ML20045F072: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML20045F072 | | number = ML20045F072 | ||
| issue date = 04/07/1993 | | issue date = 04/07/1993 | ||
| title = Rev 9 to Corporate Process Control Program Manual | | title = Rev 9 to Corporate Process Control Program Manual | ||
| author name = Vaught M | | author name = Vaught M | ||
| author affiliation = DUKE POWER CO. | | author affiliation = DUKE POWER CO. | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:s' u | {{#Wiki_filter:s' u ooom m c.m Fras pa,aap w s tasas J | ||
DUKE POWER COMPANY | DUKE POWER COMPANY PCP REVISION APPROVAL. | ||
PCP REVISION APPROVAL. | |||
Revised PCP Section: | Revised PCP Section: | ||
Corporcie PCP, Rev | Corporcie PCP, Rev. | ||
ONS PCP. Rev. L MNS PCP, Rev. | ONS PCP. Rev. L MNS PCP, Rev. | ||
CNS PCP, Rev. _, | CNS PCP, Rev. _, | ||
This reviston hos been reviewed ogainst Technical SpecticoMons, and applicobre NRC guidance documents and found to be acceptable. | This reviston hos been reviewed ogainst Technical SpecticoMons, and applicobre NRC guidance documents and found to be acceptable. | ||
Prepored By:% % .h WLt | Prepored By:% %.h WLt y | ||
. q- | |||
==Title:== | ==Title:== | ||
6%N v Rooweite Processing and Management Dote: 3/d4/T3 | 6%N v Rooweite Processing and Management Dote: 3/d4/T3 General Of!1ce Review Station Review M e!~e-By:bM By: | ||
General Of!1ce Review | f | ||
/. | |||
l C L_ | |||
==Title:== | ==Title:== | ||
h. hd u | |||
==Title:== | ==Title:== | ||
~ | |||
Date: __ | Q Date: __ | ||
Date; p3/;;l5,/73 J /24A7 This revision is opproved for use of hWec-Nuclear Stotton. | |||
/24L14~ | |||
fataqtCw NuOlear Techn! col Services Monoget Oconee Chefnistry Monocer Date: | |||
Oconee Station Monoger | Afif9_5 Date: | ||
'l-12 -9 3 | |||
/ M /L== =-.. | |||
Oconee Station Monoger M7/M Date: | |||
MBV:JI.012 9307060377 930630 3 | |||
PDR ADOCK 05000269 | |||
_fj P | |||
PDR (lj | |||
DUKE POWER COMPAMY OCONEE NUCLEAR STATION PROCESS CONTROL PROGRAM | DUKE POWER COMPAMY OCONEE NUCLEAR STATION PROCESS CONTROL PROGRAM 1.0 PURPOSE The purpose of the Oconee Nuclear Station Process. Control Program is to ensure all requirements of the DPC Corperate Process Control Program have been met for each container of solidified radioactive or mixed waste and dewatered radioactive waste shipped for burial at a licensed burial facility. | ||
1.0 | This PCP is applicable only to the solidification or dewatering of liquid or wet solid radioactive waste. | ||
2.0 | 2.0 COMPOSITION 2.1 The Oconee Nuclear Station Process Control Program shall consist of: | ||
2.1.1 | 2.1.1 The Duke Power Company Corporate Process Control Program. | ||
2.1.2 | 2.1.2 A list of all station-specific procedures that implement the requirements of the Corporate Process Control Program. | ||
2.1.3 | 2.1.3 Oconee Nuclear Station diagrams, drawings or drawing numbers showing interfaces between ONS radwaste systems and solidification and dewatering equipment. | ||
2.1.4 | 2.1.4 Documentation of Nuclear Technical-Services Manager, ONS Chemistry Manager and ONS Station Manager approval of all changes to the Oconee Process Control Program. | ||
3.0 | 3.0 EXCEPTIONS 3.1 The Oconee Nuclear Station Process Control Program takes the following exceptions with the DPC Corporate Process Control Program: | ||
3.1.1 | 3.1.1 For Corporate PCP section 3.1.3, station review and Station Manager approval are not required. | ||
O-1 | Corporate review and approval of vendor solidification and dewatering services are sufficient. | ||
O-1 Rev. 9 r | |||
t. | |||
i SECTION 2.1.2 | i SECTION 2.1.2 | ||
Imolementino Procedures CP/3/B/5200/08A " Unit 3 High Activity Spent Resin Storage Tank (HASRST) Resin Transfer to Disposable Liner" CP/0/B/5200/48 | ) | ||
Imolementino Procedures CP/3/B/5200/08A | |||
CP/0/B/5400/01 | " Unit 3 High Activity Spent Resin Storage Tank (HASRST) Resin Transfer to Disposable Liner" CP/0/B/5200/48 | ||
Smaller Liners" | " Resin Recovery System Operation" CP/0/B/4002/25 | ||
" Solidification of Grit Waste Generated by Wet Grit Blast Decon Unit" CP/0/B/5400/01 "CNSI Procedure for Dewatering of Ecodex Precoat/Powdex/ Diatomaceous Earth in CNSI 14-195 or Smaller Liners" CP/O/B/54 00/02 | |||
" Bead Dewatering Procedure for CNSI 14-195 or Smaller Liners" i | |||
CP/0/B/5400/03 | |||
" Operating Guidelines for the use of CNSI High Integrity Containers" CP/O/B/5400/04 | |||
" Handling Procedure for CNSI High Integrity Overpack Containers" CP/0/ B/54 00/07 "PCP for CNSI Solidificdtion Unit" CP/0/B/54 00/10 | |||
" Dewatering Procedure for CNSI 24" diameter Vessels Containing Activated Carbon and Ion Exchange Resins" CP/0/B/5400/12 | |||
" Westinghouse Procedure for Dewatering of Resin and Similar Media in SEG Resin Express Liners" RP/0/B/1006/01/A | |||
" Procedure for the Preparation and Shipment of Radioactive Wastes" i | |||
i i | i i | ||
0-2 | 0-2 Rev. 9 l | ||
2 SECTION 2.1.3 Drawina Index All system interfaces are shown on diagrams or described in the applicable station procedure. | 2 SECTION 2.1.3 Drawina Index All system interfaces are shown on diagrams or described in the jl applicable station procedure. | ||
j i | |||
J l | J l | ||
1 i | 1 i | ||
h i | h i | ||
ONSPCP.100 0-3 | ONSPCP.100 0-3 Rev. 9 | ||
.,.}} | |||
Latest revision as of 11:16, 19 December 2024
| ML20045F072 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/07/1993 |
| From: | Vaught M DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML15224A266 | List: |
| References | |
| PROC-930407, NUDOCS 9307060377 | |
| Download: ML20045F072 (4) | |
Text
s' u ooom m c.m Fras pa,aap w s tasas J
DUKE POWER COMPANY PCP REVISION APPROVAL.
Revised PCP Section:
Corporcie PCP, Rev.
This reviston hos been reviewed ogainst Technical SpecticoMons, and applicobre NRC guidance documents and found to be acceptable.
Prepored By:% %.h WLt y
. q-
Title:
6%N v Rooweite Processing and Management Dote: 3/d4/T3 General Of!1ce Review Station Review M e!~e-By:bM By:
f
/.
l C L_
Title:
h. hd u
Title:
~
Q Date: __
Date; p3/;;l5,/73 J /24A7 This revision is opproved for use of hWec-Nuclear Stotton.
/24L14~
fataqtCw NuOlear Techn! col Services Monoget Oconee Chefnistry Monocer Date:
Afif9_5 Date:
'l-12 -9 3
/ M /L== =-..
Oconee Station Monoger M7/M Date:
MBV:JI.012 9307060377 930630 3
PDR ADOCK 05000269
_fj P
PDR (lj
DUKE POWER COMPAMY OCONEE NUCLEAR STATION PROCESS CONTROL PROGRAM 1.0 PURPOSE The purpose of the Oconee Nuclear Station Process. Control Program is to ensure all requirements of the DPC Corperate Process Control Program have been met for each container of solidified radioactive or mixed waste and dewatered radioactive waste shipped for burial at a licensed burial facility.
This PCP is applicable only to the solidification or dewatering of liquid or wet solid radioactive waste.
2.0 COMPOSITION 2.1 The Oconee Nuclear Station Process Control Program shall consist of:
2.1.1 The Duke Power Company Corporate Process Control Program.
2.1.2 A list of all station-specific procedures that implement the requirements of the Corporate Process Control Program.
2.1.3 Oconee Nuclear Station diagrams, drawings or drawing numbers showing interfaces between ONS radwaste systems and solidification and dewatering equipment.
2.1.4 Documentation of Nuclear Technical-Services Manager, ONS Chemistry Manager and ONS Station Manager approval of all changes to the Oconee Process Control Program.
3.0 EXCEPTIONS 3.1 The Oconee Nuclear Station Process Control Program takes the following exceptions with the DPC Corporate Process Control Program:
3.1.1 For Corporate PCP section 3.1.3, station review and Station Manager approval are not required.
Corporate review and approval of vendor solidification and dewatering services are sufficient.
O-1 Rev. 9 r
t.
i SECTION 2.1.2
)
Imolementino Procedures CP/3/B/5200/08A
" Unit 3 High Activity Spent Resin Storage Tank (HASRST) Resin Transfer to Disposable Liner" CP/0/B/5200/48
" Resin Recovery System Operation" CP/0/B/4002/25
" Solidification of Grit Waste Generated by Wet Grit Blast Decon Unit" CP/0/B/5400/01 "CNSI Procedure for Dewatering of Ecodex Precoat/Powdex/ Diatomaceous Earth in CNSI 14-195 or Smaller Liners" CP/O/B/54 00/02
" Bead Dewatering Procedure for CNSI 14-195 or Smaller Liners" i
CP/0/B/5400/03
" Operating Guidelines for the use of CNSI High Integrity Containers" CP/O/B/5400/04
" Handling Procedure for CNSI High Integrity Overpack Containers" CP/0/ B/54 00/07 "PCP for CNSI Solidificdtion Unit" CP/0/B/54 00/10
" Dewatering Procedure for CNSI 24" diameter Vessels Containing Activated Carbon and Ion Exchange Resins" CP/0/B/5400/12
" Westinghouse Procedure for Dewatering of Resin and Similar Media in SEG Resin Express Liners" RP/0/B/1006/01/A
" Procedure for the Preparation and Shipment of Radioactive Wastes" i
i i
0-2 Rev. 9 l
2 SECTION 2.1.3 Drawina Index All system interfaces are shown on diagrams or described in the jl applicable station procedure.
j i
J l
1 i
h i
ONSPCP.100 0-3 Rev. 9
.,.