingly, a variation is proposed to affix Footnote (a) (i.e., "Associated with an ECCS subsystem required to be OPERABLE by LCO 3.5.2, `Reactor Pressure Vessel Water Inventory Control"') to the "Required Channels Per Function" column of Functions 1.a and 2.a of TS Table 3.3.5.2-1. The TS markup reflecting this variation and the corresponding revised TS page are included in Attachments 1 and 2, respectively.
and Function 2.a (Low Pressure Coolant Injection (LPCI) Reactor Steam Dome Pressure Low (Injection Permissive) are required in Modes 4 and 5. Prior to TSTF-542, the analogous Functions 1.c and 2.c in TS Table 3.3.5.1-1 had a Mode 4 and 5 applicability modified by a footnote specifying that these functions were only required when the associated emergency core cooling system (ECCS) subsystem(s) were required to be operable per limiting condition for operation (LCO) 3.5.2, "ECCS Shutdown." The footnote was inadvertently omitted from Table 3.3.5.2-1 Functions 1.a and 2.a in TSTF-542. Without the footnote, the Reactor Steam Dome Pressure Low functions would be required to be operable for all low pressure ECCS subsystems, regardless of whether they are credited for meeting LCO 3.5.2. Requiring the functions for all ECCS subsystems is unnecessary. In Modes 4 and 5 with the reactor steam dome at atmospheric pressure, these functions only serve to satisfy permissives for opening low pressure ECCS injection valves for manual actuation. Accordingly, a variation is proposed to affix Footnote (a) (i.e., "Associated with an ECCS subsystem required to be OPERABLE by LCO 3.5.2, `Reactor Pressure Vessel Water Inventory Control"') to the "Required Channels Per Function" column of Functions 1.a and 2.a of TS Table 3.3.5.2-1. The TS markup reflecting this variation and the corresponding revised TS page are included in Attachments 1 and 2, respectively.
Additionally, an issue was identified regarding the markups for TS Pages 3.5.2-1 and 3.5.2-3 pertaining to the use of the word subsystems versus subsystem in LCO 3.5.2 (i.e., TS Page 3.5.2-1), and system versus subsystem for the standby gas treatment system in LCO 3.5.2, Required Action DA (i.e., TS Page 3.5.2-3). The corrected markups and associated revised TS pages have been included in Attachments 1 and 2, respectively.
Additionally, an issue was identified regarding the markups for TS Pages 3.5.2-1 and 3.5.2-3 pertaining to the use of the word subsystems versus subsystem in LCO 3.5.2 (i.e., TS Page 3.5.2-1), and system versus subsystem for the standby gas treatment system in LCO 3.5.2, Required Action DA (i.e., TS Page 3.5.2-3). The corrected markups and associated revised TS pages have been included in Attachments 1 and 2, respectively.
EGC has reviewed the information supporting a finding of no significant hazards consideration, and the environmental consideration, that were previously provided to the NRC in Reference 1.
EGC has reviewed the information supporting a finding of no significant hazards consideration, and the environmental consideration, that were previously provided to the NRC in Reference 1.
The additional information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. In addition, the information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
The additional information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. In addition, the information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
EGC is notifying the State of Illinois of this supplement to a previous application for a change to the TS by sending a copy of this letter and its attachment to the designated State Official in accordance with 10 CFR 50.91, "Notice for public comment; State consultation," paragraph (b).
EGC is notifying the State of Illinois of this supplement to a previous application for a change to the TS by sending a copy of this letter and its attachment to the designated State Official in accordance with 10 CFR 50.91, "Notice for public comment; State consultation," paragraph (b).  


December 20, 2017 U.S. Nuclear Regulatory Commission Page 3 There are no regulatory commitments contained within this letter. Should you have any questions concerning this letter, please contact Mr. Mitchel A. Mathews at (630) 657-2819.
December 20, 2017 U.S. Nuclear Regulatory Commission Page 3 There are no regulatory commitments contained within this letter. Should you have any questions concerning this letter, please contact Mr. Mitchel A. Mathews at (630) 657-2819.
declare under penalty of perjury that the foregoing is true and correct. Executed on the 20th day of December 2017.
declare under penalty of perjury that the foregoing is true and correct. Executed on the 20th day of December 2017.
pectfully, 712N 1
7 112
t_
t_
Patrick R. Simpson Manager Licensing Exelon Generation Company, LLC Attachments:       1. Proposed Technical Specifications Changes (Mark-Up)
N pectfully, Patrick R. Simpson Manager Licensing Exelon Generation Company, LLC Attachments:
: 2. Revised Technical Specifications Pages cc:     NRC Regional Administrator, Region III NRC Senior Resident Inspector Dresden Nuclear Power Station Illinois Emergency Management Agency Division of Nuclear Safety
: 1. Proposed Technical Specifications Changes (Mark-Up)
: 2. Revised Technical Specifications Pages cc:
NRC Regional Administrator, Region III NRC Senior Resident Inspector Dresden Nuclear Power Station Illinois Emergency Management Agency Division of Nuclear Safety  


Dresden Nuclear Power Station, Units 2 and 3 Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, "Reactor Pressure Vessel Water Inventory Control" ATTACHMENT 1 - PROPOSED TECHNICAL SPECIFICATIONS CHANGES (MARK-UP) 3.3.5.2-3 3.5.2-1 3.5.2-3
Dresden Nuclear Power Station, Units 2 and 3 Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, "Reactor Pressure Vessel Water Inventory Control" ATTACHMENT 1 - PROPOSED TECHNICAL SPECIFICATIONS CHANGES (MARK-UP) 3.3.5.2-3 3.5.2-1 3.5.2-3  


RPV Water Inventory Control Instrumentation 3.3.5.2 Table 3.3.5.2-1 (Page 1 of 1)
RPV Water Inventory Control Instrumentation 3.3.5.2 Table 3.3.5.2-1 (Page 1 of 1)
RPV Water Inventory Control Instrumentation APPLICABLE                       CONDITIONS MODES                       REFERENCED OR OTHER         REQUIRED       FROM SPECIFIED       CHANNELS PER     REQUIRED   SURVEILLANCE       ALLOWABLE FUNCTION           CONDITIONS         FUNCTION     ACTION A.1 REQUIREMENTS           VALUE
RPV Water Inventory Control Instrumentation APPLICABLE CONDITIONS MODES REFERENCED OR OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
: 1. Core Spray System
: 1.
: a. Reactor Steam Dome     4(a), 5(al           2 (a)           C     SR 3.3.5.2.2   < 341.7 psig PressureLow (Permissive)
Core Spray System
: b. Core Spray Pump         4(a), 5(a)           1 per           D     SR 3.3.5.2.2   _> 802 gpm Discharge FlowLow                       pump (a)                                   and (Bypass)                                                                             s992 gpm
: a.
: 2. Low Pressure Coolant Injection (LPCI) System
Reactor Steam Dome 4(a),
: a. Reactor Steam Dome     4(3), 5(a)         2 (a)           C       SR 3.3.5.2.2   < 341.7 psi PressureLow (Permissive)
5(al 2 (a)
: b. Low Pressure Coolant   4(a), 5(a)         1 per           D       SR 3.3.5.2.2   _> 1107 gpm Injection Pump                           loop (a)
C SR
3.3.5.2.2  
< 341.7 psig PressureLow (Permissive)
: b.
Core Spray Pump 4(a),
5(a) 1 per D
SR
3.3.5.2.2
_> 802 gpm Discharge FlowLow pump (a) and (Bypass) s992 gpm
: 2.
Low Pressure Coolant Injection (LPCI) System
: a.
Reactor Steam Dome
4(3),
5(a) 2 (a)
C
SR 3.3.5.2.2
< 341.7 psi PressureLow (Permissive)
: b.
Low Pressure Coolant
4(a),
5(a) 1 per D
SR 3.3.5.2.2
_> 1107 gpm Injection Pump loop (a)
Discharge FlowLow (Bypass)
Discharge FlowLow (Bypass)
: 3. Shutdown Cooling System (SDC) Isolation
: 3.
: a. Reactor Vessel Water       (b)         1 per trip           B     SR 3.3.5.2.1   _> 2.65 inches LevelLow                                 system                   SR 3.3.5.2.2
Shutdown Cooling System (SDC) Isolation
: a.
Reactor Vessel
Water
(b) 1 per trip B
SR 3.3.5.2.1
_> 2.65 inches LevelLow system SR 3.3.5.2.2
: 4. Reactor Water Cleanup System Isolation
: 4. Reactor Water Cleanup System Isolation
: a. Reactor Vessel Water       (b)         1 per trip         B       SR 3.3.5.2.1     _> 2.65 inches LevelLow                                 system                   SR 3.3.5.2.2 (a) Associated with an ECCS subsystem required to be OPERABLE by LCO 3.5.2, "RPV Water Inventory Control."
: a.
Reactor Vessel Water
(b)
1 per trip
B
SR 3.3.5.2.1
_> 2.65 inches LevelLow
system SR 3.3.5.2.2 (a) Associated with an ECCS subsystem required to be OPERABLE by LCO 3.5.2, "RPV Water Inventory Control."
(b) When automatic isolation of the associated penetration flow path(s) is credited in calculating DRAIN TIME.
(b) When automatic isolation of the associated penetration flow path(s) is credited in calculating DRAIN TIME.
Dresden 2 and 3                                   3.3.5.2-3                     Amendment No.
Dresden 2 and 3
3.3.5.2-3
Amendment No.  


FM=-'cCrVc!               RPV Water Inventory Control 3.5.2 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), REACTOR PRESSURE VESSEL (RPV)
FM=-'cCrVc!
WATER INVENTORY CONTROL, AND ISOLATION CONDENSER (IC) SYSTEM 3.5.2   EGGS-S rH tdewTRPV Water Inventory Control LCO 3.5.2           DRAIN TIME of RPV water inventory to the top of active fuel (TA F) shall be >_ 36 hours.
RPV Water Inventory Control 3.5.2 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), REACTOR PRESSURE VESSEL (RPV)
WATER INVENTORY CONTROL, AND ISOLATION CONDENSER (IC) SYSTEM 3.5.2 EGGS -S rH tdewTRPV Water Inventory Control LCO 3.5.2 DRAIN TIME of RPV water inventory to the top of active fuel (TA F) shall be >_ 36 hours.
AND TweOne low pressure ECCS injection/spray subsystem= shall be OPERABLE.
AND TweOne low pressure ECCS injection/spray subsystem= shall be OPERABLE.
APPLICABILITY:       MODES 4 and 5.,
APPLICABILITY:
MO DE 5 , exGept w4h the spent -fuel sten-a-gepeel gates remn                                                             n f the ved and wateT level ~!           32  4 evepthe t op r eaG tep      uTpe v essel l n TT'QT '9n .
MODES 4 and 5.,
ACTIONS CONDITION                       REQUIRED ACTION                           COMPLETION TIME A. gRePRequired ECCS             A.1     Restore required ECCS                   4 hours injection/spray                       injection/spray subsystem inoperable.                 subsystem to OPERABLE status.
MO DE 5, exGept w4h the spent -fuel sten-a-gepeel gates remn ved and wateT level ~! 2 3 4 evepthe top n f the r eaGtep uTpe vessel TTl
B. Required Action and           B.1     Initiate action to                     Immediately associated Completion                 establish a method of Time of Condition A                   water injection not met.                               capable of operating without offsite electrical power.+-cam e p eta-e n-swith     -
'QTn
peter+; !
'9n.
                                                                ~
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. gRePRequired
ECCS A.1
Restore
required
ECCS 4
hours injection/spray injection/spray subsystem
inoperable.
subsystem to OPERABLE status.
B. Required
Action
and B.1
Initiate
action
to Immediately associated
Completion establish a method of Time of Condition
A water injection not met.
capable of operating without offsite electrical power.+-cam e p eta-e n-swith peter+;
~
4 7 i n
4 7 i n
                                              ~fTi'TT         t
~fT,
                                                        , 7'g-'h e   p a G t e p vessel Tl.T (9PPR S (continued)
i'TT 7'g-t'h e
Dresden 2 and 3                           3.5.2-1                               Amendment No.
p a G t e p Tl.T vessel
(9PPR
S (continued)
Dresden 2 and 3
3.5.2-1
Amendment No.  


RPV Water Inventory ControlGGS - S           ewH 3.5.2 ACTIONS CONDITION                       REQUIRED ACTION                     COMPLETION TIME D. DRAIN TIME < 8               D.1     ------- NOTE --------
RPV Water Inventory ControlGGS - S
hours. Requi ed Ap-tiep C-2           Required ECCS
ewH 3.5.2 ACTIONS CONDITION
          ;Ss eG4 a ted r mn,otior4         injection/spray subsystem Time-+mot met.                       or additional method of water injection shall be capable of operating without offsite electrical power.
REQUIRED ACTION
                                    -D-.4   Initiate action to establish an additional method of water injection         Immediately with water sources capable of maintaining RPV water level > TAF for
COMPLETION TIME D.
                                            >_ 36 hours. pestepe QURAB LE status .
DRAIN TIME < 8
AND D.2     Initiate action to establish secondary               Immediately containment boundary       ^r^ ors stand-by gas treatment subs stem to QPERAS E s tatus.
D.1
Immediately AND D.3     Initiate action to Tester^
------- NOTE --------
i cnl 8ti nrii sol ate each Gapabilit 4R eaGh P^^~e4~secondary containment penetration flow path not or verify it can be manually isolated from the control room.                             Immediately AND D.4     Initiate action to verify one standby gas treatment subsystem is capable of being placed in operation.
hours. Requi ed Ap-tiep C-2
(continued)
Required ECCS  
Dresden 2 and 3                           3.5.2-3                         Amendment No.
;SseG4 ated r mn,otior4
injection/spray subsystem Time-+mot met.
or additional method of water injection shall be capable of operating without offsite electrical power.  
-D-.4
Initiate action to establish an additional method of water injection
Immediately with water sources capable of maintaining RPV water level > TAF for  
>_ 36 hours. pestepe QURAB LE status.
AND D.2
Initiate action to establish secondary containment boundary
^r^ ors stand-by gas treatment subs stem to QPERAS E s tatus.
AND D.3
Initiate action to Tester^ i cnl 8ti nriisol ate each Gapabilit 4R eaGh P^^~e4~secondary containment penetration flow path not or verify it can be manually isolated from the control room.
AND D.4
Initiate action to verify one standby gas treatment subsystem is capable of being placed in operation.
Immediately Immediately Immediately (continued)
Dresden 2 and 3
3.5.2-3
Amendment No.  


Dresden Nuclear Power Station, Units 2 and 3 Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, "Reactor Pressure Vessel Water Inventory Control" ATTACHMENT 2 - REVISED TECHNICAL SPECIFICATIONS PAGES 3.3.5.2-3 3.5.2-1 3.5.2-3
Dresden Nuclear Power Station, Units 2 and 3 Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, "Reactor Pressure Vessel Water Inventory Control" ATTACHMENT 2 - REVISED TECHNICAL SPECIFICATIONS PAGES 3.3.5.2-3 3.5.2-1 3.5.2-3  


RPV Water Inventory Control Instrumentation 3.3.5.2 Table 3.3.5.2-1 (Page 1 of 1)
RPV Water Inventory Control Instrumentation 3.3.5.2 Table 3.3.5.2-1 (Page 1 of 1)
RPV Water Inventory Control Instrumentation APPLICABLE                       CONDITIONS MODES                         REFERENCED OR OTHER         REQUIRED         FROM SPECIFIED       CHANNELS PER     REQUIRED SURVEILLANCE       ALLOWABLE FUNCTION             CONDITIONS         FUNCTION     ACTION A.1 REQUIREMENTS         VALUE
RPV Water Inventory Control Instrumentation APPLICABLE CONDITIONS MODES REFERENCED OR OTHER REQUIRED
: 1. Core Spray System
FROM SPECIFIED CHANNELS
: a. Reactor Steam Dome       4(a)   5(a)         2 (a)            C    SR 3.3.5.2.2    <_ 341.7 psig PressureLow (Permissive)
PER
: b. Core Spray Pump         4(a), 5(a)           1 per            D    SR 3.3.5.2.2    >_ 802 gpm Discharge FlowLow                           pump (a)                                and (Bypass)                                                                             <_ 992 gpm
REQUIRED
: 2. Low Pressure Coolant Injection (LPCI) System
SURVEILLANCE
: a. Reactor Steam Dome       4(a), 5(a)         2 (a)           C     SR 3.3.5.2.2   _< 341.7 psig PressureLow (Permissive)
ALLOWABLE FUNCTION
: b. Low Pressure Coolant    4(a), 5(a)           1 per           D     SR 3.3.5.2.2   >_ 1107 gpm Injection Pump                              loop (a)
CONDITIONS FUNCTION
Discharge FlowLow (Bypass)
ACTION A.1
: 3. Shutdown Cooling System (SDC) Isolation
REQUIREMENTS
: a. Reactor Vessel Water          (b)          1 per trip           B     SR 3.3.5.2.1   ? 2.65 inches LevelLow                                  system                 SR 3.3.5.2.2
VALUE
: 4. Reactor Water Cleanup System Isolation
: 1.
: a. Reactor Vessel Water         (b)         1 per trip         B     SR 3.3.5.2.1   >_ 2.65 inches LevelLow                                   system                 SR 3.3.5.2.2 (a) Associated with an ECCS subsystem required to be OPERABLE by LCO 3.5.2, "RPV Water inventory Control."
Core Spray System
: a. Reactor
Steam Dome 4(a)
5(a)
PressureLow (Permissive)
: b. Core
Spray
Pump 4(a),
5(a)
Discharge
FlowLow (Bypass)
: 2.
Low
Pressure
Coolant Injection
(LPCI)
System
: a. Reactor Steam Dome 4(a),
5(a)
PressureLow (Permissive)
: b. Low
Pressure
Coolant 4(a),
5(a)
Injection
Pump Discharge
FlowLow (Bypass)
: 3.
Shutdown
Cooling System
(SDC)
Isolation
: a.
Reactor
Vessel
Water (b)
LevelLow
: 4.
Reactor
Water
Cleanup System
Isolation 2 (a)
C
SR 3.3.5.2.2
<_ 341.7 psig 1 per
D
SR 3.3.5.2.2
>_ 802 gpm pump (a)
and
<_ 992 gpm 2 (a)
C
SR 3.3.5.2.2
_< 341.7 psig 1 per
D
SR 3.3.5.2.2
>_ 1107 gpm loop (a) 1 per trip
B
SR 3.3.5.2.1
? 2.65 inches system
SR 3.3.5.2.2
: a.
Reactor Vessel Water
(b)
1 per trip
B
SR 3.3.5.2.1
>_ 2.65 inches LevelLow
system
SR 3.3.5.2.2 (a) Associated with an ECCS subsystem required to be OPERABLE by LCO 3.5.2, "RPV Water inventory Control."
(b) When automatic isolation of the associated penetration flow path(s) is credited in calculating DRAIN TIME.
(b) When automatic isolation of the associated penetration flow path(s) is credited in calculating DRAIN TIME.
Dresden 2 and 3                                   3.3.5.2-3                     Amendment No.
Dresden 2 and 3
3.3.5.2-3
Amendment No.  


RPV Water Inventory Control 3.5.2 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), REACTOR PRESSURE VESSEL (RPV)
RPV Water Inventory Control 3.5.2 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), REACTOR PRESSURE VESSEL (RPV)
WATER INVENTORY CONTROL, AND ISOLATION CONDENSER (IC) SYSTEM 3.5.2 RPV Water Inventory Control LCO 3.5.2         DRAIN TIME of RPV water inventory to the top of active fuel (TAF) shall be >_ 36 hours.
WATER INVENTORY CONTROL, AND ISOLATION CONDENSER (IC) SYSTEM 3.5.2 RPV Water Inventory Control LCO 3.5.2
DRAIN TIME of RPV water inventory to the top of active fuel (TAF) shall be >_ 36 hours.
AND One low pressure ECCS injection/spray subsystem shall be OPERABLE.
AND One low pressure ECCS injection/spray subsystem shall be OPERABLE.
APPLICABILITY:   MODES 4 and 5.
APPLICABILITY:
ACTIONS CONDITION                   REQUIRED ACTION           COMPLETION TIME A. Required ECCS           A.l     Restore required ECCS   4 hours injection/spray                   injection/spray subsystem inoperable.             subsystem to OPERABLE status.
MODES 4 and 5.
B. Required Action and     B.1     Initiate action to     Immediately associated Completion             establish a method of Time of Condition A               water injection not met.                         capable of operating without offsite electrical power.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Required
ECCS A.l
Restore
required
ECCS 4
hours injection/spray injection/spray subsystem
inoperable.
subsystem to OPERABLE status.
B. Required
Action
and B.1
Initiate
action
to Immediately associated
Completion establish
a
method
of Time
of Condition
A water
injection not met.
capable
of operating without offsite electrical
power.
(continued)
(continued)
Dresden 2 and 3                     3.5.2-1               Amendment No.
Dresden 2 and 3
3.5.2-1
Amendment No.  


RPV Water Inventory Control 3.5.2 ACTIONS CONDITION             REQUIRED ACTION           COMPLETION TIME D. DRAIN TIME < 8 hours. 1D.1   ------- NOTE --------
RPV Water Inventory Control 3.5.2 ACTIONS CONDITION REQUIRED ACTION
COMPLETION TIME D.
DRAIN TIME < 8 hours.
1D.1  
------- NOTE --------
Required ECCS injection/spray subsystem or additional method of water injection shall be capable of operating without offsite electrical power.
Required ECCS injection/spray subsystem or additional method of water injection shall be capable of operating without offsite electrical power.
Initiate action to       Immediately establish an additional method of water injection with water sources capable of maintaining RPV water level > TAF for
Initiate action to establish an additional method of water injection with water sources capable of maintaining RPV water level > TAF for  
                                  > 36 hours.
> 36 hours.
AND D.2   Initiate action to       Immediately establish secondary containment boundary.
Immediately AND D.2
AND D.3   Initiate action to       Immediately isolate each secondary containment penetration flow path or verify it can be manually isolated from the control room.
Initiate action to
AND D.4   Initiate action to       Immediately verify one standby gas treatment subsystem is capable of being placed in oppratinn-(continued)
Immediately establish secondary containment boundary.
Dresden 2 and 3                3.5.2-3               Amendment No.}}
AND D.3 Initiate action to isolate each secondary containment penetration flow path or verify it can be manually isolated from the control room.
Immediately Dresden 2 and 3 AND D.4 Initiate action to
Immediately verify one standby gas treatment subsystem is capable of being placed in oppratinn-(continued) 3.5.2-3
Amendment No.}}

Latest revision as of 09:08, 7 January 2025

Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control
ML17354B196
Person / Time
Site: Dresden  
Issue date: 12/20/2017
From: Simpson P
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CAC MF9295, CAC MF9296, RS-17-173, TSTF-542
Download: ML17354B196 (11)


Text

4300 Winfield Road IAMIMMIK

Warrenville, IL 60555 Amop-ExeLon G 630 657 2000 Office RS-17-173 10 CFR 50.90 December 20, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249

Subject:

Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, "Reactor Pressure Vessel Water Inventory Control"

References:

(1) Letter from P. R. Simpson (Exelon Generation Company, LLC (EGC)) to NRC, "Application to Revise Technical Specifications to Adopt TSTF-542,

'Reactor Pressure Vessel Water Inventory Control,"' dated February 10 2017 (2)

Letter from R. S. Haskell (NRC) to B. C. Hanson (EGC), "Dresden Nuclear Power Station, Units 2 and 3 - Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler-542, Revision 2,

'Reactor Pressure Vessel Water Inventory Control' (CAC Nos. MF9295 and MF9296)," dated July 11, 2017 (3)

Letter from P. R. Simpson (EGC) to NRC, "Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, 'Reactor Pressure Vessel Water Inventory Control,"' dated July 13, 2017 In Reference 1, Exelon Generation Company, LLC (EGC) submitted a request for amendments to the Technical Specifications (TS) for Dresden Nuclear Power Station (DNPS), Units 2 and 3.

Specifically, EGC requested that the NRC complete its review and approval of a request to adopt TSTF-542.

In Reference 2, the NRC determined that additional information was required to complete the evaluation of the Reference 1 request. The response to Reference 2 was provided in Reference 3.

December 20, 2017 U.S. Nuclear Regulatory Commission Page 2 EGC recently identified that an issue related to TSTF-542 applies to its request to adopt the TSTF for DNPS, Units 2 and 3. Specifically, in accordance with TSTF-542, TS Table 3.3.5.2-1, Function 1.a (Core Spray System Reactor Steam Dome Pressure Low (Injection Permissive),

and Function 2.a (Low Pressure Coolant Injection (LPCI) Reactor Steam Dome Pressure Low (Injection Permissive) are required in Modes 4 and 5. Prior to TSTF-542, the analogous Functions 1.c and 2.c in TS Table 3.3.5.1-1 had a Mode 4 and 5 applicability modified by a footnote specifying that these functions were only required when the associated emergency core cooling system (ECCS) subsystem(s) were required to be operable per limiting condition for operation (LCO) 3.5.2, "ECCS Shutdown." The footnote was inadvertently omitted from Table 3.3.5.2-1 Functions 1.a and 2.a in TSTF-542. Without the footnote, the Reactor Steam Dome Pressure Low functions would be required to be operable for all low pressure ECCS subsystems, regardless of whether they are credited for meeting LCO 3.5.2. Requiring the functions for all ECCS subsystems is unnecessary. In Modes 4 and 5 with the reactor steam dome at atmospheric pressure, these functions only serve to satisfy permissives for opening low pressure ECCS injection valves for manual actuation. Accordingly, a variation is proposed to affix Footnote (a) (i.e., "Associated with an ECCS subsystem required to be OPERABLE by LCO 3.5.2, `Reactor Pressure Vessel Water Inventory Control"') to the "Required Channels Per Function" column of Functions 1.a and 2.a of TS Table 3.3.5.2-1. The TS markup reflecting this variation and the corresponding revised TS page are included in Attachments 1 and 2, respectively.

Additionally, an issue was identified regarding the markups for TS Pages 3.5.2-1 and 3.5.2-3 pertaining to the use of the word subsystems versus subsystem in LCO 3.5.2 (i.e., TS Page 3.5.2-1), and system versus subsystem for the standby gas treatment system in LCO 3.5.2, Required Action DA (i.e., TS Page 3.5.2-3). The corrected markups and associated revised TS pages have been included in Attachments 1 and 2, respectively.

EGC has reviewed the information supporting a finding of no significant hazards consideration, and the environmental consideration, that were previously provided to the NRC in Reference 1.

The additional information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. In addition, the information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.

EGC is notifying the State of Illinois of this supplement to a previous application for a change to the TS by sending a copy of this letter and its attachment to the designated State Official in accordance with 10 CFR 50.91, "Notice for public comment; State consultation," paragraph (b).

December 20, 2017 U.S. Nuclear Regulatory Commission Page 3 There are no regulatory commitments contained within this letter. Should you have any questions concerning this letter, please contact Mr. Mitchel A. Mathews at (630) 657-2819.

declare under penalty of perjury that the foregoing is true and correct. Executed on the 20th day of December 2017.

7 112

t_

N pectfully, Patrick R. Simpson Manager Licensing Exelon Generation Company, LLC Attachments:

1. Proposed Technical Specifications Changes (Mark-Up)
2. Revised Technical Specifications Pages cc:

NRC Regional Administrator, Region III NRC Senior Resident Inspector Dresden Nuclear Power Station Illinois Emergency Management Agency Division of Nuclear Safety

Dresden Nuclear Power Station, Units 2 and 3 Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, "Reactor Pressure Vessel Water Inventory Control" ATTACHMENT 1 - PROPOSED TECHNICAL SPECIFICATIONS CHANGES (MARK-UP) 3.3.5.2-3 3.5.2-1 3.5.2-3

RPV Water Inventory Control Instrumentation 3.3.5.2 Table 3.3.5.2-1 (Page 1 of 1)

RPV Water Inventory Control Instrumentation APPLICABLE CONDITIONS MODES REFERENCED OR OTHER REQUIRED FROM SPECIFIED CHANNELS PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE

1.

Core Spray System

a.

Reactor Steam Dome 4(a),

5(al 2 (a)

C SR 3.3.5.2.2

< 341.7 psig PressureLow (Permissive)

b.

Core Spray Pump 4(a),

5(a) 1 per D

SR 3.3.5.2.2

_> 802 gpm Discharge FlowLow pump (a) and (Bypass) s992 gpm

2.

Low Pressure Coolant Injection (LPCI) System

a.

Reactor Steam Dome

4(3),

5(a) 2 (a)

C

SR 3.3.5.2.2

< 341.7 psi PressureLow (Permissive)

b.

Low Pressure Coolant

4(a),

5(a) 1 per D

SR 3.3.5.2.2

_> 1107 gpm Injection Pump loop (a)

Discharge FlowLow (Bypass)

3.

Shutdown Cooling System (SDC) Isolation

a.

Reactor Vessel

Water

(b) 1 per trip B

SR 3.3.5.2.1

_> 2.65 inches LevelLow system SR 3.3.5.2.2

4. Reactor Water Cleanup System Isolation
a.

Reactor Vessel Water

(b)

1 per trip

B

SR 3.3.5.2.1

_> 2.65 inches LevelLow

system SR 3.3.5.2.2 (a) Associated with an ECCS subsystem required to be OPERABLE by LCO 3.5.2, "RPV Water Inventory Control."

(b) When automatic isolation of the associated penetration flow path(s) is credited in calculating DRAIN TIME.

Dresden 2 and 3

3.3.5.2-3

Amendment No.

FM=-'cCrVc!

RPV Water Inventory Control 3.5.2 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), REACTOR PRESSURE VESSEL (RPV)

WATER INVENTORY CONTROL, AND ISOLATION CONDENSER (IC) SYSTEM 3.5.2 EGGS -S rH tdewTRPV Water Inventory Control LCO 3.5.2 DRAIN TIME of RPV water inventory to the top of active fuel (TA F) shall be >_ 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

AND TweOne low pressure ECCS injection/spray subsystem= shall be OPERABLE.

APPLICABILITY:

MODES 4 and 5.,

MO DE 5, exGept w4h the spent -fuel sten-a-gepeel gates remn ved and wateT level ~! 2 3 4 evepthe top n f the r eaGtep uTpe vessel TTl

'QTn

'9n.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. gRePRequired

ECCS A.1

Restore

required

ECCS 4

hours injection/spray injection/spray subsystem

inoperable.

subsystem to OPERABLE status.

B. Required

Action

and B.1

Initiate

action

to Immediately associated

Completion establish a method of Time of Condition

A water injection not met.

capable of operating without offsite electrical power.+-cam e p eta-e n-swith peter+;

~

4 7 i n

~fT,

i'TT 7'g-t'h e

p a G t e p Tl.T vessel

(9PPR

S (continued)

Dresden 2 and 3

3.5.2-1

Amendment No.

RPV Water Inventory ControlGGS - S

ewH 3.5.2 ACTIONS CONDITION

REQUIRED ACTION

COMPLETION TIME D.

DRAIN TIME < 8

D.1


NOTE --------

hours. Requi ed Ap-tiep C-2

Required ECCS

SseG4 ated r mn,otior4

injection/spray subsystem Time-+mot met.

or additional method of water injection shall be capable of operating without offsite electrical power.

-D-.4

Initiate action to establish an additional method of water injection

Immediately with water sources capable of maintaining RPV water level > TAF for

>_ 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. pestepe QURAB LE status.

AND D.2

Initiate action to establish secondary containment boundary

^r^ ors stand-by gas treatment subs stem to QPERAS E s tatus.

AND D.3

Initiate action to Tester^ i cnl 8ti nriisol ate each Gapabilit 4R eaGh P^^~e4~secondary containment penetration flow path not or verify it can be manually isolated from the control room.

AND D.4

Initiate action to verify one standby gas treatment subsystem is capable of being placed in operation.

Immediately Immediately Immediately (continued)

Dresden 2 and 3

3.5.2-3

Amendment No.

Dresden Nuclear Power Station, Units 2 and 3 Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, "Reactor Pressure Vessel Water Inventory Control" ATTACHMENT 2 - REVISED TECHNICAL SPECIFICATIONS PAGES 3.3.5.2-3 3.5.2-1 3.5.2-3

RPV Water Inventory Control Instrumentation 3.3.5.2 Table 3.3.5.2-1 (Page 1 of 1)

RPV Water Inventory Control Instrumentation APPLICABLE CONDITIONS MODES REFERENCED OR OTHER REQUIRED

FROM SPECIFIED CHANNELS

PER

REQUIRED

SURVEILLANCE

ALLOWABLE FUNCTION

CONDITIONS FUNCTION

ACTION A.1

REQUIREMENTS

VALUE

1.

Core Spray System

a. Reactor

Steam Dome 4(a)

5(a)

PressureLow (Permissive)

b. Core

Spray

Pump 4(a),

5(a)

Discharge

FlowLow (Bypass)

2.

Low

Pressure

Coolant Injection

(LPCI)

System

a. Reactor Steam Dome 4(a),

5(a)

PressureLow (Permissive)

b. Low

Pressure

Coolant 4(a),

5(a)

Injection

Pump Discharge

FlowLow (Bypass)

3.

Shutdown

Cooling System

(SDC)

Isolation

a.

Reactor

Vessel

Water (b)

LevelLow

4.

Reactor

Water

Cleanup System

Isolation 2 (a)

C

SR 3.3.5.2.2

<_ 341.7 psig 1 per

D

SR 3.3.5.2.2

>_ 802 gpm pump (a)

and

<_ 992 gpm 2 (a)

C

SR 3.3.5.2.2

_< 341.7 psig 1 per

D

SR 3.3.5.2.2

>_ 1107 gpm loop (a) 1 per trip

B

SR 3.3.5.2.1

? 2.65 inches system

SR 3.3.5.2.2

a.

Reactor Vessel Water

(b)

1 per trip

B

SR 3.3.5.2.1

>_ 2.65 inches LevelLow

system

SR 3.3.5.2.2 (a) Associated with an ECCS subsystem required to be OPERABLE by LCO 3.5.2, "RPV Water inventory Control."

(b) When automatic isolation of the associated penetration flow path(s) is credited in calculating DRAIN TIME.

Dresden 2 and 3

3.3.5.2-3

Amendment No.

RPV Water Inventory Control 3.5.2 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), REACTOR PRESSURE VESSEL (RPV)

WATER INVENTORY CONTROL, AND ISOLATION CONDENSER (IC) SYSTEM 3.5.2 RPV Water Inventory Control LCO 3.5.2

DRAIN TIME of RPV water inventory to the top of active fuel (TAF) shall be >_ 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

AND One low pressure ECCS injection/spray subsystem shall be OPERABLE.

APPLICABILITY:

MODES 4 and 5.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Required

ECCS A.l

Restore

required

ECCS 4

hours injection/spray injection/spray subsystem

inoperable.

subsystem to OPERABLE status.

B. Required

Action

and B.1

Initiate

action

to Immediately associated

Completion establish

a

method

of Time

of Condition

A water

injection not met.

capable

of operating without offsite electrical

power.

(continued)

Dresden 2 and 3

3.5.2-1

Amendment No.

RPV Water Inventory Control 3.5.2 ACTIONS CONDITION REQUIRED ACTION

COMPLETION TIME D.

DRAIN TIME < 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

1D.1


NOTE --------

Required ECCS injection/spray subsystem or additional method of water injection shall be capable of operating without offsite electrical power.

Initiate action to establish an additional method of water injection with water sources capable of maintaining RPV water level > TAF for

> 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

Immediately AND D.2

Initiate action to

Immediately establish secondary containment boundary.

AND D.3 Initiate action to isolate each secondary containment penetration flow path or verify it can be manually isolated from the control room.

Immediately Dresden 2 and 3 AND D.4 Initiate action to

Immediately verify one standby gas treatment subsystem is capable of being placed in oppratinn-(continued) 3.5.2-3

Amendment No.