M Power COR PO R A YIO N June 30, 1981 File: | M Power COR PO R A YIO N June 30, 1981 File: | ||
Division of Licensing | 3-F-2 0 | ||
[^.1, | A M\\ | ||
Ii | Mr. Darrell G. Eisenhut e | ||
Director Division of Licensing | |||
[^.1, Ii 4 | |||
U.S. Nuclear Regulatory Comission | |||
'? | |||
#E 06 NT%7 Washington, D.C. | |||
20555 | |||
{'.i y,s, %Nu% | {'.i y,s, %Nu% | ||
==Subject:== | ==Subject:== | ||
Crystal River Unit 3 Docket No. 50-302 | Crystal River Unit 3 Docket No. 50-302 g | ||
Operating License No. DPR-72 e, | |||
Fire Protection Modifications - Reactor Co | |||
,p Oil Collection System | |||
==References:== | ==References:== | ||
(1) Fire Protection Rule, NRC Generic Letter 81-12,to All Power Reactor Licensees with Plants Licensed Prior to January 1, 1979; Dated February 20, 1981. | (1) Fire Protection Rule, NRC Generic Letter 81-12,to All Power Reactor Licensees with Plants Licensed Prior to January 1, 1979; Dated February 20, 1981. | ||
(2) FPC Letter from Dr. | (2) FPC Letter from Dr. | ||
P. | |||
Y. | |||
Baynard to Mr. | |||
Darrell G. | |||
Eisenhut, " Fire Protection Modifications"; Dated March 19, 1981. | Eisenhut, " Fire Protection Modifications"; Dated March 19, 1981. | ||
(3) FPC Letter from Dr. | (3) FPC Letter from Dr. | ||
P. | |||
Y. | |||
Baynard to Mr. | |||
Darrell G. | |||
Eisenhut, " Fire Protection Modifications - Reactor Coolant Pump Oil Collection System"; Dated June 12, 1981. | Eisenhut, " Fire Protection Modifications - Reactor Coolant Pump Oil Collection System"; Dated June 12, 1981. | ||
==Dear Mr. Eisenhut:== | ==Dear Mr. Eisenhut:== | ||
By reference (1), you requested FlorL'a Power Corporation to submit detailed information on meeting the requirements of Sections III.G, III.J, and III.0 of Appendix R to 10 CFR 50. | |||
By reference (1), you requested FlorL'a Power Corporation to submit detailed information on meeting the requirements of Sections III.G, III.J, and III.0 of Appendix R to 10 CFR 50. | By reference (2), FPC petitioned the Commission for an extemption from retrofitting the existing Reactor Coolant Pun? | ||
Oil Collection System on the basis that the e eisting Oil Collection System meets the objective of Section III.0 and was previously approved by the NRC and implemented by FPC. | |||
Furthermore, FPC petitioned the Commission that the implementation schedule associated with this requirement be deferred idefinitely persuant to 10 CFR 50.48(c) (6) during the resolution of that petitioned exemption. | |||
=8107070337 810630P! | |||
ad F | |||
PDQj ll | |||
< PDR ADOCK 05000302i g | |||
General Office 3201 inirty-fourtn street soutn. P O Box 14042, St Petersburg. Florida 33?33 813 - 866-5151 | |||
Page 'No | Page 'No | ||
. Fire Protection Modifications-Reactor Coolant Pump Oil Collection System June 30, 1981 Since May 11, 1981, several telephone conversations were held between NRC and FPC staff members re oi ding our requested exemption. | |||
Since the submittal of reference (3), telephone conversations on June 15, 1981 between Messers. Lobo and Telford of FPC and Mr. Tom Wambach of NRC were held regarding the adequacy of the existng Oil Collection System to comply with the requirements of Section III.0 of Appendix R. | The NRC staff has stated s | ||
that the information previously submitted for the Fire Protection Safety Evaluation Report is either not available or insufficient in light of Appendix R requirements and has requested additional information. | |||
Furthermore, Mr. Tom Wambach of your staff has assured us that the implementation schedule associated with Section III.0 will be " tolled" indefinitely during the resolution of this exemption following FPC's comitment to provide additional information to complete the review. | |||
As a result of these conversations, FPC comitted, by reference (3) to provide additional information related to the existing RCP C'1 Collection System. | |||
Since the submittal of reference (3), telephone conversations on June 15, 1981 between Messers. Lobo and Telford of FPC and Mr. Tom Wambach of NRC were held regarding the adequacy of the existng Oil Collection System to comply with the requirements of Section III.0 of Appendix R. | |||
The following conclusions were reached: | |||
1. | |||
During the 1981 Refueling Outage (scheduled for September 19, through December 4, 1981), FPC will visually inspect the existing RCP Oil Collection System for potential lube oil leakage sites and perform seismic evaluation of the as-built condition to determine the existing system's adequacy to comply with the Section III.0 of Appendix R; and 2(a). If the results of the visual inspection and seismic evaluation indicate that the existing system does meet the intent of Appendix R, the staff will be so notified; or 2(b). If the results of the visual inspection and seismic evaluation indicate that the existing system does not meet the intent of Section III.0 of Appendix R, | |||
FPC will either retrofit the existing 011 Collection System or design, fabricate and install a new 011 Ccllection System to meet the intent of Appendix R, Section III.0 FPC built the existing RCP Oil Collection System to meet the requirements delineated in the Branch Technical Position BTP PCSB 9.5-1, as reflected in the Staff's Fire Protection Safety Evaluation Report. | |||
10 CFR 50, Appendix R, | |||
published in November, 1980, became effective on February 17, 1981. | |||
Since September, 1980, FPC has been operating the Crystal River Nuclear Plant at or | |||
.near fbil power and has not experienced any outage to permit re-evaluation of the adequacy of the existing RCP Oil Collection System. | |||
The planned 1981 Refueling Outage will be the first opportunity FPC will have to perform an in depth evaluation of the adequacy of the existing system. | |||
During this outage, FPC will rather whatever data necessary to complete items 1 and 2 above. | |||
g | g Page Three Fire Protection M:)difications - | ||
Page Three Fire Protection M:)difications - | Reactor Coolant Pump Oil Collection System Jur e 30,1981 To design and fabricate either a modified or a new Oil Collection System, FPC may require until July 1, 1982, as identified in the attached schedule. | ||
Reactor Coolant Pump Oil Collection System Jur e 30,1981 To design and fabricate either a modified or a new Oil Collection System, FPC may require until July 1, 1982, as identified in the attached schedule. | The modified or new Oil Collection System will be installed after July 1, | ||
: 1982, during an outage of sufficient duration. | |||
Therefore, persuant to 10 CFR 50.12(a) and 10 CFR 50.48(c)(6), FPC hereby requests an extension to the implementation schedule identified in 10 CFR 50.48(c)(3). | |||
Any required modifications will be implementated before startup after the earliest of the following events commencing July 1, 1982: | |||
(i) the first refueling ' outage, or (ii) another planced outage that lasts for at least 60 days; or (iii)an unplanned outage that lasts for at least 120 days. | (i) the first refueling ' outage, or (ii) another planced outage that lasts for at least 60 days; or (iii)an unplanned outage that lasts for at least 120 days. | ||
Should you have any questions regarding our letter, please contact Walter G. | Should you have any questions regarding our letter, please contact Walter G. | ||
Lobo at (813) 866-4422. | Lobo at (813) 866-4422. | ||
Very truly yours, 01'g- | Very truly yours, 01'g-V Dr. P. Y. Baynard | ||
PYB/jw(NRCF..) | : Manager, Nuclear 32pport Services Attachment PYB/jw(NRCF..) | ||
i i | i i | ||
.m | |||
ATTACHMENT REACTOR COOLANT PUMP OIL COLLECTION PROJECT SCHEDULE 1981 | ATTACHMENT REACTOR COOLANT PUMP OIL COLLECTION PROJECT SCHEDULE 1981 1982 1 | ||
f OUTAGE m | |||
r (need I week for data) 8/l 9/1 10/1 11/1 12/1 1/1/82 2/1 l | |||
8/15 | 8/15 l | ||
I | 11/7 l | ||
12/7 l | |||
l 1 | |||
inal Prelim. | I L | ||
3/1 | 1 Y | ||
Issue Final Design Receive Material Order | Receive r'h"# | ||
Material | contractor Comm. | ||
i | inal mobilize Start Complete Prelim. | ||
Plant Training Design i | |||
Issue Prelim, Design and Etaff contract) | |||
Design for Comm. | |||
6/1 7/14 5/l1 l | |||
3/1 4/1 2/11 2/21 3/7 l | |||
4/15 3 | |||
Issue Final Design Receive Material i | |||
Order Start Fabrication FabricatioG l | |||
Material Complete i | |||
4 i | |||
Receive Comm. | |||
Issue inal Design for i | Issue inal Design for i | ||
Comm. | Comm. | ||
W Install during next available outage 1 | W Install during next available outage 1 | ||
i M}} | i M}} | ||
Latest revision as of 03:07, 23 December 2024
| ML20008G343 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/30/1981 |
| From: | Baynard P FLORIDA POWER CORP. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| GL-81-12, NUDOCS 8107070337 | |
| Download: ML20008G343 (4) | |
Text
_
M Power COR PO R A YIO N June 30, 1981 File:
3-F-2 0
A M\\
Mr. Darrell G. Eisenhut e
Director Division of Licensing
[^.1, Ii 4
U.S. Nuclear Regulatory Comission
'?
- E 06 NT%7 Washington, D.C.
20555
{'.i y,s, %Nu%
Subject:
Crystal River Unit 3 Docket No. 50-302 g
Operating License No. DPR-72 e,
Fire Protection Modifications - Reactor Co
,p Oil Collection System
References:
(1) Fire Protection Rule, NRC Generic Letter 81-12,to All Power Reactor Licensees with Plants Licensed Prior to January 1, 1979; Dated February 20, 1981.
(2) FPC Letter from Dr.
P.
Y.
Baynard to Mr.
Darrell G.
Eisenhut, " Fire Protection Modifications"; Dated March 19, 1981.
(3) FPC Letter from Dr.
P.
Y.
Baynard to Mr.
Darrell G.
Eisenhut, " Fire Protection Modifications - Reactor Coolant Pump Oil Collection System"; Dated June 12, 1981.
Dear Mr. Eisenhut:
By reference (1), you requested FlorL'a Power Corporation to submit detailed information on meeting the requirements of Sections III.G, III.J, and III.0 of Appendix R to 10 CFR 50.
By reference (2), FPC petitioned the Commission for an extemption from retrofitting the existing Reactor Coolant Pun?
Oil Collection System on the basis that the e eisting Oil Collection System meets the objective of Section III.0 and was previously approved by the NRC and implemented by FPC.
Furthermore, FPC petitioned the Commission that the implementation schedule associated with this requirement be deferred idefinitely persuant to 10 CFR 50.48(c) (6) during the resolution of that petitioned exemption.
=8107070337 810630P!
ad F
PDQj ll
< PDR ADOCK 05000302i g
General Office 3201 inirty-fourtn street soutn. P O Box 14042, St Petersburg. Florida 33?33 813 - 866-5151
Page 'No
. Fire Protection Modifications-Reactor Coolant Pump Oil Collection System June 30, 1981 Since May 11, 1981, several telephone conversations were held between NRC and FPC staff members re oi ding our requested exemption.
The NRC staff has stated s
that the information previously submitted for the Fire Protection Safety Evaluation Report is either not available or insufficient in light of Appendix R requirements and has requested additional information.
Furthermore, Mr. Tom Wambach of your staff has assured us that the implementation schedule associated with Section III.0 will be " tolled" indefinitely during the resolution of this exemption following FPC's comitment to provide additional information to complete the review.
As a result of these conversations, FPC comitted, by reference (3) to provide additional information related to the existing RCP C'1 Collection System.
Since the submittal of reference (3), telephone conversations on June 15, 1981 between Messers. Lobo and Telford of FPC and Mr. Tom Wambach of NRC were held regarding the adequacy of the existng Oil Collection System to comply with the requirements of Section III.0 of Appendix R.
The following conclusions were reached:
1.
During the 1981 Refueling Outage (scheduled for September 19, through December 4, 1981), FPC will visually inspect the existing RCP Oil Collection System for potential lube oil leakage sites and perform seismic evaluation of the as-built condition to determine the existing system's adequacy to comply with the Section III.0 of Appendix R; and 2(a). If the results of the visual inspection and seismic evaluation indicate that the existing system does meet the intent of Appendix R, the staff will be so notified; or 2(b). If the results of the visual inspection and seismic evaluation indicate that the existing system does not meet the intent of Section III.0 of Appendix R,
FPC will either retrofit the existing 011 Collection System or design, fabricate and install a new 011 Ccllection System to meet the intent of Appendix R,Section III.0 FPC built the existing RCP Oil Collection System to meet the requirements delineated in the Branch Technical Position BTP PCSB 9.5-1, as reflected in the Staff's Fire Protection Safety Evaluation Report.
published in November, 1980, became effective on February 17, 1981.
Since September, 1980, FPC has been operating the Crystal River Nuclear Plant at or
.near fbil power and has not experienced any outage to permit re-evaluation of the adequacy of the existing RCP Oil Collection System.
The planned 1981 Refueling Outage will be the first opportunity FPC will have to perform an in depth evaluation of the adequacy of the existing system.
During this outage, FPC will rather whatever data necessary to complete items 1 and 2 above.
g Page Three Fire Protection M:)difications -
Reactor Coolant Pump Oil Collection System Jur e 30,1981 To design and fabricate either a modified or a new Oil Collection System, FPC may require until July 1, 1982, as identified in the attached schedule.
The modified or new Oil Collection System will be installed after July 1,
- 1982, during an outage of sufficient duration.
Therefore, persuant to 10 CFR 50.12(a) and 10 CFR 50.48(c)(6), FPC hereby requests an extension to the implementation schedule identified in 10 CFR 50.48(c)(3).
Any required modifications will be implementated before startup after the earliest of the following events commencing July 1, 1982:
(i) the first refueling ' outage, or (ii) another planced outage that lasts for at least 60 days; or (iii)an unplanned outage that lasts for at least 120 days.
Should you have any questions regarding our letter, please contact Walter G.
Lobo at (813) 866-4422.
Very truly yours, 01'g-V Dr. P. Y. Baynard
- Manager, Nuclear 32pport Services Attachment PYB/jw(NRCF..)
i i
.m
ATTACHMENT REACTOR COOLANT PUMP OIL COLLECTION PROJECT SCHEDULE 1981 1982 1
f OUTAGE m
r (need I week for data) 8/l 9/1 10/1 11/1 12/1 1/1/82 2/1 l
8/15 l
11/7 l
12/7 l
l 1
I L
1 Y
Receive r'h"#
contractor Comm.
inal mobilize Start Complete Prelim.
Plant Training Design i
Issue Prelim, Design and Etaff contract)
Design for Comm.
6/1 7/14 5/l1 l
3/1 4/1 2/11 2/21 3/7 l
4/15 3
Issue Final Design Receive Material i
Order Start Fabrication FabricatioG l
Material Complete i
4 i
Receive Comm.
Issue inal Design for i
Comm.
W Install during next available outage 1
i M