Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE:

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generatina Station, Unit 2
2. Reporting Period: June 1993
3. Licensed Thermal Power (Mwt): 3390
4. Nameplate Rating (Gross MWe): 1127
5. Design Electrical Rating (Net MWe): 1070
6. Maximum Dependable Capacity (Gross MWe): 1127 l
7. Maximum Dependable Capacity (Net MWe): 1070 -
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: NA

9. Power Level To Which Restricted, If Any (Net MWe): NA
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 720.00 4.343.00 86,520.00
12. Number Of Hours Reactor Was Critical 96.73 3,719.73 64.454.09
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 96.62 3,719.62 63.376.89 '
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 272,151.65 12,009.636.36 206,829,484.68 i
17. Gross Electrical Energy Generated (MWH) 96,503.50 4.149,548.00 70,195,108.00
18. Net Electrical Energy Generated (MWH) 87,248.96 3,946,550.96 66,554,066.79
19. Unit Service Factor 13.42% 85.65% 73.25%
20. Unit Availability Factor __

13.42% 85.65% 73.25%

21. Unit Capacity Factor (Using MDC Net) 31.33% 84.93% 71.89%
22. Unit Capacity Factor (Using DER Net) ;j,33% 84,93% 71.89% '
23. Unit Forced Outage Rate 0.00% 0,00% .. ___ 6.50%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuelina shutdown, June 5, 1993, forecast duration (86 days)

25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA '

COMMERCIAL OPERATION NA NA mor.jun/2 3072OO322 930715 pDR R ADOCK 050003$3_ y% _

PDR g i

9 Document Control Desk AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE:

COMPLETED BY: J. L. Darlino TELEPHONE: (714) 368-6223 ,

MONTH: June 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1090.46 16 0.00  ;

2 1083.25 17 0.00 3 860.58 18 0.00 4 773.75 19 0.00 5 0.00 20 0.00 6 0.00 21 0.00 7 0.00 22 0.00  ;

8 0.00 23 0.00 9 0.00 .4 2 0.00 10 0.00 25 0.00 11 0.00 26 0.00' 12 0.00 27 0.00' 13 0.00 28 0.00 1 14 0.00 29 0.00 l

15 0.00 30 0.00 l mor.jun/3

Document Control Desk UNIT SHUTDOWHS AND POWER REDUCTIONS DOCKET NO: 50-361 -

UNIT NAME: SONGS - 2 -

REPORT MONTH: June 1993 DATE:

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Method of Shutting Cause & Corrective i Duration Down LER System Component Action to No. Date Type! (Hours) Reason 2

Reactor 3 No. Code' Code' Prevent Recurrence 83 930602 S 623.38 C 2 NA NA NA NA Note. Power reduction for unit shutdown began on June 2, at 2235. A hold point in the power reduction occurred at 80% to perform a circulating water system heat treat. The unit was taken off line on June 5 at 0037, which is the time used to calculated shutdown duration.

I 2 3 "IEEE Std 805-1984 F-Forced Reason: Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual S

, B-Maintenance or Test 2-Manual Scram. IEEE Std 803A-1983 C-Refueling 3-Automatic Scram.

L D-Regulatory Restriction 4-Continuatior: from l- E-Operator Training & License Examination Previous Mo..th F-Administrative 5-Reduction in the Average G-Operational Error (Explain) Daily Power Level of'more H-Other (Explain) than 20% from the previous day 6-Other (Explain) mor.jun/4

. j

~

Document Control Desk.

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE:

COMPLETED BY: J. L. Darlina TELEPHunE: (714) 368-6223 Date Time Event June 1 0001 Unit is in Mode 1, 100% reactor power, 1140 MWe.

June 2 2235 Commenced load reduction to 80% to perform circulating water system heat treat and subsequent ,

unit shutdown for cycle 7 refueling outage. ,

June 3 0843 Unit at 80% reactor power.

June 4 2112 Commenced load reduction for cycle 7 refueling outage.

June 5 0037 Main turbine tripped per procedure. '

0044 Reactor manually tripped from 15% power per procedure. Entered Mode 3.

0552 Commenced cooldown to Mode 5.

1241 Entered Mode 4.

June 6 0545 Entered Mode 5.

June 10 1215 Entered Mode 6.

June 21 0255 Completed core off-load, i June 30 2400 Unit is defueled, all fuel assemblies are in the spent fuel pool .

i f

L f

mor.jun/5

Document Control Desk REFUELING INFORMATION DOCKET N0: 50-361 UNIT NAME: SONGS - 2 DATE:

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 MONTH: June 1993

1. Scheduled date for next refueling shutdown. ,

Cycle 7 refueling outage began June 5,1993. -

2. Scheduled date for restart following refueling.

Restart from Cycle 7 refueling outage is forecast for August 29, 1993.

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Yes.

What will these be?  ;

A change has been requested to Technical Specification 4.4.5.2.1 to allow a delay in performing an RCS inventory balance during plant transients. Although not required, NRC approval of this change is desired prior to startup from the Unit 2 Cycle 7 outage.

l

4. Scheduled date for submitting proposed licensing action and supporting -

information. i The proposed change on RCS Leakrate was submitted on November 20, 1992.

5. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis-methods, significant changes in fuel design, new operating procedures.  ;

None.

P mor jun/6 ,

l Document Control Desk ,

REFUELING INFORMATION D0CKET N0: 50-361 UNIT NAME: SONGS - 2 ,

DATE:

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 MONTH: June 1993

6. The number of fuel assemblies, a) In the core. O b) In the spent fuel storage pool. 879 (701 Unit 2 Spent Fuel Assemblies.108  !

New fuel Assemblies. 70 Unit 1-Spent Fuel >

Assemblies.) ,

7. Licensed. spent fuel storage capacity. 1542 Intended change in spent fuel storage capacity. None
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.  ;

Approximately 2005 (full off-load capability) l mor.j un/7 i

l

Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET N0: 50-362 UNIT NAME: SONGS - 3 DATE:

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generatina Station Unit 3
2. Reporting Period: June 1993
3. Licensed Thermal Power (MWt): 3390
4. Nameplate Rating (Gross MWe): 1127
5. Design Electrical Rating (Net MWe): 1080
6. Maximum Dependable Capacity (Gross MWe): 1127
7. Maximum Dependable Capacity (Net MWe): 1080
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: NA

9. Power Level To Which Restricted, If Any (Net MWe): NA
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours in Reporting Period 720.00 4,343.00 81,071.00
12. Number Of Hours Reactor Was Critical 720.00 4.286.97 63,486.73
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00 ';
14. Hours Generator On-Line 720.00 4,263.50 61,869.56
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 2.440,821.97 14.113.180.17 198.747,254.41

- 17. Gross Electrical Energy Generated (MWH) 826.018.00 4,836,496.00 67,463.356.00 '

18. Net Electrical Energy Generated (MWH) 785,574.00 4.595,832.00 63,741,502.36
19. Unit Service Factor 100.00% 98.17% 76.32% ,
20. Unit Availability Factor 100.00% 98.17% '76.32%
21. Unit Capacity Factor (Using MDC Net) 101.03% 97,98% 72.80%
22. Unit Capacity Factor (Using DER Net) 101.03% 97.98% 72.80%
23. Unit Forced Outage Rate 0.00% 1.83% 7.09%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuelina shutdown, October 9, 1993, forecast duration 85 days.

25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA L

COMMERCIAL OPERATION NA NA 4 mor.jun/8

Document Control Desk AVERAGE DAILY UNIT POWER LEVEL DOCKET N0: 50-362 UNIT NAME: SONGS - 3 DATE:

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 MONTH: June 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1102.04 16 1091.00 2 1102.96 17 1088.79 3 1099.54 18 1079.96 4 1096.42 19 1089.63 ,

5 1087.63 20 1094.17 6 1097.42 21 1096.92 7 1093.33 22 1096.71 8 1098.54 23 1092.63 9 1098.21 24 1087.71 10 1098.42 25 1080.00 11 1094.04 26 1085.79 12 1045.17 27 1087.75 13 1090.88 28 1092.88 14 1089.83 29 1096.67 15 1090.08 30 1087.17 mor.jun/9

Document Control Desk UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET WO: 50-362 UNIT NAME: SONGS - 3 REPORT MONTH: June 1993 DATE: -

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Method of Shutting Cause & Corrective Duration Down LER System Component Action to No. Date Type l (Hours) Reason 2

Reactor 3 No. Code' Code 5

Prevent Recurrence No unit shutdowns or power reductions occured during this reporting period 3

2 F-Forced ' Reason: Method: 'IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram. S IEEE Std 803A-1983 C-Refueling .

3-Automatic Scram.

D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month-F-Administrative 5-Reduction in the Average G-Operational Error (Explain) Daily Power Level of more H-Other (Explain) than 20% from the previous day 6-Other'(Explain) mor.jun/10

N Document Control Desk

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO: 50-362 UNIT NAME: SONGS - 3 +

DATE:

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Date Time Event June 1 0001 Unit is in Mode 1, 99% reactor power, 1146 MWe.

June 7 0155 Unit load decreased to 1020 MWe when one high pressure stop valve went closed.

0235 Commenced load increase to full load after the high i pressure stop valve was re-opened.

0305 Unit load at 1147 MWe.

June 30 2400 Unit is at 100% reactor power, 1138 MWe.

e f

mor.jun/11

f Document Control Desk REFUELING INFORMATION DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE:

COMPLETED BY: J. L. Darlina '

TELEPHONE: (714) 368-6223 MONTH: June 1993

1. Scheduled date for next refueling shutdown.

Cycle 7 refueling outage is forecast for October 9, 1993.

2. Scheduled date for restart following refueling.

Restart from Cycle 7 refueling outage is forecast for January 2,1993.

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Yes.

What will these be?

A. A change has been requested to Technical Specification 4.4.5.2.1 to

  • allow a delay in performing an RCS inventory balance during plant transients. Although not required, NRC approval of this change is desired prior to startup from the Unit 3 Cycle 7 outage.

B. A change has been requested to Technical Specification 3.7.1.1 to allow an increased tolerance on the main steam safety valves for the purpose of determining valve operability. Although not required,  ;

NRC approval of this change is desired to support the surveillance testing scheduled to be performed during the Unit 3 Cycle 7 outage.

4. Scheduled date for submitting proposed licensing action and supporting information.

A. Proposed Change on RCS Leakrate Submitted November 20, 1992 B. Proposed Change on MSSVs Submitted March 5, 1993

5. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

None. I mor.jun/12

v Document Control Desk REFUELING INFORMATION DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE:

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 MONTH: June 1993

6. The number of f ael assemblies.

a) In the core. 217 b) In the spent fuel storage pool . 602 (484 Unit 3 Spent Fuel Assemblies.118 Unit 1 Spent Fuel Assemblies) ,

7. Licensed spent fuel storage capacity, 1542 Intended change in spent fuel storage capacity. None
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

Approximately 2004 (full off-load capability)