ML19309F707

From kanterella
Jump to navigation Jump to search
Informs NRC That Response to IE Bulletin 79-03, Longitudinal Weld Defects in ASME Type 304 Stainless Steel Pipe, Has Been Suspended Due to Feasibility Study at Facility.All nuclear-related Activities Have Been Curtailed
ML19309F707
Person / Time
Site: North Anna  
Issue date: 04/25/1980
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-03, IEB-79-3, NUDOCS 8004300415
Download: ML19309F707 (1)


Text

.

8004s00 V/{

h o

mom p grg. g m co. m...cs.oo.momi

,m, Mr. James P. O'Reilly, Director Serial No. 329/04G480 Office of Inspection & Enforcement PSET.C/JW:mac: wang U. S. Nuclear Regulatory Comission Docket Nos.50-40a Region II 101 Marietta Street, Suite 3100 50 405 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

1.E. BULLE'IN 70-03A LONGITUDINAL WEiJ DEFECTS D ASME

~

TYPE 304 STA'fLESS STEEL PIPE As you '<now, Virginia Electric rad Power Company is performino a feesibility study of North Anna Units 3 and 4.

For the duration of this st'idy, ita have curtsiled our activities, most notably in nuclear related Therafore, w have suspended nur review of the subject Rulletin. We areas.

will resume our review of this Bulletin if the study indicates continuing with North Anna Units 3 and 4 as nuclear units.

If there are any questions, please coytact us.

V~ yy'.

V rs

/

j

) $r',,fd t f' e

s

'f lpl[ BrlewnIl

' Sarf C.

,J.

jj Senint Vice/ President - Po'ver St,3 tion Engineering and Constructim

/

v. Victor Stello, Director r

cc:

Of, fica of Inspection & Enforcement b

hD Mr. Harold R. Denton, Director Office of Nuclear Reactor Ragulation I

Boo /

se do i