ML19316A570: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:_ _ . - .                  - --__            - -- a - =--- -"-----
{{#Wiki_filter:_ _ _ _,
a    - - - - - - - -                  --
- -- a - =--- -"----- - - - - - - - -
V O. NUCLE AM f4E GULAT ORY r
a V O. NUCLE AM f4E GULAT ORY r
* VVIOSICN DOCKET NUMBER g jg5
* VVIOSICN DOCKET NUMBER
_5 0 - z 73 NRC DISTRIBUTION FOn PART 50 DOCKET MATERIAL FROM:                                                             DATE OF OOCUMENT
_5 0 - z 73 g jg5 NRC DISTRIBUTION FOn PART 50 DOCKET MATERIAL FROM:
  .0:
DATE OF OOCUMENT
* Duke Power Company                                                               6/21/77 i                                         harlotte, North Carolina                                       DATE RECEIVED N. R. C.     i                                          William O. Parker, Jr.                                                           6/27/77 tNPUT FORM                   NUMBER OF CCPIES RECEIVED b77gsg                                  h0TORIZED                    P R OP R gGIN AL                       NC LASSIFIE D E NCLOSU R E                                                                         ._
.0:
DESCRIPTION Amdt, to OL/ch'ange to tech specs....
Duke Power Company 6/21/77 i
ACKNOWLEDGEDj                                                         n' rized 6/2/27...concernins Oconee Unit 2, Cycle 3 operation..w/ attached                             ~
harlotte, North Carolina DATE RECEIVED N. R. C.
amendment to Babcock & Wilcox's Report BAW-1542, "Oconee Unit 2, Cycle 3 Reload R e p o r t" . . . .
William O. Parker, Jr.
DONOT REMQyg PLANT NAME:Oconee Unit 2                                                   (1-P)                     (1/ 4")
6/27/77 i
RJL             6/30/77 i
b77gsg h0TORIZED P R OP tNPUT FORM NUMBER OF CCPIES RECEIVED R gGIN AL NC LASSIFIE D E NCLOSU R E DESCRIPTION Amdt, to OL/ch'ange to tech specs....
FOR ACTION /INFORMATION                                     ENVIRUNMENTAL i                 cape 7v ASSIGNED ADr
ACKNOWLEDGEDj n' rized 6/2/27...concernins Oconee Unit 2, Cycle 3 operation..w/ attached
                                                                      ,                                      ASSIGNED AD:               V. MOORE (LTR) g unANCH CHIEFe                                             1 < AI a O_AgfL F is /                       BRANCH CHIEF:
~
    /               PROJECT MANAGER:
amendment to Babcock & Wilcox's Report BAW-1542, "Oconee Unit 2, Cycle 3 Reload R e p o r t"....
A/C t 5 kbo ,,5          ,
DONOT REMQyg PLANT NAME:Oconee Unit 2 (1-P)
(1/ 4")
RJL 6/30/77 i
FOR ACTION /INFORMATION ENVIRUNMENTAL i
cape 7v ASSIGNED AD:
V. MOORE (LTR)
ASSIGNED ADr g unANCH CHIEFe 1 < AI a O_AgfL F is /
BRANCH CHIEF:
/
PROJECT MANAGER:
PROJECT MANAGER:
    /               LICENSING ASSISTANT:                                   %gou d-                           LICENSING ASSISTANT:
A/C t 5 kbo,,5 PROJECT MANAGER:
I B. HARLESS w                                                    INTERNAL DISTRIBUTION
/
              ' orc rTt Ec )                               '
LICENSING ASSISTANT:
SYSLFMS SAFEIY PLANT SYSTE14S                         SITE SAFEIY &
%gou d-LICENSING ASSISTANT:
I J voc pnu .                                             .HEINEMAN                               TEDESCO                                     ENVIRON ANALYSIS I BENAROYA                                        DENION & MULLER
B. HARLESS I
_T     4r [G I                                     SCHROEDER CRUTCHFTET D
INTERNAL DISTRIBUTION w
    /[I l           net n ILATNAS lIPPOLITO I         .COSSICK & STAFT                                 ENGINEERING KNTGHT I
' orc rTt Ec )
F. POSA                                       ENVIR0 TECH.
SYSLFMS SAFEIY PLANT SYSTE14S SITE SAFEIY &
l/luintitro BOSNAK                                                                             ERNST vTuc c c_A cv            .
I J voc pnu.
* SIHWELL                             OPERATING REACTORS                             BALLARD vm                                              PAWLICKI                        s.           STELLO                               YOUNGBLOOD
.HEINEMAN TEDESCO ENVIRON ANALYSIS
[   L         ETcENHUT con trcT v_aNAGEMNT                             REACTOR SAFEIY               [1             SHAO cvnvunL7                                     ROSS                           I/3             BAER NOVAK                           /)             BUTLER                               GAMMILL             (2)
_T 4r [G I SCHROEDER I BENAROYA DENION & MULLER
P. CnLLINS                                                                                                                                        '
/[I ILATNAS CRUTCHFTET D l
MnUSTON                                       ROSZTOCZY                       /'             GRIMES
net n I
                                                          /     CHECK SITE ANALYSIS urLT2 VOLLMER UELTrvES AT&I                                                                                 BUNCH sit SALTZMAN                                                                     / J. COLLINS l
.COSSICK & STAFT ENGINEERING lIPPOLITO I F. POSA ENVIR0 TECH.
FUTBERG                                                                            KREGER
l/luintitro KNTGHT vTuc BOSNAK ERNST SIHWELL OPERATING REACTORS BALLARD c
        ~
c_A cv s.
EXTERNAL DISTRIBUTION                                                                     CONTROL NUMBER
STELLO YOUNGBLOOD vm PAWLICKI
)                          _, f f           ,,      , ,
[
MU 8
L ETcENHUT con trcT v_aNAGEMNT REACTOR SAFEIY
7LLPORt l## h(lla M/ i                                                                                                                                   2 h           / TTC
[1 SHAO cvnvunL7 ROSS I/3 BAER P. CnLLINS NOVAK
                                                          /         NSIC wT uB           _ _ _ _ _ _ _ _ _                                                                  3001100
/)
                , RrG IV (J. HANCHETT)1 I                               A
BUTLER GAMMILL (2)
            /     16 CYS ACRS SENT CAT 4 GORY
MnUSTON ROSZTOCZY
                                                                      /
/'
F             __
GRIMES SITE ANALYSIS urLT2
/
CHECK VOLLMER UELTrvES BUNCH sit AT&I l
SALTZMAN
/ J. COLLINS KREGER FUTBERG
)
~
EXTERNAL DISTRIBUTION CONTROL NUMBER
_, f f 8 7LLPORt l## h(lla M/ i MU 2
h / TTC
/
NSIC 3001100 wT uB
, RrG IV (J. HANCHETT)1 I A
/
16 CYS ACRS SENT CAT 4 GORY F
f,-
f,-
I i
I i
/


Du1(E Powen Co>1PANY Powru Utiunso 6,
Du1(E Powen Co>1PANY Powru Utiunso 6,
r-                  422 Socin Cuencu Straer. Ciu at.orrt. N. C. aca-s2 w w a o paanca.sa.
422 Socin Cuencu Straer. Ciu at.orrt. N. C. aca-s2 r-June 21, 1977 w w a o paanca.sa.
June 21, 1977
c.co.: c assa ? 4
                                                                        ,-                                        c.co.: c assa ? 4
.f,'"
              . set Pets ccut                                              .f,'"       PJ                                   2*340e3 I
PJ 2*340e3
bca= Pooh: tics                                                 '
. set Pets ccut bca= Pooh: tics I
                                                                  /
/
(y r
b (y
p
: b.. v r
: b. . v b                                          :
p s
s v'-
v'-
d              'h.     7-Director                                          [?/ e; ._ ~T.4
7-
                                                                                        "    'It P_.
' h.
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission               ' ;..
P_.
                                                                        ~
d
                                                                                            ,A,
[?/ e;._ ~T.4 "
                                                                                                /h  /#
Director
          'Jashington, D. C.         20553                 \t                  :,            ,,l y,,T.                         .U#
'It Office of Nuclear Reactor Regulation
Re: Oconee Unit 2                                   '\
/h U. S. Nuclear Regulatory Commission
Docket No. 50-270 7        ,g[<
~
g4g                   %-
\\t
,A,
/#
'Jashington, D. C.
20553
,,l y,,T.
.U
'\\
Re: Oconee Unit 2 7,g[<
Docket No. 50-270 g4g


==Dear Sir:==
==Dear Sir:==
 
..e Oconee Nuclear Station Our letter of May 6, 1977 proposed revisions to Technical Specifications to assure the operaticn of the Oconee Unit 2, It Cycle 3 core within applicable fuel design and performance criteria.
Our letter of May 6, 1977 proposed revisions to ..e Oconee Nuclear Station Technical Specifications to assure the operaticn of the Oconee Unit 2, It Cycle 3 core within applicable fuel design and performance                         for thecriteria. cycle length is requested that this submittal be revised to account of 277 EFPD for Oconee Unit 2, Cycle 2, and to include the insertion of 12 assemblies in Oconee Unit 2 Cycle 3 from Oconee Unit 3 Batch 1.
for the cycle length is requested that this submittal be revised to account of 277 EFPD for Oconee Unit 2, Cycle 2, and to include the insertion of 12 assemblies in Oconee Unit 2 Cycle 3 from Oconee Unit 3 Batch 1.
Therefore, pursuant to 10CFR50 550.90 proposed changes to the Oconee Nuclear Station Technical Specifications are requested which will provide                               The for Oconee Unit 2, Cycle 3 operation considering these revisiens.
proposed changes to the Oconee Therefore, pursuant to 10CFR50 550.90 Nuclear Station Technical Specifications are requested which will provide The for Oconee Unit 2, Cycle 3 operation considering these revisiens.
proposed changes are shown in I.ttachment 1 as replacement pages for the figures previously submitted in our May 6,1977 letter.
proposed changes are shown in I.ttachment 1 as replacement pages for the figures previously submitted in our {{letter dated|date=May 6, 1977|text=May 6,1977 letter}}.
Also' attached is an amendment to Babcock & Wilcox's Report BAW-1542, "Oconee Unit 2, Cycle 3 Reload Report". This amendment includes a summary of Cycle 3 operating parameters af fected by this revision and contains the safety analysis supporting the operation of Oconee Unit 2, Cycle 3 core at rated power in accordance with the revised Technical Specifications provided.
Also' attached is an amendment to Babcock & Wilcox's Report BAW-1542, "Oconee Unit 2, Cycle 3 Reload Report". This amendment includes a summary of Cycle 3 operating parameters af fected by this revision and contains the safety analysis supporting the operation of Oconee Unit 2, Cycle 3 core at rated power in accordance with the revised Technical Specifications provided.
Very truly yours, w i     O.       N     .
Very truly yours, w i O.
William O. Parker, Jr.
N William O. Parker, Jr.
LJB:ge
LJB:ge
                . Attachments I.
. Attachments I.


June 16, 1977 Page 2 f
June 16, 1977 f
Ulf I/di 0. PARKER, JR. , being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the par.t f said Company to sign and file with the Nuclear Regulatory Ccomission this request for amendment of the Oconee Nuclear Station Facility Operating Licenses DPR-38, DPR-47, and DPR-55; and that all statements and matters set forth therein are true and correct to the best of his knowledge.
Page 2 Ulf I/di 0. PARKER, JR., being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the par.t f said Company to sign and file with the Nuclear Regulatory Ccomission this request for amendment of the Oconee Nuclear Station Facility Operating Licenses DPR-38, DPR-47, and DPR-55; and that all statements and matters set forth therein are true and correct to the best of his knowledge.
W u .._ i). lEr     J William O. Parker, Jr.) Vice President Subscribed and sworn to before me this 21se day of June, 1977.
W u.._ i). lEr J
      -YtBGAL--
William O. Parker, Jr.) Vice President Subscribed and sworn to before me this 21se day of June, 1977.
Notary Public hA My Commission Expires:
-YtBGAL--
J . Ai~ nf 2 -
hA Notary Public My Commission Expires:
J. Ai~ nf 2 -
l L}}
l L}}

Latest revision as of 00:28, 2 January 2025

Requests Tech Spec Changes to Assure Compliance W/Fuel Design & Performance Criteria.Forwards Amend to BAW-1542, Oconee 2,Cycle 3 Reload Rept. W/O Encl
ML19316A570
Person / Time
Site: Oconee 
Issue date: 06/21/1977
From: Parker W
DUKE POWER CO.
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8001100788
Download: ML19316A570 (3)


Text

_ _ _ _,

- -- a - =--- -"----- - - - - - - - -

a V O. NUCLE AM f4E GULAT ORY r

  • VVIOSICN DOCKET NUMBER

_5 0 - z 73 g jg5 NRC DISTRIBUTION FOn PART 50 DOCKET MATERIAL FROM:

DATE OF OOCUMENT

.0:

Duke Power Company 6/21/77 i

harlotte, North Carolina DATE RECEIVED N. R. C.

William O. Parker, Jr.

6/27/77 i

b77gsg h0TORIZED P R OP tNPUT FORM NUMBER OF CCPIES RECEIVED R gGIN AL NC LASSIFIE D E NCLOSU R E DESCRIPTION Amdt, to OL/ch'ange to tech specs....

ACKNOWLEDGEDj n' rized 6/2/27...concernins Oconee Unit 2, Cycle 3 operation..w/ attached

~

amendment to Babcock & Wilcox's Report BAW-1542, "Oconee Unit 2, Cycle 3 Reload R e p o r t"....

DONOT REMQyg PLANT NAME:Oconee Unit 2 (1-P)

(1/ 4")

RJL 6/30/77 i

FOR ACTION /INFORMATION ENVIRUNMENTAL i

cape 7v ASSIGNED AD:

V. MOORE (LTR)

ASSIGNED ADr g unANCH CHIEFe 1 < AI a O_AgfL F is /

BRANCH CHIEF:

/

PROJECT MANAGER:

A/C t 5 kbo,,5 PROJECT MANAGER:

/

LICENSING ASSISTANT:

%gou d-LICENSING ASSISTANT:

B. HARLESS I

INTERNAL DISTRIBUTION w

' orc rTt Ec )

SYSLFMS SAFEIY PLANT SYSTE14S SITE SAFEIY &

I J voc pnu.

.HEINEMAN TEDESCO ENVIRON ANALYSIS

_T 4r [G I SCHROEDER I BENAROYA DENION & MULLER

/[I ILATNAS CRUTCHFTET D l

net n I

.COSSICK & STAFT ENGINEERING lIPPOLITO I F. POSA ENVIR0 TECH.

l/luintitro KNTGHT vTuc BOSNAK ERNST SIHWELL OPERATING REACTORS BALLARD c

c_A cv s.

STELLO YOUNGBLOOD vm PAWLICKI

[

L ETcENHUT con trcT v_aNAGEMNT REACTOR SAFEIY

[1 SHAO cvnvunL7 ROSS I/3 BAER P. CnLLINS NOVAK

/)

BUTLER GAMMILL (2)

MnUSTON ROSZTOCZY

/'

GRIMES SITE ANALYSIS urLT2

/

CHECK VOLLMER UELTrvES BUNCH sit AT&I l

SALTZMAN

/ J. COLLINS KREGER FUTBERG

)

~

EXTERNAL DISTRIBUTION CONTROL NUMBER

_, f f 8 7LLPORt l## h(lla M/ i MU 2

h / TTC

/

NSIC 3001100 wT uB

, RrG IV (J. HANCHETT)1 I A

/

16 CYS ACRS SENT CAT 4 GORY F

f,-

I i

/

Du1(E Powen Co>1PANY Powru Utiunso 6,

422 Socin Cuencu Straer. Ciu at.orrt. N. C. aca-s2 r-June 21, 1977 w w a o paanca.sa.

c.co.: c assa ? 4

.f,'"

PJ 2*340e3

. set Pets ccut bca= Pooh: tics I

/

b (y

b.. v r

p s

v'-

7-

' h.

P_.

d

[?/ e;._ ~T.4 "

Director

'It Office of Nuclear Reactor Regulation

/h U. S. Nuclear Regulatory Commission

~

\\t

,A,

/#

'Jashington, D. C.

20553

,,l y,,T.

.U

'\\

Re: Oconee Unit 2 7,g[<

Docket No. 50-270 g4g

Dear Sir:

..e Oconee Nuclear Station Our letter of May 6, 1977 proposed revisions to Technical Specifications to assure the operaticn of the Oconee Unit 2, It Cycle 3 core within applicable fuel design and performance criteria.

for the cycle length is requested that this submittal be revised to account of 277 EFPD for Oconee Unit 2, Cycle 2, and to include the insertion of 12 assemblies in Oconee Unit 2 Cycle 3 from Oconee Unit 3 Batch 1.

proposed changes to the Oconee Therefore, pursuant to 10CFR50 550.90 Nuclear Station Technical Specifications are requested which will provide The for Oconee Unit 2, Cycle 3 operation considering these revisiens.

proposed changes are shown in I.ttachment 1 as replacement pages for the figures previously submitted in our May 6,1977 letter.

Also' attached is an amendment to Babcock & Wilcox's Report BAW-1542, "Oconee Unit 2, Cycle 3 Reload Report". This amendment includes a summary of Cycle 3 operating parameters af fected by this revision and contains the safety analysis supporting the operation of Oconee Unit 2, Cycle 3 core at rated power in accordance with the revised Technical Specifications provided.

Very truly yours, w i O.

N William O. Parker, Jr.

LJB:ge

. Attachments I.

June 16, 1977 f

Page 2 Ulf I/di 0. PARKER, JR., being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the par.t f said Company to sign and file with the Nuclear Regulatory Ccomission this request for amendment of the Oconee Nuclear Station Facility Operating Licenses DPR-38, DPR-47, and DPR-55; and that all statements and matters set forth therein are true and correct to the best of his knowledge.

W u.._ i). lEr J

William O. Parker, Jr.) Vice President Subscribed and sworn to before me this 21se day of June, 1977.

-YtBGAL--

hA Notary Public My Commission Expires:

J. Ai~ nf 2 -

l L