ML19345H549

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Apr 1981
ML19345H549
Person / Time
Site: Farley 
Issue date: 05/14/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19345H550 List:
References
NUDOCS 8105210246
Download: ML19345H549 (1)


Text

~f Alibima PowIr C:mpany g

600 r! orth 18th Street

'u j Post Offics Box 2641 i

DirminghIm. Alab:ms 33291 T;liphons 205 250-1000 F. L CLAYToN, JR.

Senior Vice President Alabama Power the southem electic system May 14,1981 Docket No. 50-364 NT Director 4

\\

Office of Management Information and

. Q % O-

~j Program Control t-EO

'~

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 g

RE: Joseph M. Farley Nuclear Plant Unit No. 2 Monthly Operating Data Report Attached are two (2) copies of the April,1981 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 2, as required by Sec-tion 6.9.1.10 of the Unit 2 Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advire.

Yours very truly,

~

F.L.Clayton{Jr.

FLCJr/JRC:nac l

Attachments xc: Mr. Ted Cintula (1 copy) 5 Director;::IEc(10 copies)

Director, RII (1 copy) 00$

l Il l

81os 21oers g

_