ML19317E628: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:,                   .                        '
{{#Wiki_filter:,
    ,                                                                      UNIT    Oconta Unit 2 DATE   7/8/77 (U]
Oconta Unit 2 UNIT DATE 7/8/77 (U]
* DOCKET NO. 50-270 PREPARED BY     J   w. s4., nns OPERATING STATUS
DOCKET NO.
: 1. REPORTING PERIOD:         June 1             THROUGH         June 30. 1977 GROSS HOURS IN REPORTING PERIOD:               720.00
50-270 PREPARED BY J
: 2. CURRENTLY A'tTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):           860
: w. s4., nns OPERATING STATUS 1.
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
REPORTING PERIOD:
: 4. REASONS FOR RESTRICTION (IF ANY)
June 1 THROUGH June 30. 1977 GROSS HOURS IN REPORTING PERIOD:
This Month       Year to Date       Cumulative
720.00 2.
: 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL                                                   3548.67             17775.70 6.
CURRENTLY A'tTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):
REACTOR RESERVE SHUTDOWN HOURS
860 3.
: 7. HOURS GENERATOR ON-LINE                                     3539.47             17305.01
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) 4.
: 8. UNIT RESERVE SHUTDOWN HOURS 8864517              41625779
REASONS FOR RESTRICTION (IF ANY)
: 9. GROSS THERMAL ENERGY GENERATED (MWH)       10. GROSS ELECTRICAL ENERGY GENERATED 3007570               14163176 (MWH)
This Month Year to Date Cumulative 5.
: 11. NET ELECTRICAL ENERGY GENERATED (2065)         2877043               13461166 (MWH)
NUMBER OF HOURS THE REACTOR WAS CRITICAL 3548.67 17775.70 6.
: 12. REACTOR SERVICE FACTOR                                     81.71                 72.19
REACTOR RESERVE SHUTDOWN HOURS 7.
: 13. REACTOR AVAILABILITY FACTOR                                 81.67                 70.74 81.50                 70.28
HOURS GENERATOR ON-LINE 3539.47 17305.01 8.
: 14. UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR                                    81.50               70.28 15.
UNIT RESERVE SHUTDOWN HOURS 9.
: 16. UNIT CAPACITY FACTOR (Using Net                             77.03                63.57 Capability)
GROSS THERMAL ENERGY GENERATED (MWH) 8864517 41625779 10.
: 17. UNIT CAPACITY FACTOR (Using Design Mwe)                                          74.68               61.63 2.31                 21.59
GROSS ELECTRICAL ENERGY GENERATED 3007570 14163176 (MWH) 11.
: 18. UNIT FORCED OUTAGE RATE
NET ELECTRICAL ENERGY GENERATED (MWH)
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
(2065) 2877043 13461166 12.
: 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
REACTOR SERVICE FACTOR 81.71 72.19 13.
July 26, 1977 REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICA7. X 100 UOURS IN REPORTIh0 PERLOD REACTOR AVAILABILI'lY FACTOR = Hot?RS RTACTOR WAS_ _AVAIIAriLE TO OPERATE X 100 110URS IN REFORTING PERIOD UNIT SERVICE PACTO:1     = HOPPS Gr.NERATM ON LINE HOURS IN REPORTING PERIOD
REACTOR AVAILABILITY FACTOR 81.67 70.74 81.50 70.28 14.
* UNIT AVAIL \BILITY F ACTOR = liO'?Ils 11NTT WAS A'JAllMLC TO Grf:EFATE Y 100 HOURS IN REPukTING PERIOD
UNIT SERVICE FACTOR 81.50 70.28 15.
                      . UNIT CATACITY FACTOR     = NET ELECTRICAL P0hER GENERATFD                             i (N t C.tpatillity or Design (We-LL)) X ;10CRS LN RE:Ub;b PERIOD                                                   l UNIT FORCED OUTACE RATE     F0RCFD OUTAGE HOUns                               X 100 HOPRS GENERATOR ON 1.INE + FORCED OUTAGE HOUMS           l N 91218o[h
UNIT AVAILABILITY FACTOR 77.03 63.57 16.
UNIT CAPACITY FACTOR (Using Net Capability)
: 17. UNIT CAPACITY FACTOR 74.68 61.63 (Using Design Mwe) 2.31 21.59 18.
UNIT FORCED OUTAGE RATE 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
July 26, 1977 REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICA7. X 100 UOURS IN REPORTIh0 PERLOD REACTOR AVAILABILI'lY FACTOR = Hot?RS RTACTOR WAS_ _AVAIIAriLE TO OPERATE X 100 110URS IN REFORTING PERIOD UNIT SERVICE PACTO:1
= HOPPS Gr.NERATM ON LINE HOURS IN REPORTING PERIOD
* UNIT AVAIL \\BILITY F ACTOR = liO'?Ils 11NTT WAS A'JAllMLC TO Grf:EFATE Y 100 HOURS IN REPukTING PERIOD
. UNIT CATACITY FACTOR
= NET ELECTRICAL P0hER GENERATFD i
(N t C.tpatillity or Design (We-LL)) X ;10CRS LN RE:Ub;b PERIOD UNIT FORCED OUTACE RATE F0RCFD OUTAGE HOUns X 100 HOPRS GENERATOR ON 1.INE + FORCED OUTAGE HOUMS N 91218o[h


; .                            ?                                         -
?
l 1
i DOCKET NO.
i
50-270 l
:                                                                            DOCKET NO.       50-270 l
l UNIT oconee Unit 2 DATE 7/8/77 AVERAGE DAILY UNIT POWER LEVEL MONTH June, 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
l                                                                                     UNIT oconee Unit 2 DATE     7/8/77       I 1
DAY (MWe-net) 1 17 2
AVERAGE DAILY UNIT POWER LEVEL MONTH         June, 1977 AVERAGE DAILY POWER LEVEL                           AVERAGE DAILY POWER LEVEL DAY                   (MWe-net)                     DAY                 (MWe-net) 1                                                 17 2                                                 18 3                                                 19 4                                                 20 5                                                 21 6                                                 22 7                                                 23 8                                                 24 9                                                 25 10                                                 26 11                                                 27 12                                                 28 13                                                 29 14                                                 30 15                                                 31 16 DAILY UNrr POWER LEVEL FOR.\1 INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day m the reporting month.
18 3
19 4
20 5
21 6
22 7
23 8
24 9
25 10 26 11 27 12 28 13 29 14 30 15 31 16 DAILY UNrr POWER LEVEL FOR.\\1 INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day m the reporting month.
Compute to the nearest whole megawatt.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usinf, maximum dependable capacity t'or the ne' tiectrical ratmg of the unit. there inay be ..t easions when the daily average power level exceeds the IUO':i line tor the restricted power lesel line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
These figures will be used to plot a graph for each reporting month. Note that by usinf, maximum dependable capacity t'or the ne' tiectrical ratmg of the unit. there inay be..t easions when the daily average power level exceeds the IUO':i line tor the restricted power lesel line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.


D CKET NO.     50-270 UNIT NAME Oconee Unit 2
50-270 D CKET NO.
* UNIT SHUTDOWNS 7/8/77 DATI.
Oconee Unit 2 UNIT SHUTDOWNS UNIT NAME 7/8/77 DATI.
REPORT MONTil           June, 1977 TYPE                                 METHOD OF F FORCED   DURATION                 SHUTTING DOWN NO. DATE     S SCHEDULED (HOURS) REASON (1)       THE REACTOR (2)               CORRECTIVE ACTIONS / COMMENTS                   }
REPORT MONTil June, 1977 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO.
2   77-06-O L     S         720     C                 1                 Refueling outage continuation.
DATE S SCHEDULED (HOURS)
(1) REASON                             (2) METHOb A EQUIPMENT F AILURE (EXPLAIN)       1-MANUAL B- MAINT. OR TEST.                   2-MANUAL
REASON (1)
                                                                                                              ~
THE REACTOR (2)
C. RLFUELING                            SCRAM         '
CORRECTIVE ACTIONS / COMMENTS
D-REGULATOR'u' RESTRICTION           3- AUTOMATIC E-OPERATOR TRAINING AND                 SCRAM LICENSE EXAMINATION           4-Other F-ADMINISTRATIVE G-OPER ATIONAL ERROR (EXPLAIN)
}
2 77-06-O L S
720 C
1 Refueling outage continuation.
(1) REASON (2) METHOb A EQUIPMENT F AILURE (EXPLAIN) 1-MANUAL B-MAINT. OR TEST.
2-MANUAL C. RLFUELING
~
SCRAM D-REGULATOR'u' RESTRICTION 3-AUTOMATIC E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION 4-Other F-ADMINISTRATIVE G-OPER ATIONAL ERROR (EXPLAIN)
Il-0TilLR (EXPLAIN)
Il-0TilLR (EXPLAIN)


==SUMMARY==
==SUMMARY==
Refueling
Refueling
                                                            -     _ _ _  -_}}
-}}

Latest revision as of 21:55, 1 January 2025

Monthly Operating Rept for June 1977
ML19317E628
Person / Time
Site: Oconee  
Issue date: 07/08/1977
From: Simmons J
DUKE POWER CO.
To:
Shared Package
ML19317E625 List:
References
NUDOCS 7912180819
Download: ML19317E628 (3)


Text

,

Oconta Unit 2 UNIT DATE 7/8/77 (U]

DOCKET NO.

50-270 PREPARED BY J

w. s4., nns OPERATING STATUS 1.

REPORTING PERIOD:

June 1 THROUGH June 30. 1977 GROSS HOURS IN REPORTING PERIOD:

720.00 2.

CURRENTLY A'tTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):

860 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) 4.

REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative 5.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 3548.67 17775.70 6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENERATOR ON-LINE 3539.47 17305.01 8.

UNIT RESERVE SHUTDOWN HOURS 9.

GROSS THERMAL ENERGY GENERATED (MWH) 8864517 41625779 10.

GROSS ELECTRICAL ENERGY GENERATED 3007570 14163176 (MWH) 11.

NET ELECTRICAL ENERGY GENERATED (MWH)

(2065) 2877043 13461166 12.

REACTOR SERVICE FACTOR 81.71 72.19 13.

REACTOR AVAILABILITY FACTOR 81.67 70.74 81.50 70.28 14.

UNIT SERVICE FACTOR 81.50 70.28 15.

UNIT AVAILABILITY FACTOR 77.03 63.57 16.

UNIT CAPACITY FACTOR (Using Net Capability)

17. UNIT CAPACITY FACTOR 74.68 61.63 (Using Design Mwe) 2.31 21.59 18.

UNIT FORCED OUTAGE RATE 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

July 26, 1977 REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICA7. X 100 UOURS IN REPORTIh0 PERLOD REACTOR AVAILABILI'lY FACTOR = Hot?RS RTACTOR WAS_ _AVAIIAriLE TO OPERATE X 100 110URS IN REFORTING PERIOD UNIT SERVICE PACTO:1

= HOPPS Gr.NERATM ON LINE HOURS IN REPORTING PERIOD

  • UNIT AVAIL \\BILITY F ACTOR = liO'?Ils 11NTT WAS A'JAllMLC TO Grf:EFATE Y 100 HOURS IN REPukTING PERIOD

. UNIT CATACITY FACTOR

= NET ELECTRICAL P0hER GENERATFD i

(N t C.tpatillity or Design (We-LL)) X ;10CRS LN RE:Ub;b PERIOD UNIT FORCED OUTACE RATE F0RCFD OUTAGE HOUns X 100 HOPRS GENERATOR ON 1.INE + FORCED OUTAGE HOUMS N 91218o[h

?

i DOCKET NO.

50-270 l

l UNIT oconee Unit 2 DATE 7/8/77 AVERAGE DAILY UNIT POWER LEVEL MONTH June, 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 1 17 2

18 3

19 4

20 5

21 6

22 7

23 8

24 9

25 10 26 11 27 12 28 13 29 14 30 15 31 16 DAILY UNrr POWER LEVEL FOR.\\1 INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day m the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by usinf, maximum dependable capacity t'or the ne' tiectrical ratmg of the unit. there inay be..t easions when the daily average power level exceeds the IUO':i line tor the restricted power lesel line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

50-270 D CKET NO.

Oconee Unit 2 UNIT SHUTDOWNS UNIT NAME 7/8/77 DATI.

REPORT MONTil June, 1977 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO.

DATE S SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS

}

2 77-06-O L S

720 C

1 Refueling outage continuation.

(1) REASON (2) METHOb A EQUIPMENT F AILURE (EXPLAIN) 1-MANUAL B-MAINT. OR TEST.

2-MANUAL C. RLFUELING

~

SCRAM D-REGULATOR'u' RESTRICTION 3-AUTOMATIC E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION 4-Other F-ADMINISTRATIVE G-OPER ATIONAL ERROR (EXPLAIN)

Il-0TilLR (EXPLAIN)

SUMMARY

Refueling

-