ML19345H549: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:~f   -                                          -
{{#Wiki_filter:~f Alibima PowIr C:mpany g
Alibima PowIr C:mpany g         600 r! orth 18th Street       ,
600 r! orth 18th Street
        ,  'u j Post Offics Box 2641 DirminghIm. Alab:ms 33291 i
'u j Post Offics Box 2641 i
      .          T;liphons 205 250-1000 F. L CLAYToN, JR.
DirminghIm. Alab:ms 33291 T;liphons 205 250-1000 F. L CLAYToN, JR.
* Senior Vice President                                                 Alabama Power the southem electic system May 14,1981 Docket No. 50-364 N
Senior Vice President Alabama Power the southem electic system May 14,1981 Docket No. 50-364 NT Director 4
Director                                                               4                   T\
\\
Office of Management Information and                           . Q % O-E                      ~j Program Control                                             t-
Office of Management Information and
                                                                                  '~           O U. S. Nuclear Regulatory Commission Washington, D.C. 20555                                                                       g RE: Joseph M. Farley Nuclear Plant Unit No. 2 Monthly Operating Data Report Attached are two (2) copies of the April,1981 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 2, as required by Sec-
. Q % O-
  -                tion 6.9.1.10 of the Unit 2 Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
~j Program Control t-EO
'~
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 g
RE: Joseph M. Farley Nuclear Plant Unit No. 2 Monthly Operating Data Report Attached are two (2) copies of the April,1981 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 2, as required by Sec-tion 6.9.1.10 of the Unit 2 Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advire.
If you have any questions, please advire.
Yours very truly,
Yours very truly,
    ~
~
;                                                                  F.L.Clayton{Jr.
F.L.Clayton{Jr.
FLCJr/JRC:nac l
FLCJr/JRC:nac l
Attachments xc: Mr. Ted Cintula (1 copy) 5 Director;::IEc(10 copies)
Attachments xc: Mr. Ted Cintula (1 copy) 5 Director;::IEc(10 copies)
Director, RII       (1 copy) 00$
Director, RII (1 copy) 00$
l Il l           81os 21oers                                 g
l Il l
                                                                ._}}
81os 21oers g
_}}

Latest revision as of 08:02, 24 December 2024

Forwards Monthly Operating Rept for Apr 1981
ML19345H549
Person / Time
Site: Farley 
Issue date: 05/14/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19345H550 List:
References
NUDOCS 8105210246
Download: ML19345H549 (1)


Text

~f Alibima PowIr C:mpany g

600 r! orth 18th Street

'u j Post Offics Box 2641 i

DirminghIm. Alab:ms 33291 T;liphons 205 250-1000 F. L CLAYToN, JR.

Senior Vice President Alabama Power the southem electic system May 14,1981 Docket No. 50-364 NT Director 4

\\

Office of Management Information and

. Q % O-

~j Program Control t-EO

'~

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 g

RE: Joseph M. Farley Nuclear Plant Unit No. 2 Monthly Operating Data Report Attached are two (2) copies of the April,1981 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 2, as required by Sec-tion 6.9.1.10 of the Unit 2 Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advire.

Yours very truly,

~

F.L.Clayton{Jr.

FLCJr/JRC:nac l

Attachments xc: Mr. Ted Cintula (1 copy) 5 Director;::IEc(10 copies)

Director, RII (1 copy) 00$