ML19317E619: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNIT Oconce Un.' | ||
UNIT Oconce Un.' | DATE April 10. 1974 | ||
DATE April 10. 1974 9 | ,9 0PERATING STATUS 6 | ||
6 | 1. | ||
RZPORTING PERIOD: | |||
March 1 TO March 31. 1974 GROSS I!OURS IN REPORTING PERIOD: | |||
744 2. | |||
CURRENTLY AUTHORIZED POWER LEVEL Pfde 2568 lide-NET 2 | |||
3. | |||
POWER LEVEL TO WilICll RESTRICTED (IF ANY): | |||
None 4. | |||
REASONS FOR RESTRICTIONS (IF ANY): | |||
Oconee Unit 2 is currently in power escalation testing and is not commercially operable. Items 10-13 are not applicable. | Oconee Unit 2 is currently in power escalation testing and is not commercially operable. Items 10-13 are not applicable. | ||
- THIS CUMULATIVE MONTH YK-TO-DATE TO DATE 0 | |||
85.6 743.0 5. | |||
Il0URS REACTOR WAS CRITICAL O | |||
64.0 577.2 6. | |||
Il0URS GENERATOR ON-LINE 0 | |||
104099 709271 7. | |||
GROSS THER!!AL POWER GENERATED (MWH) 8. | |||
GROSS ELECTRICAL POWER GENERATED (MWilj' 0 | |||
33000 209310 9. | |||
NET ELECTRI \\L POWER CENERATED (MWH) | |||
-2165 21447 173734 10. | |||
REACTOR AVAILABILITY FACTOR (1) 11. | |||
PLANT AVAILABILITY FACTOR (2) 12. | |||
PLANT CAPACITY FACTOR (3) 13. | |||
DATE LAST | FORCED OUTAGE RATE (4) 14. | ||
POWER GENERATION | SHUTI;0WNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND DURATION OF EACH): | ||
CURRENTLY LICEN5ED l'0WLR LEVEL | 15. | ||
IF SilUTDOWN AT END OF REPORT PERIOD, ESTI!!ATED DATE OF STARTUP: | |||
16. | |||
PLANTS IN TEST STATUS (PRIOR TO C0121ERCIAL OPERATION) REPORT THE FOLLOWINC: | |||
DATE LAST DATE REASON FOR FORECAST ACllIEVED DIFFERENCE INITIAL CRITICALITY 11/11/73 INITIAL ELECTRICAL 12/5/73 POWER GENERATION 5/15/74 IDIERCIAL OPERATION (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR WAS CRITTCAL | |||
*100 GROSS Il0URS IN REPORTING FERIOD (2) PLANT AVAILABILITY FACTOR = _ HOURS CENERATOR ON-LINE | |||
*100 GROSS !!OURS IN REPoliTIT.G PERIOD (3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED CURRENTLY LICEN5ED l'0WLR LEVEL | |||
* GROSS 110URS IN REPORTING PERI | * GROSS 110URS IN REPORTING PERI | ||
* (4) FORCED OUTAGE RATE = FORCED OUTACE 110URS | |||
* 100 | |||
~ | |||
s _ | HOURS GENERATOR OU-LINE + FORCEDMT7d;1f110'URS | ||
~ | |||
s _ | |||
~~ | |||
e.--.- | |||
9. | |||
s s | s s | ||
N SLM:ARY In:IT NAE | N SLM:ARY In:IT NAE Odonee Unit 2 DATE April 10, 1974 4 | ||
PLANT | FIFORT MONTH March, 1974 i | ||
PLANT SHUTDOWNS TYPE MET *40D OF F-TORCED DUPATION SHUTTIND DOL'N NO. | |||
(1) REASON: | DATE S-SuiEDULED (110URS) | ||
A-EQUIPMENT FAILURE (EXFLAIN) | FIASON (1) | ||
THE REACTOR (2) | |||
CO:MNTS 3 | |||
740122 F | |||
754' A | |||
B i | |||
(1) REASON: | |||
(2) 1:ETHO3: | |||
A-EQUIPMENT FAILURE (EXFLAIN) | |||
A- ?UO*UAL B-MAINT. OR TEST B- !:/.iUAL SCFRi C-REFUELING C.8UTO'1ATIC SCRAM D-REGULATORY RESTRICTION E-OPE:tATOR T:'AINING AND LICESSE ext';INATION F-ADi!!!:ISTRATIVE G-OPERATIONAL ERROR (EXPLAIN) i | |||
.}} | |||
Latest revision as of 21:55, 1 January 2025
| ML19317E619 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/10/1974 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML19317E613 | List: |
| References | |
| NUDOCS 7912180814 | |
| Download: ML19317E619 (2) | |
Text
UNIT Oconce Un.'
DATE April 10. 1974
,9 0PERATING STATUS 6
1.
RZPORTING PERIOD:
March 1 TO March 31. 1974 GROSS I!OURS IN REPORTING PERIOD:
744 2.
CURRENTLY AUTHORIZED POWER LEVEL Pfde 2568 lide-NET 2
3.
POWER LEVEL TO WilICll RESTRICTED (IF ANY):
None 4.
REASONS FOR RESTRICTIONS (IF ANY):
Oconee Unit 2 is currently in power escalation testing and is not commercially operable. Items 10-13 are not applicable.
- THIS CUMULATIVE MONTH YK-TO-DATE TO DATE 0
85.6 743.0 5.
Il0URS REACTOR WAS CRITICAL O
64.0 577.2 6.
Il0URS GENERATOR ON-LINE 0
104099 709271 7.
GROSS THER!!AL POWER GENERATED (MWH) 8.
GROSS ELECTRICAL POWER GENERATED (MWilj' 0
33000 209310 9.
NET ELECTRI \\L POWER CENERATED (MWH)
-2165 21447 173734 10.
REACTOR AVAILABILITY FACTOR (1) 11.
PLANT AVAILABILITY FACTOR (2) 12.
PLANT CAPACITY FACTOR (3) 13.
FORCED OUTAGE RATE (4) 14.
SHUTI;0WNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND DURATION OF EACH):
15.
IF SilUTDOWN AT END OF REPORT PERIOD, ESTI!!ATED DATE OF STARTUP:
16.
PLANTS IN TEST STATUS (PRIOR TO C0121ERCIAL OPERATION) REPORT THE FOLLOWINC:
DATE LAST DATE REASON FOR FORECAST ACllIEVED DIFFERENCE INITIAL CRITICALITY 11/11/73 INITIAL ELECTRICAL 12/5/73 POWER GENERATION 5/15/74 IDIERCIAL OPERATION (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR WAS CRITTCAL
- 100 GROSS Il0URS IN REPORTING FERIOD (2) PLANT AVAILABILITY FACTOR = _ HOURS CENERATOR ON-LINE
- 100 GROSS !!OURS IN REPoliTIT.G PERIOD (3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED CURRENTLY LICEN5ED l'0WLR LEVEL
- GROSS 110URS IN REPORTING PERI
- (4) FORCED OUTAGE RATE = FORCED OUTACE 110URS
- 100
~
HOURS GENERATOR OU-LINE + FORCEDMT7d;1f110'URS
~
s _
~~
e.--.-
9.
s s
N SLM:ARY In:IT NAE Odonee Unit 2 DATE April 10, 1974 4
FIFORT MONTH March, 1974 i
PLANT SHUTDOWNS TYPE MET *40D OF F-TORCED DUPATION SHUTTIND DOL'N NO.
DATE S-SuiEDULED (110URS)
FIASON (1)
THE REACTOR (2)
CO:MNTS 3
740122 F
754' A
B i
(1) REASON:
(2) 1:ETHO3:
A-EQUIPMENT FAILURE (EXFLAIN)
A- ?UO*UAL B-MAINT. OR TEST B- !:/.iUAL SCFRi C-REFUELING C.8UTO'1ATIC SCRAM D-REGULATORY RESTRICTION E-OPE:tATOR T:'AINING AND LICESSE ext';INATION F-ADi!!!:ISTRATIVE G-OPERATIONAL ERROR (EXPLAIN) i
.