ML20005E207
| ML20005E207 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 12/21/1989 |
| From: | Sieber J DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20005E208 | List: |
| References | |
| NUDOCS 9001040084 | |
| Download: ML20005E207 (2) | |
Text
k'4, e
Whey Power Staten
$Nptungport. PA 40774004 i'
h OI.,$.$No o,=
m r
- 3s2ss j
December 21, 1989 U. S. Nuclear Regulatory Commission e
Attn Document Control Desk i
' Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 6
BV-2 Docket No. 50-412, License No. NPF-73 Proposed Operating License Change Request No. 172/33 L
Gentlemen Enclosed are:
1.
An Application for Amendment to the above operating licenses to revise the Safety Injection System Accumulators surveillance requirements.
The proposed amendment would delete surveillance requirement 4.5.1.d.
This surveillance requirement verifies that the accumulator isolation valves automatically open upon receipt of a safety injection signal and when the Reactor Coolant System pressure exceeds the P-11 interlock setpoint.
This amendment also corrects a typographical error in surveillance requirement 4.5.1.c.
2.
Documents designated Attachments A, B and C which set forth the change in the Technical Specifications, the safety analysis and the no significant hazards evaluation.
This proposed change was reviewed-by the OSC and ORC and determined to be safe and does not involve an unreviewed' safety question.
Very truly yours,
/J)L x<'
D. Sieber ice President Nuclear Group 0\\
p2%88tMusnr (9
"e BehvCr Vallcy Powcr St0ticn, Unit NO3. 1 &- 2 Docket No. 50-334, License No. DPR-66
' Docket No. 50-412, License No. NPF-73 Page 2
L.i.
cc:
Mr. J.
Beall, Sr. Resident Inspector Mr. W. T. Russell, NRC Region I Administrator Mr. P. Tam, Sr. Project Manager i
Mr. T. M. Gerusky, Director BRP/ DER
~
Mr. R. Janati, BRP/ DER Mr. R.
Saunders (VEPCO) i-t:
I l
l l
i l
l