                        .                                                                  UNIT     Oconto Unit 2 05/10/76 O                                                                       DOCKET NO.
UNIT Oconto Unit 2 DATE 05/10/76 O
DATE 50-270 PREPARED BY             E. D. Blakeman                 .
DOCKET NO.
!              OPERATING STATUS
50-270 PREPARED BY E. D. Blakeman OPERATING STATUS l.
: l. REPORTING PERIOD:     April 1               THROUGH             April 30. 1976 GROSS HOURS IN REPORTING PERIOD:                   719.00
REPORTING PERIOD:
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY
April 1 THROUGH April 30. 1976 GROSS HOURS IN REPORTING PERIOD:
719.00 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY
?
?
(MWe-Net):               871 l
l (MWe-Net):
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)                               NONE
871 3.
: 4. REASONS FOR RESTRICTION (IF ANY)
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
This Month             Year to Date         Cumulative
NONE 4.
: 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL                                       166.23                 2112.37             10671.43
REASONS FOR RESTRICTION (IF ANY)
: 6. REACTOR RESERVE SHUTDOWN HOURS                     -                        -                  -
This Month Year to Date Cumulative 5.
t
NUMBER OF HOURS THE REACTOR WAS CRITICAL 166.23 2112.37 10671.43 6.
: 7. HOURS GENERATOR ON-LINE                       160.28                 2076.54             10356.00
REACTOR RESERVE SHUTDOWN HOURS t
: 8. UNIT RESERVE SHUTDOWN HOURS                       -                        -
7.
: 9. GROSS THERMAL ENERGY GENERATED (MWH) 297865                           4922491             24594919
HOURS GENERATOR ON-LINE 160.28 2076.54 10356.00 8.
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                         103700                 1678100             8378656
UNIT RESERVE SHUTDOWN HOURS 9.
: 11. NET ELECTRICAL ENERGY GENERATED (MWH)                                         96927                   1598324             7953475
GROSS THERMAL ENERGY GENERATED (MWH) 297865 4922491 24594919 10.
: 12. REACTOR SERVICE FACTOR                         23.12                     72.77             74.11
GROSS ELECTRICAL ENERGY GENERATED (MWH) 103700 1678100 8378656 11.
: 13. REACTOR AVAILABILITY FACTOR                     22.29                     71.80             72.48
NET ELECTRICAL ENERGY GENERATED (MWH) 96927 1598324 7953475 12.
: 14. UL     SERVICE FACTOR                           22.29                     71.53             71.92
REACTOR SERVICE FACTOR 23.12 72.77 74.11 13.
: 15. UNIT AVAILABILITY FACTOR                       22.29                     71.53             71.92
REACTOR AVAILABILITY FACTOR 22.29 71.80 72.48 14.
: 16. UNIT CAPACITY FACTOR (Using Net                 15.48                     63.21             63.41 Capability)
UL SERVICE FACTOR 22.29 71.53 71.92 15.
I
UNIT AVAILABILITY FACTOR 22.29 71.53 71.92 16.
: 17. UNIT CAPACITY FACTOR (Using Design Mwe)                             15.20                     62.07             62.27
UNIT CAPACITY FACTOR (Using Net 15.48 63.21 63.41 Capability)
: 18. UNII FORCED OUTAGE RATE                       77.71                     28.47             25.75
I 17.
: 19. SHUTLTWNS SCHEDULED OVLR NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
UNIT CAPACITY FACTOR (Using Design Mwe) 15.20 62.07 62.27 18.
: 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
UNII FORCED OUTAGE RATE 77.71 28.47 25.75 19.
SHUTLTWNS SCHEDULED OVLR NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
June 9, 1976 REACTOR SERVICE FACTOR = HOURS REACTOR WAS C3TTICAI' X 100 110URS IN REPORTING PERIOD REACTOR AVAILABILIW FACTOR = HOUFS REACTOR WAS AVATLALLE TO OPERATE ~
June 9, 1976 REACTOR SERVICE FACTOR = HOURS REACTOR WAS C3TTICAI' X 100 110URS IN REPORTING PERIOD REACTOR AVAILABILIW FACTOR = HOUFS REACTOR WAS AVATLALLE TO OPERATE ~
Il0URS IN REFORTING PERIOD UNIT SERVICE I' ACTOR   = HOUPS CD.ERATOR ON LINE                   gg HOURS IN REPORTING PERIOD "
Il0URS IN REFORTING PERIOD UNIT SERVICE I' ACTOR
UNIT AVAIIABILITY FACTOR = 1100RS UNTT WAS AVA11 AOLE TO GENERATE X 100 HOURS IN REPukI150 PERIOD UNIf CAPACITY FACTCR    = NET ELECTRTCAL P0hER GENERATED (Net C.pability or Design (.v.we-Net).1 X 110CitS LN REPnh r* Nh UNIT FORCED OtIIACE RATE -      P        OUTAGE HOURS .7 912180 7@s 1g, HOURS GENERATOR ON 1.JNE + FORCED CUTAGE tt0UIS
= HOUPS CD.ERATOR ON LINE gg HOURS IN REPORTING PERIOD "
UNIT AVAIIABILITY FACTOR = 1100RS UNTT WAS AVA11 AOLE TO GENERATE X 100 HOURS IN REPukI150 PERIOD
= NET ELECTRTCAL P0hER GENERATED UNIf CAPACITY FACTCR (Net C.pability or Design (.v.we-Net).1 X 110CitS LN REPnh r* Nh OUTAGE HOURS.7 912180 7@s 1g, UNIT FORCED OtIIACE RATE -
P HOURS GENERATOR ON 1.JNE + FORCED CUTAGE tt0UIS


                                ~..                                 .-
~..
DOCKET NO. 50-270         _
DOCKET NO. 50-270 UNIT oconee 2 DATE 05/10/76 AVERAGE DAILY UNIT POWER LEVEL MONTH Acril 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe net)
UNIT oconee 2 DATE 05/10/76 AVERAGE DAILY UNIT POWER LEVEL MONTH               Acril 1976 AVERAGE DAILY POWER LEVEL                         AVERAGE DAILY POWER LEVEL DAY                     (MWe net)                 DAY               (MWe-net)           .
DAY (MWe-net) 1 616 17 2
1 616                       17 2                         615                       18 3                         616                       19                     -
615 18 3
4                        616                       20                     -
616 19 4
5                        615                       21 6                        616                       22 7                       425                       23                     -
616 20 615 21 5
8 24 9                                                 25 10
616 22 6
                              -                        M                     -
7 425 23 8
11           - - -
24 9
27 12 28 13 29                     -
25 M
14 30 15 31 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
10 11 27 12 28 13 29 14 30 15 31 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit, there may be .weasions when the daily average power level exceeds the 100% line (or the restricted power level linch in such e.ises. the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit, there may be.weasions when the daily average power level exceeds the 100% line (or the restricted power level linch in such e.ises. the average daily unit power output sheet should be footnoted to explain the apparent anomaly.


                                                                                                                                                            ~
~
DdCKET NO. 50-270 UNIT SHUTDOWNS                               UNil NAMii Oconee Unit 2 DATli 05/10/76 REPORT MONTil     April 1976 TYPE                                 METHOD OF F FORCED     DURATION                 SHUTTING 00WN NO. DATE   S SCHEDULED (HOURS)   REASON (O       THE REACTOR (2)         CORRECTIVE ACTIONS / COMMENTS 5   760407         F       558.72     A                   1       Inspection and repair of reactor internals.
DdCKET NO.
(1) REASON                         (2) METilOD A LQUIPMENT F ALLURE (EXPLAIN)     1-MANUAL B- MAINT. OR TEST.               2-MANUAL C- RLl'ULLING                         SCRAM D-REGULATORY RESTRICTION           3 - AUTOM ATIC     i E-OPER ATOR TRAINING AND             SCRAM LICENSE EXAMIN ATION F- ADMINIST R ATIVE G-GPLR AllONAL LRROR (LXPLAIN) 11 -OlllL R (EXPLAIN)
50-270 UNIT SHUTDOWNS UNil NAMii Oconee Unit 2 DATli 05/10/76 REPORT MONTil April 1976 TYPE METHOD OF F FORCED DURATION SHUTTING 00WN NO.
DATE S SCHEDULED (HOURS)
REASON (O THE REACTOR (2)
CORRECTIVE ACTIONS / COMMENTS 5
760407 F
558.72 A
1 Inspection and repair of reactor internals.
(1) REASON (2) METilOD A LQUIPMENT F ALLURE (EXPLAIN) 1-MANUAL B-MAINT. OR TEST.
2-MANUAL C-RLl'ULLING SCRAM D-REGULATORY RESTRICTION 3 - AUTOM ATIC i
E-OPER ATOR TRAINING AND SCRAM LICENSE EXAMIN ATION F-ADMINIST R ATIVE G-GPLR AllONAL LRROR (LXPLAIN) 11 -OlllL R (EXPLAIN)


==SUMMARY==
==SUMMARY==
Unit remained down at end of month for inspection and repair of reactor internals.                             ,
Unit remained down at end of month for inspection and repair of reactor internals.
_.}}
.}}

Latest revision as of 21:56, 1 January 2025

Monthly Operating Rept for Apr 1976
ML19317E528
Person / Time
Site: Oconee  
Issue date: 05/10/1976
From: Blakeman E
DUKE POWER CO.
To:
Shared Package
ML19317E522 List:
References
NUDOCS 7912180759
Download: ML19317E528 (3)


Text

'

~

UNIT Oconto Unit 2 DATE 05/10/76 O

DOCKET NO.

50-270 PREPARED BY E. D. Blakeman OPERATING STATUS l.

REPORTING PERIOD:

April 1 THROUGH April 30. 1976 GROSS HOURS IN REPORTING PERIOD:

719.00 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY

?

l (MWe-Net):

871 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)

NONE 4.

REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative 5.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 166.23 2112.37 10671.43 6.

REACTOR RESERVE SHUTDOWN HOURS t

7.

HOURS GENERATOR ON-LINE 160.28 2076.54 10356.00 8.

UNIT RESERVE SHUTDOWN HOURS 9.

GROSS THERMAL ENERGY GENERATED (MWH) 297865 4922491 24594919 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 103700 1678100 8378656 11.

NET ELECTRICAL ENERGY GENERATED (MWH) 96927 1598324 7953475 12.

REACTOR SERVICE FACTOR 23.12 72.77 74.11 13.

REACTOR AVAILABILITY FACTOR 22.29 71.80 72.48 14.

UL SERVICE FACTOR 22.29 71.53 71.92 15.

UNIT AVAILABILITY FACTOR 22.29 71.53 71.92 16.

UNIT CAPACITY FACTOR (Using Net 15.48 63.21 63.41 Capability)

I 17.

UNIT CAPACITY FACTOR (Using Design Mwe) 15.20 62.07 62.27 18.

UNII FORCED OUTAGE RATE 77.71 28.47 25.75 19.

SHUTLTWNS SCHEDULED OVLR NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

June 9, 1976 REACTOR SERVICE FACTOR = HOURS REACTOR WAS C3TTICAI' X 100 110URS IN REPORTING PERIOD REACTOR AVAILABILIW FACTOR = HOUFS REACTOR WAS AVATLALLE TO OPERATE ~

Il0URS IN REFORTING PERIOD UNIT SERVICE I' ACTOR

= HOUPS CD.ERATOR ON LINE gg HOURS IN REPORTING PERIOD "

UNIT AVAIIABILITY FACTOR = 1100RS UNTT WAS AVA11 AOLE TO GENERATE X 100 HOURS IN REPukI150 PERIOD

= NET ELECTRTCAL P0hER GENERATED UNIf CAPACITY FACTCR (Net C.pability or Design (.v.we-Net).1 X 110CitS LN REPnh r* Nh OUTAGE HOURS.7 912180 7@s 1g, UNIT FORCED OtIIACE RATE -

P HOURS GENERATOR ON 1.JNE + FORCED CUTAGE tt0UIS

~..

DOCKET NO. 50-270 UNIT oconee 2 DATE 05/10/76 AVERAGE DAILY UNIT POWER LEVEL MONTH Acril 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe net)

DAY (MWe-net) 1 616 17 2

615 18 3

616 19 4

616 20 615 21 5

616 22 6

7 425 23 8

24 9

25 M

10 11 27 12 28 13 29 14 30 15 31 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit, there may be.weasions when the daily average power level exceeds the 100% line (or the restricted power level linch in such e.ises. the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

~

DdCKET NO.

50-270 UNIT SHUTDOWNS UNil NAMii Oconee Unit 2 DATli 05/10/76 REPORT MONTil April 1976 TYPE METHOD OF F FORCED DURATION SHUTTING 00WN NO.

DATE S SCHEDULED (HOURS)

REASON (O THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS 5

760407 F

558.72 A

1 Inspection and repair of reactor internals.

(1) REASON (2) METilOD A LQUIPMENT F ALLURE (EXPLAIN) 1-MANUAL B-MAINT. OR TEST.

2-MANUAL C-RLl'ULLING SCRAM D-REGULATORY RESTRICTION 3 - AUTOM ATIC i

E-OPER ATOR TRAINING AND SCRAM LICENSE EXAMIN ATION F-ADMINIST R ATIVE G-GPLR AllONAL LRROR (LXPLAIN) 11 -OlllL R (EXPLAIN)

SUMMARY

Unit remained down at end of month for inspection and repair of reactor internals.

.