Monthly Operating Rept for Apr 1976
ML19317E529
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/10/1976
From: Blakeman E
DUKE POWER CO.
To:
Shared Package
ML19317E522 List:
References
NUDOCS 7912180760
Download: ML19317E529 (3)


Text

s ,.

'p[ . UNIT Ocon a Unit 3 V DATE 05/10/76 DOCKET NO. 50-287 PREPARED BY E. D. Blakeman OPERATING STATUS

1. REPORTING PERIOD: April 1 THROUGH April 30. 1976 GROSS HOURS IN REPORTING PERIOD: 719.00
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):2566__ NET CAPABILITY (MWe-Net): 871
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) NONE
4. REASONS FOR RESTRICTION (IF ANY) s Month Year to Date Cumula m e
5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 320.65 2013.21 9157.47
6. REACTOR RESERVE SHUTDOWN HOURS - - -
7. HOURS GENERATOR ON-LINE 307.11 1980.58 8929.28
8. UNIT RESERVE SHUTDOWN HOURS - - -
9. GROSS THERMAL ENERGY GENERATED (MWH) 677628 4507729 20425779
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 232060 1548220 6993134
11. NET ELECTRICAL ENERGY GENERATED (MWH) 217902 1474184 6652618
12. REACTOR SERVICE FACTOR 44.60 69.35 76.01
13. REACTOR AVAILABILITY FACTOR 42.71 68.42 78.09
14. UNIT SERVICE FACTOR 42.71 68.23 74.12
15. UNIT AVAILABILITY FACTOR 42.71 68.23 74.12
16. UNIT CAPACITY FACTOR (Using Net 34.79 - 58.30 63.40 Capability)
17. UNIT CAPACITY FACTOR (Using Design Mwe) 34.17 57.25 62.26
18. UNIT FORCED OUTAGE RATE 57.29 31.77 16.86
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

September 1, 1976 - Refueling - 5 Weeks

20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS PEACTOR kfAS CRTTICAT. X 100 I!OURS IN REPORTING PERLOD REACTOR AVAIIABILI'lY FACTOR = HOURS REACTOR WAS . A3SILABI.E TO CPERATE X 100 Il0URS IN RE180RTING PERIOD UNIT SERVICE TACTCR = HolrP9 CENERATOR ON LINE HOURS IN REPORIING PERIOD ~

UNIT AVAIIABILITY FACTOR = 110rRS UNTT 'a'AS AVATI AO[.E TO GENERATE X 100 HOURS IN REPukTING PERI UNIT CAPACITY FACTOR = NET ELECTRICAL P0hER Gr.NERATFD g2 180 W s, (Nut C.gability or Desi);n (Mwe-Net).1 X HOUlu, LN REPUh GL*q~

PERIOD UNIT FORCD OUTACE RATE = FOP.CED OUTAGE HOUn3 X 100 HOURS GENERATOR ON 1.INE + FORCED OUTAGE HOURS

DOCKET NO. 50-287 UNIT oconee 3 DATE 05/10/76 AVERAGE DAILY UNIT POWER LEVEL MONTH April 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-neo .

1 17 18 544 2

19 689 3

- 20 196 4

- 21 Ano 5

22 732 6

- 23 751 7

- 24 77A 8

25 745 9

783 10 _' -

_ 26 27 739 11 28 771 12

- 29 789 13

- 30 799 14 15 31 16 DAILY UNIT POWER LEVEL FORM INSTC'KTIONS On this form, list the average daily unit .cwer 3 .evel in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be .weasions when the daily average power level exceeds the 100To line (or the restricted power lesel line). In such c.ises. the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

l

.~

DdCKET NO. 50-287 .

oconee Unit 3 UNIT SHUTDOWNS UNIT NAME DATli 05/10/76 ,

REPORT MONTil April 1976 TYPE METHOD OF F. FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS j 4 760401 F 405.78 11 1 Continuation of previous outage.

5 760420 F 6.11 G 3 Reactor trip on flux imbalance.

(1) REASON (2) METilOD A -EQUIPMENT F ALLURE (EXPLAIN) 1-MANUAL B - M AINT. OR TEST. 2-MANUAL C- RLI ULLING SOtAM T D-REGULATORY RESTRICTION 3 - A UTOM ATIC E-OPER ATOR TRAINING AND SCRAM LICENSE EXAMINAllON F-ADMINISTRATIVE G-OPLRATIONAL ERROR (EXPL,ilN) ,

11-OlitLR (EXPLAIN)

SUMMARY

Unit shutdown for most of month for completion of reactor surveillance tubes inspection.

~

,-