ML20052G852: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Y | {{#Wiki_filter:Y | ||
'ME PAC I P'I C GAS AND ELECTR,IC C O M PANY i | |||
.e | |||
f LAW DEPARTMENT - 77 BEALE STR E ET, 31ST F LOO R . SAN FRAM l$ bO, C ALIFO R NI A 9 4106 . (415) 783 4211 t- | . O R2'A2 i | ||
E!C ~ 913: | f LAW DEPARTMENT - 77 BEALE STR E ET, 31ST F LOO R. SAN FRAM l$ bO, C ALIFO R NI A 9 4106. (415) 783 4211 t-E!C ~ 913: | ||
4 3 | 4 3 | ||
t May 13, 1982 Mr..R. H. Engelken, Regional Administrator Region V U. S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 | t May 13, 1982 Mr..R. H. Engelken, Regional Administrator Region V U. | ||
S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 i | |||
Halnut Creek, CA 94596 Re Docket No. 50-275 Diablo Canyon Unit 1 Facility Operating License No. DPR-76 | |||
==Dear Mr. Engelken:== | ==Dear Mr. Engelken:== | ||
PGandE's License DPR-76 as amended contains dated require ' | PGandE's License DPR-76 as amended contains dated require ' | ||
ments within Section 2.E, Physical Security Issues. | ments within Section 2.E, Physical Security Issues. | ||
The Diablo Canyon Safeguards Contingency Plan was fully implemented during the preoperational inspection conducted July 13 - 23, 1981 [ refer to NRC Report No. 50-275/81-15 | These requirements have been met as follows. | ||
(IE-V454)]. The Diablo Canyon Glard Training and Qualification | The Diablo Canyon Safeguards Contingency Plan was fully implemented during the preoperational inspection conducted July 13 - 23, 1981 [ refer to NRC Report No. 50-275/81-15 (IE-V454)]. | ||
Plan was fully implemented on April 1, 1982. | The Diablo Canyon Glard Training and Qualification Plan was fully implemented on April 1, 1982. | ||
Very truly yours, Philip A. Crane, Jr. | Very truly yours, Philip A. Crane, Jr. | ||
ERKendle/ PAC:nl cc: | ERKendle/ PAC:nl cc: | ||
Mr. Frank J. Miraglia, Jr., Chief | Mr. Frank J. Miraglia, Jr., Chief Q | ||
PDR ADOCK 05000275 | 3 Licensing Branch No. 3 Division of Licensing br(Q Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 servica T.i nt 8205190069 820513 PDR ADOCK 05000275 O | ||
PDR}} | |||
Latest revision as of 05:29, 18 December 2024
| ML20052G852 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 05/13/1982 |
| From: | Crane P PACIFIC GAS & ELECTRIC CO. |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| NUDOCS 8205190069 | |
| Download: ML20052G852 (1) | |
Text
Y
'ME PAC I P'I C GAS AND ELECTR,IC C O M PANY i
.e
. O R2'A2 i
f LAW DEPARTMENT - 77 BEALE STR E ET, 31ST F LOO R. SAN FRAM l$ bO, C ALIFO R NI A 9 4106. (415) 783 4211 t-E!C ~ 913:
4 3
t May 13, 1982 Mr..R. H. Engelken, Regional Administrator Region V U.
S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 i
Halnut Creek, CA 94596 Re Docket No. 50-275 Diablo Canyon Unit 1 Facility Operating License No. DPR-76
Dear Mr. Engelken:
PGandE's License DPR-76 as amended contains dated require '
ments within Section 2.E, Physical Security Issues.
These requirements have been met as follows.
The Diablo Canyon Safeguards Contingency Plan was fully implemented during the preoperational inspection conducted July 13 - 23, 1981 [ refer to NRC Report No. 50-275/81-15 (IE-V454)].
The Diablo Canyon Glard Training and Qualification Plan was fully implemented on April 1, 1982.
Very truly yours, Philip A. Crane, Jr.
ERKendle/ PAC:nl cc:
Mr. Frank J. Miraglia, Jr., Chief Q
3 Licensing Branch No. 3 Division of Licensing br(Q Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 servica T.i nt 8205190069 820513 PDR ADOCK 05000275 O