Docket Nos. 50-266; 50-301
Wisconsin Electric Power Company
ATTN: Mr. R. E. Link
Vice President-
Nuclear Power
231 West Michigan Street - P379
Milwaukee, WI 53201
Dear Mr. Link:
This refers to the routine safety inspection conducted by Messrs. K. R. Jury
and J. Gadzala of this office, from October 26 through December 6,1993, of
activities at the Point Beach Nuclear Plant Units 1 and 2.
Our findings were
discussed with Mr. G. J. Maxfield and members of his staff at the conclusion
of the inspection.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations.
During this inspection, certain. of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice.
Initiation of a
required shutdown was not reported as required. Although this violation is of
minimal safety concern, it could have been prevented by appropriate corrective
action in response to a previous similar occurrence.
Additionally, the time allowance specified in your General Considerations
Technical Specification to shut down the reactors is a concern, as discussed-
in Section 3.C of the report.
Please include your proposed actions to address
this concern, including the schedule for such actions, in your written
response.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
.In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject
~,
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Public Law No. 96.511.
We will gladly discuss any questions you have concerning this inspection.
,
2800:4
- i
9312300062 931223
1
'
ADOCK 05000266
j
0-
e
.
y
,
8~
t,.
.4..
h
L
!
i
!
Wisconsin Electric Power
2
.DEC 2 3 N
y
Company
,
~
p-
!
Your cooperation with us is appreciated.
,
'i
-Sincerely.-
'
h' ,hh b .
L. Robert Greger, Chief-
J'
Reactor Projects Branch 3
Enclosure:
Inspection Reports
No. 50-266/93015(DRP);
-
<
No. 50-301/93015(DRP)
i
i
cc w/ enclosure:
,
G. J. Maxfield, Plant Manager
OC/LfDCB
Resident Inspector, RIII
Virgil Kanable, Chief
Boiler Section
!
Cheryl L. Parrino, Chairman
l
'
Wisconsin Public Service
Commission
State Liaison Officer
bec:
PUBLIC
_I E - 01
!
~
!
,
t
-
RIII
ftni-
RIII.
RII
Act
L00
e.
&ngue
-Dcfcyctic
Olteanu
Gr
'
g2 21 9 3
(8 -11-4)
t 2)
j
!
i
'
i
-
<
'
..