ML18057A894: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 2: | Line 2: | ||
| number = ML18057A894 | | number = ML18057A894 | ||
| issue date = 04/30/1991 | | issue date = 04/30/1991 | ||
| title = Monthly Operating Rept for Apr 1991 for Palisades Nuclear Plant | | title = Monthly Operating Rept for Apr 1991 for Palisades Nuclear Plant | ||
| author name = Handlovits S, Mlynarek S | | author name = Handlovits S, Mlynarek S | ||
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | | author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:" | {{#Wiki_filter:" | ||
consumers Power | ( | ||
I consumers Power POW ERIN& | |||
MICHl&AN'S PRD&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 May 7, 1991 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of April, _1991. | MICHl&AN'S PRD&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 May 7, 1991 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of April, _1991. | ||
If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113. | If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113. | ||
Sincerely, MG Mlynarek _* | Sincerely, MG Mlynarek _ | ||
Reactor Engineer CC: | * Reactor Engineer CC: | ||
DPHoffman, P26~117B RMRice, Palisades ABDavis, USNRC JLKuemin, Palisades Resident Irispector, Palisades DRHahn, 'Div of Rad Health S~rvites, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, MI RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades HRSnider, P21-129 Administrator, USNRC Document Control, 950*22*35*10/L | |||
-SMH91*012 | |||
' 910514<)233. 91043(1 | |||
'*" j'\\ "\\ | |||
:. l_._ | 'p[1R: ADOCK 05000255 \\ | ||
R PDR | |||
\\ __, | |||
:.. l_._ | |||
A CMS' ENER5YCOMPANY | |||
OPERATING DATA REPORT | OPERATING DATA REPORT OPERATING STATUS: | ||
: l. UNIT NAME | : l. | ||
: 2. REPORTING PERIOD: | UNIT NAME | ||
: 3. LICENSED THERMAL POWER (MWt) | : 2. | ||
: 4. NAMEPLATE RATING (GROSS MWe) | REPORTING PERIOD: | ||
: 5. DESIGN ELECTRICAL RATING (NET MWe) | Palisades 910401-910430 | ||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) | : 3. | ||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3-7) SINCE LAST REPORT, GIVE REASONS: | LICENSED THERMAL POWER (MWt) 2530.0 | ||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): | : 4. | ||
NAMEPLATE RATING (GROSS MWe) 811.7 | |||
: 5. | |||
DESIGN ELECTRICAL RATING (NET MWe) 8D5.0 6.. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) | |||
**770 | |||
: 7. | |||
MAXIMUM DEPENDABLE CAPACITY (NET MWe) | |||
**730 | |||
: 8. | |||
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3-7) SINCE LAST REPORT, GIVE REASONS: | |||
: 9. | |||
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | : 10. REASONS FOR RESTRICTIONS, IF ANY: | ||
: 11. HOURS IN REPORTING PERIOD | |||
: 11. HOURS IN REPORTING PERIOD | : 12. NUMBER OF HOURS REACTOR WAS CRITICAL | ||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS | : 13. REACTOR RESERVE SHUTDOWN HOURS | ||
: 14. HOURS GENERATOR ON-LINE | : 14. HOURS GENERATOR ON-LINE | ||
: 15. UNIT RESERVE SHUTDOWN HOURS | : 15. UNIT RESERVE SHUTDOWN HOURS | ||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) | : 16. GROSS THERMAL ENERGY GENERATED (MWH) | ||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) | : 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) | ||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) | : 18. NET ELECTRICAL ENERGY GENERATED (MWH) | ||
: 19. UNIT SERVICE FACTOR | : 19. UNIT SERVICE FACTOR | ||
: 20. UNIT AVAILABILITY FACTOR | : 20. UNIT AVAILABILITY FACTOR | ||
: 21. UNIT CAPACITY FACTOR (USING MOC NET) | : 21. UNIT CAPACITY FACTOR (USING MOC NET) | ||
: 22. UNIT CAPACITY FACTOR (USING DER NET) | : 22. UNIT CAPACITY FACTOR (USING DER NET) | ||
: 23. UNIT FORCED OUTAGE RATE | : 23. UNIT FORCED OUTAGE RATE This Month 719.0 719.0 719.0 1809167.0 591090.0 562380.0 100.0% | ||
24 .. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): | 100.0% | ||
107.1% | |||
97.2% | |||
0.0% | |||
24.. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): | |||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | : 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | ||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | : 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | ||
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | |||
** Based on condenser backpressure | ** Based on condenser backpressure | ||
* Weighted Average (635 MWe used as MOC Net prior to October 1985) | * Weighted Average (635 MWe used as MOC Net prior to October 1985) | ||
DOCKET NO 50-255 DATE 04-30-91 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 NOTES: | |||
Yr-to-Date Cumulative 2879.0 169742.0 1207.9 91409.0 1086.4 87304.0 2289623.0 183042068.0 736780.0 57373315.0 692948.0 53991071. 0 37.7% | |||
51.4% | |||
37.7% | |||
51.4% | |||
33.0% | |||
48.2%* | |||
29.9% | |||
39.5% | |||
3.8% | |||
32.6% | |||
Forecast Achieved | |||
AVERAGE DAILY UNIT POWER LEVEL DOC KET NO | AVERAGE DAILY UNIT POWER LEVEL DOC KET NO __ | ||
: 1. | ____;;5~0-'-2=-=5:..=5 UNIT Palisades DATE 05/01/91 COMPLETED BY | ||
: 2. | _S_M_H_a~nd_._l_o~v,~.t~s MONTH APRIL 1991 TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) | ||
: 3. | (MWe Net) | ||
: 4. | : 1. | ||
: 5. | 743 | ||
: 7. | : 17. | ||
: 8. | 791 | ||
: 9. | : 2. | ||
: 10. | 752 | ||
: 11. | : 18. | ||
: 12. | 791 | ||
: 13. | : 3. | ||
: 14. | 754 | ||
: 15. | .19. | ||
: 16. | 791 | ||
On this format, list the average daiiy unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt. | : 4. | ||
760 | |||
: 20. | |||
793 | |||
: 5. | |||
767 | |||
: 21. | |||
791 6.. | |||
772 | |||
: 22. | |||
791 | |||
: 7. | |||
778 | |||
: 23. | |||
790 | |||
: 8. | |||
780 | |||
: 24. | |||
792 | |||
: 9. | |||
788 | |||
: 25. | |||
792 | |||
: 10. | |||
791 | |||
: 26. | |||
779 | |||
: 11. | |||
792 | |||
: 27. | |||
785 | |||
: 12. | |||
790 | |||
: 28. | |||
785 | |||
: 13. | |||
790 | |||
: 29. | |||
777 | |||
: 14. | |||
787 | |||
: 30. | |||
793 | |||
: 15. | |||
790 | |||
: 16. | |||
791 INSTRUCTIONS: | |||
On this format, list the average daiiy unit power level in MWe-NET for each day in the reporting month. | |||
Compute to the nearest whole megawatt. | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE FOR APRIL 1991 The plant began the month at 953 power and achieved 1003 power on the 8th. | OF OPERATING EXPERIENCE FOR APRIL 1991 The plant began the month at 953 power and achieved 1003 power on the 8th. | ||
The plant maintained full power through the end of the month.}} | The plant maintained full power through the end of the month.}} | ||
Latest revision as of 08:50, 6 January 2025
| ML18057A894 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 04/30/1991 |
| From: | Handlovits S, Mlynarek S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9105140233 | |
| Download: ML18057A894 (4) | |
Text
"
(
I consumers Power POW ERIN&
MICHl&AN'S PRD&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 May 7, 1991 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of April, _1991.
If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.
Sincerely, MG Mlynarek _
- Reactor Engineer CC:
DPHoffman, P26~117B RMRice, Palisades ABDavis, USNRC JLKuemin, Palisades Resident Irispector, Palisades DRHahn, 'Div of Rad Health S~rvites, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, MI RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades HRSnider, P21-129 Administrator, USNRC Document Control, 950*22*35*10/L
-SMH91*012
' 910514<)233. 91043(1
'*" j'\\ "\\
'p[1R: ADOCK 05000255 \\
R PDR
\\ __,
- .. l_._
A CMS' ENER5YCOMPANY
OPERATING DATA REPORT OPERATING STATUS:
- l.
UNIT NAME
- 2.
REPORTING PERIOD:
Palisades 910401-910430
- 3.
LICENSED THERMAL POWER (MWt) 2530.0
- 4.
NAMEPLATE RATING (GROSS MWe) 811.7
- 5.
DESIGN ELECTRICAL RATING (NET MWe) 8D5.0 6.. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
- 770
- 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
- 730
- 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3-7) SINCE LAST REPORT, GIVE REASONS:
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
- 11. HOURS IN REPORTING PERIOD
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH)
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MOC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NET)
- 23. UNIT FORCED OUTAGE RATE This Month 719.0 719.0 719.0 1809167.0 591090.0 562380.0 100.0%
100.0%
107.1%
97.2%
0.0%
24.. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- Weighted Average (635 MWe used as MOC Net prior to October 1985)
DOCKET NO 50-255 DATE 04-30-91 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 NOTES:
Yr-to-Date Cumulative 2879.0 169742.0 1207.9 91409.0 1086.4 87304.0 2289623.0 183042068.0 736780.0 57373315.0 692948.0 53991071. 0 37.7%
51.4%
37.7%
51.4%
33.0%
48.2%*
29.9%
39.5%
3.8%
32.6%
Forecast Achieved
AVERAGE DAILY UNIT POWER LEVEL DOC KET NO __
____;;5~0-'-2=-=5:..=5 UNIT Palisades DATE 05/01/91 COMPLETED BY
_S_M_H_a~nd_._l_o~v,~.t~s MONTH APRIL 1991 TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net)
- 1.
743
- 17.
791
- 2.
752
- 18.
791
- 3.
754
.19.
791
- 4.
760
- 20.
793
- 5.
767
- 21.
791 6..
772
- 22.
791
- 7.
778
- 23.
790
- 8.
780
- 24.
792
- 9.
788
- 25.
792
- 10.
791
- 26.
779
- 11.
792
- 27.
785
- 12.
790
- 28.
785
- 13.
790
- 29.
777
- 14.
787
- 30.
793
- 15.
790
- 16.
791 INSTRUCTIONS:
On this format, list the average daiiy unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
SUMMARY
OF OPERATING EXPERIENCE FOR APRIL 1991 The plant began the month at 953 power and achieved 1003 power on the 8th.
The plant maintained full power through the end of the month.