Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE:
COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 OPERATING STATUS
- 1. Unit Name: San Onofre Nuclear Generatina Station, Unit 2
- 2. Reporting Period: June 1993
- 3. Licensed Thermal Power (Mwt): 3390
- 4. Nameplate Rating (Gross MWe): 1127
- 5. Design Electrical Rating (Net MWe): 1070
- 6. Maximum Dependable Capacity (Gross MWe): 1127 l
- 7. Maximum Dependable Capacity (Net MWe): 1070 -
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons: NA
- 9. Power Level To Which Restricted, If Any (Net MWe): NA
- 10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 720.00 4.343.00 86,520.00
- 12. Number Of Hours Reactor Was Critical 96.73 3,719.73 64.454.09
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 96.62 3,719.62 63.376.89 '
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 272,151.65 12,009.636.36 206,829,484.68 i
- 17. Gross Electrical Energy Generated (MWH) 96,503.50 4.149,548.00 70,195,108.00
- 18. Net Electrical Energy Generated (MWH) 87,248.96 3,946,550.96 66,554,066.79
- 19. Unit Service Factor 13.42% 85.65% 73.25%
- 20. Unit Availability Factor __
13.42% 85.65% 73.25%
- 21. Unit Capacity Factor (Using MDC Net) 31.33% 84.93% 71.89%
- 22. Unit Capacity Factor (Using DER Net) ;j,33% 84,93% 71.89% '
- 23. Unit Forced Outage Rate 0.00% 0,00% .. ___ 6.50%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refuelina shutdown, June 5, 1993, forecast duration (86 days)
- 25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA '
COMMERCIAL OPERATION NA NA mor.jun/2 3072OO322 930715 pDR R ADOCK 050003$3_ y% _
PDR g i
9 Document Control Desk AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE:
COMPLETED BY: J. L. Darlino TELEPHONE: (714) 368-6223 ,
MONTH: June 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1090.46 16 0.00 ;
2 1083.25 17 0.00 3 860.58 18 0.00 4 773.75 19 0.00 5 0.00 20 0.00 6 0.00 21 0.00 7 0.00 22 0.00 ;
8 0.00 23 0.00 9 0.00 .4 2 0.00 10 0.00 25 0.00 11 0.00 26 0.00' 12 0.00 27 0.00' 13 0.00 28 0.00 1 14 0.00 29 0.00 l
15 0.00 30 0.00 l mor.jun/3
Document Control Desk UNIT SHUTDOWHS AND POWER REDUCTIONS DOCKET NO: 50-361 -
UNIT NAME: SONGS - 2 -
REPORT MONTH: June 1993 DATE:
COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Method of Shutting Cause & Corrective i Duration Down LER System Component Action to No. Date Type! (Hours) Reason 2
Reactor 3 No. Code' Code' Prevent Recurrence 83 930602 S 623.38 C 2 NA NA NA NA Note. Power reduction for unit shutdown began on June 2, at 2235. A hold point in the power reduction occurred at 80% to perform a circulating water system heat treat. The unit was taken off line on June 5 at 0037, which is the time used to calculated shutdown duration.
I 2 3 "IEEE Std 805-1984 F-Forced Reason: Method:
S-Scheduled A-Equipment Failure (Explain) 1-Manual S
, B-Maintenance or Test 2-Manual Scram. IEEE Std 803A-1983 C-Refueling 3-Automatic Scram.
L D-Regulatory Restriction 4-Continuatior: from l- E-Operator Training & License Examination Previous Mo..th F-Administrative 5-Reduction in the Average G-Operational Error (Explain) Daily Power Level of'more H-Other (Explain) than 20% from the previous day 6-Other (Explain) mor.jun/4
. j
~
Document Control Desk.
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE:
COMPLETED BY: J. L. Darlina TELEPHunE: (714) 368-6223 Date Time Event June 1 0001 Unit is in Mode 1, 100% reactor power, 1140 MWe.
June 2 2235 Commenced load reduction to 80% to perform circulating water system heat treat and subsequent ,
unit shutdown for cycle 7 refueling outage. ,
June 3 0843 Unit at 80% reactor power.
June 4 2112 Commenced load reduction for cycle 7 refueling outage.
June 5 0037 Main turbine tripped per procedure. '
0044 Reactor manually tripped from 15% power per procedure. Entered Mode 3.
0552 Commenced cooldown to Mode 5.
1241 Entered Mode 4.
June 6 0545 Entered Mode 5.
June 10 1215 Entered Mode 6.
June 21 0255 Completed core off-load, i June 30 2400 Unit is defueled, all fuel assemblies are in the spent fuel pool .
i f
L f
mor.jun/5
Document Control Desk REFUELING INFORMATION DOCKET N0: 50-361 UNIT NAME: SONGS - 2 DATE:
COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 MONTH: June 1993
- 1. Scheduled date for next refueling shutdown. ,
Cycle 7 refueling outage began June 5,1993. -
- 2. Scheduled date for restart following refueling.
Restart from Cycle 7 refueling outage is forecast for August 29, 1993.
- 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Yes.
What will these be? ;
A change has been requested to Technical Specification 4.4.5.2.1 to allow a delay in performing an RCS inventory balance during plant transients. Although not required, NRC approval of this change is desired prior to startup from the Unit 2 Cycle 7 outage.
l
- 4. Scheduled date for submitting proposed licensing action and supporting -
information. i The proposed change on RCS Leakrate was submitted on November 20, 1992.
- 5. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis-methods, significant changes in fuel design, new operating procedures. ;
None.
P mor jun/6 ,
l Document Control Desk ,
REFUELING INFORMATION D0CKET N0: 50-361 UNIT NAME: SONGS - 2 ,
DATE:
COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 MONTH: June 1993
- 6. The number of fuel assemblies, a) In the core. O b) In the spent fuel storage pool. 879 (701 Unit 2 Spent Fuel Assemblies.108 !
New fuel Assemblies. 70 Unit 1-Spent Fuel >
Assemblies.) ,
- 7. Licensed. spent fuel storage capacity. 1542 Intended change in spent fuel storage capacity. None
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. ;
Approximately 2005 (full off-load capability) l mor.j un/7 i
l
Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET N0: 50-362 UNIT NAME: SONGS - 3 DATE:
COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 OPERATING STATUS
- 1. Unit Name: San Onofre Nuclear Generatina Station Unit 3
- 2. Reporting Period: June 1993
- 3. Licensed Thermal Power (MWt): 3390
- 4. Nameplate Rating (Gross MWe): 1127
- 5. Design Electrical Rating (Net MWe): 1080
- 6. Maximum Dependable Capacity (Gross MWe): 1127
- 7. Maximum Dependable Capacity (Net MWe): 1080
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons: NA
- 9. Power Level To Which Restricted, If Any (Net MWe): NA
- 10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
- 11. Hours in Reporting Period 720.00 4,343.00 81,071.00
- 12. Number Of Hours Reactor Was Critical 720.00 4.286.97 63,486.73
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00 ';
- 14. Hours Generator On-Line 720.00 4,263.50 61,869.56
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 2.440,821.97 14.113.180.17 198.747,254.41
- 17. Gross Electrical Energy Generated (MWH) 826.018.00 4,836,496.00 67,463.356.00 '
- 18. Net Electrical Energy Generated (MWH) 785,574.00 4.595,832.00 63,741,502.36
- 19. Unit Service Factor 100.00% 98.17% 76.32% ,
- 20. Unit Availability Factor 100.00% 98.17% '76.32%
- 21. Unit Capacity Factor (Using MDC Net) 101.03% 97,98% 72.80%
- 22. Unit Capacity Factor (Using DER Net) 101.03% 97.98% 72.80%
- 23. Unit Forced Outage Rate 0.00% 1.83% 7.09%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refuelina shutdown, October 9, 1993, forecast duration 85 days.
- 25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA L
COMMERCIAL OPERATION NA NA 4 mor.jun/8
Document Control Desk AVERAGE DAILY UNIT POWER LEVEL DOCKET N0: 50-362 UNIT NAME: SONGS - 3 DATE:
COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 MONTH: June 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1102.04 16 1091.00 2 1102.96 17 1088.79 3 1099.54 18 1079.96 4 1096.42 19 1089.63 ,
5 1087.63 20 1094.17 6 1097.42 21 1096.92 7 1093.33 22 1096.71 8 1098.54 23 1092.63 9 1098.21 24 1087.71 10 1098.42 25 1080.00 11 1094.04 26 1085.79 12 1045.17 27 1087.75 13 1090.88 28 1092.88 14 1089.83 29 1096.67 15 1090.08 30 1087.17 mor.jun/9
Document Control Desk UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET WO: 50-362 UNIT NAME: SONGS - 3 REPORT MONTH: June 1993 DATE: -
COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Method of Shutting Cause & Corrective Duration Down LER System Component Action to No. Date Type l (Hours) Reason 2
Reactor 3 No. Code' Code 5
Prevent Recurrence No unit shutdowns or power reductions occured during this reporting period 3
2 F-Forced ' Reason: Method: 'IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram. S IEEE Std 803A-1983 C-Refueling .
3-Automatic Scram.
D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month-F-Administrative 5-Reduction in the Average G-Operational Error (Explain) Daily Power Level of more H-Other (Explain) than 20% from the previous day 6-Other'(Explain) mor.jun/10
N Document Control Desk
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO: 50-362 UNIT NAME: SONGS - 3 +
DATE:
COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 Date Time Event June 1 0001 Unit is in Mode 1, 99% reactor power, 1146 MWe.
June 7 0155 Unit load decreased to 1020 MWe when one high pressure stop valve went closed.
0235 Commenced load increase to full load after the high i pressure stop valve was re-opened.
0305 Unit load at 1147 MWe.
June 30 2400 Unit is at 100% reactor power, 1138 MWe.
e f
mor.jun/11
f Document Control Desk REFUELING INFORMATION DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE:
COMPLETED BY: J. L. Darlina '
TELEPHONE: (714) 368-6223 MONTH: June 1993
- 1. Scheduled date for next refueling shutdown.
Cycle 7 refueling outage is forecast for October 9, 1993.
- 2. Scheduled date for restart following refueling.
Restart from Cycle 7 refueling outage is forecast for January 2,1993.
- 3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Yes.
What will these be?
A. A change has been requested to Technical Specification 4.4.5.2.1 to
- allow a delay in performing an RCS inventory balance during plant transients. Although not required, NRC approval of this change is desired prior to startup from the Unit 3 Cycle 7 outage.
B. A change has been requested to Technical Specification 3.7.1.1 to allow an increased tolerance on the main steam safety valves for the purpose of determining valve operability. Although not required, ;
NRC approval of this change is desired to support the surveillance testing scheduled to be performed during the Unit 3 Cycle 7 outage.
- 4. Scheduled date for submitting proposed licensing action and supporting information.
A. Proposed Change on RCS Leakrate Submitted November 20, 1992 B. Proposed Change on MSSVs Submitted March 5, 1993
- 5. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None. I mor.jun/12
v Document Control Desk REFUELING INFORMATION DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE:
COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 MONTH: June 1993
- 6. The number of f ael assemblies.
a) In the core. 217 b) In the spent fuel storage pool . 602 (484 Unit 3 Spent Fuel Assemblies.118 Unit 1 Spent Fuel Assemblies) ,
- 7. Licensed spent fuel storage capacity, 1542 Intended change in spent fuel storage capacity. None
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
Approximately 2004 (full off-load capability)
I I