ML19345H551

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1981
ML19345H551
Person / Time
Site: Farley 
Issue date: 05/01/1981
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML19345H550 List:
References
NUDOCS 8105210249
Download: ML19345H551 (5)


Text

JOSEPli M. FARLEY NUCLEAR PLANT UNIT 2 9

NARRATIVE SUte!ARY OF OPERATIONS APRIL, 1981 Alabama Power Company's Joseph M. Farley Nuclear Plant, Unit 2 loaded fuel March 8, 1981 and received a Full Power License on March 25, 1981. Projected date for initial criticality is May 6,1981.

h 8105 210M74

OPERATING DATA REPORT C-DOCKET NO. 50-364 DATE 5/1/d1 COMPLETED BY W.G.Hnirsg8 III TELEPHONE GUM 699-OPERATING STATUS

1. Unit Name.

Joseph M. Farley - Unit 2 Notes (1) Ioaded fuel' March 8,

2. Reporting Period:

April,1 di 1981. (O Received Full Power

3. Licensed Thermal Power (MWt):

132 License March 23, 1981.

4. Nameplate Rating (Gass MWe):

860

5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe):

860*

7. Maximum Dependable Capacity (Net MWe):

829*

3. If Changes Occue in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions,if Any: N/A

~ is Month Yr.-to.Date Cumulative II. Hours In Reporting Period 12. Number Of Hours Reactor Was Critical 13. Reactor Reserve Shutdown Hours _

14. Hours Generator On-Line -0--
15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) ~
17. Gross Electrical Energy Generated (MWH) -U-
18. Net Electrical Energy Generated (MWH) 19. Unit Service Factor N/A N/A N/A
20. Unit Availability Factor N/A N/A N/A
21. Unit Capacity Factor (Using MDC Net).

N/A N/A N/A

22. Unit Capacity Factor (Using DER Net)

N/A N/A N/A

23. Unit Forced Outage Rate N/A N/A N/A l
24. Shutdowns Scheduled Over Next 6 Months (Type, Date.and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 5/6/81 N/A INITIAL ELECTRICITY 5/24/81 N/A COMMERCIAL OPERATION 7/8/81 N/A

  • 'Ihe Natmplate Rating / Design Electrical Rating will be used for the Maxinun Dependable Capacity until an accurate value can be determined from operat goj773 ing experience.

l L

m s-DOCKET NO. 50-3'64 D.,

2 UNn-

~

CATI 5/1/81 COMPLETED BY W.G.Hairston, III i

TELEPHONE (205)899-5156

,e MONTH April, 1981 d

DAY AVERAGE DAILY POWER LEVEL

  • DAY AVERACE DAILY POWER LEVEL (MWe Net)

(Mwe. Net) 3, No txwer output in April g7 2

18 3

39 o

4 20 5

21

~

6 22

./-

1 B

~,

8 24

~

9 10 26 II 27, 12

- - s 13 29

~

l 14 30 15

3g

' ~.

16 t.

INSTRUCITONS i

~

On this formst. list the aversge daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole mepwatt.

~

(9(77) 4 e

s e

'**me m m. _ eo. e m -.oo.m.me.

- - -- -. _. se.e.m em.

- w.o

n.........

m.,,.

,,__n

O A ;E UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAME J.M.Farlev-Unit 2 DATE 5/1/DL A

COMPLETED BY W.G.Hairston, III REPORTMONTil pril,1981 TELEPIIONE (205)899-5156 e.

'5 u, $

15 c

re LICCUS'C 5%

g*.

Cause & Corrective No.

Date E.

5_y

{

g5g

~

Event g]

S.

U Sje g,7 g.

Acigo,,,

O -@

ymj Repor: #

u t.'

Prevent Becurrence M

6 load x1 fuel Marcl 8, 1981. Rcceived Full Power License Farch 21, 1981.

8mm I

2 3

4 F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data 11-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee.

C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-e D Regulatory Restriction 4 Other (Explain) 0161)

E Operator Training & License lixamination F. Administrative 5

G. Operational Error (Explain)

Exhibit I-Same S.mree (9/77)

Il Other (Explain)