1 Proposed Changes to Core Operating Limits Reports North Anna Unit 1' & 2 4 | |||
+ | |||
a i | |||
i | |||
,{ | |||
2 Virginia. Electric and Power Company 9011080248 901030 PDR ADOCK 05000339 | |||
- P PDC p | |||
COLR for North Anna Unit 1 Cycle 8 l | |||
1.0. CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for North Anna Unit 1 Cycle 8 has been prepared in accordance with the requirements of Technical Specification L,- | |||
6.9.1.7. | |||
The Technical Specifications affected by this report are listed below: | |||
i.. | |||
L 3/4.1.1.4 Moderator Temperature Coefficient 3/4.1.3.5 Shutdown Bank Insertion Limit | |||
.3/4.1.3.6. Control Bank Insertion Limits K | |||
3/4.2.1 Axial Flux Difference 3/4.2.2 Heat Flux Hot Channel Factor 3/4.2.3 | |||
' Nuclear Enthalpy Rise Hot Channel Factor | |||
~ /4.9.1 Boron Concentration 3 | |||
( | |||
L 1 | |||
1' Page 1 of 10 | |||
COLA for North h a W IT 1 CYCLE 4 | |||
-k 228 (54,228) 200 (100,194) | |||
E 150 L | |||
g BAR C 3 | |||
(O. 118) | |||
L 100 Mo iI | |||
/ | |||
s t | |||
(4.8,,0)- | |||
o se so se so too Percent of MTED THEMAL POWER Note: | |||
Control Banks A And B-Must Be Withdrawn From The Core i | |||
1 Prior To Power Operation t | |||
Figure 1 Control Red Bank Insertion Lietts vs Percent MTED THEMAL POWlR Page 5 of 10 m | |||
COLR for North Anna Unit 2 Cycle 7 r | |||
1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for North Anna Unit 2 Cycle 7 has been preparec'in accordance with the requirements of Technical Specification 6.9.1.7. | |||
The Technical Specifications affected by this report are listed below: | |||
3/4.1.1.4 Moderator Ternperature Coefficient 3/4.1.3.5 Shutdown Bank Insertion Limit 3/4.1.3.6 Control Bank Insertion Limits 3/4.2.1 Axial Flux Ditference 3/4.2.2 Heat Flux Hot Channel Factor 3/4.2.3 Nuclear Enthalpy Rise Hot Channel Factor 3/4.9.1 Boron Concentration Page 1 of t1 | |||
COLR for flerth Anna WIIT I CYCLE 7 tre (N.IN) too u | |||
_5(-. | |||
100. 194) | |||
/ | |||
,,0 RNil C S2 (0,lle) l aunt 0 100 l | |||
} | |||
l 1 | |||
l 50 l | |||
4 (4.8,,0) 0 N | |||
40 00 to 100 Ponent of RATED THENIRL POWER Note: Control Banks A And B Must De Withdrawn From The Core Prior To Power Operation Figure 1 Control Red Bank Insertion Listts vs Pereent RATED THtst4L POWili Page 5 of 11 | |||
\\ | |||
.. -..}} | |||
Latest revision as of 10:28, 17 December 2024
| ML20058F384 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 10/30/1990 |
| From: | VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML20058F379 | List: |
| References | |
| NUDOCS 9011080248 | |
| Download: ML20058F384 (5) | |
Text
.
. _ -.. ~..
1 Y
1 Proposed Changes to Core Operating Limits Reports North Anna Unit 1' & 2 4
+
a i
i
,{
2 Virginia. Electric and Power Company 9011080248 901030 PDR ADOCK 05000339
- P PDC p
COLR for North Anna Unit 1 Cycle 8 l
1.0. CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for North Anna Unit 1 Cycle 8 has been prepared in accordance with the requirements of Technical Specification L,-
6.9.1.7.
The Technical Specifications affected by this report are listed below:
i..
L 3/4.1.1.4 Moderator Temperature Coefficient 3/4.1.3.5 Shutdown Bank Insertion Limit
.3/4.1.3.6. Control Bank Insertion Limits K
3/4.2.1 Axial Flux Difference 3/4.2.2 Heat Flux Hot Channel Factor 3/4.2.3
' Nuclear Enthalpy Rise Hot Channel Factor
~ /4.9.1 Boron Concentration 3
(
L 1
1' Page 1 of 10
COLA for North h a W IT 1 CYCLE 4
-k 228 (54,228) 200 (100,194)
E 150 L
g BAR C 3
(O. 118)
L 100 Mo iI
/
s t
(4.8,,0)-
o se so se so too Percent of MTED THEMAL POWER Note:
Control Banks A And B-Must Be Withdrawn From The Core i
1 Prior To Power Operation t
Figure 1 Control Red Bank Insertion Lietts vs Percent MTED THEMAL POWlR Page 5 of 10 m
COLR for North Anna Unit 2 Cycle 7 r
1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for North Anna Unit 2 Cycle 7 has been preparec'in accordance with the requirements of Technical Specification 6.9.1.7.
The Technical Specifications affected by this report are listed below:
3/4.1.1.4 Moderator Ternperature Coefficient 3/4.1.3.5 Shutdown Bank Insertion Limit 3/4.1.3.6 Control Bank Insertion Limits 3/4.2.1 Axial Flux Ditference 3/4.2.2 Heat Flux Hot Channel Factor 3/4.2.3 Nuclear Enthalpy Rise Hot Channel Factor 3/4.9.1 Boron Concentration Page 1 of t1
COLR for flerth Anna WIIT I CYCLE 7 tre (N.IN) too u
_5(-.
100. 194)
/
,,0 RNil C S2 (0,lle) l aunt 0 100 l
}
l 1
l 50 l
4 (4.8,,0) 0 N
40 00 to 100 Ponent of RATED THENIRL POWER Note: Control Banks A And B Must De Withdrawn From The Core Prior To Power Operation Figure 1 Control Red Bank Insertion Listts vs Pereent RATED THtst4L POWili Page 5 of 11
\\
.. -..