{{#Wiki_filter:'
{{#Wiki_filter:UNIT Oconce Un.'
UNIT Oconce Un.'
DATE April 10. 1974
DATE April 10. 1974 9       0PERATING               STATUS                                     ,
,9 0PERATING STATUS 6
6
1.
: 1. RZPORTING PERIOD:     March 1                             TO   March 31. 1974 GROSS I!OURS IN REPORTING PERIOD:                 744
RZPORTING PERIOD:
: 2. CURRENTLY AUTHORIZED POWER LEVEL Pfde 2568                       lide-NET                               2
March 1 TO March 31. 1974 GROSS I!OURS IN REPORTING PERIOD:
: 3.                                                                 None
744 2.
      ,                      POWER LEVEL TO WilICll RESTRICTED (IF ANY):
CURRENTLY AUTHORIZED POWER LEVEL Pfde 2568 lide-NET 2
: 4. REASONS FOR RESTRICTIONS (IF ANY):
3.
POWER LEVEL TO WilICll RESTRICTED (IF ANY):
None 4.
REASONS FOR RESTRICTIONS (IF ANY):
Oconee Unit 2 is currently in power escalation testing and is not commercially operable. Items 10-13 are not applicable.
Oconee Unit 2 is currently in power escalation testing and is not commercially operable. Items 10-13 are not applicable.
                                                                                - THIS                     CUMULATIVE MONTH   YK-TO-DATE     TO DATE
- THIS CUMULATIVE MONTH YK-TO-DATE TO DATE 0
: 5. Il0URS REACTOR WAS CRITICAL 0         85.6       743.0
85.6 743.0 5.
: 6. Il0URS GENERATOR ON-LINE O        64.0       577.2
Il0URS REACTOR WAS CRITICAL O
: 7.                                                             0        104099      709271 GROSS THER!!AL POWER GENERATED (MWH)
64.0 577.2 6.
: 8. GROSS ELECTRICAL POWER GENERATED (MWilj'                 0       33000       209310
Il0URS GENERATOR ON-LINE 0
: 9. NET ELECTRI \L POWER CENERATED (MWH)                   -2165       21447       173734
104099 709271 7.
: 10. REACTOR AVAILABILITY FACTOR (1)
GROSS THER!!AL POWER GENERATED (MWH) 8.
: 11. PLANT AVAILABILITY FACTOR (2)
GROSS ELECTRICAL POWER GENERATED (MWilj' 0
: 12. PLANT CAPACITY FACTOR (3)
33000 209310 9.
: 13. FORCED OUTAGE RATE (4)
NET ELECTRI \\L POWER CENERATED (MWH)
: 14. SHUTI;0WNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND
-2165 21447 173734 10.
                    ,        DURATION OF EACH):
REACTOR AVAILABILITY FACTOR (1) 11.
    ,                15. IF SilUTDOWN AT END OF REPORT PERIOD, ESTI!!ATED DATE OF STARTUP:
PLANT AVAILABILITY FACTOR (2) 12.
: 16. PLANTS IN TEST STATUS (PRIOR TO C0121ERCIAL OPERATION) REPORT THE FOLLOWINC:
PLANT CAPACITY FACTOR (3) 13.
DATE LAST               DATE       REASON FOR FORECAST             ACllIEVED   DIFFERENCE INITIAL CRITICALITY                                             11/11/73 INITIAL ELECTRICAL                                             12/5/73 _
FORCED OUTAGE RATE (4) 14.
POWER GENERATION IDIERCIAL OPERATION 5/15/74 (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR WAS CRITTCAL                         *100 GROSS Il0URS IN REPORTING FERIOD (2) PLANT AVAILABILITY FACTOR = _ HOURS CENERATOR ON-LINE                           *100 GROSS !!OURS IN REPoliTIT.G PERIOD (3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED                                           _ , , ,
SHUTI;0WNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND DURATION OF EACH):
CURRENTLY LICEN5ED l'0WLR LEVEL
15.
IF SilUTDOWN AT END OF REPORT PERIOD, ESTI!!ATED DATE OF STARTUP:
16.
PLANTS IN TEST STATUS (PRIOR TO C0121ERCIAL OPERATION) REPORT THE FOLLOWINC:
DATE LAST DATE REASON FOR FORECAST ACllIEVED DIFFERENCE INITIAL CRITICALITY 11/11/73 INITIAL ELECTRICAL 12/5/73 POWER GENERATION 5/15/74 IDIERCIAL OPERATION (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR WAS CRITTCAL
*100 GROSS Il0URS IN REPORTING FERIOD (2) PLANT AVAILABILITY FACTOR = _ HOURS CENERATOR ON-LINE
*100 GROSS !!OURS IN REPoliTIT.G PERIOD (3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED CURRENTLY LICEN5ED l'0WLR LEVEL
* GROSS 110URS IN REPORTING PERI
* GROSS 110URS IN REPORTING PERI
                      * (4) FORCED OUTAGE RATE = FORCED OUTACE 110URS
* (4) FORCED OUTAGE RATE = FORCED OUTACE 110URS
                                                              ~
* 100
* 100 HOURS GENERATOR OU-LINE + FORCEDMT7d;1f110'URS                     ~
~
s _             ~~                 ,                e.--.-               - . . . . . _                                    ..          9.
HOURS GENERATOR OU-LINE + FORCEDMT7d;1f110'URS
~
s _
~~
e.--.-
9.


s s                                                                                                                                       .
s s
N SLM:ARY In:IT NAE Odonee Unit 2 DATE       April 10, 1974 4           FIFORT MONTH     March, 1974 i
N SLM:ARY In:IT NAE Odonee Unit 2 DATE April 10, 1974 4
PLANT         SHUTDOWNS TYPE                                       MET *40D OF F-TORCED       DUPATION                   SHUTTIND DOL'N NO.           DATE     S-SuiEDULED     (110URS)   FIASON (1)     THE REACTOR (2)               CO:MNTS                                                 .
FIFORT MONTH March, 1974 i
3          740122           F             754'         A                 B i
PLANT SHUTDOWNS TYPE MET *40D OF F-TORCED DUPATION SHUTTIND DOL'N NO.
(1) REASON:                               (2) 1:ETHO3:
DATE S-SuiEDULED (110URS)
A-EQUIPMENT FAILURE (EXFLAIN)               A- ?UO*UAL B-MAINT. OR TEST                           B- !:/.iUAL SCFRi C-REFUELING                                 C .8UTO'1ATIC SCRAM D-REGULATORY RESTRICTION E-OPE:tATOR T:'AINING AND
FIASON (1)
                                                                                  '                LICESSE ext';INATION F-ADi!!!:ISTRATIVE G-OPERATIONAL ERROR
THE REACTOR (2)
              -                                                                                      (EXPLAIN) i                                                                                                         .
CO:MNTS 3
_}}
740122 F
754' A
B i
(1) REASON:
(2) 1:ETHO3:
A-EQUIPMENT FAILURE (EXFLAIN)
A- ?UO*UAL B-MAINT. OR TEST B- !:/.iUAL SCFRi C-REFUELING C.8UTO'1ATIC SCRAM D-REGULATORY RESTRICTION E-OPE:tATOR T:'AINING AND LICESSE ext';INATION F-ADi!!!:ISTRATIVE G-OPERATIONAL ERROR (EXPLAIN) i
.}}

Latest revision as of 21:55, 1 January 2025

Monthly Operating Rept for Mar 1974
ML19317E619
Person / Time
Site: Oconee  
Issue date: 04/10/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19317E613 List:
References
NUDOCS 7912180814
Download: ML19317E619 (2)


Text

UNIT Oconce Un.'

DATE April 10. 1974

,9 0PERATING STATUS 6

1.

RZPORTING PERIOD:

March 1 TO March 31. 1974 GROSS I!OURS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTHORIZED POWER LEVEL Pfde 2568 lide-NET 2

3.

POWER LEVEL TO WilICll RESTRICTED (IF ANY):

None 4.

REASONS FOR RESTRICTIONS (IF ANY):

Oconee Unit 2 is currently in power escalation testing and is not commercially operable. Items 10-13 are not applicable.

- THIS CUMULATIVE MONTH YK-TO-DATE TO DATE 0

85.6 743.0 5.

Il0URS REACTOR WAS CRITICAL O

64.0 577.2 6.

Il0URS GENERATOR ON-LINE 0

104099 709271 7.

GROSS THER!!AL POWER GENERATED (MWH) 8.

GROSS ELECTRICAL POWER GENERATED (MWilj' 0

33000 209310 9.

NET ELECTRI \\L POWER CENERATED (MWH)

-2165 21447 173734 10.

REACTOR AVAILABILITY FACTOR (1) 11.

PLANT AVAILABILITY FACTOR (2) 12.

PLANT CAPACITY FACTOR (3) 13.

FORCED OUTAGE RATE (4) 14.

SHUTI;0WNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE, DATE AND DURATION OF EACH):

15.

IF SilUTDOWN AT END OF REPORT PERIOD, ESTI!!ATED DATE OF STARTUP:

16.

PLANTS IN TEST STATUS (PRIOR TO C0121ERCIAL OPERATION) REPORT THE FOLLOWINC:

DATE LAST DATE REASON FOR FORECAST ACllIEVED DIFFERENCE INITIAL CRITICALITY 11/11/73 INITIAL ELECTRICAL 12/5/73 POWER GENERATION 5/15/74 IDIERCIAL OPERATION (1) REACTOR AVAILABILITY FACTOR = 110URS REACTOR WAS CRITTCAL

  • 100 GROSS Il0URS IN REPORTING FERIOD (2) PLANT AVAILABILITY FACTOR = _ HOURS CENERATOR ON-LINE
  • 100 GROSS !!OURS IN REPoliTIT.G PERIOD (3) PLANT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED CURRENTLY LICEN5ED l'0WLR LEVEL
  • GROSS 110URS IN REPORTING PERI
  • (4) FORCED OUTAGE RATE = FORCED OUTACE 110URS
  • 100

~

HOURS GENERATOR OU-LINE + FORCEDMT7d;1f110'URS

~

s _

~~

e.--.-

9.

s s

N SLM:ARY In:IT NAE Odonee Unit 2 DATE April 10, 1974 4

FIFORT MONTH March, 1974 i

PLANT SHUTDOWNS TYPE MET *40D OF F-TORCED DUPATION SHUTTIND DOL'N NO.

DATE S-SuiEDULED (110URS)

FIASON (1)

THE REACTOR (2)

CO:MNTS 3

740122 F

754' A

B i

(1) REASON:

(2) 1:ETHO3:

A-EQUIPMENT FAILURE (EXFLAIN)

A- ?UO*UAL B-MAINT. OR TEST B- !:/.iUAL SCFRi C-REFUELING C.8UTO'1ATIC SCRAM D-REGULATORY RESTRICTION E-OPE:tATOR T:'AINING AND LICESSE ext';INATION F-ADi!!!:ISTRATIVE G-OPERATIONAL ERROR (EXPLAIN) i

.