ML20004F025: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_ | {{#Wiki_filter:_ | ||
TABLE 4.1-1 (Continued) | TABLE 4.1-1 (Continued) | ||
[ | [ | ||
ep | CllANNEL DESCRIPTION CllECK TEST CALIBRATE REMARKS ep CD 28. | ||
Radiation Monitoring Systems W(1)(3) | |||
M(3) | |||
Q(2) | |||
(1) Using the installed check 4 | |||
source when background is less cb than twice the expected increase 4 | |||
3 in cpm which would result from 4h the check source alone. Back-C3 ground readings greater than this | |||
'l value are sufficient in themselves to show that the monitor is functioning. | |||
(2) Except area gamma radiation monitors RM-C6, RM-07, and RM-C8 which are located in high radia-tion areas of the Reactor Building. | (2) Except area gamma radiation monitors RM-C6, RM-07, and RM-C8 which are located in high radia-tion areas of the Reactor Building. | ||
These monitors will be calibrated i | |||
c-i quarterly or at the next scheduled reactor shutdown following the l | |||
I | quarter in which calibration would normally be due, if a shut-down during ehe quarter does not l | ||
isolation only. | occur. | ||
I (3) Surveillances are to be performed only when containment integrity is required, This applies to monitors which initiate containment isolation only. | |||
i | 29. | ||
liigh and Low Pressure Injection Systems: | |||
4}} | Flow Channels NA NA R | ||
i i | |||
4 i | |||
l 4}} | |||
Latest revision as of 10:38, 23 December 2024
| ML20004F025 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 06/10/1981 |
| From: | METROPOLITAN EDISON CO. |
| To: | |
| Shared Package | |
| ML20004F021 | List: |
| References | |
| NUDOCS 8106160407 | |
| Download: ML20004F025 (1) | |
Text
_
TABLE 4.1-1 (Continued)
[
CllANNEL DESCRIPTION CllECK TEST CALIBRATE REMARKS ep CD 28.
Radiation Monitoring Systems W(1)(3)
M(3)
Q(2)
(1) Using the installed check 4
source when background is less cb than twice the expected increase 4
3 in cpm which would result from 4h the check source alone. Back-C3 ground readings greater than this
'l value are sufficient in themselves to show that the monitor is functioning.
(2) Except area gamma radiation monitors RM-C6, RM-07, and RM-C8 which are located in high radia-tion areas of the Reactor Building.
These monitors will be calibrated i
c-i quarterly or at the next scheduled reactor shutdown following the l
quarter in which calibration would normally be due, if a shut-down during ehe quarter does not l
occur.
I (3) Surveillances are to be performed only when containment integrity is required, This applies to monitors which initiate containment isolation only.
29.
liigh and Low Pressure Injection Systems:
Flow Channels NA NA R
i i
4 i
l 4