ML20010D151
| ML20010D151 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/17/1981 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML20010D153 | List: |
| References | |
| NUDOCS 8108240059 | |
| Download: ML20010D151 (2) | |
Text
,
Malling Address Alabama Power Company 600 North 18th Street Post office Boa 2641 i
Birmingham. Alabama 35291 i
Telephone 205 783-6081 F. L. Cf ayton, Jr.
RO'l3%7"'
Alabama Power e
see sowen ev:ric t.s:em August 17, 1981 Docket No. 50-348 Q
Director, Office of Management
~
6 S
l Information and Program Control
'b f3
(/?/
U. S. Nuclear Regulatory Commission S
Washington, D.C.
20555 V7
\\
Dear Sir:
N g p RE: Joseph M. Farley Nuclear Plant Unit No.1 Monthly Operating Data Report Attached are two (2) copies of the July,1981 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Specifications.
As requested by letter from Mr.
John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a ",'larrative Summary of Operating Experience" is included in the attached repart.
If you have any questions, please advise.
Yours very truly, k
F.L.Clayton,J(
FLCJr/ HOT:nac l
Attachments xc: Mr. Ted Cintula (1 copy)
Director, IE"(10 copies)
I Director, RII (1 copy)
TOY M
.5 l
l ji l
l 8108240059 810817 PDR ADOCK 05000348 M
i R
PDR 46f L
s.
s JOSEPH H. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS JULY, 1981 There were three (3) power reductions in the month of July.
The following safety-related maintenance was performed in the month of July:
1.
Miscellaneous maintenance on diesel generators.
2.
Replaced fiber optics lamp on "A" chlorine detector.
3.
Installed vibration monitoring instrumentation on IB charging pump.
-