JUL 081982 | |||
Docket Nos. 50-245 | |||
License Nos. DPR-21 | |||
50-336 | |||
DPR-65 | |||
Northeast Nuclear Energy Company | |||
ATTN: Mr. W. G. Counsil | |||
Senior Vice President - Nuclear | |||
Engineering and Operations Group | |||
, | |||
P. O. Box 270 | |||
I | |||
Hartford, Connecticut 06101 | |||
l | |||
Gentlemen: | |||
Subject: | |||
Inspection Nos. 50-245/82-13; 50-336/82-13 | |||
This refers to the routine safety inspection conducted by Dr. P. K. Eapen | |||
of this office on June 1 - 4, 1982, at the Millstone Nuclear Power Station | |||
and at your corporate offices of activities authorized by NRC License Nos. | |||
DPR-21 and DPR-65 and to the discussions of our findings held by Dr. P. K. | |||
Eapen with Mr. Mroczka and other members of your staff at the conclusion of | |||
the inspection. | |||
Areas examined during this inspection are described in the NRC Region I | |||
Inspection Report which is enclosed with this letter. Within these areas, | |||
the inspection consisted of selective examinations of procedures and representative | |||
records, interviews with personnel, and observations by the inspector. | |||
Based on the results of this inspection, it appears that one of y ur activities | |||
was not conducted in full compliance with NRC requirements, as set forth in | |||
the Notice of Violation, enclosed herewith as Appendix A. | |||
This violation | |||
has been categorized by severity level in accordance with the NRC Enforcement | |||
policy (10 CFR 2, Appendix C) published in the Federal Register Notice (47 | |||
FR 9987) dated March 9, 1982. You are required to respond to this letter | |||
and in preparing your response, you should follow the instructions in | |||
Appendix A. | |||
The responses directed by this letter and the accompanying Notice are not | |||
subject to the clearance procedures of the Office of Management and Budget | |||
as requiret by the Paperwork Reduction Act of 1980, PL 96-511. | |||
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures | |||
will be placed in the NRC Public Document Room unless you notify this | |||
office, by telephone, within ten days of the date of this letter and submit | |||
written application to withhold information contained therein within thirty | |||
days of the date of this letter. | |||
Such application must be consistent with | |||
the requirements of 2.790(b)(1). | |||
The telephone notification of your intent | |||
to request withholding, or any request for an extension of the 10 day | |||
period which you believe necessary, should be made to the Supervisor, | |||
Files, Mail and Records, USNRC Region I, at (215) 337-5223. | |||
0FFICIAL RECORD COPY | |||
8207220306 820708 | |||
'' | |||
[( | |||
PDR ADOCK 05000245 | |||
Q | |||
PDR | |||
, | |||
.. | |||
- | |||
, | |||
, | |||
l^ | |||
! | |||
Northeast Nuclear Energy Co. | |||
2 | |||
Your cooperation with us in this matter is appreciated. | |||
Sincerely, | |||
origin 1 Stened By: | |||
A Thomas T. Martin, Director | |||
') | |||
Division of Engineering and | |||
Technical Programs | |||
Enclosures: | |||
; | |||
1. | |||
Appendix A, Notice of Violation | |||
2. | |||
NRC Region I Inspection Report Numbers 50-245/82-13 and 50-336/82-13 | |||
' | |||
cc w/encls: | |||
J. F. Opeka, Vice President, Nuclear Operations | |||
E. J. Mroczka, Station Superintendent | |||
D. G. Diedrick, Manager of Quality Assurance | |||
R. T. Laudenat, Manager, Generation Facilities Licensing | |||
Public Document Room (PDR) | |||
local Public Document Room (LPDR) | |||
Nuclear Safety Information Center (NSIC) | |||
NRC Resident Inspector | |||
State of Connecticut | |||
bec w/ encl: | |||
Region I Docket Room (with concurrences) | |||
Chief, Operational Support Section (w/o encis) | |||
T. C. Elsasser | |||
- | |||
.. | |||
RI:DETP | |||
Rf:DETP | |||
RI:DETP | |||
Espen/dmg | |||
Caphton | |||
Ebneter | |||
6/18/82 | |||
fp | |||
dj | |||
OFFICIAL RECORD COPY | |||
; | |||
I | |||
, --. | |||
- , , - | |||
- | |||
- | |||
. . . | |||
, - . | |||
. . . - | |||
. - . | |||
.- | |||
-- | |||
- | |||
}} | }} | ||
Latest revision as of 15:49, 17 December 2024
| ML20055B444 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/08/1982 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20055B445 | List: |
| References | |
| NUDOCS 8207220306 | |
| Download: ML20055B444 (2) | |
See also: IR 05000245/1982013
Text
-_
- _ _ - - _
.
.
JUL 081982
Docket Nos. 50-245
License Nos. DPR-21
50-336
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Senior Vice President - Nuclear
Engineering and Operations Group
,
P. O. Box 270
I
Hartford, Connecticut 06101
l
Gentlemen:
Subject:
Inspection Nos. 50-245/82-13; 50-336/82-13
This refers to the routine safety inspection conducted by Dr. P. K. Eapen
of this office on June 1 - 4, 1982, at the Millstone Nuclear Power Station
and at your corporate offices of activities authorized by NRC License Nos.
DPR-21 and DPR-65 and to the discussions of our findings held by Dr. P. K.
Eapen with Mr. Mroczka and other members of your staff at the conclusion of
the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas,
the inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of y ur activities
was not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
This violation
has been categorized by severity level in accordance with the NRC Enforcement
policy (10 CFR 2, Appendix C) published in the Federal Register Notice (47 FR 9987) dated March 9, 1982. You are required to respond to this letter
and in preparing your response, you should follow the instructions in
Appendix A.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as requiret by the Paperwork Reduction Act of 1980, PL 96-511.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this
office, by telephone, within ten days of the date of this letter and submit
written application to withhold information contained therein within thirty
days of the date of this letter.
Such application must be consistent with
the requirements of 2.790(b)(1).
The telephone notification of your intent
to request withholding, or any request for an extension of the 10 day
period which you believe necessary, should be made to the Supervisor,
Files, Mail and Records, USNRC Region I, at (215) 337-5223.
0FFICIAL RECORD COPY
8207220306 820708
[(
PDR ADOCK 05000245
Q
,
..
-
,
,
l^
!
Northeast Nuclear Energy Co.
2
Your cooperation with us in this matter is appreciated.
Sincerely,
origin 1 Stened By:
A Thomas T. Martin, Director
')
Division of Engineering and
Technical Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report Numbers 50-245/82-13 and 50-336/82-13
'
cc w/encls:
J. F. Opeka, Vice President, Nuclear Operations
E. J. Mroczka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bec w/ encl:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
T. C. Elsasser
-
..
RI:DETP
Rf:DETP
RI:DETP
Espen/dmg
Caphton
Ebneter
6/18/82
fp
dj
OFFICIAL RECORD COPY