ML19261D669: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 2: | Line 2: | ||
| number = ML19261D669 | | number = ML19261D669 | ||
| issue date = 05/08/1979 | | issue date = 05/08/1979 | ||
| title = Responds to NRC | | title = Responds to NRC Re Violation Noted in IE Insp Rept 50-369/79-11.Corrective Actions:Shutdown Request Issued & Damaged Cable Replaced | ||
| author name = Parker W | | author name = Parker W | ||
| author affiliation = DUKE POWER CO. | | author affiliation = DUKE POWER CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 7906250170 | | document report number = NUDOCS 7906250170 | ||
| title reference date = 04-11-1979 | |||
| package number = ML19261D666 | | package number = ML19261D666 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| Line 17: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:C | {{#Wiki_filter:C DUKE PowMWQE[r$dD J-Powra Bt wtwo 422 Sot:Tu Cat:acu Srazzi, CnAnwTrz, N. C. 28242 l9 nu 11 A10 : 45 wn.u-o. ma nca.s a. | ||
!!ay 8,1979 ViC F PRESS 0fNY TELEp=ON".:A#EA 704 Sf taas PnODwCYiON 373-4363 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: RII:RJH 50-369/79-11 | |||
==Dear Mr. O'Reilly:== | ==Dear Mr. O'Reilly:== | ||
As requested by Mr. C. E. Murphy's letter of April 1.1, 1979 a supplemental response to IE Inspection Report No. 50-369/79-11 follows: | As requested by Mr. C. E. Murphy's letter of April 1.1, 1979 a supplemental response to IE Inspection Report No. 50-369/79-11 follows: | ||
Since our initial response to IE Inspection Report No. 50-369/79-11 dated April 2, 1979, the damaged cable has been meggered and indicated an apparent Iailure of one conductor. A shutdown request was issued and subsequently the cable replaced on May 3, 1979. This action was documented on Nonconforming Item Report No. 8753. | Since our initial response to IE Inspection Report No. 50-369/79-11 dated April 2, 1979, the damaged cable has been meggered and indicated an apparent Iailure of one conductor. A shutdown request was issued and subsequently the cable replaced on May 3, 1979. This action was documented on Nonconforming Item Report No. 8753. | ||
V | V truly yours hev a 0. W William O. Parker, Jr. | ||
GJP:ses 2210 353 o50110 | GJP:ses 2210 353 o50110 Qf0/Y{ | ||
1 pyle 1AL COPY p.**=}} | |||
pyle 1AL COPY p.**=}} | |||
Latest revision as of 10:43, 3 January 2025
| ML19261D669 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 05/08/1979 |
| From: | Parker W DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19261D666 | List: |
| References | |
| NUDOCS 7906250170 | |
| Download: ML19261D669 (1) | |
Text
C DUKE PowMWQE[r$dD J-Powra Bt wtwo 422 Sot:Tu Cat:acu Srazzi, CnAnwTrz, N. C. 28242 l9 nu 11 A10 : 45 wn.u-o. ma nca.s a.
!!ay 8,1979 ViC F PRESS 0fNY TELEp=ON".:A#EA 704 Sf taas PnODwCYiON 373-4363 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: RII:RJH 50-369/79-11
Dear Mr. O'Reilly:
As requested by Mr. C. E. Murphy's letter of April 1.1, 1979 a supplemental response to IE Inspection Report No. 50-369/79-11 follows:
Since our initial response to IE Inspection Report No. 50-369/79-11 dated April 2, 1979, the damaged cable has been meggered and indicated an apparent Iailure of one conductor. A shutdown request was issued and subsequently the cable replaced on May 3, 1979. This action was documented on Nonconforming Item Report No. 8753.
V truly yours hev a 0. W William O. Parker, Jr.
GJP:ses 2210 353 o50110 Qf0/Y{
1 pyle 1AL COPY p.**=