ML20045H361: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-      -
{{#Wiki_filter:-
                                                      ,;p., f"%:
f"%:
* c
c
      .                                                       w~
,;p.,w~
Southem Califomia Edison Company                                       i 23 PARKER STREET IHVINE, CAliFORNI A 92718 I
Southem Califomia Edison Company i
WAL'I E R C. M ARSH                                                                 TE LE PHONE MANAGER OF NUCL 4 AM Rf GulATOHY M F AIRS                                                 ( f 1414 fh4 -4403 July 15, 1993 U. S. Nuclear Regulatory Commission Attention: Document Control Desk i
23 PARKER STREET IHVINE, CAliFORNI A 92718 I
Washington, D.C. 20555 Gentlemen:                                                                                           i
WAL'I E R C. M ARSH TE LE PHONE MANAGER OF NUCL 4 AM Rf GulATOHY M F AIRS
( f 1414 fh4 -4403 July 15, 1993 U. S. Nuclear Regulatory Commission Attention: Document Control Desk i
Washington, D.C.
20555 Gentlemen:
i


==Subject:==
==Subject:==
Docket Nos. 50-361 and 50-362 Monthly Operating Reports for June 1993 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 6.9.1.10 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires SCE to provide a Monthly Operating Report for each Unit,
Docket Nos. 50-361 and 50-362 Monthly Operating Reports for June 1993 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 6.9.1.10 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires SCE to provide a Monthly Operating Report for each Unit, which includes: routine operating statistics and shutdown experience; all
                                                                                    ~
~
which includes: routine operating statistics and shutdown experience; all challenges to safety valves; any changes to the Offsite Dose Calculation Manual (ODCM); and any major changes to the radioactive waste treatment system. All covered activities are reported monthly, except for ODCM changes, which are reported within 90 days from the time the changes were made effective.
challenges to safety valves; any changes to the Offsite Dose Calculation Manual (ODCM); and any major changes to the radioactive waste treatment system. All covered activities are reported monthly, except for ODCM changes, which are reported within 90 days from the time the changes were made effective.
This letter transmits the June 1993 Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to safety valves, no changes to the ODCM, and no major changes to the Units 2 and 3 radioactive waste treatment systems during the reporting period.                                                                         ,
This letter transmits the June 1993 Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to safety valves, no changes to the ODCM, and no major changes to the Units 2 and 3 radioactive waste treatment systems during the reporting period.
if you require any additional information, please let me know.
if you require any additional information, please let me know.
Sincerely,                                           i
Sincerely, i
                                                            #m/
#m/
Enclosures cc:      B. H. Faulkenberry (Regional Administrator, USNRC Region V)
Enclosures B. H. Faulkenberry (Regional Administrator, USNRC Region V) cc:
M. B. Fields (NRC Project Manager, Units 2 and 3)
M. B. Fields (NRC Project Manager, Units 2 and 3)
C. W. Caldwell (USNRC Senior Resident Inspector, Units 1, 2 and 3)                         -
C. W. Caldwell (USNRC Senior Resident Inspector, Units 1, 2 and 3) l m
l m
93072001gggjoo$$61
93072001gggjoo$$61                                                                         p'      )   <
@k p
ADO                 PDR   @k gDR
)
        ..  .v v vv                                                                   y                     1 ,
ADO PDR gDR
__                  .}}
.v v vv y
1
.}}

Latest revision as of 10:40, 19 December 2024

Forwards Monthly Operating Repts for June 1993 for SONGS, Units 2 & 3.Informs That No Challenges to Safety Valves,No Changes to ODCM & No Major Changes to Both Units Radwaste Treatment Sys During Reporting Period
ML20045H361
Person / Time
Site: San Onofre  
Issue date: 07/15/1993
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045H362 List:
References
NUDOCS 9307200128
Download: ML20045H361 (1)


Text

-

f"%:

c

,;p.,w~

Southem Califomia Edison Company i

23 PARKER STREET IHVINE, CAliFORNI A 92718 I

WAL'I E R C. M ARSH TE LE PHONE MANAGER OF NUCL 4 AM Rf GulATOHY M F AIRS

( f 1414 fh4 -4403 July 15, 1993 U. S. Nuclear Regulatory Commission Attention: Document Control Desk i

Washington, D.C.

20555 Gentlemen:

i

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for June 1993 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 6.9.1.10 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires SCE to provide a Monthly Operating Report for each Unit, which includes: routine operating statistics and shutdown experience; all

~

challenges to safety valves; any changes to the Offsite Dose Calculation Manual (ODCM); and any major changes to the radioactive waste treatment system. All covered activities are reported monthly, except for ODCM changes, which are reported within 90 days from the time the changes were made effective.

This letter transmits the June 1993 Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to safety valves, no changes to the ODCM, and no major changes to the Units 2 and 3 radioactive waste treatment systems during the reporting period.

if you require any additional information, please let me know.

Sincerely, i

  1. m/

Enclosures B. H. Faulkenberry (Regional Administrator, USNRC Region V) cc:

M. B. Fields (NRC Project Manager, Units 2 and 3)

C. W. Caldwell (USNRC Senior Resident Inspector, Units 1, 2 and 3) l m

93072001gggjoo$$61

@k p

)

ADO PDR gDR

.v v vv y

1

.