* i:Lcu,.7 consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 U. So Nuclear Regulatory Commission Mail and Records Section Washington, D. C., 20555 Gentlemen:
* i:Lcu ,.7 consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 July 2, 1975
Re:
                                                                                                          \-_
License Reports DPR-20 Docket No.:
I *.
50-255 July 2, 1975 Enclosed is a copy of the monthly operating data for the Palisades Nuclear Plant for the month of June, 1975*
U. So Nuclear Regulatory Commission Mail and Records Section Washington, D. C., 20555 Re: License Reports DPR-20 Docket No.:       50-255 Gentlemen:
JAM: DB cc:
Enclosed is a copy of the monthly operating data for the Palisades Nuclear Plant for the month of June, 1975*
J.G.Keppler, NRG R.L.Haueter R.B.Sewell Sincerely, James A. Meineke General Engineer 7 17'i J
Sincerely, James A. Meineke General Engineer JAM: DB cc:   J.G.Keppler, NRG R.L.Haueter R.B.Sewell 7J 17'i
\\-_
I


                              .-*                                                                                                       *--~
~-*O
APPENDIX C DOCKET NO. -~5_0-_2~5~5__
;.-:.h APPENDIX C
UNIT __P_a_l_i_s_a_d_e_s_
* DOCKET NO. -~5_0-_2~5~5 __
DATE     July -2,   1975 COMPLETED BY         J .A.Meineke AVERAGE DAILY UNIT POWER LEVEL MONTH       June 121'.2 AVERAGE DAILY POWER LEVEL                             A VERA GE DAILY POWER LEVEL DAY                   (MWc-net)                   DAY                     (MWe-net) 1                 505                             17*.                     495 2                 504                             18                       482 I"
UNIT __
3                 506                             19'                     488 4                 494                             20                       408 5                 427                             21                         0 6               504                             22
P_a_l_i_s_a_d_e_s_
  ~-*O
DATE July -2, 1975 COMPLETED BY J.A.Meineke AVERAGE DAILY UNIT POWER LEVEL MONTH June 121'.2 AVERAGE DAILY POWER LEVEL A VERA GE DAILY POWER LEVEL DAY (MWc-net)
            *.  ;.-:.h 7                507                               23                         0 B               503                               24                       . 0 9               504                               25                         0
DAY (MWe-net) 1 505 17*.
                          . 10               5.DO                             26                         o*
495 2
11               428                               27.                         6 12               505                               28                         0 13               211                               29                         0 14               208                               30 1"5               505                               31 16               '204 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in t-.*1\Ve-net for each day in the reporting month.
504 18 I"
482 3
506 19' 488 4
494 20 408 5
427 21 0
6 504 22 7
507 23 0
B 503 24  
. 0 9
504 25 0  
. 10 5.DO 26 o*
11 428
: 27.
6 12 505 28 0
13 211 29 0
14 208 30 1"5 505 31 16  
'204 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in t-.*1\\Ve-net for each day in the reporting month.
Compute to the nearest whole megawatt.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily
These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily averJge power level exceeds the 100% line (or the restricted power level* line). In such cases, the  
.L. . . .. .. .. .
*--~
  *.
Q*:**''.  
* averJge power level exceeds the 100% line (or the restricted power level* line). In such cases, the
*: averJge daily unit power output sheet should be footnoted to explain the ap.parentanomaly.
..
(9''  
* Q*:**''.     *: averJge daily unit power output sheet should be footnoted to explain the ap.parentanomaly.
-~..  
(9''                 -~       .   .                                                                                         .
. L 1.10.C-l.  
1.10.C-l .                .            .        . _. _  .  .
.* r.~.:rn"l'l-*_ ** ~**'"'""""'~="'.,..~'''l"""."1'>1'"*"'''~:=~-~.,.~~'~-!1'1'\\~~"'."~~~'"!-"'''~">'i'"=~'?M"*.*<;l>"?'~.'.'."~~i -*  
        .*r.~.:rn"l'l-*_ **~**'"'""""'~="'.,..~'''l"""."1'>1'"*"'''~:=~-~.,.~~'~-!1'1'\~~"'."~~~'"!-"'''~">'i'"=~'?M"*.*<;l>"?'~.'.'."~~i   -*


                                                                                                                                                                                              \*,_..........,
*~. l !
                                              * "*W*****-'~iw->i'i*<rn1'"'1w
*~ l..
* l;L,'           ,.. ....,,_,._.,...bc,.........._ ...,.,:...o
:~
                                                                                                                                                    - w.... *--~--.......,--,,_,._........_.               '
. j 0
..
' TYPE F-FORCED NO.
0 APPENDIX E
DATE S-SCHEDULED 3
                                                                                                                                                                                      .o DOCKETNO. --"-50_-_25~5_ _ __
750620 F.
UNlT SHUTDOWNS                                                                      UNIT NAME       Palisades
4 750630 F
* DATE     July 2, 1975 COMPLETED BY             J .A.Meineke REPORT MONTH _ _;.J;..;;u=n=e....::1=9'"""7""5_ _
* "*W*****-'~iw->i'i*<rn1'"'1w
TYPE                                                METHOD OF F-FORCED  DURATION                                $HUTTING DOWN NO. DATE      S-SCHEDULED  (HOURS)        REASON (1)             THE REACTOR (2)                             CORRECTIVE ACTIONS/COMMENTS 3    750620        F.          227.3              A                     l                         Shutdown to Repair CRDM Seal Leak 4    750630        F              7.9            R                       2                         Feedwater                         Pump     trip
* l;L,'  
                                                                                                                    '\
....,,_,._.,...bc,.......... _...,.,:...o  
(1) REASON                                                     (2) METHOD A--EQUIPMENT FAILURE* (EXPLAIN)                               I-MANUAL B- MAINT. OR TEST                                             2-MANUAL C--REFUELING                                                     SCRAM D-REGULATORY RESTRICTION                                       3-A UTOMA TIC*
......... w.... *--~--.......,--,,_,. _........_.  
E-OPERATOR TRAINING AND                                           SCRAM LICENSE EXAMINATION
\\*,_..........,
                                                                - .                                                    F-ADMINISTRATIVE G-OPERATIONAL ERROR.
DURATION (HOURS) 227.3 7.9
*~.
~
0 APPENDIX E UNlT SHUTDOWNS
.o DOCKETNO. --"-50_-_25~5 ___ _
UNIT NAME Palisades
* DATE July 2, 1975 COMPLETED BY J.A.Meineke REPORT MONTH _ _;.J;..;;u=n=e....::1=9'"""7""5 __
METHOD OF  
$HUTTING DOWN REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS/COMMENTS A
l Shutdown to Repair CRDM Seal Leak R
2 Feedwater Pump trip  
'\\
(1) REASON (2) METHOD A--EQUIPMENT FAILURE* (EXPLAIN)
I-MANUAL B-MAINT. OR TEST 2-MANUAL C--REFUELING SCRAM D-REGULATORY RESTRICTION 3-A UTOMA TIC*
E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR.
(EXPLAIN)
(EXPLAIN)
H-OTHER (EXPLAIN) l
H-OTHER (EXPLAIN)
                                                ~
I  
                                                                                ..                                                                                                                            I l.*~
:~  *.


==SUMMARY==
==SUMMARY==
:    IJ:he unit operated at 80% power until June. 20t~ when a:leaking Control_ Rod seal caused the unit to shut down. The unit was put on-line June 30th af'ter repairs, taken off when a feedwater pump tripped, and again put on-line andhold~ng at 25%.
IJ:he unit operated at 80% power until June. 20t~ when a:leaking Control_ Rod seal caused the unit to shut down.
                                                                                                                                                                                  'i''
The unit was put on-line June 30th af'ter repairs, taken off when a feedwater pump tripped, and again put on-line andhold~ng at 25%.  
  .j
'i''  


~ ~
~  
l
~
  'j * . '. ..._; .-
.... :-......:...::.:::..o.\\-... ~.-.-:--~*--.4..o~-...-------.....~~-~*---*
                                                **e                             APPENDIX D*
l  
UNIT _ _P_a_l_i_s_a_d_e_s__
'j *. '.... _;.-
(
**e
0
( 0 c;**,*Q.'.
                        ,/
>[*.*
DATE       July 2 J.;975
APPENDIX D*  
* 616-764-8913 .
,/
                                                                                                                    ' COMPLETED BY _ _J_._A_._M_e_in_c_k_e_
UNIT __
                            ' '                                                                                          DOCKET N0. _ _5_0_-_2'--55'-----
P_a_l_i_s_a_d_e_s __
DATE July 2 J.;975
* 616-764-8913.  
' COMPLETED BY __
J_._A_._M_e_in_c_k_e_
DOCKET N0. __
5_0_-_2'--5 5'-----
OPERATING STATt;S
OPERATING STATt;S
: 1. REPORTING PERIOD: _ _ _7_5_0_6_0_l_ _ _ _ _ _ _ _ THROUGH _ _ _7'-5_0_6-'3_0_ _~----
: 1.
HOURS IN REPORTl:-:G PERIOD: _ _ _ _7'-2_0_---,--------------------..,--,---
REPORTING PERIOD: ___
: 2. CURRENTLY ACTHORIZED POWER LEVEL ('.\1Wth).                         2200 MAX. DEPENDABLE CAPACITY (l\!We-NET) 6R4
7_5_0_6_0_l ________ THROUGH ___
: 3. LOWEST POWER LEVEL TO WlllCI! SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): _ _ _6_3~0______
7'-5_0_6-'3_0 __ ~----
: 4. REASONS FOR RESTRICTION (IF AN,Y):               Power .restricted to 2100 Mvrt due to reduced*
HOURS IN REPORTl:-:G PERIOD: ____ 7'-2_0_---,--------------------..,--,---
: 2.
CURRENTLY ACTHORIZED POWER LEVEL ('.\\1Wth).
2200 MAX. DEPENDABLE CAPACITY (l\\!We-NET) 6R4
: 3.
LOWEST POWER LEVEL TO WlllCI! SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): ___
6_3~0 _____ _
: 4.
REASONS FOR RESTRICTION (IF AN,Y):
Power.restricted to 2100 Mvrt due to reduced*
Pr:ilnary Coolant Flow as a result of Steam Generator Tube plugging.
Pr:ilnary Coolant Flow as a result of Steam Generator Tube plugging.
THIS                                       CUMULATIVE REPORTING PERIOD                   YR TO DATE            TO DATE S. HOURS REACTOR WAS CRITICAL. . . . . . . . * . . . .                           492.7                  1,976.5          12,213.4
THIS CUMULATIVE REPORTING PERIOD S.
: 6. REACTOR RES!ORYE SHUTDOWN HOURS                   ......*                     /" 0                        0                      0
HOURS REACTOR WAS CRITICAL........*....
: 7. HOURS GENERA TOR ON LINE. *. . . . . . . . . . . * .
: 6.
* 485.5                  1,887.3          11, 208. 4
REACTOR RES!ORYE SHUTDOWN HOURS......*
: 8. UNJT RESERVE SHUTDOWN HOURS . *.. ~ . . . . . .
: 7.
* 0                        0                      0
HOURS GENERA TOR ON LINE. *...........*.*
: 9. GROSS THERC\IAL ENERGY GENERATED(MWHJ . . . . . * . . . . . . . * . * . . . * .                 873,360                  3,175,872          17,289,432
: 8.
: 10. GROSS ELECi:RICAL ENERGY GENERA TED ('.\!Wll) . . . . . . . . . . . . . . . . * . . . .           257,000                  952,840              5,457,090 c;**,*Q.'.        11. NET ELECTRICAL ENERGY GENERATED
UNJT RESERVE SHUTDOWN HOURS. *.. ~......*
(!\!Will ...................*..*.*....                                                             881,977              5 ,135 ,682 68.4~                                            39.9%.
: 9.
        >[*.*
GROSS THERC\\IAL ENERGY GENERATED(MWHJ.....*.......*.*...*.
l :!. REACTOR AVAILABILITY fACTOR (!) . . . . . . . . .                                                   "45.5%
: 10.
: 13. UNIT AVAILABILITY FACTOR (2) . . . * * . * * . * . .                         61.4' 0                ' 43*.4~          _      _,;.;36_._6%;
GROSS ELECi:RICAL ENERGY
: 14. l 1NIT C-AP.*\CITY FACTOR (3)   ............*..                             48.4%                    29.7&deg;/o                  28.J%
: 11.
: 15. UNIT FORCED OllTAGE RATE (4) . . . * . . . . . * . .                         32.6%                 _26.6%                     60.8%
l :!.
: 16. SllVTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH):
: 13.
Steam Generator         inspect1:si~l1~~st,                       8 weeks_ .                               . *
: 14.
: 17. IF SHt:T DOWN AT END OF. REPORT PERIOD, ESTIMATED DATE Of S T A R T U P : - - - - - - - - - - - -
GENERA TED ('.\\!Wll)................*....
: 18. UNITS IN TEST STATUS (PRIOR TO COM:.IERCIAL OPERATION) REPORT THE FOLLOWING:
NET ELECTRICAL ENERGY GENERATED
DATE LAST        DA TE FORECAST      ACHIEVED INITIAL CRITICALITY INITIAL ELECrRICAL POWER GENERATION * .
(!\\!Will...................*..*.*....
COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL (1)    R,EAC'TOR A \'AILABILITY FACTOR                                                                x 100 HOURS IN REPORTING PERIOD
REACTOR AVAILABILITY fACTOR (!).........
_H_O_U_R_S__G_l_:N_'E_*R_A_T_O_R_O_N_L_IN._'E_ _ X I OO t:NIT A\' AlLABILITY FACTOR HOURS IN REPORTING PERIOD NET ELF.CTR IC' AL POWFR GE!'IERATED MAX. DEl'ENDABLI-: CAPACITY (l\!Wc-NET) X HOURS IN REPORTING l'EIUOD FORCED OUTAGE HOURS.
UNIT AVAILABILITY FACTOR (2)...**.**.*..
                                                                                                              - - - - - - - - - - - - x 100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS 1.16-D-J}}
l 1NIT C-AP.*\\CITY FACTOR (3)............*..
UNIT FORCED OllTAGE RATE (4)...*.....*..
492.7
/" 0 485.5 0
873,360 257,000 68.4~
61.4' 0 48.4%
32.6%
YR TO DATE 1,976.5 0
1,887.3 0
3,175,872 952,840 881,977 "45.5%
' 43*.4~
29.7&deg;/o
_26.6%
TO DATE 12,213.4 0
11, 208. 4 0
17,289,432 5,457,090 5,135,682 39.9%.
_,;.;36_._6%;
28.J%
60.8%
: 15.
: 16.
SllVTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH):
Steam Generator inspect1:si~l1~~st, 8 weeks_.
: 17.
IF SHt:T DOWN AT END OF. REPORT PERIOD, ESTIMATED DATE Of STARTUP:------------
: 18.
UNITS IN TEST STATUS (PRIOR TO COM:.IERCIAL OPERATION) REPORT THE FOLLOWING:
(1)
R,EAC'TOR A \\'AILABILITY FACTOR t:NIT A\\' AlLABILITY FACTOR INITIAL CRITICALITY INITIAL ELECrRICAL POWER GENERATION *.
COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100
_H_O_U_R_S __ G_l_:N_'E_*R_A_T_O_R_O_N_L_IN._'E __
X I OO HOURS IN REPORTING PERIOD NET ELF.CTR IC' AL POWFR GE!'IERATED DATE LAST DA TE FORECAST ACHIEVED MAX. DEl'ENDABLI-: CAPACITY (l\\!Wc-NET) X HOURS IN REPORTING l'EIUOD FORCED OUTAGE HOURS. ------------x 100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS 1.16-D-J}}

Latest revision as of 08:33, 5 January 2025

Monthly Operating Data for June 1975
ML18347A836
Person / Time
Site: Palisades 
Issue date: 07/02/1975
From: Meincke J
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A836 (4)


Text

,...t.

'ti9-:---,_~*;;;::;;.::---.,

  • i:Lcu,.7 consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 U. So Nuclear Regulatory Commission Mail and Records Section Washington, D. C., 20555 Gentlemen:

Re:

License Reports DPR-20 Docket No.:

50-255 July 2, 1975 Enclosed is a copy of the monthly operating data for the Palisades Nuclear Plant for the month of June, 1975*

JAM: DB cc:

J.G.Keppler, NRG R.L.Haueter R.B.Sewell Sincerely, James A. Meineke General Engineer 7 17'i J

\\-_

I

~-*O

.-
.h APPENDIX C
  • DOCKET NO. -~5_0-_2~5~5 __

UNIT __

P_a_l_i_s_a_d_e_s_

DATE July -2, 1975 COMPLETED BY J.A.Meineke AVERAGE DAILY UNIT POWER LEVEL MONTH June 121'.2 AVERAGE DAILY POWER LEVEL A VERA GE DAILY POWER LEVEL DAY (MWc-net)

DAY (MWe-net) 1 505 17*.

495 2

504 18 I"

482 3

506 19' 488 4

494 20 408 5

427 21 0

6 504 22 7

507 23 0

B 503 24

. 0 9

504 25 0

. 10 5.DO 26 o*

11 428

27.

6 12 505 28 0

13 211 29 0

14 208 30 1"5 505 31 16

'204 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in t-.*1\\Ve-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit, there may be occasions when the daily averJge power level exceeds the 100% line (or the restricted power level* line). In such cases, the

  • --~

Q*:**.

  • averJge daily unit power output sheet should be footnoted to explain the ap.parentanomaly.

(9

-~..

. L 1.10.C-l.

.* r.~.:rn"l'l-*_ ** ~**'"'""""'~="'.,..~l"""."1'>1'"*"~:=~-~.,.~~'~-!1'1'\\~~"'."~~~'"!-"~">'i'"=~'?M"*.*<;l>"?'~.'.'."~~i -*

  • ~. l !
  • ~ l..
~

. j 0

' TYPE F-FORCED NO.

DATE S-SCHEDULED 3

750620 F.

4 750630 F

  • "*W*****-'~iw->i'i*<rn1'"'1w
  • l;L,'

....,,_,._.,...bc,.......... _...,.,:...o

......... w.... *--~--.......,--,,_,. _........_.

\\*,_..........,

DURATION (HOURS) 227.3 7.9

~

0 APPENDIX E UNlT SHUTDOWNS

.o DOCKETNO. --"-50_-_25~5 ___ _

UNIT NAME Palisades

  • DATE July 2, 1975 COMPLETED BY J.A.Meineke REPORT MONTH _ _;.J;..;;u=n=e....::1=9'"""7""5 __

METHOD OF

$HUTTING DOWN REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS/COMMENTS A

l Shutdown to Repair CRDM Seal Leak R

2 Feedwater Pump trip

'\\

(1) REASON (2) METHOD A--EQUIPMENT FAILURE* (EXPLAIN)

I-MANUAL B-MAINT. OR TEST 2-MANUAL C--REFUELING SCRAM D-REGULATORY RESTRICTION 3-A UTOMA TIC*

E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR.

(EXPLAIN)

H-OTHER (EXPLAIN)

I

SUMMARY

IJ:he unit operated at 80% power until June. 20t~ when a:leaking Control_ Rod seal caused the unit to shut down.

The unit was put on-line June 30th af'ter repairs, taken off when a feedwater pump tripped, and again put on-line andhold~ng at 25%.

'i

~

~

.... :-......:...::.:::..o.\\-... ~.-.-:--~*--.4..o~-...-------.....~~-~*---*

l

'j *. '.... _;.-

    • e

( 0 c;**,*Q.'.

>[*.*

APPENDIX D*

,/

UNIT __

P_a_l_i_s_a_d_e_s __

DATE July 2 J.;975

  • 616-764-8913.

' COMPLETED BY __

J_._A_._M_e_in_c_k_e_

DOCKET N0. __

5_0_-_2'--5 5'-----

OPERATING STATt;S

1.

REPORTING PERIOD: ___

7_5_0_6_0_l ________ THROUGH ___

7'-5_0_6-'3_0 __ ~----

HOURS IN REPORTl:-:G PERIOD: ____ 7'-2_0_---,--------------------..,--,---

2.

CURRENTLY ACTHORIZED POWER LEVEL ('.\\1Wth).

2200 MAX. DEPENDABLE CAPACITY (l\\!We-NET) 6R4

3.

LOWEST POWER LEVEL TO WlllCI! SPECIFICALLY RESTRICTED (IF ANY) (MWe-NET): ___

6_3~0 _____ _

4.

REASONS FOR RESTRICTION (IF AN,Y):

Power.restricted to 2100 Mvrt due to reduced*

Pr:ilnary Coolant Flow as a result of Steam Generator Tube plugging.

THIS CUMULATIVE REPORTING PERIOD S.

HOURS REACTOR WAS CRITICAL........*....

6.

REACTOR RES!ORYE SHUTDOWN HOURS......*

7.

HOURS GENERA TOR ON LINE. *...........*.*

8.

UNJT RESERVE SHUTDOWN HOURS. *.. ~......*

9.

GROSS THERC\\IAL ENERGY GENERATED(MWHJ.....*.......*.*...*.

10.

GROSS ELECi:RICAL ENERGY

11.

l :!.

13.
14.

GENERA TED ('.\\!Wll)................*....

NET ELECTRICAL ENERGY GENERATED

(!\\!Will...................*..*.*....

REACTOR AVAILABILITY fACTOR (!).........

UNIT AVAILABILITY FACTOR (2)...**.**.*..

l 1NIT C-AP.*\\CITY FACTOR (3)............*..

UNIT FORCED OllTAGE RATE (4)...*.....*..

492.7

/" 0 485.5 0

873,360 257,000 68.4~

61.4' 0 48.4%

32.6%

YR TO DATE 1,976.5 0

1,887.3 0

3,175,872 952,840 881,977 "45.5%

' 43*.4~

29.7°/o

_26.6%

TO DATE 12,213.4 0

11, 208. 4 0

17,289,432 5,457,090 5,135,682 39.9%.

_,;.;36_._6%;

28.J%

60.8%

15.
16.

SllVTDOWNS SCHEDULED TO BEGIN IN. NEXT 6 MONTHS (STATE TYPE, DATE, A ND DURATION OF EACH):

Steam Generator inspect1:si~l1~~st, 8 weeks_.

17.

IF SHt:T DOWN AT END OF. REPORT PERIOD, ESTIMATED DATE Of STARTUP:------------

18.

UNITS IN TEST STATUS (PRIOR TO COM:.IERCIAL OPERATION) REPORT THE FOLLOWING:

(1)

R,EAC'TOR A \\'AILABILITY FACTOR t:NIT A\\' AlLABILITY FACTOR INITIAL CRITICALITY INITIAL ELECrRICAL POWER GENERATION *.

COMMERCIAL OPERATION HOURS RF.ACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100

_H_O_U_R_S __ G_l_:N_'E_*R_A_T_O_R_O_N_L_IN._'E __

X I OO HOURS IN REPORTING PERIOD NET ELF.CTR IC' AL POWFR GE!'IERATED DATE LAST DA TE FORECAST ACHIEVED MAX. DEl'ENDABLI-: CAPACITY (l\\!Wc-NET) X HOURS IN REPORTING l'EIUOD FORCED OUTAGE HOURS. ------------x 100 HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS 1.16-D-J