RBG-47886, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425): Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:* Entergx C-=--
{{#Wiki_filter:*
Entergy Operations, Inc.
C-=--Entergx RSG-47886 July 24, 2018 Attn: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 N SI. Francisville, LA 70775 Tel 225-381-4374 Timothy Schenk Regulatory Assurance Manager RSG-47886 July 24, 2018 Attn : Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738
River Bend Station 5485 U.S. Highway 61 N SI. Francisville, LA 70775 Tel 225-381-4374 Timothy Schenk Regulatory Assurance Manager  


==Subject:==
==Subject:==
Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)
Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)
River Send Station , Unit 1 Docket No. 50-458 License No. NPF-47 RSF1 0146
River Send Station, Unit 1 Docket No. 50-458 License No. NPF-47 RSF1 0146  


==Dear Sir or Madam :==
==Dear Sir or Madam:==
 
In accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR 50.90), "Application for amendment of license, construction permit, or early site permit,"
In accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR 50.90) , "Application for amendment of license, construction permit, or early site permit,"
Entergy Operations, Inc. (Entergy) previously submitted a request for an amendment to the Technical Specifications (TS) for River Send Station, Unit 1 (RSS).
Entergy Operations, Inc. (Entergy) previously submitted a request for an amendment to the Technical Specifications (TS) for River Send Station , Unit 1 (RSS) .
The proposed amendment would modify the RSS TS by relocating specific surveillance frequencies to a licensee-controlled program with the implementation of Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specification Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies."
The proposed amendment would modify the RSS TS by relocating specific surveillance frequencies to a licensee-controlled program with the implementation of Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specification Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies."
Entergy originally submitted this request by RBS letter RSG-47799 dated February 28, 2018.
Entergy originally submitted this request by RBS letter RSG-47799 dated February 28, 2018.
[ADAMS Accession Number ML18067A115]
[ADAMS Accession Number ML18067A115]
It has recently been discovered that the supplement to the proposed amendment, submitted by RBS letter RBG-47882 dated July 10, 2018 [ADAMS Accession Number ML18191S010],
It has recently been discovered that the supplement to the proposed amendment, submitted by RBS letter RBG-47882 dated July 10, 2018 [ADAMS Accession Number ML18191S010],
contains errors and should be disregarded. The Attachments of this letter should be used instead.
contains errors and should be disregarded. The Attachments of this letter should be used instead. contains the five current RSS TS pages with the proposed changes (mark-up). contains the revised TS pages. The five pages contained in this supplement should supersede the corresponding pages of the original amendment and RSS letter RSG-47882.  
Attachment 1 contains the five current RSS TS pages with the proposed changes (mark-up) .
Attachment 2 contains the revised TS pages. The five pages contained in this supplement should supersede the corresponding pages of the original amendment and RSS letter RSG-47882.


RBG-47886 Page 2 of 2 The supplemental information provided does not change the scope of the original submittal.
RBG-47886 Page 2 of 2 The supplemental information provided does not change the scope of the original submittal.
Line 42: Line 39:
There are no regulatory commitments contained in this submittal. If you have any questions, please contact Mr. Tim Schenk at 225-381 -4177.
There are no regulatory commitments contained in this submittal. If you have any questions, please contact Mr. Tim Schenk at 225-381 -4177.
TAS/twf ATTACHMENT:
TAS/twf ATTACHMENT:
: 1. Proposed Technical Specification Changes (Mark-up)
: 1.
: 2. Revised Technical Specification Pages cc:
Proposed Technical Specification Changes (Mark-up)
u.s. Nuclear Regulatory Commission Attn: Ms. Lisa M. Regner, Project Manager 09-0-14 One White Flint North 11555 Rockville Pike Rockville , MO 20852 u .S. Nuclear Regulatory Commission Region IV 1600 East Lamar Blvd.
: 2.
Arlington , TX 76011-4511 NRC Senior Resident Inspector Attn : Mr. Jeff Sowa 5485 U.S. Highway 61 , Suite 1 St. Francisville, LA 70775 Public Utility Commission of Texas Attn : PUC Filing Clerk 1701 N. Congress Avenue P. O. Box 13326 Austin , TX 78711 -3326
Revised Technical Specification Pages cc:
u.s. Nuclear Regulatory Commission Attn: Ms. Lisa M. Regner, Project Manager 09-0-14 One White Flint North 11555 Rockville Pike Rockville, MO 20852 u.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Blvd.
Arlington, TX 76011-4511 NRC Senior Resident Inspector Attn: Mr. Jeff Sowa 5485 U.S. Highway 61, Suite 1 St. Francisville, LA 70775 Public Utility Commission of Texas Attn: PUC Filing Clerk 1701 N. Congress Avenue P. O. Box 13326 Austin, TX 78711 -3326  


ATTACHMENT 1 RBG-47886 PROPOSED TECHNICAL SPECIFICATION CHANGES (MARK-UP)
ATTACHMENT 1 RBG-47886 PROPOSED TECHNICAL SPECIFICATION CHANGES (MARK-UP)  


SLC System 3.1.7 SURVEILLANCE                                      FREQUENCY SR 3.1.7.5 Verify the available weight of Boron-10 is ~ 170 Ibs ,     31 days    4~------.
SR 3.1.7.5 SR 3.1.7.6 SR 3.1.7.7 SR 3.1.7.8 RIVER BEND SURVEILLANCE Verify the available weight of Boron-10 is ~ 170 Ibs, and the percent weight concentration of sodium pentaborate in solution is ~ 9.5% by weight, and determine the minimum required available solution volume.
and the percent weight concentration of sodium pentaborate in solution is ~ 9.5% by weight, and determine the minimum required available solution volume.                                                   Once within 24 hours after water or boron is added to solution Once within 24 hours after solution temperature is restored to ~ 45°F SR 3.1.7.6 Verify each SLC subsystem manual , power operated ,       31 days   4 4 - -- - 1 and automatic valve in the flow path that is not locked , sealed , or otherwise secured in position , is in the correct position , or can be aligned to the correct position .
SLC System 3.1.7 FREQUENCY 31 days 4~------.
SR 3.1.7.7 Verify each pump develops a flow rate     ~ 41 .2 gpm at In accordance with a discharge pressure ~ 1250 psig .                         the Inservice Testing Program SR 3.1.7.8 Verify flow through one SLC subsystem from pump           24 months on a +--
Once within 24 hours after water or boron is added to solution Once within 24 hours after solution temperature is restored to ~ 45°F Verify each SLC subsystem manual, power operated,
into reactor pressure vessel.                             STAGGERED TEST BASIS (continued)
31 days 44----1 and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position, is in the correct position, or can be aligned to the correct position.
In accordance with the Surveillance frequency Control Program                             -
Verify each pump develops a flow rate ~ 41.2 gpm at a discharge pressure ~ 1250 psig.
RIVER BEND                              3.1-22                  Amendment No. 81 114, ~
In accordance with the Inservice Testing Program Verify flow through one SLC subsystem from pump into reactor pressure vessel.
24 months on a +--
STAGGERED 3.1-22 TEST BASIS (continued)
In accordance with the Surveillance frequency Control Program Amendment No. 81 114, ~  


SGT System 3.6.4.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                        FREQUENCY SR 3.6.4.3.1   Operate each SGT subsystem for       ~ 15 continuous     3~ lays   ./
SGT System 3.6.4.3 SURVEILLANCE REQUIREMENTS SR 3.6.4.3.1 SR 3.6.4.3.2 SR 3.6.4.3.3 SR 3.6.4.3.4 RIVER BEND SURVEILLANCE Operate each SGT subsystem for ~ 1 minutes.
minutes.
5 continuous FREQUENCY 3~ lays  
SR 3.6.4.3.2  Perform required SGT filter testing in accordance        In accordance with with the Ventilation Filter Testing Prog ram (VFTP). the VFTP SR 3.6.4.3.3  Verify each SGT subsystem actuates on an actual          24  Ffl9AtRS    L..
./
or simulated initiation signal.
accordance Perform required SGT filter testing in with the Ventilation Filter Testing Prog ram (VFTP).
L..
In accordance with the VFTP Verify each SGT subsystem actuates or simulated initiation signal.
SR 3.6.4.3.4  Verify each SGT filter cooling bypass                   24  Ffl9AtRS damper can be opened and the fan started .
Verify each SGT filter cooling bypass damper can be opened and the fan started.
In accordance with the Surveillance Frequency Control       1-Program RIVER BEND                              3.6-52                Amendment No. 8-1-, 168, 183
3.6-52 on an actual 24 Ffl9AtRS L..
24 Ffl9AtRS L..
In accordance with the Surveillance Frequency Control Program Amendment No. 8-1-, 168, 183 1-


Fuel Building Ventilation System-Fuel Handling 3.6.4.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                        FREQUENCY SR 3.6.4.7.1   Verify one fuel building ventilation ch arcoa                  el:lFS ./
Fuel Building Ventilation System-Fuel Handling 3.6.4.7 SURVEILLANCE REQUIREMENTS SR 3.6.4.7.1 SR 3.6.4.7.2 SR 3.6.4.7.3 SR 3.6.4.7.4 SR 3.6.4.7.5 RIVER BEND SURVEILLANCE Verify one fuel building ventilation ch filtration subsystem in operation.
filtration subsystem in operation.
arcoa on charcoal Operate each fuel building ventilati filtration subsystem for ~ 15 continu ous minutes.
SR 3.6.4.7.2  Operate each fuel building ventilati on charcoal          31 days    ./
rcoal filtration Ventilation Perform fuel building ventilation cha filter testing in accordance with the Filter Testing Program (VFTP).
filtration subsystem for ~ 15 continu ous minutes.
Verify each fuel building ventilation filtration subsystem actuates on an simulated initiation signal.
SR 3.6.4.7 .3  Perform fuel building ventilation cha rcoal filtration    In accordance with filter testing in accordance with the Ventilation          the VFTP Filter Testing Program (VFTP).
charcoal actual or charcoal er can be Verify each fuel building ventilation filtration filter cooling bypass damp opened and the fan started.
SR 3.6.4.7.4  Verify each fuel building ventilation charcoal            24 menths      ./
FREQUENCY el:lFS
filtration subsystem actuates on an actual or simulated initiation signal.
./
SR 3.6.4.7.5  Verify each fuel building ventilation charcoal            24 menths      ~
31 days
filtration filter cooling bypass damp er can be opened and the fan started .
./
In accordance with the Surveillance Frequency Control Program RIVER BEND                                3.6-59               Amendment No. 8-1-, 4eS, ~
In accordance with the VFTP 24 menths
./
24 menths
~
In accordance with the Surveillance Frequency Control Program 3.6-59 Amendment No. 8-1-, 4eS, ~  


CRFA System 3.7.2 ACTIONS (continued)
ACTIONS (continued)
CONDITION                         REQUIRED ACTION                COMPLETION TIME F. Two CRFA subsystems             F.1 Suspend movement of              Immediately inoperable during                     recently irradiated fuel movement of recently                 assemblies in the primary irradiated fuel assemblies           containment and fuel in the primary containment           building.
CONDITION F.
or fuel building, or during OPDRVs.
Two CRFA subsystems inoperable during movement of recently irradiated fuel assemblies in the primary containment or fuel building, or during OPDRVs.
F.2 Initiate action to suspend      Immediately OPDRVs.
One or more CRFA subsystems inoperable due to inoperable CRE boundary during movement of recently irradiated fuel assemblies in the primary containment or fuel building, or during OPDRVs.
One or more CRFA subsystems inoperable due to inoperable CRE boundary during movement of recently irradiated fuel assemblies in the primary containment or fuel building, or during OPDRVs.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                       FREQUENCY SR 3.7.2.1         Operate each CRFA subsystem for       ~ 15 continuous     31 days    "
SURVEILLANCE REQUIREMENTS REQUIRED ACTION F.1 Suspend movement of recently irradiated fuel assemblies in the primary containment and fuel building.
minutes.
F.2 Initiate action to suspend OPDRVs.
SR 3.7.2.2         Perform required CRFA filter testing in accordance        In accordance with with the Ventilation Filter Testing Program (VFTP).       the VFTP SR 3.7.2.3         Verify each CRFA subsystem actuates on an actual           24 months     L...
SURVEILLANCE SR 3.7.2.1 Operate each CRFA subsystem for ~ 15 continuous minutes.
or simulated initiation signal.
SR 3.7.2.2 Perform required CRFA filter testing in accordance with the Ventilation Filter Testing Program (VFTP).
SR 3.7.2.3 Verify each CRFA subsystem actuates on an actual or simulated initiation signal.
CRFA System 3.7.2 COMPLETION TIME Immediately Immediately FREQUENCY 31 days In accordance with the VFTP 24 months L...
(continued)
(continued)
In accordance with the Surveillance t---
In accordance with the Surveillance RIVER BEND 3.7-7 Frequency Control Program Amendment No. 81119132154  
Frequency Control Program RIVER BEND                                     3.7-7               Amendment No. 81119132154
+%, +68, 4-83 t---
                                                                                    +%, +68, 4-83


DC Sources- Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                       FREQUENCY SR 3.8.4.1   Verify battery terminal voltage is   ~ 130.2 Von float     7 days    .....
SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.8.4.1 Verify battery terminal voltage is ~ 130.2 Von float charge.
charge .
SR 3.8.4.2 Verify no visible corrosion at battery terminals and connectors.
SR 3.8.4.2   Verify no visible corrosion at battery terminals and       9~  days connectors .
OR Verify battery connection resistance is  
OR Verify battery connection resistance is
~ 1.5 E-4 ohm for inter-cell connections,  
              ~ 1.5 E-4 ohm for inter-cell connections ,
~ 1.5 E-4 ohm for inter-rack connections,  
In accordance with the
~ 1.5 E-4 ohm for inter-tier connections, and  
              ~ 1.5 E-4 ohm for inter-rack connections, Surveillance Freq uency
~ 1.5 E-4 ohm for terminal connections.
              ~ 1.5 E-4 ohm for inter-tier connections , and Control Program
AND Verify the total resistance for battery inter-cell, inter-rack, inter-tier, and terminal connections combined is ~ 27.45 E-4 ohms.
              ~ 1.5 E-4 ohm for terminal connections.
SR 3.8.4.3 Verify battery cells, cell plates, and racks show no visual indication of physical damage or abnormal deterioration.
AND Verify the total resistance for battery inter-cell ,
SR 3.8.4.4 Remove visible corrosion, and verify battery cell to cell and terminal connections are coated with anti-corrosion material.
inter-rack, inter-tier, and terminal connections combined is ~ 27.45 E-4 ohms.
SR 3.8.4.5 Verify battery connection resistance is
SR 3.8.4.3   Verify battery cells , cell plates, and racks show no     ~4  months          ~
visual indication of physical damage or abnormal deterioration.
                                                                                              ./
SR 3.8.4.4     Remove visible corrosion, and verify battery cell to     ~4  months            .....
cell and terminal connections are coated with anti-corrosion material.
SR 3.8.4.5     Verify battery connection resistance is                   ~4  months      ./
::; 1.5 E-4 ohm for inter-cell connections,
::; 1.5 E-4 ohm for inter-cell connections,
::; 1.5 E-4 ohm for inter-rack connections,
::; 1.5 E-4 ohm for inter-rack connections,
Line 111: Line 113:
::; 1.5 E-4 ohm for terminal connections.
::; 1.5 E-4 ohm for terminal connections.
AND Verify the total resistance for battery inter-cell, inter-rack, inter-tier, and terminal connections combined is ~ 27.45 E-4 ohms.
AND Verify the total resistance for battery inter-cell, inter-rack, inter-tier, and terminal connections combined is ~ 27.45 E-4 ohms.
RIVER BEND                                 3.8-25                 Amendment No. M , 4-68, 4-84
DC Sources-Operating 3.8.4 FREQUENCY 7 days 9~ days In accordance wit Surveillance Freq Control Program
~4 months
~
~4 months
./
~4 months
./
RIVER BEND 3.8-25 Amendment No. M, 4-68, 4-84 h the uency


ATTACHMENT 2 RBG-47886 REVISED TECHNICAL SPECIFICATION PAGES
ATTACHMENT 2 RBG-47886 REVISED TECHNICAL SPECIFICATION PAGES  


SLC System 3_1.7 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                      FREQUENCY SR 3.1 .7.5 Verify the available weight of Boron-1 0 is ~ 170 Ibs ,   In accordance with and the percent weight concentration of sodium             the Surveillance pentaborate in solution is ~ 9.5% by weight, and           Frequency Control determine the minimum required available solution         Program volume.
SR 3.1.7.5 SR 3.1.7.6 SR 3.1.7.7 SR 3.1.7.8 SURVEILLANCE Verify the available weight of Boron-1 0 is ~ 170 Ibs, and the percent weight concentration of sodium pentaborate in solution is ~ 9.5% by weight, and determine the minimum required available solution volume.
Once within 24 hours after water or boron is added to solution Once within 24 hours after solution temperature is restored to ~ 45°F SR 3.1.7.6  Verify each SLC subsystem manual , power operated ,       In accordance with and automatic valve in the flow path that is not           the Surveillance locked , sealed , or otherwise secured in position , is in Frequency Control the correct position, or can be aligned to the correct     Program position .
Verify each SLC subsystem manual, power operated,
SR 3.1.7.7  Verify each pump develops a flow rate   ~ 41 .2 gpm at   In accordance with a discharge pressure ~ 1250 psig .                         the Inservice Testing Program SR 3.1 .7.8  Verify flow through one SLC subsystem from pump           In accordance with into reactor pressure vessel.                             the Surveillance Frequency Control Program (continued)
and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position, is in the correct position, or can be aligned to the correct position.
RIVER BEND                               3.1-22                 Amendment No. 81 114, .:t-e8
Verify each pump develops a flow rate ~ 41.2 gpm at a discharge pressure ~ 1250 psig.
Verify flow through one SLC subsystem from pump into reactor pressure vessel.
SLC System 3_ 1.7 FREQUENCY In accordance with the Surveillance Frequency Control Program Once within 24 hours after water or boron is added to solution Once within 24 hours after solution temperature is restored to ~ 45°F In accordance with the Surveillance Frequency Control Program In accordance with the Inservice Testing Program In accordance with the Surveillance Frequency Control Program (continued)
RIVER BEND 3.1-22 Amendment No. 81 114,.:t-e8  


SGT System 3.6.4.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                    FREQUENCY SR 3.6.4.3.1   Operate each SGT subsystem for       ~ 15 continuous In accordance with minutes .                                           the Surveillance frequency Control Program SR 3.6.4.3.2  Perform required SGT filter testing in accordance   In accordance with with the Ventilation Filter Testing Program (VFTP). the VFTP SR 3.6.4.3.3  Verify each SGT subsystem actuates on an actual     In accordance with or simulated initiation signal.                     the Surveillance frequency Control Program SR 3.6.4.3.4  Verify each SGT filter cooling bypass               In accordance with damper can be opened and the fan                     the Surveillance started .                                            frequency Control Program RIVER BEND                              3.6-52               Amendment No. 84, ~   +83
SGT System 3.6.4.3 SURVEILLANCE REQUIREMENTS SR 3.6.4.3.1 SR 3.6.4.3.2 SR 3.6.4.3.3 SR 3.6.4.3.4 RIVER BEND SURVEILLANCE Operate each SGT subsystem for ~ 15 continuous minutes.
Perform required SGT filter testing in accordance with the Ventilation Filter Testing Program (VFTP).
Verify each SGT subsystem actuates on an actual or simulated initiation signal.
Verify each SGT filter cooling bypass damper can be opened and the fan started.
FREQUENCY In accordance with the Surveillance frequency Control Program In accordance with the VFTP In accordance with the Surveillance frequency Control Program In accordance with the Surveillance frequency Control Program 3.6-52 Amendment No. 84, ~  
+83  


Fuel Building Ventilation System-Fuel Handling 3.6.4.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                        FREQUENCY SR 3.6.4.7.1   Verify one fuel building ventilation charcoal             In accordance with filtration subsystem in operation.                       the Surveillance Frequency Control Program SR 3.6.4.7.2  Operate each fuel building ventilation charcoal           In accordance with filtration subsystem for ~ 15 continuous minutes.         the Surveillance Frequency Control Program SR 3.6.4.7.3  Perform fuel building ventilation charcoal filtration     In accordance with filter testing in accordance with the Ventilation         the VFTP Filter Testing Program (VFTP).
Fuel Building Ventilation System-Fuel Handling 3.6.4.7 SURVEILLANCE REQUIREMENTS SR 3.6.4.7.1 SR 3.6.4.7.2 SR 3.6.4.7.3 SR 3.6.4.7.4 SR 3.6.4.7.5 RIVER BEND SURVEILLANCE Verify one fuel building ventilation charcoal filtration subsystem in operation.
SR 3.6.4.7.4  Verify each fuel building ventilation charcoal             In accordance with filtration subsystem actuates on an actual or             the Surveillance simulated initiation signal.                               Frequency Control Program SR 3.6.4.7.5  Verify each fuel building ventilation charcoal             In accordance with filtration filter cooling bypass damper can be             the Surveillance opened and the fan started .                               Frequency Control Program RIVER BEND                                3.6-59               Amendment No. 8+, 468, 4Sa
Operate each fuel building ventilation charcoal filtration subsystem for ~ 15 continuous minutes.
Perform fuel building ventilation charcoal filtration filter testing in accordance with the Ventilation Filter Testing Program (VFTP).
Verify each fuel building ventilation charcoal filtration subsystem actuates on an actual or simulated initiation signal.
Verify each fuel building ventilation charcoal filtration filter cooling bypass damper can be opened and the fan started.
FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the VFTP In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program 3.6-59 Amendment No. 8+, 468, 4Sa  


CRFA System 3.7.2 ACTIONS (continued)
ACTIONS (continued)
CONDITION                         REQUIRED ACTION              COMPLETION TIME F. Two CRFA subsystems             F.1 Suspend movement of            Immediately inoperable during                     recently irradiated fuel movement of recently                 assemblies in the primary irradiated fuel assemblies           containment and fuel in the primary containment           building.
CONDITION F.
or fuel building, or during OPDRVs.
Two CRFA subsystems inoperable during movement of recently irradiated fuel assemblies in the primary containment or fuel building, or during OPDRVs.
F.2 Initiate action to suspend      Immediately OPDRVs.
One or more CRFA subsystems inoperable due to inoperable CRE boundary during movement of recently irradiated fuel assemblies in the primary containment or fuel building, or during OPDRVs.
One or more CRFA subsystems inoperable due to inoperable CRE boundary during movement of recently irradiated fuel assemblies in the primary containment or fuel building , or during OPDRVs.
SURVEILLANCE REQUIREMENTS REQUIRED ACTION F.1 Suspend movement of recently irradiated fuel assemblies in the primary containment and fuel building.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                     FREQUENCY SR 3.7.2.1         Operate each CRFA subsystem for ~ 15 continuous           In accordance with minutes.                                                 the Surveillance Frequency Control Program SR 3.7.2.2        Perform required CRFA filter testing in accordance        In accordance with with the Ventilation Filter Testing Program (VFTP).     the VFTP SR 3.7.2.3        Verify each CRFA subsystem actuates on an actual         In accordance with or simulated initiation signal.                         the Surveillance Frequency Control Program (continued)
F.2 Initiate action to suspend OPDRVs.
RIVER BEND                                     3.7-7               Amendment No. 81 119 132 154
SURVEILLANCE SR 3.7.2.1 SR 3.7.2.2 SR 3.7.2.3 Operate each CRFA subsystem for ~ 15 continuous minutes.
                                                                                    +ee, +68, +Sa
Perform required CRFA filter testing in accordance with the Ventilation Filter Testing Program (VFTP).
Verify each CRFA subsystem actuates on an actual or simulated initiation signal.
CRFA System 3.7.2 COMPLETION TIME Immediately Immediately FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the VFTP In accordance with the Surveillance Frequency Control Program (continued)
RIVER BEND 3.7-7 Amendment No. 81 119 132 154  
+ee, +68, +Sa  


DC Sources- Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                      FREQUENCY SR 3.8.4.1     Verify battery terminal voltage is   ~ 130.2 Von float   In accordance with charge.                                                   the Surveillance Frequency Control Program SR 3.8.4.2    Verify no visible corrosion at battery terminals and     In accordance with connectors .                                             the Surveillance Frequency Control Program Verify battery connection resistance is
DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS SR 3.8.4.1 SR 3.8.4.2 SR 3.8.4.3 SR 3.8.4.4 SR 3.8.4.5 RIVER BEND SURVEILLANCE Verify battery terminal voltage is ~ 130.2 Von float charge.
:s; 1.5 E-4 ohm for inter-cell connections ,
Verify no visible corrosion at battery terminals and connectors.
Verify battery connection resistance is
:s; 1.5 E-4 ohm for inter-cell connections,
:s; 1.5 E-4 ohm for inter-rack connections,
:s; 1.5 E-4 ohm for inter-rack connections,
:s; 1.5 E-4 ohm for inter-tier connections, and
:s; 1.5 E-4 ohm for inter-tier connections, and
:s; 1.5 E-4 ohm for terminal connections.
:s; 1.5 E-4 ohm for terminal connections.
Verify the total resistance for battery inter-cell, inter-rack, inter-tier, and terminal connections combined is ~ 27.45 E-4 ohms.
Verify the total resistance for battery inter-cell, inter-rack, inter-tier, and terminal connections combined is ~ 27.45 E-4 ohms.
SR 3.8.4.3    Verify battery cells , cell plates, and racks show no     In accordance with visual indication of physical damage or abnormal         the Surveillance deterioration.                                           Frequency Control Program SR 3.8.4.4    Remove visible corrosion , and verify battery cell to     In accordance with cell and terminal connections are coated with             the Surveillance anti-corrosion material.                                 Frequency Control Program SR 3.8.4.5    Verify battery connection resistance is                   In accordance with
Verify battery cells, cell plates, and racks show no visual indication of physical damage or abnormal deterioration.
:s; 1.5 E-4 ohm for inter-cell connections ,             the Surveillance
Remove visible corrosion, and verify battery cell to cell and terminal connections are coated with anti-corrosion material.
:s; 1.5 E-4 ohm for inter-rack connections,               Frequency Control
Verify battery connection resistance is
:s; 1.5 E-4 ohm for inter-tier connections, and           Program
:s; 1.5 E-4 ohm for inter-cell connections,
:s; 1.5 E-4 ohm for inter-rack connections,
:s; 1.5 E-4 ohm for inter-tier connections, and
:s; 1.5 E-4 ohm for terminal connections.
:s; 1.5 E-4 ohm for terminal connections.
Verify the total resistance for battery inter-cell ,
Verify the total resistance for battery inter-cell, inter-rack, inter-tier, and terminal connections combined is ~ 27.45 E-4 ohms.
inter-rack, inter-tier, and terminal connections combined is ~ 27.45 E-4 ohms.
FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program 3.8-25 Amendment No. 84, 46-8, 484}}
RIVER BEND                                  3.8-25                 Amendment No. 84, 46-8, 484}}

Latest revision as of 17:08, 5 January 2025

Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)
ML18205A520
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/24/2018
From: Schenk T
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBG-47886, TSTF-425
Download: ML18205A520 (14)


Text

C-=--Entergx RSG-47886 July 24, 2018 Attn: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61 N SI. Francisville, LA 70775 Tel 225-381-4374 Timothy Schenk Regulatory Assurance Manager

Subject:

Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)

River Send Station, Unit 1 Docket No. 50-458 License No. NPF-47 RSF1 0146

Dear Sir or Madam:

In accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR 50.90), "Application for amendment of license, construction permit, or early site permit,"

Entergy Operations, Inc. (Entergy) previously submitted a request for an amendment to the Technical Specifications (TS) for River Send Station, Unit 1 (RSS).

The proposed amendment would modify the RSS TS by relocating specific surveillance frequencies to a licensee-controlled program with the implementation of Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specification Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies."

Entergy originally submitted this request by RBS letter RSG-47799 dated February 28, 2018.

[ADAMS Accession Number ML18067A115]

It has recently been discovered that the supplement to the proposed amendment, submitted by RBS letter RBG-47882 dated July 10, 2018 [ADAMS Accession Number ML18191S010],

contains errors and should be disregarded. The Attachments of this letter should be used instead. contains the five current RSS TS pages with the proposed changes (mark-up). contains the revised TS pages. The five pages contained in this supplement should supersede the corresponding pages of the original amendment and RSS letter RSG-47882.

RBG-47886 Page 2 of 2 The supplemental information provided does not change the scope of the original submittal.

Entergy requests approval the proposed license amendment by February 28, 2019 with the amendment being implemented within 90 days.

There are no regulatory commitments contained in this submittal. If you have any questions, please contact Mr. Tim Schenk at 225-381 -4177.

TAS/twf ATTACHMENT:

1.

Proposed Technical Specification Changes (Mark-up)

2.

Revised Technical Specification Pages cc:

u.s. Nuclear Regulatory Commission Attn: Ms. Lisa M. Regner, Project Manager 09-0-14 One White Flint North 11555 Rockville Pike Rockville, MO 20852 u.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Blvd.

Arlington, TX 76011-4511 NRC Senior Resident Inspector Attn: Mr. Jeff Sowa 5485 U.S. Highway 61, Suite 1 St. Francisville, LA 70775 Public Utility Commission of Texas Attn: PUC Filing Clerk 1701 N. Congress Avenue P. O. Box 13326 Austin, TX 78711 -3326

ATTACHMENT 1 RBG-47886 PROPOSED TECHNICAL SPECIFICATION CHANGES (MARK-UP)

SR 3.1.7.5 SR 3.1.7.6 SR 3.1.7.7 SR 3.1.7.8 RIVER BEND SURVEILLANCE Verify the available weight of Boron-10 is ~ 170 Ibs, and the percent weight concentration of sodium pentaborate in solution is ~ 9.5% by weight, and determine the minimum required available solution volume.

SLC System 3.1.7 FREQUENCY 31 days 4~------.

Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after water or boron is added to solution Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after solution temperature is restored to ~ 45°F Verify each SLC subsystem manual, power operated,

31 days 44----1 and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position, is in the correct position, or can be aligned to the correct position.

Verify each pump develops a flow rate ~ 41.2 gpm at a discharge pressure ~ 1250 psig.

In accordance with the Inservice Testing Program Verify flow through one SLC subsystem from pump into reactor pressure vessel.

24 months on a +--

STAGGERED 3.1-22 TEST BASIS (continued)

In accordance with the Surveillance frequency Control Program Amendment No. 81 114, ~

SGT System 3.6.4.3 SURVEILLANCE REQUIREMENTS SR 3.6.4.3.1 SR 3.6.4.3.2 SR 3.6.4.3.3 SR 3.6.4.3.4 RIVER BEND SURVEILLANCE Operate each SGT subsystem for ~ 1 minutes.

5 continuous FREQUENCY 3~ lays

./

accordance Perform required SGT filter testing in with the Ventilation Filter Testing Prog ram (VFTP).

In accordance with the VFTP Verify each SGT subsystem actuates or simulated initiation signal.

Verify each SGT filter cooling bypass damper can be opened and the fan started.

3.6-52 on an actual 24 Ffl9AtRS L..

24 Ffl9AtRS L..

In accordance with the Surveillance Frequency Control Program Amendment No. 8-1-, 168, 183 1-

Fuel Building Ventilation System-Fuel Handling 3.6.4.7 SURVEILLANCE REQUIREMENTS SR 3.6.4.7.1 SR 3.6.4.7.2 SR 3.6.4.7.3 SR 3.6.4.7.4 SR 3.6.4.7.5 RIVER BEND SURVEILLANCE Verify one fuel building ventilation ch filtration subsystem in operation.

arcoa on charcoal Operate each fuel building ventilati filtration subsystem for ~ 15 continu ous minutes.

rcoal filtration Ventilation Perform fuel building ventilation cha filter testing in accordance with the Filter Testing Program (VFTP).

Verify each fuel building ventilation filtration subsystem actuates on an simulated initiation signal.

charcoal actual or charcoal er can be Verify each fuel building ventilation filtration filter cooling bypass damp opened and the fan started.

FREQUENCY el:lFS

./

31 days

./

In accordance with the VFTP 24 menths

./

24 menths

~

In accordance with the Surveillance Frequency Control Program 3.6-59 Amendment No. 8-1-, 4eS, ~

ACTIONS (continued)

CONDITION F.

Two CRFA subsystems inoperable during movement of recently irradiated fuel assemblies in the primary containment or fuel building, or during OPDRVs.

One or more CRFA subsystems inoperable due to inoperable CRE boundary during movement of recently irradiated fuel assemblies in the primary containment or fuel building, or during OPDRVs.

SURVEILLANCE REQUIREMENTS REQUIRED ACTION F.1 Suspend movement of recently irradiated fuel assemblies in the primary containment and fuel building.

F.2 Initiate action to suspend OPDRVs.

SURVEILLANCE SR 3.7.2.1 Operate each CRFA subsystem for ~ 15 continuous minutes.

SR 3.7.2.2 Perform required CRFA filter testing in accordance with the Ventilation Filter Testing Program (VFTP).

SR 3.7.2.3 Verify each CRFA subsystem actuates on an actual or simulated initiation signal.

CRFA System 3.7.2 COMPLETION TIME Immediately Immediately FREQUENCY 31 days In accordance with the VFTP 24 months L...

(continued)

In accordance with the Surveillance RIVER BEND 3.7-7 Frequency Control Program Amendment No. 81119132154

+%, +68, 4-83 t---

SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.8.4.1 Verify battery terminal voltage is ~ 130.2 Von float charge.

SR 3.8.4.2 Verify no visible corrosion at battery terminals and connectors.

OR Verify battery connection resistance is

~ 1.5 E-4 ohm for inter-cell connections,

~ 1.5 E-4 ohm for inter-rack connections,

~ 1.5 E-4 ohm for inter-tier connections, and

~ 1.5 E-4 ohm for terminal connections.

AND Verify the total resistance for battery inter-cell, inter-rack, inter-tier, and terminal connections combined is ~ 27.45 E-4 ohms.

SR 3.8.4.3 Verify battery cells, cell plates, and racks show no visual indication of physical damage or abnormal deterioration.

SR 3.8.4.4 Remove visible corrosion, and verify battery cell to cell and terminal connections are coated with anti-corrosion material.

SR 3.8.4.5 Verify battery connection resistance is

1.5 E-4 ohm for inter-cell connections,
1.5 E-4 ohm for inter-rack connections,
1.5 E-4 ohm for inter-tier connections, and
1.5 E-4 ohm for terminal connections.

AND Verify the total resistance for battery inter-cell, inter-rack, inter-tier, and terminal connections combined is ~ 27.45 E-4 ohms.

DC Sources-Operating 3.8.4 FREQUENCY 7 days 9~ days In accordance wit Surveillance Freq Control Program

~4 months

~

~4 months

./

~4 months

./

RIVER BEND 3.8-25 Amendment No. M, 4-68, 4-84 h the uency

ATTACHMENT 2 RBG-47886 REVISED TECHNICAL SPECIFICATION PAGES

SURVEILLANCE REQUIREMENTS (continued)

SR 3.1.7.5 SR 3.1.7.6 SR 3.1.7.7 SR 3.1.7.8 SURVEILLANCE Verify the available weight of Boron-1 0 is ~ 170 Ibs, and the percent weight concentration of sodium pentaborate in solution is ~ 9.5% by weight, and determine the minimum required available solution volume.

Verify each SLC subsystem manual, power operated,

and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position, is in the correct position, or can be aligned to the correct position.

Verify each pump develops a flow rate ~ 41.2 gpm at a discharge pressure ~ 1250 psig.

Verify flow through one SLC subsystem from pump into reactor pressure vessel.

SLC System 3_ 1.7 FREQUENCY In accordance with the Surveillance Frequency Control Program Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after water or boron is added to solution Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after solution temperature is restored to ~ 45°F In accordance with the Surveillance Frequency Control Program In accordance with the Inservice Testing Program In accordance with the Surveillance Frequency Control Program (continued)

RIVER BEND 3.1-22 Amendment No. 81 114,.:t-e8

SGT System 3.6.4.3 SURVEILLANCE REQUIREMENTS SR 3.6.4.3.1 SR 3.6.4.3.2 SR 3.6.4.3.3 SR 3.6.4.3.4 RIVER BEND SURVEILLANCE Operate each SGT subsystem for ~ 15 continuous minutes.

Perform required SGT filter testing in accordance with the Ventilation Filter Testing Program (VFTP).

Verify each SGT subsystem actuates on an actual or simulated initiation signal.

Verify each SGT filter cooling bypass damper can be opened and the fan started.

FREQUENCY In accordance with the Surveillance frequency Control Program In accordance with the VFTP In accordance with the Surveillance frequency Control Program In accordance with the Surveillance frequency Control Program 3.6-52 Amendment No. 84, ~

+83

Fuel Building Ventilation System-Fuel Handling 3.6.4.7 SURVEILLANCE REQUIREMENTS SR 3.6.4.7.1 SR 3.6.4.7.2 SR 3.6.4.7.3 SR 3.6.4.7.4 SR 3.6.4.7.5 RIVER BEND SURVEILLANCE Verify one fuel building ventilation charcoal filtration subsystem in operation.

Operate each fuel building ventilation charcoal filtration subsystem for ~ 15 continuous minutes.

Perform fuel building ventilation charcoal filtration filter testing in accordance with the Ventilation Filter Testing Program (VFTP).

Verify each fuel building ventilation charcoal filtration subsystem actuates on an actual or simulated initiation signal.

Verify each fuel building ventilation charcoal filtration filter cooling bypass damper can be opened and the fan started.

FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the VFTP In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program 3.6-59 Amendment No. 8+, 468, 4Sa

ACTIONS (continued)

CONDITION F.

Two CRFA subsystems inoperable during movement of recently irradiated fuel assemblies in the primary containment or fuel building, or during OPDRVs.

One or more CRFA subsystems inoperable due to inoperable CRE boundary during movement of recently irradiated fuel assemblies in the primary containment or fuel building, or during OPDRVs.

SURVEILLANCE REQUIREMENTS REQUIRED ACTION F.1 Suspend movement of recently irradiated fuel assemblies in the primary containment and fuel building.

F.2 Initiate action to suspend OPDRVs.

SURVEILLANCE SR 3.7.2.1 SR 3.7.2.2 SR 3.7.2.3 Operate each CRFA subsystem for ~ 15 continuous minutes.

Perform required CRFA filter testing in accordance with the Ventilation Filter Testing Program (VFTP).

Verify each CRFA subsystem actuates on an actual or simulated initiation signal.

CRFA System 3.7.2 COMPLETION TIME Immediately Immediately FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the VFTP In accordance with the Surveillance Frequency Control Program (continued)

RIVER BEND 3.7-7 Amendment No. 81 119 132 154

+ee, +68, +Sa

DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS SR 3.8.4.1 SR 3.8.4.2 SR 3.8.4.3 SR 3.8.4.4 SR 3.8.4.5 RIVER BEND SURVEILLANCE Verify battery terminal voltage is ~ 130.2 Von float charge.

Verify no visible corrosion at battery terminals and connectors.

Verify battery connection resistance is

s; 1.5 E-4 ohm for inter-cell connections,
s; 1.5 E-4 ohm for inter-rack connections,
s; 1.5 E-4 ohm for inter-tier connections, and
s; 1.5 E-4 ohm for terminal connections.

Verify the total resistance for battery inter-cell, inter-rack, inter-tier, and terminal connections combined is ~ 27.45 E-4 ohms.

Verify battery cells, cell plates, and racks show no visual indication of physical damage or abnormal deterioration.

Remove visible corrosion, and verify battery cell to cell and terminal connections are coated with anti-corrosion material.

Verify battery connection resistance is

s; 1.5 E-4 ohm for inter-cell connections,
s; 1.5 E-4 ohm for inter-rack connections,
s; 1.5 E-4 ohm for inter-tier connections, and
s; 1.5 E-4 ohm for terminal connections.

Verify the total resistance for battery inter-cell, inter-rack, inter-tier, and terminal connections combined is ~ 27.45 E-4 ohms.

FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program 3.8-25 Amendment No. 84, 46-8, 484