ML19309F707: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
8004s00 V/{ | 8004s00 V/{ | ||
h o | h o | ||
mom p grg. g m co. m...cs.oo.momi | |||
,m, Mr. James P. O'Reilly, Director Serial No. 329/04G480 Office of Inspection & Enforcement PSET.C/JW:mac: wang U. S. Nuclear Regulatory Comission Docket Nos. 50-40a Region II 101 Marietta Street, Suite 3100 50 405 Atlanta, Georgia 30303 | |||
==Dear Mr. O'Reilly:== | ==Dear Mr. O'Reilly:== | ||
1.E. BULLE'IN 70-03A LONGITUDINAL WEiJ DEFECTS D ASME | 1.E. BULLE'IN 70-03A LONGITUDINAL WEiJ DEFECTS D ASME | ||
~ | |||
TYPE 304 STA'fLESS STEEL PIPE As you '<now, Virginia Electric rad Power Company is performino a feesibility study of North Anna Units 3 and 4. For the duration of this st'idy, ita have curtsiled our activities, most notably in nuclear related | TYPE 304 STA'fLESS STEEL PIPE As you '<now, Virginia Electric rad Power Company is performino a feesibility study of North Anna Units 3 and 4. | ||
For the duration of this st'idy, ita have curtsiled our activities, most notably in nuclear related Therafore, w have suspended nur review of the subject Rulletin. We areas. | |||
will resume our review of this Bulletin if the study indicates continuing with North Anna Units 3 and 4 as nuclear units. | |||
If there are any questions, please coytact us. | If there are any questions, please coytact us. | ||
V~ yy'. | |||
V rs | |||
/ | |||
j | |||
) $r',,fd t f' e | |||
s | |||
'f lp''l[ BrlewnIl | |||
' Sarf C. | |||
Of, fica of Inspection & Enforcement Mr. Harold R. Denton, Director | ,J. | ||
jj Senint Vice/ President - Po'ver St,3 tion Engineering and Constructim | |||
/ | |||
v. Victor Stello, Director r | |||
cc: | |||
Of, fica of Inspection & Enforcement b | |||
hD Mr. Harold R. Denton, Director Office of Nuclear Reactor Ragulation I | |||
Boo / | Boo / | ||
se do | se do i}} | ||
Latest revision as of 02:43, 2 January 2025
| ML19309F707 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 04/25/1980 |
| From: | Brown S VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-79-03, IEB-79-3, NUDOCS 8004300415 | |
| Download: ML19309F707 (1) | |
Text
.
8004s00 V/{
h o
mom p grg. g m co. m...cs.oo.momi
,m, Mr. James P. O'Reilly, Director Serial No. 329/04G480 Office of Inspection & Enforcement PSET.C/JW:mac: wang U. S. Nuclear Regulatory Comission Docket Nos.50-40a Region II 101 Marietta Street, Suite 3100 50 405 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
1.E. BULLE'IN 70-03A LONGITUDINAL WEiJ DEFECTS D ASME
~
TYPE 304 STA'fLESS STEEL PIPE As you '<now, Virginia Electric rad Power Company is performino a feesibility study of North Anna Units 3 and 4.
For the duration of this st'idy, ita have curtsiled our activities, most notably in nuclear related Therafore, w have suspended nur review of the subject Rulletin. We areas.
will resume our review of this Bulletin if the study indicates continuing with North Anna Units 3 and 4 as nuclear units.
If there are any questions, please coytact us.
V~ yy'.
V rs
/
j
) $r',,fd t f' e
s
'f lpl[ BrlewnIl
' Sarf C.
,J.
jj Senint Vice/ President - Po'ver St,3 tion Engineering and Constructim
/
v. Victor Stello, Director r
cc:
Of, fica of Inspection & Enforcement b
hD Mr. Harold R. Denton, Director Office of Nuclear Reactor Ragulation I
Boo /
se do i