{{#Wiki_filter:ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
{{#Wiki_filter:ENCLOSURE 2
UNITS 2 AND 3 PROPOSED   TECHNICAL SPECIFICATION (TS) CHANGES TS-391T MARKED PAGES CUSTOM TS I. AFFE TED PA   E LI T Unit 2   page   3.9/4.9-9 Unit 3   page 3.9/4.9-8 See attached.
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
970702024i 9706i9 PDR   ADOCK 05000260 P               PDR
UNITS 2 AND 3 PROPOSED TECHNICAL SPECIFICATION (TS)
CHANGES TS-391T MARKED PAGES CUSTOM TS I.
AFFE TED PA E LI T Unit 2 page 3.9/4.9-9 Unit 3 page 3.9/4.9-8 See attached.
970702024i 9706i9 PDR ADOCK 05000260 P
PDR


NOV                  i8 1988 LIMITIHG COHDITIOHS   FOR OPERATIOH                   SURVEILLAHCE REQUIREMEHTS 4.9.B.                         '.9.B.
LIMITIHG COHDITIOHS FOR OPERATIOH NOV i8 1988 SURVEILLAHCE REQUIREMEHTS
3~ When one of     the units   1                     3. When one of the and 2 diesel     generator     is                       units 1 and 2 diesel IHOPEKQKZ, continued                                     generators is found REACTOR POWER     OPERATIOH is                           to be  IHOPERABLE, permissible during the                                   all of  the remaining succeeding 7 days,                                       diesel generators provided that     2 offsite                             shall be demonstrated power sources are                                       to be OPERABLZ within available as specified                                   24  hours, and power in 3.9.A.l.c and all of                                 availability for                  the the CS, RHR (LPCI and                                   associated boards containment cooling)                                     shall be verified systems, and the remaining                               within 1 hour and three units 1 and 2 diesel                               at least once per generators are OPERABLZ.                                8 hours thereafter.
'.9.B.
If   this requirement cannot be met, an orderly shutdown   shall   be initiated   and the   reactor shall   be in the COLD SHUTDOWH COHDITIOH within 24 hours.
4.9.B.
4, When one   units   1 and 2                         4. When one   4-kV 4-kV shutdown board is                                  shutdown board             is IHOPERABLZ, continued                                   found to be REACTOR POWER OPERATIOH                                 IHOPERABLE,  all is permissible for a period                             diesel generators of 5 days provided that                                 associated with the 2 offsite power sources                                 remaining 4-kV are available as                                                   boards shall  'hutdown specified in 3.9.A.l.c                                   be demonstrated to be and the remaining 4-kV                                   OPERABLZ within 24 hours, shutdown boards and                                     and power  availability associated diesel                                       for the remaining 4-kV generators, CS, RHR (LPCI                                           boards                      'hutdown and containment cooling)                               shall be verified systems,   and all   480-V                             within 1 hours and emergency power boards                                 at least once per are OPERABLE.     If this                             8 hours thereafter.
3 ~
requirement cannot be met, an orderly shutdown shall b'e initiated   and                 [Temporary Change: The preceding 7-day LCO time limit may be the reactor shall      be in                extended to 14 days to support completion of the COLD SHUTDOWH      COHDITIOH            maintenance activities within 24 hours.                              during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be. used only once for       each individual diesel generator).
When one of the units 1
BFH                                           3 '/4.9-9                 AMENDMENT NO.                   15 4 Unit 2
and 2 diesel generator is IHOPEKQKZ, continued REACTOR POWER OPERATIOH is permissible during the succeeding 7 days, provided that 2 offsite power sources are available as specified in 3.9.A.l.c and all of the CS, RHR (LPCI and containment cooling)
: systems, and the remaining three units 1 and 2 diesel generators are OPERABLZ.
If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the COLD SHUTDOWH COHDITIOH within 24 hours.
3.
When one of the units 1 and 2 diesel generators is found to be IHOPERABLE, all of the remaining diesel generators shall be demonstrated to be OPERABLZ within 24 hours, and power availability for the associated boards shall be verified within 1 hour and at least once per 8 hours thereafter.
4, When one units 1 and 2
4-kV shutdown board is IHOPERABLZ, continued REACTOR POWER OPERATIOH is permissible for a period of 5 days provided that 2 offsite power sources are available as specified in 3.9.A.l.c and the remaining 4-kV shutdown boards and associated diesel generators, CS, RHR (LPCI and containment cooling)
: systems, and all 480-V emergency power boards are OPERABLE. If this requirement cannot be
: met, an orderly shutdown shall b'e initiated and the reactor shall be in the COLD SHUTDOWH COHDITIOH within 24 hours.
4.
When one 4-kV shutdown board is found to be IHOPERABLE, all diesel generators associated with the remaining 4-kV
'hutdown boards shall be demonstrated to be OPERABLZ within 24 hours, and power availability for the remaining 4-kV
'hutdown boards shall be verified within 1 hours and at least once per 8 hours thereafter.
[Temporary Change:
The preceding 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1,
1998, to February 1,
: 1999, after which time this temporary change is no longer valid.
This allowance can be. used only once for each individual diesel generator).
BFH Unit 2 3'/4.9-9 AMENDMENTNO. 15 4


4       UX         R   E EC   IC     SYS AUB 19 1888 NG COtjtD       0 S   0 OP     T 0                           CE       U           S 3.9.B. 0 erat     o   v th     o erable             4.9.B.     0   erat   o     with     no erable
4 UX R
          ~ui    >~me  t                                            ~uiment Whenever the         reactor is in STARTUP mode         or RUH mode and not in     a   Cold Condition, the availability of electric power shall be as specified in 3.9.A except as specified herein.
E EC IC SYS NG COtjtD 0
: 1. From and       after the date                     1. When    only one that only       one   offsite                        offsite pover source pover source is available,                             is OPERABLE, all unit             3 reactor operation is                                diesel generators must permissible under this                                be demonstrated           to be condition for seven days.                            OPERABLE       vithin 24 hours, and pover availability for the associated boards shall be verified vithin 1 hour and   at least once per           8 hours thereafter.
S 0
: 2. When one        unit  3  diesel                    2. When one       unit   3 diesel generator (3A, 3B, 3C,                               generator is found to be or 3D) is inoperable,                                 inoperable, all of the continued reactor operation                           remaining unit 3 diesel is permissible during the                             generators shall be succeeding 7 days, provided                           demonstrated to be that tvo offsite pover                               OPERABLE vithin 24 hours, sources are available as                             and pover availability specified in 3.9.A.l.c.                               for the associated boards and all of the CS, RHR                               shall    be  verified vithin (LPCI and containment                                 1  hour and at least once cooling) systems, and the                             per 8 hours thereafter.
OP T 0 AUB 19 1888 CE U
remaining three         unit 3 diesel generators are OPERABLE.         f th s require-ment cannot be met, an                                                   preceding
S 3.9.B.
[Temporary Change: The orderly shutdown shall be                                                         comp e initiated and the reactor                 extended to 14 days to support shall be shut dovn and in                 maintenance activities the time period the Cold Condition vithin                                 1, 1998, to Februarychange 1, 19 99 24    hours.                                      which time   t hi s temporary e
0 erat o
This allowance is no longer   val can be used   only once   for eac individual diesel genezatorj.
v th o erable
                                                              /<~ ~ "+)
~ui >~me t 4.9.B.
BFH                                             3.9/4.9-8             AMENDMBfTHg,         yp4 Unit  3
0 erat o
with no erable
~uiment Whenever the reactor is in STARTUP mode or RUH mode and not in a Cold Condition, the availability of electric power shall be as specified in 3.9.A except as specified herein.
1.
From and after the date that only one offsite pover source is available, reactor operation is permissible under this condition for seven days.
1.
When only one offsite pover source is OPERABLE, all unit 3 diesel generators must be demonstrated to be OPERABLE vithin 24 hours, and pover availability for the associated boards shall be verified vithin 1 hour and at least once per 8
hours thereafter.
2.
When one unit 3 diesel generator (3A, 3B, 3C, or 3D) is inoperable, continued reactor operation is permissible during the succeeding 7 days, provided that tvo offsite pover sources are available as specified in 3.9.A.l.c.
and all of the CS, RHR (LPCI and containment cooling) systems, and the remaining three unit 3 diesel generators are OPERABLE.
f th s require-ment cannot be met, an orderly shutdown shall be initiated and the reactor shall be shut dovn and in the Cold Condition vithin 24 hours.
2.
When one unit 3 diesel generator is found to be inoperable, all of the remaining unit 3 diesel generators shall be demonstrated to be OPERABLE vithin 24 hours, and pover availability for the associated boards shall be verified vithin 1 hour and at least once per 8 hours thereafter.
[Temporary Change:
The preceding extended to 14 days to support comp e
maintenance activities 1,
1998, to February 1,
19 the time period 99 hi temporary change This allowance which time t s
e is no longer val can be used only once for eac individual diesel genezatorj.
/<~ ~"+)
BFH Unit 3 3.9/4.9-8 AMENDMBfTHg, y p 4


ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
ENCLOSURE 3
UNITS 2 AND 3 PROPOSED   TECHNICAL SPECIFICATION (TS) CHANGES TS-391T REVISED PAGES CUSTOM TS I. AFFE TED PA     E LI T Unit   2   page 3.9/4.9-9 Unit: 3   page 3.9/4.9-8 II. VI   ED PA E See   attached.
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 2 AND 3 PROPOSED TECHNICAL SPECIFICATION (TS)
CHANGES TS-391T REVISED PAGES CUSTOM TS I.
AFFE TED PA E LI T Unit 2 page 3.9/4.9-9 Unit: 3 page 3.9/4.9-8 II.
VI ED PA E See attached.


4                   E   CTRIC         STE
4 E
                                      *J LI T   G CONDI     ONS FO     OP       ION             SURVEI LANCE RE UXREMENTS 3.9.B. O   eration With       I o e   able               4.9.8. 0  eration  W th Ino erable
CTRIC STE
          ~Ei     ment                                               ~Ei imermt
*J LI T
: 3. When one     of the units 1                         3. When one  of the and 2   diesel generator is                             units 1 and 2 diesel INOPERABLE,       continued                               generators is found REACTOR POWER OPERATION             is                   to be INOPERABLE, permissible during the                                   all of the remaining succeeding 7 days,                                       diesel generators provided that 2 offsite                                   shall be demonstrated power sources are                                         to be OPERABLE within available as specified                                   24 hours, and power in 3.9.A.l.c and all of                                   availability for the the CS, RHR (LPCI and                                     associated boards containment cooling)                                     shall be verified systems, and the remaining                               within 1 hour and three units 1 and 2 diesel                               at least once per generators are        OPERABLE.                          8 hours thereafter.
G CONDI ONS FO OP ION SURVEI LANCE RE UXREMENTS 3.9.B.
P'emporary Change: The preceding 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities, during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be used only once for each individual diesel generator.]
O eration With I o e able
If this     requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the COLD SHUTDOWN CONDITION within 24 hours.
~Ei ment 3.
          '4. When one     units   1   and 2                     4. When one  4-kV 4-kV shutdown board             is                        shutdown board    is INOPERABLE,       continued                             found to be REACTOR POWER OPERATION                                   INOPERABLE,  all is permissible for           a period                   diesel generators of   5 days provided that                               associated with the 2   offsite   power sources                             remaining 4-kV are available as                                         shutdown boards shall specified in 3.9.A.l.c                                   be demonstrated to be and the remaining 4-kV                                   OPERABLE within 24 hours, shutdown boards and                                       and power availability associated diesel                                         for the remaining 4-kV generatorsg CSg RHR (LPCI                                 shutdown boards and containment cooling)                                 shall be verified systems, and all 480-V                                   within 1 hours and emergency power boards                                   at least once per are OPERABLE.         If   this                           8 hours thereafter.
When one of the units 1
requirement cannot be met, an orderly shutdown shall   be   initiated       and the reactor shall be in the COLD SHUTDOWN CONDITION within 24 hours.
and 2 diesel generator is INOPERABLE, continued REACTOR POWER OPERATION is permissible during the succeeding 7 days, provided that 2 offsite power sources are available as specified in 3.9.A.l.c and all of the CS, RHR (LPCI and containment cooling)
BFN                                                     3.9/4.9-9 Unit  2
: systems, and the remaining three units 1 and 2 diesel generators are OPERABLE.
4.9.8.
0 eration W th Ino erable
~Ei imermt 3.
When one of the units 1 and 2 diesel generators is found to be INOPERABLE, all of the remaining diesel generators shall be demonstrated to be OPERABLE within 24 hours, and power availability for the associated boards shall be verified within 1 hour and at least once per 8 hours thereafter.
P'emporary Change:
The preceding 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities, during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be used only once for each individual diesel generator.]
If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the COLD SHUTDOWN CONDITION within 24 hours.
'4.
When one units 1 and 2
4-kV shutdown board is INOPERABLE, continued REACTOR POWER OPERATION is permissible for a period of 5 days provided that 2 offsite power sources are available as specified in 3.9.A.l.c and the remaining 4-kV shutdown boards and associated diesel generatorsg CSg RHR (LPCI and containment cooling)
: systems, and all 480-V emergency power boards are OPERABLE. If this requirement cannot be
: met, an orderly shutdown shall be initiated and the reactor shall be in the COLD SHUTDOWN CONDITION within 24 hours.
4.
When one 4-kV shutdown board is found to be INOPERABLE, all diesel generators associated with the remaining 4-kV shutdown boards shall be demonstrated to be OPERABLE within 24 hours, and power availability for the remaining 4-kV shutdown boards shall be verified within 1 hours and at least once per 8 hours thereafter.
BFN Unit 2 3.9/4.9-9


r~
r ~
3.9       UXILI   Y ELECTRICAL S STE I
 
LIM TI   CONDIT ONS F         OPERATIO                   SURVEILLANCE RE UIREMENTS 3.9.B. eratio     w t   Ino erable                  4.9.B. 0  eration wit
3.9 UXILI Y ELECTRICAL S STE I
                                                                    ~cCu~iient I  o erable EcCE~>m~ef Whenever   the reactor is in STARTUP mode     or RUN mode and not in   a Cold Condition, the availability of electric power   shall be as specified in 3.9.A except as specified herein.
LIM TI CONDIT ONS F
: l. From and     after the date that only one offsite
OPERATIO SURVEILLANCE RE UIREMENTS 3.9.B.
: 1. When only one offsite power source power source is available,                            is OPERABLE, all unit   3 reactor operation is                                  diesel generators must permissible under this                                be demonstrated to be condition for seven days.                              OPERABLE   within   24 hours, and power   availability for the associated boards shall be verified within l hour and at least once per   8 hours   thereafter.
eratio w t Ino erable EcCE~>m~ef Whenever the reactor is in STARTUP mode or RUN mode and not in a Cold Condition, the availability of electric power shall be as specified in 3.9.A except as specified herein.
: 2. When one    unit  3  diesel                      2. When one unit 3 diesel generator (3A, 3B, 3C,                                 generator is found to be or 3D) is inoperable,                                 inoperable, all of the continued reactor operation                           remaining unit 3 diesel is permissible during the                             generators shall be succeeding 7 days, provided                           demonstrated to be that two offsite power                                 OPERABLE within 24 hours, sources are available as                               and power availability specified in 3.9.A.l.c.                               for the associated boards and all of the CS, RHR                                 shall be verified within (LPCI and containment                                 l hour and at least once per 8 hours thereafter.
4.9.B.
cooling) systems, and the remaining three unit 3 diesel generators are OPERABLE.
0 eration wit I o erable
[Temporary Change: The preceding 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be used. only once for each individual diesel generator.]
~cCu~iient l.
If this requirement cannot be met, an orderly shutdown shall be   initiated and the reactor shall be shut down and in the Cold Condition within 24 hours.
From and after the date that only one offsite power source is available, reactor operation is permissible under this condition for seven days.
BFN                                                 3.9/4.9-8 Unit  3
1.
When only one offsite power source is OPERABLE, all unit 3
diesel generators must be demonstrated to be OPERABLE within 24 hours, and power availability for the associated boards shall be verified within l hour and at least once per 8 hours thereafter.
2.
When one unit 3 diesel generator (3A, 3B, 3C, or 3D) is inoperable, continued reactor operation is permissible during the succeeding 7 days, provided that two offsite power sources are available as specified in 3.9.A.l.c.
and all of the CS, RHR (LPCI and containment cooling) systems, and the remaining three unit 3 diesel generators are OPERABLE.
2.
When one unit 3 diesel generator is found to be inoperable, all of the remaining unit 3 diesel generators shall be demonstrated to be OPERABLE within 24 hours, and power availability for the associated boards shall be verified within l hour and at least once per 8 hours thereafter.
[Temporary Change:
The preceding 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be used. only once for each individual diesel generator.]
If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be shut down and in the Cold Condition within 24 hours.
BFN Unit 3 3.9/4.9-8


4
4
  ~ ~
~ ~


ENCLOSURE 4 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
ENCLOSURE 4
UNITS 2 AND 3 PROPOSED   IMPROVED STANDARD TECHNICAL SPECIFICATIONS (ISTS) CHANGE TS-391T MARKED PAGES   ISTS I. AFFE TED PA E     LI T Unit   2 and 3 page 3.8-3 II.         D PA E See attached.
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 2 AND 3 PROPOSED IMPROVED STANDARD TECHNICAL SPECIFICATIONS (ISTS)
CHANGE TS-391T MARKED PAGES ISTS I.
AFFE TED PA E LI T Unit 2 and 3
page 3.8-3 II.
D PA E
See attached.


                                                                        ~
~
AC Sources Operating 3.8.1 ACTIONS COND IT ION                      REQUIRED ACTION                   COMPLETION TIME B.  (continued)                  B.3.1    Determine    OPERABLE        24 hours Unit  1  and 2 DG(s) are not inoperable due  to  commo'n  cause failure.
AC Sources Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.
OR B.3.2      Perform    SR  3.8.1.1        24 hours for  OPERABLE    Unit  1 and  2  DG(s).
AND B.4        Restore Unit      1  and 2    7 day DG  to OPERABLE status.                        AND 14 days    from discovery of failure to meet LCO  .
C. One  division of    480  V    C.l        Restore required              7  days load shed logic                          division of 480 V inoperable.                              load shed logic to OPERABLE    status.
D. One  division of    common    D. 1      Restore required              7  days accident signal logic                    division of      common inoperable.                              accident signal logic to OPERABLE status.
(continued)
(continued)
*[Temporary Change: This 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities                 during the time time this 1999,  after period from January 1, 1998, to February 1, allowance can be used      which temporary change is no     longer   valid. This                               only once fo each individual diesel.]
B.3.1 Determine OPERABLE Unit 1
BFN-UNIT 2                                   3. 8-3                                 Amendment *Rl
and 2 DG(s) are not inoperable due to commo'n cause failure.
24 hours OR B.3.2 Perform SR 3.8.1.1 for OPERABLE Unit 1
and 2 DG(s).
24 hours AND B.4 Restore Unit 1
and 2
DG to OPERABLE status.
7 day AND 14 days from discovery of failure to meet LCO C.
One division of 480 V
load shed logic inoperable.
C.l Restore required division of 480 V
load shed logic to OPERABLE status.
7 days D.
One division of common accident signal logic inoperable.
D. 1 Restore required division of common accident signal logic to OPERABLE status.
7 days (continued)
*[Temporary Change:
This 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1,
: 1998, to February 1,
1999, after which time this temporary change is no longer valid.
This allowance can be used only once fo each individual diesel.]
BFN-UNIT 2
: 3. 8-3 Amendment *Rl


AC Sources Operating 3.8.1 ACTIONS CONDITION                     REQUIRED ACTION               COHPLETION TIHE B.   {continued)             B.3. 1   Determine   OPERABLE       24 hours Unit 3 DG(s) are not inoperable due to common cause'ailure.
AC Sources Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COHPLETION TIHE B.
OR 8.3.2     Perform SR 3.8.1.1 for OPERABLE Unit 3     24 hours DG(s).
{continued)
AND B.4       Restore Unit   3 DG to OPERABLE status,           7 days AND 14 days from discovery of failure to meet LCO C. One division of 480 V   C.1       Restore required           7  days load shed logic                    division of 480 V inoperable.                          load shed logic to OPERABLE   status.
B.3. 1 Determine OPERABLE Unit 3 DG(s) are not inoperable due to common cause'ailure.
D. One division of common   0.1       Restore required           7  days accident signal logic              division of   common inoperable.                          accident signal logic to OPERABLE status.
24 hours OR 8.3.2 Perform SR 3.8.1.1 for OPERABLE Unit 3 DG(s).
(continued)
AND 24 hours B.4 Restore Unit 3 DG to OPERABLE status, 7 days AND 14 days from discovery of failure to meet LCO C.
*(Temporary Change: This 7-day   LCO time limit may   be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be used only once for g )
One division of 480 V
each individual   diesel.]
load shed logic inoperable.
8FN-UNIT 3                               3.8-3                             Amendment   *Rl
C.1 Restore required division of 480 V
load shed logic to OPERABLE status.
7 days D.
One division of common accident signal logic inoperable.
0.1 Restore required division of common accident signal logic to OPERABLE status.
7 days (continued)
*(Temporary Change:
This 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1,
1998, to February 1,
1999, after which time this
)
temporary change is no longer valid.
This allowance can be used only once for g each individual diesel.]
8FN-UNIT 3 3.8-3 Amendment *Rl


ENCLOSURE 5 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
ENCLOSURE 5
UNITS 2 AND 3 PROPOSED   IMPROVED STANDARD TECHNICAL SPECIFICATIONS (ISTS)
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
CHANGES TS-391T REVISED PAGES -ISTS I. AFFE TED PA E   LI T Unit 2 and 3       page 3.8-3 page 3.8-3a II. REVI ED PA   E See attached.
UNITS 2 AND 3 PROPOSED IMPROVED STANDARD TECHNICAL SPECIFICATIONS (ISTS)
CHANGES TS-391T REVISED PAGES -ISTS I.
AFFE TED PA E LI T Unit 2 and 3
page 3.8-3 page 3.8-3a II.
REVI ED PA E
See attached.


                                              ~   AC Sources Operating 3.8.1 ACTIONS CONDITION       REQUIRED ACTION             COMPLETION TIME B. (continued)   B.3.1   Determine OPERABLE       24 hours Unit 1 and 2 DG(s) are not inoperable due to common cause failure.
~AC Sources Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.
OR B.3.2   Perform SR 3.8.1.2       24 hours for OPERABLE Unit 1 and 2 DG(s).
(continued)
AND B.4     Restore Unit 1 and 2   7  days DG to OPERABLE status.                   [Temporary Change:   This 7 day LCO time limit may   be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999,   after which time this temporary change is no longer valid. This allowance can be used only once for each individual diesel.]
B.3.1 OR Determine OPERABLE Unit 1 and 2 DG(s) are not inoperable due to common cause failure.
24 hours B.3.2 Perform SR 3.8.1.2 for OPERABLE Unit 1
and 2 DG(s).
AND 24 hours B.4 Restore Unit 1 and 2
DG to OPERABLE status.
7 days
[Temporary Change:
This 7
day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1,
: 1998, to February 1,
1999, after which time this temporary change is no longer valid.
This allowance can be used only once for each individual diesel.]
AND (continued)
AND (continued)
BFN-UNIT 2                 3.8-3                           Amendment   *Rl
BFN-UNIT 2 3.8-3 Amendment *Rl


~ ~
~ ~
AC Sources Operating 3.8.1 ACTIONS CONDITION              REQUIRED ACTION            COMPLETION TIME B.  (continued)                                            14 days  from discovery of failure to meet LCO C. One division of 480 V  C.I    Restore required        7 days load shed logic              division of 480 V inoperable.                  load shed logic to OPERABLE status.
D. One division of common D. 1  Restore required        7 days accident signal logic        division of  common inoperable.                  accident signal logic to OPERABLE  status.
(continued)
BFN-UNIT 2                      3.8-3a                            Amendment


AC Sources -Operating 3.8.1 ACTIONS CONDITION         REQUIRED ACTION             COMPLETION TIME B. (continued)     8.3.1   Determine   OPERABLE       24 hours Unit 3 DG(s) are not inoperable due to common cause   failure.
AC Sources Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.
OR B.3.2   Perform SR 3.8.1.1 for OPERABLE Unit 3     24 hours DG(s).
(continued) 14 days from discovery of failure to meet LCO C.
AND B.4     Restore Unit   3 DG to OPERABLE status.         7 days
One division of 480 V
                                                        )Temporary Change:   This 7 day LCO time limit may   be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999,   after which time this temporary change is no longer valid. This allowance can be used only once for each individual diesel.]
load shed logic inoperable.
C.I Restore required division of 480 V
load shed logic to OPERABLE status.
7 days D.
One division of common accident signal logic inoperable.
D. 1 Restore required division of common accident signal logic to OPERABLE status.
7 days (continued)
BFN-UNIT 2 3.8-3a Amendment
 
AC Sources -Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.
(continued) 8.3.1 Determine OPERABLE Unit 3 DG(s) are not inoperable due to common cause failure.
OR B.3.2 Perform SR 3.8.1.1 for OPERABLE Unit 3 DG(s).
AND B.4 Restore Unit 3 DG to OPERABLE status.
24 hours 24 hours 7 days
)Temporary Change:
This 7
day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1,
: 1998, to February 1,
1999, after which time this temporary change is no longer valid.
This allowance can be used only once for each individual diesel.]
AND (continued)
AND (continued)
BFN-UNIT 3                   3.8-3                           Amendment *RI
BFN-UNIT 3 3.8-3 Amendment *RI


AC Sources -Operating 3.8.1 ACTIONS CONDITION                 REQUIRED ACTION           COMPLETION TIME B.   (continued)                                               14 days from discovery of failure to meet LCO C. One division of     480 V C.1   Restore required         7 days load shed logic                  division of 480 Y inoperable.                      load shed logic to OPERABLE status.
AC Sources -Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.
D. One di vi s i on of common D.l   Restore required         7 days accident signal logic            division of common inoperable.                      accident signal logic to OPERABLE status.
(continued) 14 days from discovery of failure to meet LCO C.
(continued)
One division of 480 V
BFN-UNIT 3                         3.8-3a                             Amendment
load shed logic inoperable.
C.1 Restore required division of 480 Y
load shed logic to OPERABLE status.
7 days D.
One divi s i on of common accident signal logic inoperable.
D.l Restore required division of common accident signal logic to OPERABLE status.
7 days (continued)
BFN-UNIT 3 3.8-3a Amendment


a t gp V
a t gp V


ENCLOSURE 6 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
ENCLOSURE 6
TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
TS-391T UNITS 2 AND 3 COMMITMENT  
TS-391T UNITS 2 AND 3 COMMITMENT  


==SUMMARY==
==SUMMARY==
These compensatory measures will be included as activity restrictions in the plant outage schedule for the EDGs and will be applied for any EDG outage time past the current EDG 7-day LCO.
Require that another off-site power source be available to the affected unit in addition to TS requirement that two off-site sources be available.
Requiring a third off-site source further reduces the likelihood that EDGs would be needed.
3.
Restrict any work activities that would affect the ability to cross-tie the opposite unit EDG to the 4-kV shutdown board for the EDG in the outage (i.e.,
EDG A cross-tie capability to 4-kV Shutdown Board 3EA).
This would ensure that an on-site power source would be readily available for manual alignment to the affected shutdown board if needed.
Restrict work activities on the 500-kV switchyard cross-tie breakers supporting the affected unit.
This will ensure the required 500-kV off-site sources have access to both 500-kV buses, reducing the likelihood that a 500-kV source would be lost to the affected unit.
4.
No high risk switchyard maintenance will be scheduled during the outage time period when the EDG is unavailable.
High risk emergent work, if any, will be required to be approved by the Plant Manager and Operations Manager.


These compensatory    measures  will be  included as activity restrictions in the plant outage schedule for the EDGs and will be applied for any EDG outage time past the current EDG 7-day LCO.
~
Require that another off-site power source be available to the affected unit in addition to TS requirement off-site sources be available. Requiring a thirdthat      two off-site source further reduces the likelihood that EDGs would be needed.
+
Restrict any work activities that would affect the ability to cross-tie the opposite unit EDG to the 4-kV shutdown board for the EDG in the outage (i.e., EDG A cross-tie capability to 4-kV Shutdown Board 3EA). This would ensure that an on-site power source would be readily available for manual alignment to the      affected shutdown board  if needed.
~
: 3. Restrict work activities on the 500-kV switchyard cross-tie breakers supporting the affected unit. This will ensure the required 500-kV off-site sources have access to both 500-kV buses, reducing the likelihood that a 500-kV source would be lost to the affected unit.
~
: 4. No  high risk switchyard maintenance will be scheduled during the outage time period when the EDG is unavailable.
High risk emergent work,      if any, will be required to be approved by the Plant Manager and Operations Manager.
 
  ~ + ~ ~
Lo I}}
Lo I}}

Latest revision as of 11:27, 6 January 2025

Proposed Tech Specs Supporting one-time 14-day Limiting Condition for Operation for Each EDG to Accommodate Pending Vendor Recommended Maint Activities
ML18038B906
Person / Time
Site: Browns Ferry  
Issue date: 06/19/1997
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML18038B905 List:
References
NUDOCS 9707020241
Download: ML18038B906 (23)


Text

ENCLOSURE 2

TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 2 AND 3 PROPOSED TECHNICAL SPECIFICATION (TS)

CHANGES TS-391T MARKED PAGES CUSTOM TS I.

AFFE TED PA E LI T Unit 2 page 3.9/4.9-9 Unit 3 page 3.9/4.9-8 See attached.

970702024i 9706i9 PDR ADOCK 05000260 P

PDR

LIMITIHG COHDITIOHS FOR OPERATIOH NOV i8 1988 SURVEILLAHCE REQUIREMEHTS

'.9.B.

4.9.B.

3 ~

When one of the units 1

and 2 diesel generator is IHOPEKQKZ, continued REACTOR POWER OPERATIOH is permissible during the succeeding 7 days, provided that 2 offsite power sources are available as specified in 3.9.A.l.c and all of the CS, RHR (LPCI and containment cooling)

systems, and the remaining three units 1 and 2 diesel generators are OPERABLZ.

If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the COLD SHUTDOWH COHDITIOH within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

3.

When one of the units 1 and 2 diesel generators is found to be IHOPERABLE, all of the remaining diesel generators shall be demonstrated to be OPERABLZ within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and power availability for the associated boards shall be verified within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

4, When one units 1 and 2

4-kV shutdown board is IHOPERABLZ, continued REACTOR POWER OPERATIOH is permissible for a period of 5 days provided that 2 offsite power sources are available as specified in 3.9.A.l.c and the remaining 4-kV shutdown boards and associated diesel generators, CS, RHR (LPCI and containment cooling)

systems, and all 480-V emergency power boards are OPERABLE. If this requirement cannot be
met, an orderly shutdown shall b'e initiated and the reactor shall be in the COLD SHUTDOWH COHDITIOH within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

4.

When one 4-kV shutdown board is found to be IHOPERABLE, all diesel generators associated with the remaining 4-kV

'hutdown boards shall be demonstrated to be OPERABLZ within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and power availability for the remaining 4-kV

'hutdown boards shall be verified within 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

[Temporary Change:

The preceding 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1,

1998, to February 1,

1999, after which time this temporary change is no longer valid.

This allowance can be. used only once for each individual diesel generator).

BFH Unit 2 3'/4.9-9 AMENDMENTNO. 15 4

4 UX R

E EC IC SYS NG COtjtD 0

S 0

OP T 0 AUB 19 1888 CE U

S 3.9.B.

0 erat o

v th o erable

~ui >~me t 4.9.B.

0 erat o

with no erable

~uiment Whenever the reactor is in STARTUP mode or RUH mode and not in a Cold Condition, the availability of electric power shall be as specified in 3.9.A except as specified herein.

1.

From and after the date that only one offsite pover source is available, reactor operation is permissible under this condition for seven days.

1.

When only one offsite pover source is OPERABLE, all unit 3 diesel generators must be demonstrated to be OPERABLE vithin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and pover availability for the associated boards shall be verified vithin 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8

hours thereafter.

2.

When one unit 3 diesel generator (3A, 3B, 3C, or 3D) is inoperable, continued reactor operation is permissible during the succeeding 7 days, provided that tvo offsite pover sources are available as specified in 3.9.A.l.c.

and all of the CS, RHR (LPCI and containment cooling) systems, and the remaining three unit 3 diesel generators are OPERABLE.

f th s require-ment cannot be met, an orderly shutdown shall be initiated and the reactor shall be shut dovn and in the Cold Condition vithin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

2.

When one unit 3 diesel generator is found to be inoperable, all of the remaining unit 3 diesel generators shall be demonstrated to be OPERABLE vithin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and pover availability for the associated boards shall be verified vithin 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

[Temporary Change:

The preceding extended to 14 days to support comp e

maintenance activities 1,

1998, to February 1,

19 the time period 99 hi temporary change This allowance which time t s

e is no longer val can be used only once for eac individual diesel genezatorj.

/<~ ~"+)

BFH Unit 3 3.9/4.9-8 AMENDMBfTHg, y p 4

ENCLOSURE 3

TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 2 AND 3 PROPOSED TECHNICAL SPECIFICATION (TS)

CHANGES TS-391T REVISED PAGES CUSTOM TS I.

AFFE TED PA E LI T Unit 2 page 3.9/4.9-9 Unit: 3 page 3.9/4.9-8 II.

VI ED PA E See attached.

4 E

CTRIC STE

G CONDI ONS FO OP ION SURVEI LANCE RE UXREMENTS 3.9.B.

O eration With I o e able

~Ei ment 3.

When one of the units 1

and 2 diesel generator is INOPERABLE, continued REACTOR POWER OPERATION is permissible during the succeeding 7 days, provided that 2 offsite power sources are available as specified in 3.9.A.l.c and all of the CS, RHR (LPCI and containment cooling)

systems, and the remaining three units 1 and 2 diesel generators are OPERABLE.

4.9.8.

0 eration W th Ino erable

~Ei imermt 3.

When one of the units 1 and 2 diesel generators is found to be INOPERABLE, all of the remaining diesel generators shall be demonstrated to be OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and power availability for the associated boards shall be verified within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

P'emporary Change:

The preceding 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities, during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be used only once for each individual diesel generator.]

If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the COLD SHUTDOWN CONDITION within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

'4.

When one units 1 and 2

4-kV shutdown board is INOPERABLE, continued REACTOR POWER OPERATION is permissible for a period of 5 days provided that 2 offsite power sources are available as specified in 3.9.A.l.c and the remaining 4-kV shutdown boards and associated diesel generatorsg CSg RHR (LPCI and containment cooling)

systems, and all 480-V emergency power boards are OPERABLE. If this requirement cannot be
met, an orderly shutdown shall be initiated and the reactor shall be in the COLD SHUTDOWN CONDITION within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

4.

When one 4-kV shutdown board is found to be INOPERABLE, all diesel generators associated with the remaining 4-kV shutdown boards shall be demonstrated to be OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and power availability for the remaining 4-kV shutdown boards shall be verified within 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

BFN Unit 2 3.9/4.9-9

r ~

3.9 UXILI Y ELECTRICAL S STE I

LIM TI CONDIT ONS F

OPERATIO SURVEILLANCE RE UIREMENTS 3.9.B.

eratio w t Ino erable EcCE~>m~ef Whenever the reactor is in STARTUP mode or RUN mode and not in a Cold Condition, the availability of electric power shall be as specified in 3.9.A except as specified herein.

4.9.B.

0 eration wit I o erable

~cCu~iient l.

From and after the date that only one offsite power source is available, reactor operation is permissible under this condition for seven days.

1.

When only one offsite power source is OPERABLE, all unit 3

diesel generators must be demonstrated to be OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and power availability for the associated boards shall be verified within l hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

2.

When one unit 3 diesel generator (3A, 3B, 3C, or 3D) is inoperable, continued reactor operation is permissible during the succeeding 7 days, provided that two offsite power sources are available as specified in 3.9.A.l.c.

and all of the CS, RHR (LPCI and containment cooling) systems, and the remaining three unit 3 diesel generators are OPERABLE.

2.

When one unit 3 diesel generator is found to be inoperable, all of the remaining unit 3 diesel generators shall be demonstrated to be OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and power availability for the associated boards shall be verified within l hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

[Temporary Change:

The preceding 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1, 1998, to February 1, 1999, after which time this temporary change is no longer valid. This allowance can be used. only once for each individual diesel generator.]

If this requirement cannot be met, an orderly shutdown shall be initiated and the reactor shall be shut down and in the Cold Condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

BFN Unit 3 3.9/4.9-8

4

~ ~

ENCLOSURE 4

TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 2 AND 3 PROPOSED IMPROVED STANDARD TECHNICAL SPECIFICATIONS (ISTS)

CHANGE TS-391T MARKED PAGES ISTS I.

AFFE TED PA E LI T Unit 2 and 3

page 3.8-3 II.

D PA E

See attached.

~

AC Sources Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.

(continued)

B.3.1 Determine OPERABLE Unit 1

and 2 DG(s) are not inoperable due to commo'n cause failure.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OR B.3.2 Perform SR 3.8.1.1 for OPERABLE Unit 1

and 2 DG(s).

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND B.4 Restore Unit 1

and 2

DG to OPERABLE status.

7 day AND 14 days from discovery of failure to meet LCO C.

One division of 480 V

load shed logic inoperable.

C.l Restore required division of 480 V

load shed logic to OPERABLE status.

7 days D.

One division of common accident signal logic inoperable.

D. 1 Restore required division of common accident signal logic to OPERABLE status.

7 days (continued)

  • [Temporary Change:

This 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1,

1998, to February 1,

1999, after which time this temporary change is no longer valid.

This allowance can be used only once fo each individual diesel.]

BFN-UNIT 2

3. 8-3 Amendment *Rl

AC Sources Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COHPLETION TIHE B.

{continued)

B.3. 1 Determine OPERABLE Unit 3 DG(s) are not inoperable due to common cause'ailure.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OR 8.3.2 Perform SR 3.8.1.1 for OPERABLE Unit 3 DG(s).

AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B.4 Restore Unit 3 DG to OPERABLE status, 7 days AND 14 days from discovery of failure to meet LCO C.

One division of 480 V

load shed logic inoperable.

C.1 Restore required division of 480 V

load shed logic to OPERABLE status.

7 days D.

One division of common accident signal logic inoperable.

0.1 Restore required division of common accident signal logic to OPERABLE status.

7 days (continued)

  • (Temporary Change:

This 7-day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1,

1998, to February 1,

1999, after which time this

)

temporary change is no longer valid.

This allowance can be used only once for g each individual diesel.]

8FN-UNIT 3 3.8-3 Amendment *Rl

ENCLOSURE 5

TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 2 AND 3 PROPOSED IMPROVED STANDARD TECHNICAL SPECIFICATIONS (ISTS)

CHANGES TS-391T REVISED PAGES -ISTS I.

AFFE TED PA E LI T Unit 2 and 3

page 3.8-3 page 3.8-3a II.

REVI ED PA E

See attached.

~AC Sources Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.

(continued)

B.3.1 OR Determine OPERABLE Unit 1 and 2 DG(s) are not inoperable due to common cause failure.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B.3.2 Perform SR 3.8.1.2 for OPERABLE Unit 1

and 2 DG(s).

AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B.4 Restore Unit 1 and 2

DG to OPERABLE status.

7 days

[Temporary Change:

This 7

day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1,

1998, to February 1,

1999, after which time this temporary change is no longer valid.

This allowance can be used only once for each individual diesel.]

AND (continued)

BFN-UNIT 2 3.8-3 Amendment *Rl

~ ~

AC Sources Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.

(continued) 14 days from discovery of failure to meet LCO C.

One division of 480 V

load shed logic inoperable.

C.I Restore required division of 480 V

load shed logic to OPERABLE status.

7 days D.

One division of common accident signal logic inoperable.

D. 1 Restore required division of common accident signal logic to OPERABLE status.

7 days (continued)

BFN-UNIT 2 3.8-3a Amendment

AC Sources -Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.

(continued) 8.3.1 Determine OPERABLE Unit 3 DG(s) are not inoperable due to common cause failure.

OR B.3.2 Perform SR 3.8.1.1 for OPERABLE Unit 3 DG(s).

AND B.4 Restore Unit 3 DG to OPERABLE status.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 24 hours 7 days

)Temporary Change:

This 7

day LCO time limit may be extended to 14 days to support completion of maintenance activities during the time period from January 1,

1998, to February 1,

1999, after which time this temporary change is no longer valid.

This allowance can be used only once for each individual diesel.]

AND (continued)

BFN-UNIT 3 3.8-3 Amendment *RI

AC Sources -Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.

(continued) 14 days from discovery of failure to meet LCO C.

One division of 480 V

load shed logic inoperable.

C.1 Restore required division of 480 Y

load shed logic to OPERABLE status.

7 days D.

One divi s i on of common accident signal logic inoperable.

D.l Restore required division of common accident signal logic to OPERABLE status.

7 days (continued)

BFN-UNIT 3 3.8-3a Amendment

a t gp V

ENCLOSURE 6

TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

TS-391T UNITS 2 AND 3 COMMITMENT

SUMMARY

These compensatory measures will be included as activity restrictions in the plant outage schedule for the EDGs and will be applied for any EDG outage time past the current EDG 7-day LCO.

Require that another off-site power source be available to the affected unit in addition to TS requirement that two off-site sources be available.

Requiring a third off-site source further reduces the likelihood that EDGs would be needed.

3.

Restrict any work activities that would affect the ability to cross-tie the opposite unit EDG to the 4-kV shutdown board for the EDG in the outage (i.e.,

EDG A cross-tie capability to 4-kV Shutdown Board 3EA).

This would ensure that an on-site power source would be readily available for manual alignment to the affected shutdown board if needed.

Restrict work activities on the 500-kV switchyard cross-tie breakers supporting the affected unit.

This will ensure the required 500-kV off-site sources have access to both 500-kV buses, reducing the likelihood that a 500-kV source would be lost to the affected unit.

4.

No high risk switchyard maintenance will be scheduled during the outage time period when the EDG is unavailable.

High risk emergent work, if any, will be required to be approved by the Plant Manager and Operations Manager.

~

+

~

~

Lo I