{{#Wiki_filter:February 19, 1980                                                         TOLEDO
{{#Wiki_filter:February 19, 1980 TOLEDO
                                                                    % EDISON Docket No. 50-346 License No. NPF-3                                                         a,c-a-o p cacuse
% EDISON Docket No. 50-346 License No. NPF-3 a,c-a-o p cacuse Serial No. 592
                                                                          ;u a-v et Serial No. 592                                                            ww a 253 em Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C.       20555
;u a-v et ww a 253 em Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C.
20555


==Dear Mr. Denton:==
==Dear Mr. Denton:==
EncloseJ ;rt five (5) copies of Revision 12 to the currently approved and effective
EncloseJ ;rt five (5) copies of Revision 12 to the currently approved and effective
" Industrial Fecurity Plan," AD 1808.00, for the Davis-Besse Nuclear Power Station, Unit No. 1.
" Industrial Fecurity Plan," AD 1808.00, for the Davis-Besse Nuclear Power Station, Unit No. 1.
These changes have been analyzed and it has been determined that they do not decrease the effectiveness of the approved security plan. The requirements to conduct the performance tests on the Main Steam Line 1 and 2 hatches while Davis-Besse Unit No. 1 is operating were deleted for personnel safety considerations.       The tests will be conducted when the plant is in Mode 5 or 6.       In order to gain access to the roof area where the hatches are located, a person must pass through another vital area access control point for which the performance tests are conducted while operating.             There are no ladders or similar devices which permit direct access to the roof, within eighteen feet of the ground.     In addition, a roving patrol guard checks that the Main Steam Line Hatches are closed every two hours.
These changes have been analyzed and it has been determined that they do not decrease the effectiveness of the approved security plan. The requirements to conduct the performance tests on the Main Steam Line 1 and 2 hatches while Davis-Besse Unit No. 1 is operating were deleted for personnel safety considerations.
The tests will be conducted when the plant is in Mode 5 or 6.
In order to gain access to the roof area where the hatches are located, a person must pass through another vital area access control point for which the performance tests are conducted while operating.
There are no ladders or similar devices which permit direct access to the roof, within eighteen feet of the ground.
In addition, a roving patrol guard checks that the Main Steam Line Hatches are closed every two hours.
This revision is being submitted pursuant to 10 CFR 50.54(p) as the report containing a description of the change.
This revision is being submitted pursuant to 10 CFR 50.54(p) as the report containing a description of the change.
Application is being made to withhold the enclosed information from public disclosure pursuant to 10 CFR 2.790(d).
Application is being made to withhold the enclosed information from public disclosure pursuant to 10 CFR 2.790(d).
Yours very truly, ffb =                 -
Yours very truly, ffb =
RPC:MRP:lle Enclosure Copy:   Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement w/o Enclosure s/
RPC:MRP:lle Enclosure Copy:
                                                                                          )Ch>
Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement w/o Enclosure
)Ch> \\
s/
f> } $
f> } $
                                                                                                      \
Enclosure Contains t
Enclosure Contains                                       t l
l 10 CFR 2.790(d) Inf o rmation THE TCLECO ECISCN COMPANY EDISON PLAZA 300 MACISCN AVENUE TCLECO. CHIO 43652 c
10 CFR 2.790(d) Inf o rmation THE TCLECO ECISCN COMPANY   EDISON PLAZA 300 MACISCN AVENUE TCLECO. CHIO 43652 c               8002200 P                             2 3> O}}
8002200 P
2 3> O}}

Latest revision as of 08:33, 2 January 2025

Forwards Revision 12 to Industrial Security Plan. Plan Withheld (Ref 10CFR2.790)
ML19294A944
Person / Time
Site: Davis Besse 
Issue date: 02/19/1980
From: Crouse R
TOLEDO EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
592, NUDOCS 8002260230
Download: ML19294A944 (1)


Text

February 19, 1980 TOLEDO

% EDISON Docket No. 50-346 License No. NPF-3 a,c-a-o p cacuse Serial No. 592

u a-v et ww a 253 em Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

EncloseJ ;rt five (5) copies of Revision 12 to the currently approved and effective

" Industrial Fecurity Plan," AD 1808.00, for the Davis-Besse Nuclear Power Station, Unit No. 1.

These changes have been analyzed and it has been determined that they do not decrease the effectiveness of the approved security plan. The requirements to conduct the performance tests on the Main Steam Line 1 and 2 hatches while Davis-Besse Unit No. 1 is operating were deleted for personnel safety considerations.

The tests will be conducted when the plant is in Mode 5 or 6.

In order to gain access to the roof area where the hatches are located, a person must pass through another vital area access control point for which the performance tests are conducted while operating.

There are no ladders or similar devices which permit direct access to the roof, within eighteen feet of the ground.

In addition, a roving patrol guard checks that the Main Steam Line Hatches are closed every two hours.

This revision is being submitted pursuant to 10 CFR 50.54(p) as the report containing a description of the change.

Application is being made to withhold the enclosed information from public disclosure pursuant to 10 CFR 2.790(d).

Yours very truly, ffb =

RPC:MRP:lle Enclosure Copy:

Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement w/o Enclosure

)Ch> \\

s/

f> } $

Enclosure Contains t

l 10 CFR 2.790(d) Inf o rmation THE TCLECO ECISCN COMPANY EDISON PLAZA 300 MACISCN AVENUE TCLECO. CHIO 43652 c

8002200 P

2 3> O