ML20010D154: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 19: | Line 19: | ||
{{#Wiki_filter:,. | {{#Wiki_filter:,. | ||
a OPERATI iG DATA REPORT DOCKET NO. 50-348 DATE 8/1/81 COMPLETED BY W.G.hairston, III TELEPHONE (ZU))69925156 OPERATING STATUS | a OPERATI iG DATA REPORT DOCKET NO. 50-348 DATE 8/1/81 COMPLETED BY W.G.hairston, III TELEPHONE (ZU))69925156 OPERATING STATUS | ||
: 1. Unit Name: J SePh M. Farley - Unit 1 | : 1. Unit Name: J SePh M. Farley - Unit 1 Notes 1) Cumulative data | ||
: 2. Reporting Period: | : 2. Reporting Period: | ||
July, 1981 since 12/1/77, date of | |||
: 3. Licensed Thennal Power (MWt): | : 3. Licensed Thennal Power (MWt): | ||
2652 | 2652 commercial operation. | ||
: 4. Nameplate Rating (Gross MWe): | 860 | ||
: 4. Nameplate Rating (Gross MWe): | |||
: 5. Design Electrical Rating (Net MWe): 829 | : 5. Design Electrical Rating (Net MWe): 829 | ||
: 6. Maximum Dependable Capacity (Gross MWe): | : 6. Maximum Dependable Capacity (Gross MWe): | ||
: 7. Maximum Dependable Capacity (Net MWe): | 844.6 | ||
: 7. Maximum Dependable Capacity (Net MWe): | |||
803.6 | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Gise Reasons: | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Gise Reasons: | ||
N/A | N/A | ||
: 9. Power Lesel To Which Re tsicted. If Any (Net MWe): | : 9. Power Lesel To Which Re tsicted. If Any (Net MWe): | ||
: 10. Rea>ons For Restrictions,1f Any: | N/A | ||
: 11. ilours In Reporting Period | : 10. Rea>ons For Restrictions,1f Any: | ||
: 12. Number Of flours Reactor Was Critical | N/A This Month Yr.-to-Da te Cuhulatise | ||
: 13. Reactor Reserte Shutdown !!ours | : 11. ilours In Reporting Period 744 5,087 32,135 | ||
: 14. Ilours Generator On.Line | : 12. Number Of flours Reactor Was Critical 744 2,840.8 20,023.1 | ||
: 15. Unit Reserve Shutdown Hours | : 13. Reactor Reserte Shutdown !!ours 0 | ||
0 | 374.1 2,820.9 | ||
: 16. Gross Thennal Energy Generated (MWH) | : 14. Ilours Generator On.Line 744 2,670.6 19,374.0 | ||
: 17. Gross Electrical Energy Generated (MWH) | : 15. Unit Reserve Shutdown Hours 0 | ||
: 18. Net Electrical Energy Generated (MWH) | 0 0 | ||
: 19. Unit Service Factor | : 16. Gross Thennal Energy Generated (MWH) 1.889.655.9 J,500,017.8 48,489,909.6 | ||
: 20. Unit Availability Factor | : 17. Gross Electrical Energy Generated (MWH) 590,366 2,052,874 15,472,282 | ||
52.5 | : 18. Net Electrical Energy Generated (MWH) 558,978 1 911,386 14.519,136 | ||
: 21. Unit capacity Factor (Using MDC Net) | : 19. Unit Service Factor 100.0 | ||
_ 52.5 60.3 | |||
: 22. Unit Capacity Factor (Using DER Net) | : 20. Unit Availability Factor 100.0 46.8 56.2 52.5 60.3 | ||
: 23. Unit Forced Outage Rate | : 21. Unit capacity Factor (Using MDC Net) 93.5 | ||
: 22. Unit Capacity Factor (Using DER Net) 90.6 45.3 54.5 | |||
: 23. Unit Forced Outage Rate 00.0 10.8 07.5 | |||
: 24. ShutdownsSchedated Oser Next 6 Months (Type.Date.and Duration of Each): | : 24. ShutdownsSchedated Oser Next 6 Months (Type.Date.and Duration of Each): | ||
Maintenance / Design Change Modifications associated with TMI-2; Mid-September, 1981; Anoroximately 2-3 weeks. | Maintenance / Design Change Modifications associated with TMI-2; Mid-September, 1981; Anoroximately 2-3 weeks. | ||
: 25. If Shur Down At End Of Report Period. Estimated Date of Startup: | : 25. If Shur Down At End Of Report Period. Estimated Date of Startup: | ||
: 26. Units In Test Status (Prior to Commercial Operation): | N/A | ||
: 26. Units In Test Status (Prior to Commercial Operation): | |||
Forecast Achiesed INITIA L CRITICA LITY 8/6/77 8/9/77 INITIA L ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/1/77 12/1/77-8108240060 810817 PDR ADOCK 05000348 R | |||
PDR (u1771 | |||
AVERAGE DAILY UNIT POWER LEVEL | AVERAGE DAILY UNIT POWER LEVEL | ||
+ | |||
,/ | |||
50-348 | |||
,. ' ~ | |||
DOCKET NO. | |||
~ | |||
t UNIT 1 | |||
DATE 8/1/81 | |||
~ | |||
N | N | ||
* C' II"I | * C' II"I E '' III NLETED BY | ||
,t TELEPHONE (205) 899-5156 MONTl! | |||
DAY | July. 1981 DAY AVERAGE DAILY POWER LEVEL | ||
* DAY | * DAY AVERAGE DAll POWER LEVEL (MWe-Net) | ||
(MWe. Net) 411 | |||
775 2 | ~778 1 | ||
17 781 775 2 | |||
3 | IS 789 | ||
39 4 | ~ | ||
20 | 786 3 | ||
39 4 | |||
722 20 785 3 | |||
593 786 | |||
6 | .1 4 | ||
7 | 6 654 785 3 | ||
7 777 23 786 m | |||
i 782 g | |||
783 y | |||
1 9 | |||
10 | 784 25-731 | ||
~ -- | |||
10 780 26 704 | |||
~ | |||
12 | gg 780 | ||
''T 774 J,., | |||
13 | 12 769 | ||
14 | ,, 23 779 13 773 780 | ||
30 | ~. - | ||
3 14 755 783 30 | |||
:33 | :33 | ||
'784 | |||
. 15 767 | |||
-775 16 | |||
INS 7RUCDONS | ~ | ||
On this formst. list the average daily unit power level in MWe-Net for c:ch d:y in the reporting month. Compute to the ne: rest whole meg: watt. | INS 7RUCDONS On this formst. list the average daily unit power level in MWe-Net for c:ch d:y in the reporting month. Compute to the ne: rest whole meg: watt. | ||
%g e | |||
p | p t | ||
m 7- | |||
D UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. | |||
UNIT SIIUTDOWNS AND POWER REDUCTIONS | 50-348 UNIT NAME J.M.Feirley-Unit [ | ||
DATE _ R /1/R1 REPORT MONTil July, 1981 | DATE _ R /1/R1 REPORT MONTil July, 1981 COMPLETED BY U.C.HMrston. III TELEPilONE (705)R99-5156 "E | ||
TELEPilONE (705)R99-5156 "E | e ei | ||
e | .3 no : | ||
5 | |||
.2 _e E | |||
018 | ,.s X Licensee cg | ||
019 | -o | ||
$.'3 cL Cause & Corrective a | |||
No. | |||
Date g | |||
3g g | |||
jg5 Event u? | |||
Action to | |||
$5 5 | |||
j di g Report e iN0 5O Prevent Recurrence H | |||
6 018 810701 F | |||
0 G | |||
4 N/A RB ZZZZZZ Continuation of Power reduction from 6/30/81 due to accumulation of 72 penalty points for axial flux differ-ence (AI) being out'of target band during power ascension. | |||
019 210704 F | |||
0 A | |||
4 N/A RB INSTRU Unit power reduced to and held at less than.'5% (639 Mwe) due to indicated Quadrant Power Tilt Ratio exceeding Tech. Spec, limit (QPTR-1.07). Recalibrated NIS fol-lowing verification that QPTR had not. | |||
exceeded Tech. Spec. limit. | exceeded Tech. Spec. limit. | ||
020 | 020 810725 S | ||
0 B | |||
I | 4 N/A HB INSTRU Unit power reduced to and held at 33%,(205 MWe) to place flow trans-mitter FT-426 back in service. | ||
D. Regulatory Restriction | I 2 | ||
3 4 | |||
1: 1 orced Reason: | |||
Metliod: | |||
lixhibit G. Instinctions S: Scheduled A liquipment Failure (Explain) ' | |||
: l. Manual for Preparation of Data ll Maintenance of Test 2.Manu.il Scram. | |||
I?ntiy Sheet > for I.icensee C. Refueling | |||
: 3. Automatic Seram. | |||
Event Report (LliR)l ile (NUREG. | |||
D. Regulatory Restriction 4 Other(Explain) 0161) | |||
E. Operator Training & License lixamination 1;. Administrative 5 | E. Operator Training & License lixamination 1;. Administrative 5 | ||
G. Operational Error (Explain) | G. Operational Error (Explain) | ||
('l/77) | Exlubit ! Same Source | ||
('l/77) | |||
II.Othes (Fxplain) - | |||
,}} | |||
Latest revision as of 06:43, 21 December 2024
| ML20010D154 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/01/1981 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML20010D153 | List: |
| References | |
| NUDOCS 8108240060 | |
| Download: ML20010D154 (3) | |
Text
,.
a OPERATI iG DATA REPORT DOCKET NO. 50-348 DATE 8/1/81 COMPLETED BY W.G.hairston, III TELEPHONE (ZU))69925156 OPERATING STATUS
- 1. Unit Name: J SePh M. Farley - Unit 1 Notes 1) Cumulative data
- 2. Reporting Period:
July, 1981 since 12/1/77, date of
- 3. Licensed Thennal Power (MWt):
2652 commercial operation.
860
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe):
844.6
- 7. Maximum Dependable Capacity (Net MWe):
803.6
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Gise Reasons:
N/A
- 9. Power Lesel To Which Re tsicted. If Any (Net MWe):
N/A
- 10. Rea>ons For Restrictions,1f Any:
N/A This Month Yr.-to-Da te Cuhulatise
- 11. ilours In Reporting Period 744 5,087 32,135
- 12. Number Of flours Reactor Was Critical 744 2,840.8 20,023.1
- 13. Reactor Reserte Shutdown !!ours 0
374.1 2,820.9
- 14. Ilours Generator On.Line 744 2,670.6 19,374.0
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thennal Energy Generated (MWH) 1.889.655.9 J,500,017.8 48,489,909.6
- 17. Gross Electrical Energy Generated (MWH) 590,366 2,052,874 15,472,282
- 18. Net Electrical Energy Generated (MWH) 558,978 1 911,386 14.519,136
- 19. Unit Service Factor 100.0
_ 52.5 60.3
- 20. Unit Availability Factor 100.0 46.8 56.2 52.5 60.3
- 21. Unit capacity Factor (Using MDC Net) 93.5
- 22. Unit Capacity Factor (Using DER Net) 90.6 45.3 54.5
- 23. Unit Forced Outage Rate 00.0 10.8 07.5
- 24. ShutdownsSchedated Oser Next 6 Months (Type.Date.and Duration of Each):
Maintenance / Design Change Modifications associated with TMI-2; Mid-September, 1981; Anoroximately 2-3 weeks.
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICA LITY 8/6/77 8/9/77 INITIA L ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/1/77 12/1/77-8108240060 810817 PDR ADOCK 05000348 R
PDR (u1771
AVERAGE DAILY UNIT POWER LEVEL
+
,/
50-348
,. ' ~
DOCKET NO.
~
t UNIT 1
DATE 8/1/81
~
N
- C' II"I E III NLETED BY
,t TELEPHONE (205) 899-5156 MONTl!
July. 1981 DAY AVERAGE DAILY POWER LEVEL
- DAY AVERAGE DAll POWER LEVEL (MWe-Net)
(MWe. Net) 411
~778 1
17 781 775 2
IS 789
~
786 3
39 4
722 20 785 3
593 786
.1 4
6 654 785 3
7 777 23 786 m
i 782 g
783 y
1 9
784 25-731
~ --
10 780 26 704
~
gg 780
T 774 J,.,
12 769
,, 23 779 13 773 780
~. -
3 14 755 783 30
- 33
'784
. 15 767
-775 16
~
INS 7RUCDONS On this formst. list the average daily unit power level in MWe-Net for c:ch d:y in the reporting month. Compute to the ne: rest whole meg: watt.
%g e
p t
m 7-
D UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-348 UNIT NAME J.M.Feirley-Unit [
DATE _ R /1/R1 REPORT MONTil July, 1981 COMPLETED BY U.C.HMrston. III TELEPilONE (705)R99-5156 "E
e ei
.3 no :
5
.2 _e E
,.s X Licensee cg
-o
$.'3 cL Cause & Corrective a
No.
Date g
3g g
jg5 Event u?
Action to
$5 5
j di g Report e iN0 5O Prevent Recurrence H
6 018 810701 F
0 G
4 N/A RB ZZZZZZ Continuation of Power reduction from 6/30/81 due to accumulation of 72 penalty points for axial flux differ-ence (AI) being out'of target band during power ascension.
019 210704 F
0 A
4 N/A RB INSTRU Unit power reduced to and held at less than.'5% (639 Mwe) due to indicated Quadrant Power Tilt Ratio exceeding Tech. Spec, limit (QPTR-1.07). Recalibrated NIS fol-lowing verification that QPTR had not.
exceeded Tech. Spec. limit.
020 810725 S
0 B
4 N/A HB INSTRU Unit power reduced to and held at 33%,(205 MWe) to place flow trans-mitter FT-426 back in service.
I 2
3 4
1: 1 orced Reason:
Metliod:
lixhibit G. Instinctions S: Scheduled A liquipment Failure (Explain) '
- l. Manual for Preparation of Data ll Maintenance of Test 2.Manu.il Scram.
I?ntiy Sheet > for I.icensee C. Refueling
- 3. Automatic Seram.
Event Report (LliR)l ile (NUREG.
D. Regulatory Restriction 4 Other(Explain) 0161)
E. Operator Training & License lixamination 1;. Administrative 5
G. Operational Error (Explain)
Exlubit ! Same Source
('l/77)
II.Othes (Fxplain) -
,