ML20005E207: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:k'4,     ,
{{#Wiki_filter:k'4, e
      '*                                      e    Whey Power Staten
Whey Power Staten
                                            $Nptungport. PA 40774004 i'
$Nptungport. PA 40774004 i'
h OI.,$.$No o,=                                                                 m r
h OI.,$.$No o,=
* 3s2ss j                                                                             December 21, 1989 U. S. Nuclear Regulatory Commission e         Attn     Document Control Desk i       ' Washington, DC 20555
m r
* 3s2ss j
December 21, 1989 U. S. Nuclear Regulatory Commission e
Attn Document Control Desk i
' Washington, DC 20555


==Reference:==
==Reference:==
Beaver Valley Power Station, Unit No. 1 and No. 2 6                        BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Proposed Operating License Change Request No. 172/33 L
Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 6
BV-2 Docket No. 50-412, License No. NPF-73 Proposed Operating License Change Request No. 172/33 L
Gentlemen Enclosed are:
Gentlemen Enclosed are:
: 1. An Application for Amendment to the above operating licenses to   revise   the   Safety             Injection   System Accumulators surveillance requirements.                   The proposed amendment would delete surveillance requirement 4.5.1.d. This surveillance requirement verifies that the accumulator isolation valves automatically open upon receipt of a safety injection signal and when the Reactor Coolant System pressure exceeds the P-11 interlock setpoint.                   This amendment also corrects a typographical error in surveillance requirement 4.5.1.c.
1.
: 2. Documents designated Attachments A, B and C which set forth the change in the Technical Specifications, the safety analysis and the no significant hazards evaluation.
An Application for Amendment to the above operating licenses to revise the Safety Injection System Accumulators surveillance requirements.
This proposed     change   was reviewed- by the OSC and ORC and determined to be       safe   and does not involve an unreviewed' safety question.
The proposed amendment would delete surveillance requirement 4.5.1.d.
Very truly yours,                  ,
This surveillance requirement verifies that the accumulator isolation valves automatically open upon receipt of a safety injection signal and when the Reactor Coolant System pressure exceeds the P-11 interlock setpoint.
                                                                          /J)L     x<'
This amendment also corrects a typographical error in surveillance requirement 4.5.1.c.
                                                                          . D. Sieber ice President Nuclear Group 0\
2.
p2%88tMusnr                                               (9
Documents designated Attachments A, B and C which set forth the change in the Technical Specifications, the safety analysis and the no significant hazards evaluation.
This proposed change was reviewed-by the OSC and ORC and determined to be safe and does not involve an unreviewed' safety question.
Very truly yours,
/J)L x<'
D. Sieber ice President Nuclear Group 0\\
p2%88tMusnr (9


          "e   ,
"e BehvCr Vallcy Powcr St0ticn, Unit NO3. 1 &- 2 Docket No. 50-334, License No. DPR-66
            ,  BehvCr Vallcy Powcr St0ticn, Unit NO3. 1 &- 2
' Docket No. 50-412, License No. NPF-73 Page 2
        .      Docket No. 50-334, License No. DPR-66
L.i.
              ' Docket No. 50-412, License No. NPF-73 Page 2 L .i.
cc:
cc:   Mr. J. Beall, Sr. Resident Inspector Mr. W. T. Russell, NRC Region I Administrator Mr. P. Tam, Sr. Project Manager i
Mr. J.
  ~
Beall, Sr. Resident Inspector Mr. W. T. Russell, NRC Region I Administrator Mr. P. Tam, Sr. Project Manager i
Mr. T. M. Gerusky, Director BRP/ DER Mr. R. Janati, BRP/ DER Mr. R. Saunders (VEPCO) i-t:
Mr. T. M. Gerusky, Director BRP/ DER
~
Mr. R. Janati, BRP/ DER Mr. R.
Saunders (VEPCO) i-t:
I l
I l
l l
l l
i l
i l
l}}
l}}

Latest revision as of 08:45, 23 December 2024

Forwards Application for Amends to Licenses DPR-66 & NPF-73, Consisting of Proposed Operating License Change Request 172/33.Amends Delete Surveillance Requirement 4.5.1.d & Correct Typo in Surveillance Requirement 4.5.1.c
ML20005E207
Person / Time
Site: Beaver Valley
Issue date: 12/21/1989
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20005E208 List:
References
NUDOCS 9001040084
Download: ML20005E207 (2)


Text

k'4, e

Whey Power Staten

$Nptungport. PA 40774004 i'

h OI.,$.$No o,=

m r

  • 3s2ss j

December 21, 1989 U. S. Nuclear Regulatory Commission e

Attn Document Control Desk i

' Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 6

BV-2 Docket No. 50-412, License No. NPF-73 Proposed Operating License Change Request No. 172/33 L

Gentlemen Enclosed are:

1.

An Application for Amendment to the above operating licenses to revise the Safety Injection System Accumulators surveillance requirements.

The proposed amendment would delete surveillance requirement 4.5.1.d.

This surveillance requirement verifies that the accumulator isolation valves automatically open upon receipt of a safety injection signal and when the Reactor Coolant System pressure exceeds the P-11 interlock setpoint.

This amendment also corrects a typographical error in surveillance requirement 4.5.1.c.

2.

Documents designated Attachments A, B and C which set forth the change in the Technical Specifications, the safety analysis and the no significant hazards evaluation.

This proposed change was reviewed-by the OSC and ORC and determined to be safe and does not involve an unreviewed' safety question.

Very truly yours,

/J)L x<'

D. Sieber ice President Nuclear Group 0\\

p2%88tMusnr (9

"e BehvCr Vallcy Powcr St0ticn, Unit NO3. 1 &- 2 Docket No. 50-334, License No. DPR-66

' Docket No. 50-412, License No. NPF-73 Page 2

L.i.

cc:

Mr. J.

Beall, Sr. Resident Inspector Mr. W. T. Russell, NRC Region I Administrator Mr. P. Tam, Sr. Project Manager i

Mr. T. M. Gerusky, Director BRP/ DER

~

Mr. R. Janati, BRP/ DER Mr. R.

Saunders (VEPCO) i-t:

I l

l l

i l

l