ML19345H549
| ML19345H549 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/14/1981 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19345H550 | List: |
| References | |
| NUDOCS 8105210246 | |
| Download: ML19345H549 (1) | |
Text
~f Alibima PowIr C:mpany g
600 r! orth 18th Street
'u j Post Offics Box 2641 i
DirminghIm. Alab:ms 33291 T;liphons 205 250-1000 F. L CLAYToN, JR.
Senior Vice President Alabama Power the southem electic system May 14,1981 Docket No. 50-364 NT Director 4
\\
Office of Management Information and
. Q % O-
~j Program Control t-EO
'~
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 g
RE: Joseph M. Farley Nuclear Plant Unit No. 2 Monthly Operating Data Report Attached are two (2) copies of the April,1981 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 2, as required by Sec-tion 6.9.1.10 of the Unit 2 Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advire.
Yours very truly,
~
F.L.Clayton{Jr.
FLCJr/JRC:nac l
Attachments xc: Mr. Ted Cintula (1 copy) 5 Director;::IEc(10 copies)
Director, RII (1 copy) 00$
l Il l
81os 21oers g
_