* i:Lcu,.7 consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 U. So Nuclear Regulatory Commission Mail and Records Section Washington, D. C., 20555 Gentlemen: | |||
* i:Lcu ,.7 consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 | Re: | ||
License Reports DPR-20 Docket No.: | |||
50-255 July 2, 1975 Enclosed is a copy of the monthly operating data for the Palisades Nuclear Plant for the month of June, 1975* | |||
U. So Nuclear Regulatory Commission Mail and Records Section Washington, D. C., 20555 Re: License Reports DPR-20 Docket No.: | JAM: DB cc: | ||
Enclosed is a copy of the monthly operating data for the Palisades Nuclear Plant for the month of June, 1975* | J.G.Keppler, NRG R.L.Haueter R.B.Sewell Sincerely, James A. Meineke General Engineer 7 17'i J | ||
\\-_ | |||
I | |||
~-*O | |||
APPENDIX C DOCKET NO. -~5_0-_2~5~ | ;.-:.h APPENDIX C | ||
UNIT | * DOCKET NO. -~5_0-_2~5~5 __ | ||
DATE | UNIT __ | ||
3 | P_a_l_i_s_a_d_e_s_ | ||
DATE July -2, 1975 COMPLETED BY J.A.Meineke AVERAGE DAILY UNIT POWER LEVEL MONTH June 121'.2 AVERAGE DAILY POWER LEVEL A VERA GE DAILY POWER LEVEL DAY (MWc-net) | |||
DAY (MWe-net) 1 505 17*. | |||
495 2 | |||
11 | 504 18 I" | ||
482 3 | |||
506 19' 488 4 | |||
494 20 408 5 | |||
427 21 0 | |||
6 504 22 7 | |||
507 23 0 | |||
B 503 24 | |||
. 0 9 | |||
504 25 0 | |||
. 10 5.DO 26 o* | |||
11 428 | |||
: 27. | |||
6 12 505 28 0 | |||
13 211 29 0 | |||
14 208 30 1"5 505 31 16 | |||
'204 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in t-.*1\\Ve-net for each day in the reporting month. | |||
Compute to the nearest whole megawatt. | Compute to the nearest whole megawatt. | ||
These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily | These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily averJge power level exceeds the 100% line (or the restricted power level* line). In such cases, the | ||
*--~ | |||
Q*:**''. | |||
*: averJge daily unit power output sheet should be footnoted to explain the ap.parentanomaly. | |||
(9'' | |||
-~.. | |||
(9'' | . L 1.10.C-l. | ||
1.10.C-l | .* r.~.:rn"l'l-*_ ** ~**'"'""""'~="'.,..~'''l"""."1'>1'"*"'''~:=~-~.,.~~'~-!1'1'\\~~"'."~~~'"!-"'''~">'i'"=~'?M"*.*<;l>"?'~.'.'."~~i -* | ||
*~. l ! | |||
*~ l.. | |||
* l;L,' | :~ | ||
. j 0 | |||
' TYPE F-FORCED NO. | |||
0 APPENDIX E | DATE S-SCHEDULED 3 | ||
750620 F. | |||
4 750630 F | |||
* DATE | * "*W*****-'~iw->i'i*<rn1'"'1w | ||
* l;L,' | |||
....,,_,._.,...bc,.......... _...,.,:...o | |||
(1) REASON | ......... w.... *--~--.......,--,,_,. _........_. | ||
E-OPERATOR TRAINING AND | \\*,_.........., | ||
DURATION (HOURS) 227.3 7.9 | |||
~ | |||
0 APPENDIX E UNlT SHUTDOWNS | |||
.o DOCKETNO. --"-50_-_25~5 ___ _ | |||
UNIT NAME Palisades | |||
* DATE July 2, 1975 COMPLETED BY J.A.Meineke REPORT MONTH _ _;.J;..;;u=n=e....::1=9'"""7""5 __ | |||
METHOD OF | |||
$HUTTING DOWN REASON (1) | |||
THE REACTOR (2) | |||
CORRECTIVE ACTIONS/COMMENTS A | |||
l Shutdown to Repair CRDM Seal Leak R | |||
2 Feedwater Pump trip | |||
'\\ | |||
(1) REASON (2) METHOD A--EQUIPMENT FAILURE* (EXPLAIN) | |||
I-MANUAL B-MAINT. OR TEST 2-MANUAL C--REFUELING SCRAM D-REGULATORY RESTRICTION 3-A UTOMA TIC* | |||
E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR. | |||
(EXPLAIN) | (EXPLAIN) | ||
H-OTHER (EXPLAIN) | H-OTHER (EXPLAIN) | ||
I | |||
==SUMMARY== | ==SUMMARY== | ||
IJ:he unit operated at 80% power until June. 20t~ when a:leaking Control_ Rod seal caused the unit to shut down. | |||
The unit was put on-line June 30th af'ter repairs, taken off when a feedwater pump tripped, and again put on-line andhold~ng at 25%. | |||
'i'' | |||
~ ~ | ~ | ||
l | ~ | ||
.... :-......:...::.:::..o.\\-... ~.-.-:--~*--.4..o~-...-------.....~~-~*---* | |||
l | |||
UNIT | 'j *. '.... _;.- | ||
**e | |||
( 0 c;**,*Q.'. | |||
>[*.* | |||
DATE | APPENDIX D* | ||
* 616-764-8913 . | ,/ | ||
UNIT __ | |||
P_a_l_i_s_a_d_e_s __ | |||
DATE July 2 J.;975 | |||
* 616-764-8913. | |||
' COMPLETED BY __ | |||
J_._A_._M_e_in_c_k_e_ | |||
DOCKET N0. __ | |||
5_0_-_2'--5 5'----- | |||
OPERATING STATt;S | OPERATING STATt;S | ||
: 1. REPORTING PERIOD: | : 1. | ||
HOURS IN REPORTl:-:G PERIOD: | REPORTING PERIOD: ___ | ||
: 2. CURRENTLY ACTHORIZED POWER LEVEL ('.\1Wth). | 7_5_0_6_0_l ________ THROUGH ___ | ||
: 3. LOWEST POWER LEVEL TO WlllCI! SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ | 7'-5_0_6-'3_0 __ ~---- | ||
: 4. REASONS FOR RESTRICTION (IF AN,Y): | HOURS IN REPORTl:-:G PERIOD: ____ 7'-2_0_---,--------------------..,--,--- | ||
: 2. | |||
CURRENTLY ACTHORIZED POWER LEVEL ('.\\1Wth). | |||
2200 MAX. DEPENDABLE CAPACITY (l\\!We-NET) 6R4 | |||
: 3. | |||
LOWEST POWER LEVEL TO WlllCI! SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): ___ | |||
6_3~0 _____ _ | |||
: 4. | |||
REASONS FOR RESTRICTION (IF AN,Y): | |||
Power.restricted to 2100 Mvrt due to reduced* | |||
Pr:ilnary Coolant Flow as a result of Steam Generator Tube plugging. | Pr:ilnary Coolant Flow as a result of Steam Generator Tube plugging. | ||
THIS | THIS CUMULATIVE REPORTING PERIOD S. | ||
: 6. REACTOR RES!ORYE SHUTDOWN HOURS | HOURS REACTOR WAS CRITICAL........*.... | ||
: 7. HOURS GENERA TOR ON LINE. *. . . . . . . . . . . * . | : 6. | ||
* | REACTOR RES!ORYE SHUTDOWN HOURS......* | ||
: 8. UNJT RESERVE SHUTDOWN HOURS . *.. ~ . . . . . . | : 7. | ||
* | HOURS GENERA TOR ON LINE. *...........*.* | ||
: 9. GROSS THERC\IAL ENERGY GENERATED(MWHJ . . . . . * . . . . . . . * . * . . . * . | : 8. | ||
: 10. GROSS ELECi:RICAL ENERGY GENERA TED ('.\!Wll) . . . . . . . . . . . . . . . . * . . . . | UNJT RESERVE SHUTDOWN HOURS. *.. ~......* | ||
(!\!Will | : 9. | ||
GROSS THERC\\IAL ENERGY GENERATED(MWHJ.....*.......*.*...*. | |||
: 10. | |||
GROSS ELECi:RICAL ENERGY | |||
: 11. | |||
l :!. | |||
: 16. SllVTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH): | : 13. | ||
Steam Generator | : 14. | ||
: 17. IF SHt:T DOWN AT END OF. REPORT PERIOD, ESTIMATED DATE Of | GENERA TED ('.\\!Wll)................*.... | ||
: 18. UNITS IN TEST STATUS (PRIOR TO COM:.IERCIAL OPERATION) REPORT THE FOLLOWING: | NET ELECTRICAL ENERGY GENERATED | ||
(!\\!Will...................*..*.*.... | |||
COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL | REACTOR AVAILABILITY fACTOR (!)......... | ||
UNIT AVAILABILITY FACTOR (2)...**.**.*.. | |||
l 1NIT C-AP.*\\CITY FACTOR (3)............*.. | |||
UNIT FORCED OllTAGE RATE (4)...*.....*.. | |||
492.7 | |||
/" 0 485.5 0 | |||
873,360 257,000 68.4~ | |||
61.4' 0 48.4% | |||
32.6% | |||
YR TO DATE 1,976.5 0 | |||
1,887.3 0 | |||
3,175,872 952,840 881,977 "45.5% | |||
' 43*.4~ | |||
29.7°/o | |||
_26.6% | |||
TO DATE 12,213.4 0 | |||
11, 208. 4 0 | |||
17,289,432 5,457,090 5,135,682 39.9%. | |||
_,;.;36_._6%; | |||
28.J% | |||
60.8% | |||
: 15. | |||
: 16. | |||
SllVTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH): | |||
Steam Generator inspect1:si~l1~~st, 8 weeks_. | |||
: 17. | |||
IF SHt:T DOWN AT END OF. REPORT PERIOD, ESTIMATED DATE Of STARTUP:------------ | |||
: 18. | |||
UNITS IN TEST STATUS (PRIOR TO COM:.IERCIAL OPERATION) REPORT THE FOLLOWING: | |||
(1) | |||
R,EAC'TOR A \\'AILABILITY FACTOR t:NIT A\\' AlLABILITY FACTOR INITIAL CRITICALITY INITIAL ELECrRICAL POWER GENERATION *. | |||
COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 | |||
_H_O_U_R_S __ G_l_:N_'E_*R_A_T_O_R_O_N_L_IN._'E __ | |||
X I OO HOURS IN REPORTING PERIOD NET ELF.CTR IC' AL POWFR GE!'IERATED DATE LAST DA TE FORECAST ACHIEVED MAX. DEl'ENDABLI-: CAPACITY (l\\!Wc-NET) X HOURS IN REPORTING l'EIUOD FORCED OUTAGE HOURS. ------------x 100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS 1.16-D-J}} | |||
Latest revision as of 08:33, 5 January 2025
| ML18347A836 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/02/1975 |
| From: | Meincke J Consumers Power Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18347A836 (4) | |
Text
,...t.
'ti9-:---,_~*;;;::;;.::---.,
- i:Lcu,.7 consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 U. So Nuclear Regulatory Commission Mail and Records Section Washington, D. C., 20555 Gentlemen:
Re:
License Reports DPR-20 Docket No.:
50-255 July 2, 1975 Enclosed is a copy of the monthly operating data for the Palisades Nuclear Plant for the month of June, 1975*
JAM: DB cc:
J.G.Keppler, NRG R.L.Haueter R.B.Sewell Sincerely, James A. Meineke General Engineer 7 17'i J
\\-_
I
~-*O
- .-
- .h APPENDIX C
- DOCKET NO. -~5_0-_2~5~5 __
UNIT __
P_a_l_i_s_a_d_e_s_
DATE July -2, 1975 COMPLETED BY J.A.Meineke AVERAGE DAILY UNIT POWER LEVEL MONTH June 121'.2 AVERAGE DAILY POWER LEVEL A VERA GE DAILY POWER LEVEL DAY (MWc-net)
DAY (MWe-net) 1 505 17*.
495 2
504 18 I"
482 3
506 19' 488 4
494 20 408 5
427 21 0
6 504 22 7
507 23 0
B 503 24
. 0 9
504 25 0
. 10 5.DO 26 o*
11 428
- 27.
6 12 505 28 0
13 211 29 0
14 208 30 1"5 505 31 16
'204 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in t-.*1\\Ve-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily averJge power level exceeds the 100% line (or the restricted power level* line). In such cases, the
- --~
Q*:**.
- averJge daily unit power output sheet should be footnoted to explain the ap.parentanomaly.
(9
-~..
. L 1.10.C-l.
.* r.~.:rn"l'l-*_ ** ~**'"'""""'~="'.,..~l"""."1'>1'"*"~:=~-~.,.~~'~-!1'1'\\~~"'."~~~'"!-"~">'i'"=~'?M"*.*<;l>"?'~.'.'."~~i -*
- ~. l !
- ~ l..
- ~
. j 0
' TYPE F-FORCED NO.
DATE S-SCHEDULED 3
750620 F.
4 750630 F
- "*W*****-'~iw->i'i*<rn1'"'1w
- l;L,'
....,,_,._.,...bc,.......... _...,.,:...o
......... w.... *--~--.......,--,,_,. _........_.
\\*,_..........,
DURATION (HOURS) 227.3 7.9
~
0 APPENDIX E UNlT SHUTDOWNS
.o DOCKETNO. --"-50_-_25~5 ___ _
UNIT NAME Palisades
- DATE July 2, 1975 COMPLETED BY J.A.Meineke REPORT MONTH _ _;.J;..;;u=n=e....::1=9'"""7""5 __
METHOD OF
$HUTTING DOWN REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS A
l Shutdown to Repair CRDM Seal Leak R
2 Feedwater Pump trip
'\\
(1) REASON (2) METHOD A--EQUIPMENT FAILURE* (EXPLAIN)
I-MANUAL B-MAINT. OR TEST 2-MANUAL C--REFUELING SCRAM D-REGULATORY RESTRICTION 3-A UTOMA TIC*
E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR.
(EXPLAIN)
H-OTHER (EXPLAIN)
I
SUMMARY
IJ:he unit operated at 80% power until June. 20t~ when a:leaking Control_ Rod seal caused the unit to shut down.
The unit was put on-line June 30th af'ter repairs, taken off when a feedwater pump tripped, and again put on-line andhold~ng at 25%.
'i
~
~
.... :-......:...::.:::..o.\\-... ~.-.-:--~*--.4..o~-...-------.....~~-~*---*
l
'j *. '.... _;.-
- e
( 0 c;**,*Q.'.
>[*.*
APPENDIX D*
,/
UNIT __
P_a_l_i_s_a_d_e_s __
DATE July 2 J.;975
- 616-764-8913.
' COMPLETED BY __
J_._A_._M_e_in_c_k_e_
DOCKET N0. __
5_0_-_2'--5 5'-----
OPERATING STATt;S
- 1.
REPORTING PERIOD: ___
7_5_0_6_0_l ________ THROUGH ___
7'-5_0_6-'3_0 __ ~----
HOURS IN REPORTl:-:G PERIOD: ____ 7'-2_0_---,--------------------..,--,---
- 2.
CURRENTLY ACTHORIZED POWER LEVEL ('.\\1Wth).
2200 MAX. DEPENDABLE CAPACITY (l\\!We-NET) 6R4
- 3.
LOWEST POWER LEVEL TO WlllCI! SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): ___
6_3~0 _____ _
- 4.
REASONS FOR RESTRICTION (IF AN,Y):
Power.restricted to 2100 Mvrt due to reduced*
Pr:ilnary Coolant Flow as a result of Steam Generator Tube plugging.
THIS CUMULATIVE REPORTING PERIOD S.
HOURS REACTOR WAS CRITICAL........*....
- 6.
REACTOR RES!ORYE SHUTDOWN HOURS......*
- 7.
HOURS GENERA TOR ON LINE. *...........*.*
- 8.
UNJT RESERVE SHUTDOWN HOURS. *.. ~......*
- 9.
GROSS THERC\\IAL ENERGY GENERATED(MWHJ.....*.......*.*...*.
- 10.
GROSS ELECi:RICAL ENERGY
- 11.
l :!.
- 13.
- 14.
GENERA TED ('.\\!Wll)................*....
NET ELECTRICAL ENERGY GENERATED
(!\\!Will...................*..*.*....
REACTOR AVAILABILITY fACTOR (!).........
UNIT AVAILABILITY FACTOR (2)...**.**.*..
l 1NIT C-AP.*\\CITY FACTOR (3)............*..
UNIT FORCED OllTAGE RATE (4)...*.....*..
492.7
/" 0 485.5 0
873,360 257,000 68.4~
61.4' 0 48.4%
32.6%
YR TO DATE 1,976.5 0
1,887.3 0
3,175,872 952,840 881,977 "45.5%
' 43*.4~
29.7°/o
_26.6%
TO DATE 12,213.4 0
11, 208. 4 0
17,289,432 5,457,090 5,135,682 39.9%.
_,;.;36_._6%;
28.J%
60.8%
- 15.
- 16.
SllVTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH):
Steam Generator inspect1:si~l1~~st, 8 weeks_.
- 17.
IF SHt:T DOWN AT END OF. REPORT PERIOD, ESTIMATED DATE Of STARTUP:------------
- 18.
UNITS IN TEST STATUS (PRIOR TO COM:.IERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
R,EAC'TOR A \\'AILABILITY FACTOR t:NIT A\\' AlLABILITY FACTOR INITIAL CRITICALITY INITIAL ELECrRICAL POWER GENERATION *.
COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100
_H_O_U_R_S __ G_l_:N_'E_*R_A_T_O_R_O_N_L_IN._'E __
X I OO HOURS IN REPORTING PERIOD NET ELF.CTR IC' AL POWFR GE!'IERATED DATE LAST DA TE FORECAST ACHIEVED MAX. DEl'ENDABLI-: CAPACITY (l\\!Wc-NET) X HOURS IN REPORTING l'EIUOD FORCED OUTAGE HOURS. ------------x 100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS 1.16-D-J