| title = 01/07/1977 Letter Operating Status Reports of December 1976
| title = Letter Operating Status Reports of December 1976
| author name = Schmidt A
| author name = Schmidt A
| author affiliation = Florida Power & Light Co
| author affiliation = Florida Power & Light Co
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:NRC FORM 195                                       U.S. NUCLEAR REGULATORY COMMISSION DOCK        BER IZ 76)                                                                                   5        251/335 FILE NUMBER
{{#Wiki_filter:NRC FORM 195 U.S. NUCLEAR REGULATORY COMMISSION IZ 76)
              , NRC DISTRIBUTION FQR     rART 50 DOCKET MATERIAL                         MONTHLY REPORT TO:     USNRC                               FROM: HLORDIA PWR 6 LIGHT CO ~           DATE OF DOCUMENT MIAMI, FLORDIA                          1/7/77 A.D. SCHMIDT                      DATE RECEIVED 1/ g/77 C3LETTE R               ONOTORIZED           PROP                   INPUT FORM         NUMBER OF COPIES RECEIVED
, NRC DISTRIBUTION FQR rART 50 DOCKET MATERIAL 251/335 DOCK 5
~QQ R I G N AL I            KIUNCLASSIFIE0 OCOPY LETTER TRANS THE POLL(NING:                             MONTHLY REPORT FOR     DECEMBER 1976 PLANT & COMPONENT OPERABILITY &
BER FILE NUMBER MONTHLY REPORT TO:
AVAILABILITY, THIS   REPORT TO BE USED             IN PREPARING GRAY BOOK BY PLANS &
USNRC FROM:
OPERATIONS'LANT NAME ~ TURKEY PT o g 1 <<3>> 6 4               ACRNOWLEDGED DO NOT REMOVE I
HLORDIA PWR 6 LIGHT CO ~
FOR ACTION/INFORMATION MIPC W   CYS FOR ACT ON INTERNAL D IST R I BUTION DR BRANCH CHIEF     L             ZIEMANN /LEAR PARRISH DIGGS EXTERNAL DISTRIBUTION                                     CONTROL NUMBER MIAMI FL.
MIAMI, FLORDIA A.D. SCHMIDT DATE OF DOCUMENT 1/7/77 DATE RECEIVED 1/ g/77 C3LETTE R
NRC FORM 156 IZ.76)
~QQ R IG INAL OCOPY ONOTORIZED KIUNCLASSIFIE0 PROP INPUT FORM NUMBER OF COPIES RECEIVED LETTER TRANS THE POLL(NING:
MONTHLY REPORT FOR DECEMBER 1976 PLANT & COMPONENT OPERABILITY &
AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &
OPERATIONS'LANT NAME~
TURKEY PT o g
1 <<3>>
6 4 ACRNOWLEDGED DO NOT REMOVE I
MIPC W
CYS FOR ACT ON FOR ACTION/INFORMATION INTERNALDISTR I BUTION DR BRANCH CHIEF L ZIEMANN /LEAR PARRISH DIGGS EXTERNAL DISTRIBUTION MIAMI FL.
CONTROL NUMBER NRC FORM 156 IZ.76)


r III             r I
r III r
I
- f I
- f I
            ~, 9C II II 4 v
~,
9C II II 4
v


~gegu atOYf cy yQCXF+
gg1QT.> 5 pe ~g'Ah Dobe< ~"
P. O. BOX 013100, MIAMI, FL 33101
P. O. BOX 013100, MIAMI, FL 33101
                                                                        ~ykl /fr
~ykl /fr r
        ~gegu atOYf r
FLORIDAPOWER & LIGHTCOMPANY January 7,
FLORIDA POWER & LIGHT COMPANY cy yQCXF+
1977 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.
January 7, 1977 gg1QT.>
20555 Gentlemen:
5
Ik r
                                    ~g'Ah pe Dobe< ~"
i I
Office of   Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.       20555 Gentlemen:                                             Ik r             i I
Attached are the December',
Attached are the December', 1976 Operating Status.'Reports for Turkey Point Unit Nos.,'3 and' and St.'ucie Unit No. l.
1976 Operating Status.'Reports for Turkey Point Unit Nos.,'3 and' and St.'ucie Unit No. l.
Very truly yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc:   Mr. Norman C. Moseley Jack R. Newman, Esquire PEOPLE... SERVING PEOPLE
Very truly yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc:
Mr. Norman C. Moseley Jack R.
Newman, Esquire PEOPLE... SERVING PEOPLE


                      <1 gy rz>
rz>
I ')
<1 gy I ')
L~
I'I gp ~
I'I gp ~
L~
l'p P4 y@i j,
l'p P4 y@i j,


APPENDS B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 250 UNIT   Turkey Point Unit No. 3 DATE   Jan. 6 1977 COMPLETED BY     V. T. Chi   on TELEPHONE   (305)   552-3830 MONTH   December,   19 7'6 DAY AVERAGE DAILY POWER LEVEL               DAY AVERAGE DAILY POWER LEVEL (NHe-Net)                                      (Kle-Net) 17 18 3                                           19 20 21'2 23 25 10                                           26 27 12                                           28 13                                           29 3.4                                           30 31 16
APPENDS B
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50 250 UNIT Turkey Point Unit No.
3 DATE Jan.
6 1977 COMPLETED BY V. T. Chi on TELEPHONE (305) 552-3830 MONTH
: December, 19 7'6 DAY AVERAGE DAILY POWER LEVEL (NHe-Net)
DAY AVERAGE DAILY POWER LEVEL (Kle-Net) 17 18 3
19 20 21'2 23 25 10 26 27 12 28 13 3.4 29 30 31 16


APPENDIX C OPERATING DATA REPOR~
APPENDIX C OPERATING DATA REPOR~
DOCKET NO ~
REPORT MONTH December 1976 DOCKET NO ~
Turkey Point Unit No. 3 REPORT MONTH      December      1976                                                              Jsn. 6, 1977 COMPLFTED BY     V. T. Chilson TELEPHONE OPERATING STATUS 1~   REPORTING PERIOD:     0001 76 12 01         GROSS       HOURS     IN REPORTING PERIOD:         744.0 THROUGH
Turkey Point Unit No.
: 2. CURRENTLY AUTHORIZED POWER LEVEL               (MWt): 2200 HAE a DEPEND. CAPACEEE       (NNA-Nat):
3 Jsn.
DESIGN ELECTRICAL RATING (MWe-Net):                             693
6, 1977 COMPLFTED BY V. T. Chilson OPERATING STATUS TELEPHONE 1 ~
: 3. POWER   LEVEL TO WHICH RESTRICTED             (IF   ANY)         (MWc-Valet):         NONE
REPORTING PERIOD:
: 4. REASONS FOR RESTRICTION       (IP ANY):
0001 76 12 01 GROSS HOURS IN REPORTING PERIOD:
THIS MONTH     YEAR TO DATE       CUMULATIVE
THROUGH 2.
: 5. NUMBERS OF HOURS REACTOR 'WAS           CRITICAL....                     0.0         6 760.0         28 040.1
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200 HAE a DEPEND.
: 6. REACTOR RESERVE SHUTDOWN       HOURS.........,..                       0.0             64.2             67.4 7 ~   HOURS GENERATOR ON       LINE   ~           ~     ~       , ~ ~         0 0         6 669.1         27 039.1
CAPACEEE (NNA-Nat):
: 8. UNIT RESERVE   SHUTDOWN     HOURS...............                       0.0             0.0             85.0
DESIGN ELECTRICAL RATING (MWe-Net):
: 9. GROSS THERMO     ENERGY GENERATED (PAUL) ~             .....                       14 417 328        51 729 588
693 744.0 3.
: 10. GROSS   ELECTRICAL ENERGY GENERATED (MWH) ~                   ~ ~                   4 555 215        16 570 451
POWER LEVEL TO WHICH RESTRICTED (IF ANY)
: 11. NET ELECTRICAL ENERGY GENERATED               (MWH).....           - 1 706         4 320 173       15 675 935
(MWc-Valet):
: 12. REACTOR SERVICE FACTOR                                                   0.0             77.0             78.5 t
4.
: 13. REACTOR   AVAILABILITYFACTOR...............                             0. 0           77.7             78.7
REASONS FOR RESTRICTION (IP ANY):
: 14. UNIT SERVICE FACTOR.                                                     0.0 15 'NIT AVAILABILITY        PACTORA  ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ a 0.0             75.9            75.9
NONE THIS MONTH YEAR TO DATE CUMULATIVE 5.
: 16. EfZT CAPACITY   PACTOR     (USing   (AADC).........                   0~0             73.8            66.8
NUMBERS OF HOURS REACTOR 'WAS CRITICAL....
: 17. UNIT CAPACITY FACTOR (Using Design                 We)...               0 0             71.0            63.3 a
0.0 6 760.0 28 040.1 6.
: 18. UNIT FORCED OUTAGE RATE.         .         ..........,                  0'              0.1                2.9 19 'HUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
REACTOR RESERVE SHUTDOWN HOURS.........,..
: 20. IF SHUTDOWN AT END OF REPORT           PERIOD, ESTIMATED DATE OFSTARTUP:                     Jen. 16, 1977
0.0 64.2 67.4 7 ~
: 21. UNITS IN TEST STATUS (PRIOR TO COKKRCZAL OPERATION):                                   FORECAST     ACHIEVED INITIAL CRITICALITY IiNITIAL ELECTRZCITY a
HOURS GENERATOR ON LINE
~
~
~
~ ~
0 0 6 669.1 27 039.1 8.
UNIT RESERVE SHUTDOWN HOURS...............
0.0 0.0 85.0 9.
GROSS THERMO ENERGY GENERATED (PAUL) ~.....
10.
GROSS ELECTRICAL ENERGY GENERATED (MWH) ~ ~ ~
11.
NET ELECTRICAL ENERGY GENERATED (MWH)..... - 1 706 14 417 328 51 729 588 4 555 215 16 570 451 4 320 173 15 675 935 12.
REACTOR SERVICE FACTOR 0.0 t
13.
REACTOR AVAILABILITYFACTOR...............
: 0. 0 77.0 77.7 78.5 78.7 14.
UNIT SERVICE FACTOR.
0.0 15'NIT AVAILABILITYPACTORA
~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ a 0.0 16.
EfZT CAPACITY PACTOR (USing (AADC).........
0 ~ 0 17.
UNIT CAPACITY FACTOR (Using Design We)...
0 0 18.
UNIT FORCED OUTAGE RATE.
0 '
75.9 73.8 71.0 0.1 75.9 66.8 63.3 a
2.9 19 'HUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) 20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OFSTARTUP:
Jen.
16, 1977 21.
UNITS IN TEST STATUS (PRIOR TO COKKRCZAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY IiNITIALELECTRZCITY a
COMMiRCIAL OPERATION
COMMiRCIAL OPERATION


(1) REASON APPEHDIX D                              DOCKET NO. 50  - 250 A: EQUIPMEHT FAILURE (EXPLAIN)
1:
B: MAIHT. OR TEST UNIT  SHUTDOWNS AN) POWER REDUCTIONS                UNIT  NAME    Turkey Point Unit Ho. 3 C: REFUELINC D: RECULATORY RESTRICTION                                                                                     'ATE            Jan. 6, 1977 E: OPERATOR TRAINIHG AHD LICENSE EXAMINATION                                                                                       COMPLETED BY  V. T. Chilson F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPIAIN)                                   REPORT MONTH December                        TELEPHONE      (3O5) 1976 H: OTHER   (EXPLAIN)
MANUAL 2:
(2) METHOD 1: MANUAL                                                                                METHOD OF 2: JIANUAL SCRAM                                  TYPE                                 SWOTTING DOWN 3: ,AUTOMATIC SCRAM                            F: FORCED   DURATION                    THE REACTOR OR 4: OIIIER (EXP LAIII)    NO. DATE      S: SCHEDULED   (BOURS)     REASON(1)   REDUCINC POWER(2)           CORRECTIVE ACTIONS/CMHE'.ITS 21     76-11-14                     744.0                                       Unit No. 3 removed from service for refueling, maintenance, and inspections.   (Continued from previous month) (Nuclear and Non-nuclear systems)
JIANUAL SCRAM 3:
SIRMARY: Unit No. 3 removed from service for refueling, maintenance, and inspections.   (Continued from previous month)
,AUTOMATIC SCRAM 4:
OIIIER (EXPLAIII)
NO.
(1)
REASON A:
EQUIPMEHT FAILURE (EXPLAIN)
B:
MAIHT. OR TEST C:
REFUELINC D:
RECULATORY RESTRICTION E:
OPERATOR TRAINIHG AHD LICENSE EXAMINATION F:
ADMINISTRATIVE G:
OPERATIONAL ERROR (EXPIAIN)
H:
OTHER (EXPLAIN)
(2)
METHOD DATE TYPE F:
FORCED S:
SCHEDULED REPORT MONTH December 1976 DURATION (BOURS)
REASON(1)
METHOD OF SWOTTING DOWN THE REACTOR OR REDUCINC POWER(2)
APPEHDIX D UNIT SHUTDOWNS AN) POWER REDUCTIONS DOCKET NO.
50 - 250 UNIT NAME Turkey Point Unit Ho. 3
'ATE Jan.
6, 1977 COMPLETED BY V. T. Chilson TELEPHONE (3O5)
CORRECTIVE ACTIONS/CMHE'.ITS 21 76-11-14 744.0 Unit No.
3 removed from service for refueling, maintenance, and inspections.
(Continued from previous month)
(Nuclear and Non-nuclear systems)
SIRMARY:
Unit No.
3 removed from service for refueling, maintenance, and inspections.
(Continued from previous month)


APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT   Turkey Point Unit No. 4 Jan. 6, 1977 COMPLETED BY   V. T. Chilson TELEPHONE MONTH December,   1976 (K<e-Valet)
UNIT Turkey Point Unit No.
DAY AVERAGE DAILY POWER LEVEL               DAY AVERAGE DAILY POWER LEVEL (Mle-Net) 17             690 18             697 17                            ,19             689 521                              20            605
4 Jan.
                '83 21            683 689                              22            692 687                              23            692 661                                            693.
6, 1977 COMPLETED BY V. T. Chilson TELEPHONE MONTH
664                                            695 10          696                              26            692 690                              27            691 12          689                                            693 684                              29            689 680.                              30            688 15         687                               31           690 687                               NOTE     Average     daily power level greater than 666'&#xc3;h due to cooler condenser cooling water.
: December, 1976 DAY AVERAGE DAILY POWER LEVEL (Mle-Net)
DAY AVERAGE DAILY POWER LEVEL (K<e-Valet) 10 12 17 521
'83 689 687 661 664 696 690 689 684 680.
17 18
,19 20 21 22 23 26 27 29 30 690 697 689 605 683 692 692 693.
695 692 691 693 689 688 15 687 31 690 687 NOTE Average daily power level greater than 666'&#xc3;h due to cooler condenser cooling water.


APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 - 250 UNIT Turke               Point Unit No.
APPENDIX C OPERATING DATA REPORT ORT MONTH
ORT MONTH    December,  1976                                                      DATE Jan. 6             1977 CO'fPLETED BY V. T. Chileon OPERATING STATUS
: December, 1976 DOCKET NO.
: 1. REPORTING PERIOD:   0001>76>12,01         GROSS       HOURS     IN REPORTING PERIOD:         744.0 THROUGH   2400,76,~12 31
50 - 250 UNIT Turke Point Unit No.
: 2. CURRENTLY AUTHORIZED POWER LEVEL             (MWt):
DATE Jan.
      >AX.DE>E>>. CA>AC>>>       (>>> -N   t):
6 1977 CO'fPLETED BY V. T. Chileon OPERATING STATUS 1.
DESIGN ELECTRICAL RATING (MWe-Net):                           693 3 ~ POWER LEVEL TO WHICH RESTRICTED             (IP       ANY)     ('fffe-Net)f     NONE
REPORTING PERIOD:
: 4. REASONS FOR RESTRICTION       (ZF ANY):
0001>76>12,01 GROSS HOURS IN REPORTING PERIOD:
THIS MONTH     YEAR TO DATE               CffMULATIVE
THROUGH 2400,76,~12 31 2.
: 5. i%uSERS   OF HOURS REACTOR 'WAS       CRZTZCAL.....                 718.2           6 075.9                   21 721.8 HOURS'
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
: 6.   ~> CTOR RESERVE SHUTDOf6f HOURS.         ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~                         21.7                       138.8 7
>AX.DE>E>>. CA>AC>>>
8.
(>>> -N t):
HOURS GENERATOR ON UNIT RESERVE LINE.........,,,,....,.
DESIGN ELECTRICAL RATING (MWe-Net):
SHUTDOWiN              . ..
693 3 ~
                                              ~     ~ ~   .... ..
POWER LEVEL TO WHICH RESTRICTED (IP ANY)
                                                                ~
('fffe-Net)f NONE 4.
670.1 0.0         '.0 5 828.4                  20 542.0 0.0
REASONS FOR RESTRICTION (ZF ANY):
: 9. GROSS THERfLQ ENERGY GENERATED           (MWH).....:             I 453   037     ll 103 004                 41 751 640
744.0 THIS MONTH YEAR TO DATE CffMULATIVE 5.
: 10. GROSS ELECTRICAL EffERGY GENERATED (MWH)...                         479 100       3 978 606                 13 957 688 ll,   ifET ELECTRICAL ENERGY GEVERATED (MffH)                 ~...         455           3 771 836                 13 230 466
i%uSERS OF HOURS REACTOR 'WAS CRZTZCAL.....
: 12. REACTOR SERVICE FACTOR.                                               96.5              69.2                        73.8 4
718.2 6 075.9 21 721.8 6.
: 13. REACTOR   AVAILABILITYFACTOR......           ~.....                 99.4             69.5                       74.2 14 'NIT SERVICE FACTOR...       ~   ~ . ~ .. .... . . .
~>
                                              ~           ~                90.1-             66. 4                       69.8
CTOR RESERVE SHUTDOf6f HOURS.
: 15. UNIT AVAILABILITYFACTOR..................                               90.1             66.4                       69.8 16 'UNIT CAPACITY PACTOR (Using (MDC)... ......           ~                                    64.5                       68.2
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
: 17. UNIT CAPACITY FACTOR (Using Design                 ffWe)...                             62.0                       64.8
21.7 138.8 7
: 18. UNIT FORCED OUTAGE     RATE............,......                         0~5               3~ 7                       3.6
HOURS GENERATOR ON LINE.........,,,,....,.
: 19. SHUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE>                       DATE, AND DURATION OF EACH):
670.1 5 828.4 20 542.0 8.
repair steam generator     tube leek       -     Jan. 6, 1977 through Jan. 12, 1977.
UNIT RESERVE SHUTDOWiN HOURS'
maintenance     and inspections - April 4, 1977 throu h May 22, 1977.
~..
20.'F
~ ~....
                                                                                                        'eEueling, SHUTDOWN AT END OF ffEPORT       PERIOD, ESTIMATED DATE OF STARTSPf
~..
: 21. UNITS IN TEST STATUS (PRIOR TO COf0fERCIAL OPERATION):                               FORECAST               ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
0.0
'.0 0.0 9.
GROSS THERfLQ ENERGY GENERATED (MWH).....: I 453 037 ll 103 004 41 751 640 10.
GROSS ELECTRICAL EffERGY GENERATED (MWH)...
479 100 3 978 606 13 957 688 ll,ifET ELECTRICAL ENERGY GEVERATED (MffH) ~...
455 3 771 836 13 230 466 12.
REACTOR SERVICE FACTOR.
4 13.
REACTOR AVAILABILITYFACTOR...... ~.....
96.5 99.4 69.2 69.5 73.8 74.2 14'NIT SERVICE FACTOR...
~
~.
~..
~....
~
90.1-
: 66. 4 69.8 15.
UNIT AVAILABILITYFACTOR..................
90.1 66.4 69.8 16'UNIT CAPACITY PACTOR (Using (MDC)... ~......
64.5 68.2 17.
UNIT CAPACITY FACTOR (Using Design ffWe)...
62.0 64.8 18.
UNIT FORCED OUTAGE RATE............,......
0 ~ 5 3 ~ 7 3.6 19.
SHUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE> DATE, AND DURATION OF EACH):
repair steam generator tube leek - Jan.
6, 1977 through Jan.
12, 1977.
'eEueling, maintenance and inspections - April 4, 1977 throu h May 22, 1977.
20.'F SHUTDOWN AT END OF ffEPORT PERIOD, ESTIMATED DATE OF STARTSPf 21.
UNITS IN TEST STATUS (PRIOR TO COf0fERCIAL OPERATION):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION FORECAST ACHIEVED


4 ~
4
(1) REASON APPEHDIX D                              DOCKET NO.    '0 -  251 A:   EQUIPMENT FAILURE (EXPLAIN)
~
B:   MAINT. OR TEST WHIT SHUTDOWNS AND POWER REDUCTIONS                  UNIT  NAME    Turke    Point Unit No. 4 C:   REFUELING D:   REGULATORY RESTRICTION                                                                                       DATE            Jan. 6    1977 E-   OPERATOR TRAINING AND LICENSE EXAHINATION                                                                                       COHPLETED BY    V. T. Chilson F:   ADMINISTRATIVE G:   OPERATIONAL ERROR (EXPLAIN)                                   REPORT MONTH December   1976                 TELEPHONE       (305)   552-3830 N:  OTHER (EXPLAIN)
 
(2) METHOD 1:   MAliUAL                                                                               METHOD OF 2: .MANUAL SCRAM                                   TYPE                                SHUTTING DOWN 3:   AUTOHATIC SCRAM                             F: FORCED  DURATION                    THE REACTOR OR 4:   OIHER (EXPLAIN)       NO. DATE       S: SCHEDULED   (HOURS)     REASON (1)   REDUCING POWER(2)             CORRECTIVE ACTIONS/CQDiENTS 28     76-10-28                     69.4                                     Unit No. 4 was removed from service for steam gener-ator tube inspection program. (Continued from previous month)     (Nuclear system) 29     76-12-04                       3.2                                     Unit No. 4   tripped on steam generator     No. 4 A high level during a transient condition caused by the loss of a vital instrument bus power supply. (Nuclear system) 30     76-12-20                       1.3                                     Unit No. 4   tripped during   a transient condition caused by the   failure of   a component   in nuclear instrumen-tation   system channel N-41.       (Nuclear system)
(1)
REASON A:
EQUIPMENT FAILURE (EXPLAIN)
B:
MAINT. OR TEST C:
REFUELING D:
REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAHINATION F:
ADMINISTRATIVE G:
OPERATIONAL ERROR (EXPLAIN)
N:
OTHER (EXPLAIN)
(2)
METHOD APPEHDIX D WHIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH December 1976 DATE Jan.
6 1977 COHPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 DOCKET NO. '0 - 251 UNIT NAME Turke Point Unit No.
4 1:
MAliUAL 2:
.MANUAL SCRAM 3:
AUTOHATIC SCRAM 4:
OIHER (EXPLAIN)
NO.
DATE TYPE F:
FORCED S:
SCHEDULED DURATION (HOURS)
REASON (1)
METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2)
CORRECTIVE ACTIONS/CQDiENTS 28 76-10-28 69.4 Unit No.
4 was removed from service for steam gener-ator tube inspection program.
(Continued from previous month)
(Nuclear system) 29 76-12-04 3.2 Unit No.
4 tripped on steam generator No.
4 A high level during a transient condition caused by the loss of a vital instrument bus power supply.
(Nuclear system) 30 76-12-20 1.3 Unit No.
4 tripped during a transient condition caused by the failure of a component in nuclear instrumen-tation system channel N-41.
(Nuclear system)


==SUMMARY==
==SUMMARY==
Unit No. 4 was returned to service on December 3, 1976 following completion of steam generator tube inspection program.
Unit No.
4 was returned to service on December 3, 1976 following completion of steam generator tube inspection program.
Unit operated at IOOX R.P. during month except for outages on Dec. 4, 1976 and Dec. 20, 1976.
Unit operated at IOOX R.P. during month except for outages on Dec. 4, 1976 and Dec. 20, 1976.


APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 335 UNIT St. Lucie Unit No. 1 DATE Jan. 6, 1977 COMPLETED BY   V. T. Chilson TELEPHONE (305) 552-3830 i~mONTH Dec embe DAY AVERAGE DAILY POEM LEVEL                DAY AVERAGE DAlLY POWER LEVEL (K<e-Net)                                   (MNe-Net) 18 3                                          19 20 21           370 377 23           376 24            374 25            380 10                                          26            374 27            371 12                                          28            378 13                                          29            376 14                                          30            373 374 16
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 335 UNIT St. Lucie Unit No.
1 DATE Jan.
6, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 i~mONTH Dec embe DAY AVERAGE DAILY POEM LEVEL (K<e-Net)
DAY AVERAGE DAlLY POWER LEVEL (MNe-Net) 3 18 19 20 21 370 377 10 12 13 14 23 24 25 26 27 28 29 30 376 374 380 374 371 378 376 373 374 16


APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 335 UNIT St. Lucia     Unit No. 1 REpORT  MOL~ Decenber. 1976                                                  DATE   Jan. 6, 1977 COMPLETED BY   V. T. Chilson OPERATING STATUS                                                             TELEPHONE   (305) 552-3830
APPENDIX C OPERATING DATA REPORT REpORT MOL~ Decenber.
: 1. REPORTING PERIOD:   0001,76,12,21   GROSS     HOURS       IN REPORTING PERIOD:       264.0 THROUGH
1976 DOCKET NO. 50 335 UNIT St. Lucia Unit No.
: 2. CURRENTLY AUTHORIZED POWER LEVEL       (MWt):       2560 DESIGN ELECTRICAL RATING (MWe-Net):                     802
1 DATE Jan.
: 3. POWER   LEVEL TO WHICH RESTRICTED (ZF ANY)               ("JWe-LRJet):           722
6, 1977 COMPLETED BY V. T. Chilson OPERATING STATUS TELEPHONE (305) 552-3830 1.
: 4. REASONS FOR RESTRICTION     (ZF ALJY):
REPORTING PERIOD: 0001,76,12,21 GROSS HOURS IN REPORTING PERIOD:
    "Tenporary 90X     restriction   pending reactor coolant flow analysis" THIS   MONTH   YEAR TO DATE       CUMULATIVE 5   NUMBERS OF HOURS REACTOR WAS       CRITICAL                   264.0           264.0             264.0
264.0 THROUGH 2.
: 6. REACTOR RESERVE SHUTDOWN HOURS..       ~ .. ...
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
                                                  ~ ~                  O. 0
2560 DESIGN ELECTRICAL RATING (MWe-Net):
: 7. HOURS ORMHRSUOR OS     LRMS.......         ....               264.0
802 3.
: 8. UNIT RESERVE   SHUTDOWN   HOURS...............                                   0.0               0.0
POWER LEVEL TO WHICH RESTRICTED (ZF ANY)
("JWe-LRJet):
722 4.
REASONS FOR RESTRICTION (ZF ALJY):
"Tenporary 90X restriction pending reactor coolant flow analysis" THIS MONTH YEAR TO DATE CUMULATIVE 5
NUMBERS OF HOURS REACTOR WAS CRITICAL 264.0 264.0 264.0 6.
REACTOR RESERVE SHUTDOWN HOURS..
~..
~ ~...
O. 0 7.
HOURS ORMHRSUOR OS LRMS...........
264.0 8.
UNIT RESERVE SHUTDOWN HOURS...............
0.0 0.0 12.
REACTOR SERVICE FACTOR.............,...,..
100.0 100.0 13 REACTOR AVAILABZLITYFACTOR............,..
100.0 100.0 14.
UNIT SERVICE FACTORS
~
100.0 100 ~ 0
~ 9.
GROSS THERMAL RJERGY GENERATED (MWH)...,..
~
~
: 9. GROSS  THERMAL RJERGY GENERATED    (MWH)..., ..          ~  347 603           347 603           347 603
347 603 347 603 10.
: 10. GROSS   ELECTRICS ENERGY     GERJERATED   {LRJWH)...         108 270           108 270          108 270 ll. NET ELECTRICAL ENERGY GENERATED       (MWH).....               98 975           98 975           98 975
GROSS ELECTRICS ENERGY GERJERATED
: 12. REACTOR SERVICE    FACTOR.............,...,..                100.0             100.0             100.0 13    REACTOR  AVAILABZLITYFACTOR............,..                  100.0            100.0            100.0
{LRJWH)...
: 14. UNIT SERVICE FACTORS    ~                                    100.0            100 ~ 0          100.0
108 270 108 270 ll.
: 15. UNIT AVAILABILITYFACTOR..................                     100.0             100.0             100.0
NET ELECTRICAL ENERGY GENERATED (MWH).....
: 16. UNIT CAPACITY FACTOR (Using {HPC)       ........   ~ .       46 ~ I           46.7              46.7
98 975 98 975 347 603 108 270 98 975 100.0 100.0 100.0 15.
: 17. UNIT CAPACITY FACTOR (Using Design MWe)...                     46.7             46. 7             46.7
UNIT AVAILABILITYFACTOR..................
: 18. UNIT FORCED OUTAGE     RATE...............     ~ ~ ..           0.0               0.0               0.0
100.0 100.0 100.0 16.
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MOLLHS             (TYPE, DATE, AND DURATION OF EACH):
UNIT CAPACITY FACTOR (Using
: 20. IF SHUTDOWLN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
{HPC)........
: 21. UNITS IN TEST STATUS (PRIOR TO COiJMERCIAL OPERATION):                         FORECAST       ACHIEVED INITIAL CRITICALITY                                                                April 22,   1976 INITIAL ELECTRICITY                                                                ~M7     1976 CO"DJERCIAL OPERATION                                                              ~O. 2   1976
~.
46 ~ I 17.
UNIT CAPACITY FACTOR (Using Design MWe)...
46.7 46.7
: 46. 7 46.7 46.7 18.
UNIT FORCED OUTAGE RATE...............
~ ~..
0.0 0.0 0.0 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MOLLHS (TYPE, DATE, AND DURATION OF EACH):
20.
IF SHUTDOWLN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO COiJMERCIAL OPERATION):
INITIALCRITICALITY INITIALELECTRICITY CO"DJERCIAL OPERATION FORECAST ACHIEVED April 22, 1976
~M7 1976
~O.
2 1976


(I) REASON                                                                   hPPENDIX D                              DOCRET NO. 50  - 335 A: EqUIPMENT FAILURE (EXPLAIN)
(I)
B: HAINT. OR TEST                                         UNIT SllUTDOWNS AND POWER RFDUCTIONS                UNIT NAME      St. Lucio Unit No. I C: REFUEl ING D: REGULATORY RESTRICTION                                                                                       DATE          Jan. 6, 1977 E: OPERATOR TRAINING AND LICENSE EXAMINATION                                                                                       COMPLETED EY  V. T. Chilson F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)                                   REPORT HONT)1 December   1976 TELEPHONE       (305)   552-3830 II: OTHER (EXPLAIN)
REASON A:
(2) METHOD I: MANUAL                                                                               METHOD OF 2: MANUAL SCRAM                                 TYPE                                  SBUTTING DOWN 3: AUTOHATIC SCRAM                           F: FORCED    DURATION                    THE REACTOR OR 4: OTHER (EXPLAIN)       NO. DATE       S: SCHEDULED     (BOURS)     REASON(1)   REDUCING POWER(2)           CORRECTIVE ACTIONS/COtlMENTS NONE
EqUIPMENT FAILURE (EXPLAIN)
B:
HAINT. OR TEST C:
REFUEl ING D:
REGULATORY RESTRICTION E:
OPERATOR TRAINING AND LICENSE EXAMINATION F:
ADMINISTRATIVE G:
OPERATIONAL ERROR (EXPLAIN)
II:
OTHER (EXPLAIN) hPPENDIX D UNIT SllUTDOWNS AND POWER RFDUCTIONS REPORT HONT)1 December 1976 DATE Jan.
6, 1977 COMPLETED EY V. T. Chilson TELEPHONE (305) 552-3830 DOCRET NO.
50 - 335 UNIT NAME St. Lucio Unit No. I (2)
METHOD I:
MANUAL 2:
MANUAL SCRAM 3:
AUTOHATIC SCRAM 4:
OTHER (EXPLAIN)
NO.
DATE TYPE F:
FORCED S:
SCHEDULED DURATION (BOURS)
REASON(1)
METHOD OF SBUTTING DOWN THE REACTOR OR REDUCING POWER(2)
CORRECTIVE ACTIONS/COtlMENTS NONE


==SUMMARY==
==SUMMARY==
: Unit No. 1 was placed in commercial operation on December 21, 1976, at 12:Ol a.m. Unit operated at approximately 50X R.P. through end of month.
Unit No.
1 was placed in commercial operation on December 21, 1976, at 12:Ol a.m.
Unit operated at approximately 50X R.P.
through end of month.


0 J
0 J
4}}
4}}

Latest revision as of 14:41, 5 January 2025

Letter Operating Status Reports of December 1976
ML18227B081
Person / Time
Site: Saint Lucie, Turkey Point  
Issue date: 01/07/1977
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227B081 (17)


Text

NRC FORM 195 U.S. NUCLEAR REGULATORY COMMISSION IZ 76)

, NRC DISTRIBUTION FQR rART 50 DOCKET MATERIAL 251/335 DOCK 5

BER FILE NUMBER MONTHLY REPORT TO:

USNRC FROM:

HLORDIA PWR 6 LIGHT CO ~

MIAMI, FLORDIA A.D. SCHMIDT DATE OF DOCUMENT 1/7/77 DATE RECEIVED 1/ g/77 C3LETTE R

~QQ R IG INAL OCOPY ONOTORIZED KIUNCLASSIFIE0 PROP INPUT FORM NUMBER OF COPIES RECEIVED LETTER TRANS THE POLL(NING:

MONTHLY REPORT FOR DECEMBER 1976 PLANT & COMPONENT OPERABILITY &

AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &

OPERATIONS'LANT NAME~

TURKEY PT o g

1 <<3>>

6 4 ACRNOWLEDGED DO NOT REMOVE I

MIPC W

CYS FOR ACT ON FOR ACTION/INFORMATION INTERNALDISTR I BUTION DR BRANCH CHIEF L ZIEMANN /LEAR PARRISH DIGGS EXTERNAL DISTRIBUTION MIAMI FL.

CONTROL NUMBER NRC FORM 156 IZ.76)

r III r

I

- f I

~,

9C II II 4

v

~gegu atOYf cy yQCXF+

gg1QT.> 5 pe ~g'Ah Dobe< ~"

P. O. BOX 013100, MIAMI, FL 33101

~ykl /fr r

FLORIDAPOWER & LIGHTCOMPANY January 7,

1977 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Ik r

i I

Attached are the December',

1976 Operating Status.'Reports for Turkey Point Unit Nos.,'3 and' and St.'ucie Unit No. l.

Very truly yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc:

Mr. Norman C. Moseley Jack R.

Newman, Esquire PEOPLE... SERVING PEOPLE

rz>

<1 gy I ')

L~

I'I gp ~

l'p P4 y@i j,

APPENDS B

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50 250 UNIT Turkey Point Unit No.

3 DATE Jan.

6 1977 COMPLETED BY V. T. Chi on TELEPHONE (305) 552-3830 MONTH

December, 19 7'6 DAY AVERAGE DAILY POWER LEVEL (NHe-Net)

DAY AVERAGE DAILY POWER LEVEL (Kle-Net) 17 18 3

19 20 21'2 23 25 10 26 27 12 28 13 3.4 29 30 31 16

APPENDIX C OPERATING DATA REPOR~

REPORT MONTH December 1976 DOCKET NO ~

Turkey Point Unit No.

3 Jsn.

6, 1977 COMPLFTED BY V. T. Chilson OPERATING STATUS TELEPHONE 1 ~

REPORTING PERIOD:

0001 76 12 01 GROSS HOURS IN REPORTING PERIOD:

THROUGH 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200 HAE a DEPEND.

CAPACEEE (NNA-Nat):

DESIGN ELECTRICAL RATING (MWe-Net):

693 744.0 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY)

(MWc-Valet):

4.

REASONS FOR RESTRICTION (IP ANY):

NONE THIS MONTH YEAR TO DATE CUMULATIVE 5.

NUMBERS OF HOURS REACTOR 'WAS CRITICAL....

0.0 6 760.0 28 040.1 6.

REACTOR RESERVE SHUTDOWN HOURS.........,..

0.0 64.2 67.4 7 ~

HOURS GENERATOR ON LINE

~

~

~

~ ~

0 0 6 669.1 27 039.1 8.

UNIT RESERVE SHUTDOWN HOURS...............

0.0 0.0 85.0 9.

GROSS THERMO ENERGY GENERATED (PAUL) ~.....

10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) ~ ~ ~

11.

NET ELECTRICAL ENERGY GENERATED (MWH)..... - 1 706 14 417 328 51 729 588 4 555 215 16 570 451 4 320 173 15 675 935 12.

REACTOR SERVICE FACTOR 0.0 t

13.

REACTOR AVAILABILITYFACTOR...............

0. 0 77.0 77.7 78.5 78.7 14.

UNIT SERVICE FACTOR.

0.0 15'NIT AVAILABILITYPACTORA

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ a 0.0 16.

EfZT CAPACITY PACTOR (USing (AADC).........

0 ~ 0 17.

UNIT CAPACITY FACTOR (Using Design We)...

0 0 18.

UNIT FORCED OUTAGE RATE.

0 '

75.9 73.8 71.0 0.1 75.9 66.8 63.3 a

2.9 19 'HUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) 20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OFSTARTUP:

Jen.

16, 1977 21.

UNITS IN TEST STATUS (PRIOR TO COKKRCZAL OPERATION):

FORECAST ACHIEVED INITIALCRITICALITY IiNITIALELECTRZCITY a

COMMiRCIAL OPERATION

1:

MANUAL 2:

JIANUAL SCRAM 3:

,AUTOMATIC SCRAM 4:

OIIIER (EXPLAIII)

NO.

(1)

REASON A:

EQUIPMEHT FAILURE (EXPLAIN)

B:

MAIHT. OR TEST C:

REFUELINC D:

RECULATORY RESTRICTION E:

OPERATOR TRAINIHG AHD LICENSE EXAMINATION F:

ADMINISTRATIVE G:

OPERATIONAL ERROR (EXPIAIN)

H:

OTHER (EXPLAIN)

(2)

METHOD DATE TYPE F:

FORCED S:

SCHEDULED REPORT MONTH December 1976 DURATION (BOURS)

REASON(1)

METHOD OF SWOTTING DOWN THE REACTOR OR REDUCINC POWER(2)

APPEHDIX D UNIT SHUTDOWNS AN) POWER REDUCTIONS DOCKET NO.

50 - 250 UNIT NAME Turkey Point Unit Ho. 3

'ATE Jan.

6, 1977 COMPLETED BY V. T. Chilson TELEPHONE (3O5)

CORRECTIVE ACTIONS/CMHE'.ITS 21 76-11-14 744.0 Unit No.

3 removed from service for refueling, maintenance, and inspections.

(Continued from previous month)

(Nuclear and Non-nuclear systems)

SIRMARY:

Unit No.

3 removed from service for refueling, maintenance, and inspections.

(Continued from previous month)

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT Turkey Point Unit No.

4 Jan.

6, 1977 COMPLETED BY V. T. Chilson TELEPHONE MONTH

December, 1976 DAY AVERAGE DAILY POWER LEVEL (Mle-Net)

DAY AVERAGE DAILY POWER LEVEL (K<e-Valet) 10 12 17 521

'83 689 687 661 664 696 690 689 684 680.

17 18

,19 20 21 22 23 26 27 29 30 690 697 689 605 683 692 692 693.

695 692 691 693 689 688 15 687 31 690 687 NOTE Average daily power level greater than 666'Ãh due to cooler condenser cooling water.

APPENDIX C OPERATING DATA REPORT ORT MONTH

December, 1976 DOCKET NO.

50 - 250 UNIT Turke Point Unit No.

DATE Jan.

6 1977 CO'fPLETED BY V. T. Chileon OPERATING STATUS 1.

REPORTING PERIOD:

0001>76>12,01 GROSS HOURS IN REPORTING PERIOD:

THROUGH 2400,76,~12 31 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

>AX.DE>E>>. CA>AC>>>

(>>> -N t):

DESIGN ELECTRICAL RATING (MWe-Net):

693 3 ~

POWER LEVEL TO WHICH RESTRICTED (IP ANY)

('fffe-Net)f NONE 4.

REASONS FOR RESTRICTION (ZF ANY):

744.0 THIS MONTH YEAR TO DATE CffMULATIVE 5.

i%uSERS OF HOURS REACTOR 'WAS CRZTZCAL.....

718.2 6 075.9 21 721.8 6.

~>

CTOR RESERVE SHUTDOf6f HOURS.

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

21.7 138.8 7

HOURS GENERATOR ON LINE.........,,,,....,.

670.1 5 828.4 20 542.0 8.

UNIT RESERVE SHUTDOWiN HOURS'

~..

~ ~....

~..

0.0

'.0 0.0 9.

GROSS THERfLQ ENERGY GENERATED (MWH).....: I 453 037 ll 103 004 41 751 640 10.

GROSS ELECTRICAL EffERGY GENERATED (MWH)...

479 100 3 978 606 13 957 688 ll,ifET ELECTRICAL ENERGY GEVERATED (MffH) ~...

455 3 771 836 13 230 466 12.

REACTOR SERVICE FACTOR.

4 13.

REACTOR AVAILABILITYFACTOR...... ~.....

96.5 99.4 69.2 69.5 73.8 74.2 14'NIT SERVICE FACTOR...

~

~.

~..

~....

~

90.1-

66. 4 69.8 15.

UNIT AVAILABILITYFACTOR..................

90.1 66.4 69.8 16'UNIT CAPACITY PACTOR (Using (MDC)... ~......

64.5 68.2 17.

UNIT CAPACITY FACTOR (Using Design ffWe)...

62.0 64.8 18.

UNIT FORCED OUTAGE RATE............,......

0 ~ 5 3 ~ 7 3.6 19.

SHUTDOWiNS SCHEDULED OVER NEXT 6 MONTHS (TYPE> DATE, AND DURATION OF EACH):

repair steam generator tube leek - Jan.

6, 1977 through Jan.

12, 1977.

'eEueling, maintenance and inspections - April 4, 1977 throu h May 22, 1977.

20.'F SHUTDOWN AT END OF ffEPORT PERIOD, ESTIMATED DATE OF STARTSPf 21.

UNITS IN TEST STATUS (PRIOR TO COf0fERCIAL OPERATION):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION FORECAST ACHIEVED

4

~

(1)

REASON A:

EQUIPMENT FAILURE (EXPLAIN)

B:

MAINT. OR TEST C:

REFUELING D:

REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAHINATION F:

ADMINISTRATIVE G:

OPERATIONAL ERROR (EXPLAIN)

N:

OTHER (EXPLAIN)

(2)

METHOD APPEHDIX D WHIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH December 1976 DATE Jan.

6 1977 COHPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 DOCKET NO. '0 - 251 UNIT NAME Turke Point Unit No.

4 1:

MAliUAL 2:

.MANUAL SCRAM 3:

AUTOHATIC SCRAM 4:

OIHER (EXPLAIN)

NO.

DATE TYPE F:

FORCED S:

SCHEDULED DURATION (HOURS)

REASON (1)

METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2)

CORRECTIVE ACTIONS/CQDiENTS 28 76-10-28 69.4 Unit No.

4 was removed from service for steam gener-ator tube inspection program.

(Continued from previous month)

(Nuclear system) 29 76-12-04 3.2 Unit No.

4 tripped on steam generator No.

4 A high level during a transient condition caused by the loss of a vital instrument bus power supply.

(Nuclear system) 30 76-12-20 1.3 Unit No.

4 tripped during a transient condition caused by the failure of a component in nuclear instrumen-tation system channel N-41.

(Nuclear system)

SUMMARY

Unit No.

4 was returned to service on December 3, 1976 following completion of steam generator tube inspection program.

Unit operated at IOOX R.P. during month except for outages on Dec. 4, 1976 and Dec. 20, 1976.

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 335 UNIT St. Lucie Unit No.

1 DATE Jan.

6, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 i~mONTH Dec embe DAY AVERAGE DAILY POEM LEVEL (K<e-Net)

DAY AVERAGE DAlLY POWER LEVEL (MNe-Net) 3 18 19 20 21 370 377 10 12 13 14 23 24 25 26 27 28 29 30 376 374 380 374 371 378 376 373 374 16

APPENDIX C OPERATING DATA REPORT REpORT MOL~ Decenber.

1976 DOCKET NO. 50 335 UNIT St. Lucia Unit No.

1 DATE Jan.

6, 1977 COMPLETED BY V. T. Chilson OPERATING STATUS TELEPHONE (305) 552-3830 1.

REPORTING PERIOD: 0001,76,12,21 GROSS HOURS IN REPORTING PERIOD:

264.0 THROUGH 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt):

2560 DESIGN ELECTRICAL RATING (MWe-Net):

802 3.

POWER LEVEL TO WHICH RESTRICTED (ZF ANY)

("JWe-LRJet):

722 4.

REASONS FOR RESTRICTION (ZF ALJY):

"Tenporary 90X restriction pending reactor coolant flow analysis" THIS MONTH YEAR TO DATE CUMULATIVE 5

NUMBERS OF HOURS REACTOR WAS CRITICAL 264.0 264.0 264.0 6.

REACTOR RESERVE SHUTDOWN HOURS..

~..

~ ~...

O. 0 7.

HOURS ORMHRSUOR OS LRMS...........

264.0 8.

UNIT RESERVE SHUTDOWN HOURS...............

0.0 0.0 12.

REACTOR SERVICE FACTOR.............,...,..

100.0 100.0 13 REACTOR AVAILABZLITYFACTOR............,..

100.0 100.0 14.

UNIT SERVICE FACTORS

~

100.0 100 ~ 0

~ 9.

GROSS THERMAL RJERGY GENERATED (MWH)...,..

~

347 603 347 603 10.

GROSS ELECTRICS ENERGY GERJERATED

{LRJWH)...

108 270 108 270 ll.

NET ELECTRICAL ENERGY GENERATED (MWH).....

98 975 98 975 347 603 108 270 98 975 100.0 100.0 100.0 15.

UNIT AVAILABILITYFACTOR..................

100.0 100.0 100.0 16.

UNIT CAPACITY FACTOR (Using

{HPC)........

~.

46 ~ I 17.

UNIT CAPACITY FACTOR (Using Design MWe)...

46.7 46.7

46. 7 46.7 46.7 18.

UNIT FORCED OUTAGE RATE...............

~ ~..

0.0 0.0 0.0 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MOLLHS (TYPE, DATE, AND DURATION OF EACH):

20.

IF SHUTDOWLN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

21.

UNITS IN TEST STATUS (PRIOR TO COiJMERCIAL OPERATION):

INITIALCRITICALITY INITIALELECTRICITY CO"DJERCIAL OPERATION FORECAST ACHIEVED April 22, 1976

~M7 1976

~O.

2 1976

(I)

REASON A:

EqUIPMENT FAILURE (EXPLAIN)

B:

HAINT. OR TEST C:

REFUEl ING D:

REGULATORY RESTRICTION E:

OPERATOR TRAINING AND LICENSE EXAMINATION F:

ADMINISTRATIVE G:

OPERATIONAL ERROR (EXPLAIN)

II:

OTHER (EXPLAIN) hPPENDIX D UNIT SllUTDOWNS AND POWER RFDUCTIONS REPORT HONT)1 December 1976 DATE Jan.

6, 1977 COMPLETED EY V. T. Chilson TELEPHONE (305) 552-3830 DOCRET NO.

50 - 335 UNIT NAME St. Lucio Unit No. I (2)

METHOD I:

MANUAL 2:

MANUAL SCRAM 3:

AUTOHATIC SCRAM 4:

OTHER (EXPLAIN)

NO.

DATE TYPE F:

FORCED S:

SCHEDULED DURATION (BOURS)

REASON(1)

METHOD OF SBUTTING DOWN THE REACTOR OR REDUCING POWER(2)

CORRECTIVE ACTIONS/COtlMENTS NONE

SUMMARY

Unit No.

1 was placed in commercial operation on December 21, 1976, at 12:Ol a.m.

Unit operated at approximately 50X R.P.