ML20059A225: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:r
{{#Wiki_filter:r
h (L h b y) 8 -
<
>
L
L
  <    >
gQ23 N
                                                                                    h (L h b y) 8 -
Docket Nos. 50-266; 50-301
                                                      gQ23 N
Wisconsin Electric Power Company
        Docket Nos. 50-266; 50-301
ATTN: Mr. R. E. Link
        Wisconsin Electric Power Company
Vice President-
        ATTN: Mr. R. E. Link
Nuclear Power
                  Vice President-
231 West Michigan Street - P379
                  Nuclear Power
Milwaukee, WI 53201
          231 West Michigan Street - P379
Dear Mr. Link:
        Milwaukee, WI 53201
This refers to the routine safety inspection conducted by Messrs. K. R. Jury
        Dear Mr. Link:
and J. Gadzala of this office, from October 26 through December 6,1993, of
        This refers to the routine safety inspection conducted by Messrs. K. R. Jury
activities at the Point Beach Nuclear Plant Units 1 and 2.
          and J. Gadzala of this office, from October 26 through December 6,1993, of
Our findings were
          activities at the Point Beach Nuclear Plant Units 1 and 2. Our findings were
discussed with Mr. G. J. Maxfield and members of his staff at the conclusion
        discussed with Mr. G. J. Maxfield and members of his staff at the conclusion
of the inspection.
          of the inspection.
Areas examined during the inspection are identified in the report. Within
        Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
          these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations.
          and representative records, interviews with personnel, and observations.
During this inspection, certain. of your activities appeared to be in violation
        During this inspection, certain. of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice.
          of NRC requirements, as specified in the enclosed Notice. Initiation of a
Initiation of a
          required shutdown was not reported as required. Although this violation is of
required shutdown was not reported as required. Although this violation is of
        minimal safety concern, it could have been prevented by appropriate corrective
minimal safety concern, it could have been prevented by appropriate corrective
          action in response to a previous similar occurrence.
action in response to a previous similar occurrence.
        Additionally, the time allowance specified in your General Considerations
Additionally, the time allowance specified in your General Considerations
        Technical Specification to shut down the reactors is a concern, as discussed-
Technical Specification to shut down the reactors is a concern, as discussed-
          in Section 3.C of the report.     Please include your proposed actions to address
in Section 3.C of the report.
          this concern, including the schedule for such actions, in your written
Please include your proposed actions to address
          response.
this concern, including the schedule for such actions, in your written
          You are required to respond to this letter and should follow the instructions
response.
          specified in the enclosed Notice when preparing your response.
You are required to respond to this letter and should follow the instructions
        .In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
specified in the enclosed Notice when preparing your response.
          this letter, the enclosures, and your response to this letter will be placed
.In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
          in the NRC Public Document Room.
this letter, the enclosures, and your response to this letter will be placed
        The responses directed by this letter and the enclosed Notice are not subject               ,
in the NRC Public Document Room.
          to the clearance procedures of the Office of Management and Budget as required
The responses directed by this letter and the enclosed Notice are not subject
                                                                                                    ~
~,
          by the Paperwork Reduction Act of 1980, Public Law No. 96.511.
to the clearance procedures of the Office of Management and Budget as required
          We will gladly discuss any questions you have concerning this inspection.
by the Paperwork Reduction Act of 1980, Public Law No. 96.511.
                                                                                                    ,
We will gladly discuss any questions you have concerning this inspection.
                  2800:4                                                                     ;i     l
,
    9312300062 931223
2800:4
    PDR                                                                                            1
;i
                                                                                                      '
9312300062 931223
    0-      ADOCK 05000266                                                                       j
1
                          PDR
'
e                                                   _.                 _      _
PDR
ADOCK 05000266
j
0-
PDR
e
.


                                                                                          y
y
                                                                                              ,
,
t,.
8~
              8~
t,.
    .4..                                                                                     h
.4..
L                                                                                           !
h
                                                                                              i
L
                                                                                              !
!
                Wisconsin Electric Power               2                 .DEC 2 3 N       y
i
  ,               Company
!
Wisconsin Electric Power
2
.DEC 2 3 N
y
Company
,
~
p-
p-
                                                                                          ~
!
                                                                                              !
Your cooperation with us is appreciated.
                Your cooperation with us is appreciated.                                     ,
,
                                                                                            'i
'i
                                                                -Sincerely.-
-Sincerely.-
                                                                                              '
'
                                                                h'     ,hh b .
h' ,hh b .
                                                                L. Robert Greger, Chief- J'
L. Robert Greger, Chief-
                                                                Reactor Projects Branch 3
J'
                Enclosure:
Reactor Projects Branch 3
                Inspection Reports
Enclosure:
                  No. 50-266/93015(DRP);
Inspection Reports
                          -
No. 50-266/93015(DRP);
                                                                                              <
-
                  No. 50-301/93015(DRP)                                                     i
<
                                                                                              i
No. 50-301/93015(DRP)
                cc w/ enclosure:                                                             ,
i
                G. J. Maxfield, Plant Manager
i
                OC/LfDCB
cc w/ enclosure:
                Resident Inspector, RIII
,
                Virgil Kanable, Chief                                                         ;
G. J. Maxfield, Plant Manager
                  Boiler Section                                                             !
OC/LfDCB
                Cheryl L. Parrino, Chairman                                                   l
Resident Inspector, RIII
                                                                                              '
Virgil Kanable, Chief
                  Wisconsin Public Service
;
                  Commission
Boiler Section
                State Liaison Officer
!
                bec:   PUBLIC   _I E - 01                                                   ;
Cheryl L. Parrino, Chairman
                                                                                              !
l
                                                                                              :
'
                                                                                          ~!
Wisconsin Public Service
                                                                                              :
Commission
                                                                                              !
State Liaison Officer
                                                                                              :
bec:
                                                                                              ,
PUBLIC
                                                                                              :
_I E - 01
                                                                                              t
;
  -
!
                RIII         ftni-         RIII.   RII                                     :
:
          e.      Act                       L00           ''
~
                                                                                              '
:
                  &ngue       -Dcfcyctic   Olteanu   Gr
!
            g2 21 9 3                     (8 -11-4)     j t 2)                               :
:
                                                                                              !
,
                                                                                              i
:
t
-
RIII
ftni-
RIII.
RII
:
Act
L00
''
e.
&ngue
-Dcfcyctic
Olteanu
Gr
'
g2 21 9 3
(8 -11-4)
t 2)
:
j
!
i
'
'
                                                                                              i
i
                                                                                          -
-
                                                                                              '
<
<
'
..
}}
}}

Latest revision as of 07:19, 17 December 2024

Forwards Insp Repts 50-266/93-15 & 50-301/93-15 on 931026-1206 & Notice of Violations
ML20059A225
Person / Time
Site: Point Beach  
Issue date: 12/23/1993
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Link R
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20059A228 List:
References
NUDOCS 9312300062
Download: ML20059A225 (2)


See also: IR 05000266/1993015

Text

r

h (L h b y) 8 -

<

>

L

gQ23 N

Docket Nos. 50-266; 50-301

Wisconsin Electric Power Company

ATTN: Mr. R. E. Link

Vice President-

Nuclear Power

231 West Michigan Street - P379

Milwaukee, WI 53201

Dear Mr. Link:

This refers to the routine safety inspection conducted by Messrs. K. R. Jury

and J. Gadzala of this office, from October 26 through December 6,1993, of

activities at the Point Beach Nuclear Plant Units 1 and 2.

Our findings were

discussed with Mr. G. J. Maxfield and members of his staff at the conclusion

of the inspection.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations.

During this inspection, certain. of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice.

Initiation of a

required shutdown was not reported as required. Although this violation is of

minimal safety concern, it could have been prevented by appropriate corrective

action in response to a previous similar occurrence.

Additionally, the time allowance specified in your General Considerations

Technical Specification to shut down the reactors is a concern, as discussed-

in Section 3.C of the report.

Please include your proposed actions to address

this concern, including the schedule for such actions, in your written

response.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

.In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the enclosed Notice are not subject

~,

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Public Law No. 96.511.

We will gladly discuss any questions you have concerning this inspection.

,

2800:4

i

9312300062 931223

1

'

PDR

ADOCK 05000266

j

0-

PDR

e

.

y

,

8~

t,.

.4..

h

L

!

i

!

Wisconsin Electric Power

2

.DEC 2 3 N

y

Company

,

~

p-

!

Your cooperation with us is appreciated.

,

'i

-Sincerely.-

'

h' ,hh b .

L. Robert Greger, Chief-

J'

Reactor Projects Branch 3

Enclosure:

Inspection Reports

No. 50-266/93015(DRP);

-

<

No. 50-301/93015(DRP)

i

i

cc w/ enclosure:

,

G. J. Maxfield, Plant Manager

OC/LfDCB

Resident Inspector, RIII

Virgil Kanable, Chief

Boiler Section

!

Cheryl L. Parrino, Chairman

l

'

Wisconsin Public Service

Commission

State Liaison Officer

bec:

PUBLIC

_I E - 01

!

~

!

,

t

-

RIII

ftni-

RIII.

RII

Act

L00

e.

&ngue

-Dcfcyctic

Olteanu

Gr

'

g2 21 9 3

(8 -11-4)

t 2)

j

!

i

'

i

-

<

'

..