ML20011D805: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:f}n | ||
a | ,y | ||
~ = = | |||
a | |||
,,1 | |||
-c. | |||
,we a,s : | |||
* ??6 f t' 5 | |||
di sc 5 | |||
JlU L | |||
f t | f t | ||
,n | |||
? | |||
4 | |||
CATAWBA NUCLEAR STATION | ,7 | ||
MONTHLY OPERATING STATUS REPORT | '? | ||
:l | ] | ||
October 1989 | CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT q | ||
:l October 1989 | |||
-t 1. | |||
\ | . Personnel Exposure- | ||
o For the month of Octobr;r,'no' individual (s)-exceeded 10 | \\ | ||
o For the month of Octobr;r,'no' individual (s)-exceeded 10 1 | |||
l | .percentEof their1 allo':able annual radiation dose' limit.- | ||
l 2. | |||
The, total ~ station liquid release.for October has been compared with the Technical Specifications maximum annual | |||
p | ' dose commitment *and was less'than'10: percent of this limit. | ||
p The total station. gaseous release for October has.been-compared with the. Technical Specifications maximum annual L | |||
dose commitment and was'less than 10 percent of this limit. | dose commitment and was'less than 10 percent of this limit. | ||
8912290103 891215 PDR- ADOCK 05000413 | 8912290103 891215 PDR-ADOCK 05000413 R | ||
PDR | |||
+ | |||
- -}} | |||
Latest revision as of 04:33, 21 December 2024
| ML20011D805 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/31/1989 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20011D157 | List: |
| References | |
| NUDOCS 8912290183 | |
| Download: ML20011D805 (1) | |
Text
f}n
,y
~ = =
a
,,1
-c.
,we a,s :
- ??6 f t' 5
di sc 5
JlU L
f t
,n
?
4
,7
'?
]
CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT q
- l October 1989
-t 1.
. Personnel Exposure-
\\
o For the month of Octobr;r,'no' individual (s)-exceeded 10 1
.percentEof their1 allo':able annual radiation dose' limit.-
l 2.
The, total ~ station liquid release.for October has been compared with the Technical Specifications maximum annual
' dose commitment *and was less'than'10: percent of this limit.
p The total station. gaseous release for October has.been-compared with the. Technical Specifications maximum annual L
dose commitment and was'less than 10 percent of this limit.
8912290103 891215 PDR-ADOCK 05000413 R
+
- -