JOSEPli M. FARLEY NUCLEAR PLANT UNIT 2 9
NARRATIVE SUte!ARY OF OPERATIONS APRIL, 1981 Alabama Power Company's Joseph M. Farley Nuclear Plant, Unit 2 loaded fuel March 8, 1981 and received a Full Power License on March 25, 1981. Projected date for initial criticality is May 6,1981.
h 8105 210M74
OPERATING DATA REPORT C-DOCKET NO. 50-364 DATE 5/1/d1 COMPLETED BY W.G.Hnirsg8 III TELEPHONE GUM 699-OPERATING STATUS
- 1. Unit Name.
Joseph M. Farley - Unit 2 Notes (1) Ioaded fuel' March 8,
- 2. Reporting Period:
April,1 di 1981. (O Received Full Power
- 3. Licensed Thermal Power (MWt):
132 License March 23, 1981.
- 4. Nameplate Rating (Gass MWe):
860
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe):
860*
- 7. Maximum Dependable Capacity (Net MWe):
829*
- 3. If Changes Occue in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted,If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any: N/A
~ is Month Yr.-to.Date Cumulative II. Hours In Reporting Period 12. Number Of Hours Reactor Was Critical 13. Reactor Reserve Shutdown Hours _
- 14. Hours Generator On-Line -0--
- 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) ~
- 17. Gross Electrical Energy Generated (MWH) -U-
- 18. Net Electrical Energy Generated (MWH) 19. Unit Service Factor N/A N/A N/A
- 20. Unit Availability Factor N/A N/A N/A
- 21. Unit Capacity Factor (Using MDC Net).
N/A N/A N/A
- 22. Unit Capacity Factor (Using DER Net)
N/A N/A N/A
- 23. Unit Forced Outage Rate N/A N/A N/A l
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date.and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 5/6/81 N/A INITIAL ELECTRICITY 5/24/81 N/A COMMERCIAL OPERATION 7/8/81 N/A
- 'Ihe Natmplate Rating / Design Electrical Rating will be used for the Maxinun Dependable Capacity until an accurate value can be determined from operat goj773 ing experience.
l L
m s-DOCKET NO. 50-3'64 D.,
2 UNn-
~
CATI 5/1/81 COMPLETED BY W.G.Hairston, III i
TELEPHONE (205)899-5156
,e MONTH April, 1981 d
DAY AVERAGE DAILY POWER LEVEL
- DAY AVERACE DAILY POWER LEVEL (MWe Net)
(Mwe. Net) 3, No txwer output in April g7 2
18 3
39 o
4 20 5
21
~
6 22
./-
1 B
~,
8 24
~
9 10 26 II 27, 12
- - s 13 29
~
l 14 30 15
- 3g
' ~.
16 t.
INSTRUCITONS i
~
On this formst. list the aversge daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole mepwatt.
~
(9(77) 4 e
s e
'**me m m. _ eo. e m -.oo.m.me.
- - -- -. _. se.e.m em.
- w.o
- n.........
m.,,.
,,__n
O A ;E UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAME J.M.Farlev-Unit 2 DATE 5/1/DL A
COMPLETED BY W.G.Hairston, III REPORTMONTil pril,1981 TELEPIIONE (205)899-5156 e.
'5 u, $
15 c
re LICCUS'C 5%
g*.
Cause & Corrective No.
Date E.
5_y
{
g5g
~
Event g]
S.
U Sje g,7 g.
Acigo,,,
O -@
ymj Repor: #
u t.'
Prevent Becurrence M
6 load x1 fuel Marcl 8, 1981. Rcceived Full Power License Farch 21, 1981.
8mm I
2 3
4 F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data 11-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee.
C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-e D Regulatory Restriction 4 Other (Explain) 0161)
E Operator Training & License lixamination F. Administrative 5
G. Operational Error (Explain)
Exhibit I-Same S.mree (9/77)
Il Other (Explain)