W3P90-1163, Forwards Relief Requests Associated w/10-yr Inservice Insp Program Per Section 50.55a(g)(6)(i) of 10CFR50: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 22: | Line 22: | ||
t. | t. | ||
.p | .p | ||
- Unt:r;y Oper; tion:, Inn.- | |||
O:- | |||
8%Of1S: | t#;w Qtans L A 70112 317 Banyve St 8%Of1S: | ||
wss2ms 4 | |||
1el 504-739-6771 Raymond F. Burski | |||
4 W3P90-1163 A4;05 QA' | -- uvwu.. | ||
' $dely & RettAnsy A% | |||
4 W3P90-1163 A4;05 QA' S | |||
Se'ptember'6, 1990 | |||
-.U.S. Nuclear ' Reg ilatory Commission | |||
Washington, ' D.C. :20555 - | -- ATTN: | ||
Document ~ Contcol--Desk Washington, ' D.C. :20555 - | |||
1; | |||
~ | |||
3 | 3 | ||
==Subject:== | ==Subject:== | ||
' Docket' No. 50-382 Waterford 3 SES 1 | |||
License No. NPF-38 | |||
= Ten Year Inservice Inspec' tion Program 1 | |||
- Relief Requests i | |||
Gentlemen: | Gentlemen: | ||
4 | |||
-In accordance with 10CFR50.55a(g)(5)(ill), Entergy Operations, Inc. hereby submits by attachment seven relief requests which are associated with the l | |||
revisions to existing relief- requests and one is a new relief- request. | Ten Year Inservice Inspection Program. | ||
The attachment to this letter includes a brief summary of the changes, and provides the new and 1evised relief requests. The~ changes to the. relief requests have been noted by revision bars in the right margin.. | Six of these relief. requests are | ||
i pk | ~ | ||
03031 | revisions to existing relief-requests and one is a new relief-request. | ||
o Furthermore, four relief requests have been deleted.- The i | |||
revisions / deletions whic'a have been made' resulted largely from the :NRC Safety Evaluations -(SE4) which were submitted to Waterfordc3 on Junef 6, 1989. | |||
Also, Request lor Relief.No. ISI-001 has been updated to reflect information obtained nuring our second and third refueling outages. | |||
The attachment to this letter includes a brief summary of the changes, and provides the new and 1evised relief requests. | |||
The~ changes to the. relief requests have been noted by revision bars in the right margin.. | |||
o It is hereby requested that the ASME Section XI code relief requested be granted pursuant to Section 50.55a(g)(6)(1) of 10CFR50. | |||
i pk 03031 I | |||
9009130022 900906 PDR ADOCK 050003021 O | |||
PNUg; | |||
q._ | q._ | ||
l o | l o | ||
L | L | ||
:.W3P90-1163 4 | |||
Page 2- | l- | ||
l Should you; havejany quesUons, please contact' Ms. 3.R. Loetzerich at (504)' | = Ten Year Inservice Inspection Program - | ||
Relief Requests; September.6, 1990 e | |||
Page 2-l Should you; havejany quesUons, please contact' Ms. 3.R. Loetzerich at (504)' | |||
? | |||
739-6636. | 739-6636. | ||
Very truly yours, - | Very truly yours, - | ||
/- | |||
. V.- | |||
Attachment - | RFB/BRL/ssf Attachment - | ||
cc . (w/ attachment): | cc. (w/ attachment): | ||
Mr. R.D.f Martin,, NRC Region IV NRC - Resident' Inspectors Office cc -(w/o attachment): Messrs. D.L. Wigginton, NRC-NRR 1 | |||
W.M. Stevenson R.B. McGehee- | E.L. Blake - | ||
1 | W.M. Stevenson R.B. McGehee-1 | ||
't i | |||
i s | i s | ||
t i | t i | ||
r t | |||
*-**-1e-s J | |||
-*e-w--- | |||
m- -- | |||
_.___m,_.___A a-- | |||
4 | |||
'W | |||
~Page 1 of 5-. | |||
,, y i | |||
.' s en l | |||
~ | |||
SUfMARY OF CHANGES TO ASME SECTION XI RELIEF REQUESTS - | |||
!~ | !~ | ||
l | l | ||
^ | |||
RELIEF REQUEST NUMBER | RELIEF REQUEST NUMBER DESCRIPTION CHANGE ISI-001 Limited Examination of Welds Revised request to update exam results | ||
- obtained'during Refuel 2 and 3.. | |||
~ | |||
ISI-002 | ISI-002 Supplemental Examinations for No changes. | ||
Intergranular Stress corrosion Cracking (IGSCC) | Intergranular Stress corrosion Cracking (IGSCC) | ||
-C ISI-003 VT-3 Examinations on Pump and Valve 7 Revised' request to' address the. internal" Internals fexamination'of' pump casings.(Code ~ Item- | |||
~ | |||
ISI-004 | Bl.2.20).. Pump. casings had previously-been addressed as part of-Relief Request ISI-004, however, duelto thei similarities involved with internal) examination of valve bodies,:it was combined with ISI-003.- | ||
ISI-004 Reactor Coolent Pump Casing Welds _ | |||
Waterford 3-has elected to' withdraw ~ | Waterford 3-has elected to' withdraw ~ | ||
~ | |||
C(DELETED) | C(DELETED) | ||
Linternal examination.of pump casings and~ volumetric examination.of pump casing. welds. . Internal. examinations- | ~ | ||
.-this request which addressed the r -- | |||
Linternal examination.of pump casings and~ volumetric examination.of pump casing. welds.. Internal. examinations-- | |||
f | f | ||
.of pump casings'is now-addressed.In-1S1-003-(see above)._'For~ pump casing welds, this. request requested to'- | |||
volumetrically' examine the. casing welds only if the pump was' disassembled for maintenance. However, per.the Safety- | volumetrically' examine the. casing welds only if the pump was' disassembled for maintenance. However, per.the Safety- | ||
-l h | |||
m | |||
,, a a. | |||
_ _. ;,_,2 | |||
'2 Page 2'of;5L a. | |||
m | m | ||
==SUMMARY== | ==SUMMARY== | ||
OF CHANGES TO ASME SECTION XI T.ELIEF REQUESTS | OF CHANGES TO ASME SECTION XI T.ELIEF REQUESTS | ||
~ | |||
RELIEF REQUEST NUMBER | RELIEF REQUEST NUMBER DESCRIPTION CHANGE ISI-004 Reactor Coolant PtLatp Casing Welds - | ||
ISI-004 | Evaluation,'the welds would require a: | ||
(Cont'd) | (Cont'd) | ||
: interval if.the pumps were not | (DELETED) | ||
' volumetric _ exam at the end.of the f | |||
: interval if.the pumps were not | |||
~ | |||
disassembled for maint'enance. Siace | disassembled for maint'enance. Siace | ||
* Section XI allows the deferral of this". | * Section XI allows the deferral of this". | ||
~ | |||
~ | |||
exam until the'end of the-interval,. ~ | exam until the'end of the-interval,. ~ | ||
no relief. request is'necessary | no relief. request is'necessary. | ||
ISI-005 | ISI-005 | ||
(DELETED) | - Categorization-of IND into IWF This request has'been5 deleted. It (DELETED) addressed theicategorization oflIND portions of component; supports into IWF. _The Safety' Evaluation stated thatc this was~ acceptable and that no Relief; Request:is n'ecessary. Therefore, Section 4.1 of the. Ten Year ISI Program- | ||
: has been revised to address this~ and 'a figure has been included-in~Section 4'.4.- | : has been revised to address this~ and 'a figure has been included-in~Section 4'.4.- | ||
(Figure 1D)-for. clarification; | (Figure 1D)-for. clarification; ISI-006 Support Access Partially;orL Revised to' incorporate ^the examinationL Completely Blocked by Non-i | ||
'of,all nonexempt component' supports' j.. | |||
Removable Thermal'. Insulation' | |||
~ | |||
within'the. Chilled Water' system.i Also,y.. | within'the. Chilled Water' system.i Also,y.. | ||
~ | |||
. Request..for1 Relief ~.No. ISI-009 which' | |||
~ | |||
i' | i' | ||
^ | |||
' addressed partial blockage.of component-supports-within the-Chilled Water... | |||
l | l system was: combined with'ISI-006 which | ||
~ | |||
previously.only, addressed' total.. | previously.only, addressed' total.. | ||
l blockage of supports; These changes were based on the. Safety Evaluation,- | l blockage of supports; These changes were based on the. Safety Evaluation,- | ||
l' l | l' l | ||
I | I | ||
~ | |||
_,.L,,m | |||
_~ | ...__.;7.., | ||
_~ | |||
~.. _,,,,, | |||
..,,-.w m._ | |||
___m....._.~__ | |||
Page 3lof 5- | Page 3lof 5- | ||
, }g C | |||
/ | |||
-=. | |||
j- | j- | ||
,, ~ | |||
SUMP 3RY OF CHANGES TO ASME SECTION XI RELIEF REQUESTS RELIEF REQUEST NUMBER | SUMP 3RY OF CHANGES TO ASME SECTION XI RELIEF REQUESTS RELIEF REQUEST NUMBER DESCRIPTION | ||
__ CHANGE ISI-006 Support Access Partially or. | |||
' which' stated to select an alternate (Cont'd) | |||
Completely Blocked by Non - | |||
~ support similar initype, design ar.d Removable Thermal Insulation-function.for each. support which was-partially or completely blocked. | |||
.However,-due'to the amount of supports | |||
- within the Chilled Water. system which-were partially.or completely blocked: | |||
by non-removable' insulation,; | by non-removable' insulation,; | ||
Waterford 3 has elected to examine 100%- | Waterford 3 has elected to examine 100%- | ||
~.(134)'of the nonexempt' component-... | |||
supports within this system from the-insulation surface'to the building' structure.- Therefore, an additional 61 | supports within this system from the-insulation surface'to the building' structure.- Therefore, an additional 61 | ||
~ | |||
~ supports were added to the Class 3.- | |||
" Total Selected for Examination" column-of Examination Table'F.-C-in.the. Ten Year ISI Program. This is explained | |||
of Examination Table'F.-C-in.the. Ten Year ISI Program. This is explained | .further in.the Relief _ Request. | ||
~ ' | |||
~.. | |||
ISI-007.. | |||
ISI-007. . | . Supports'in Penetration'with-Revised to ' select an. additional' support; | ||
Revised to ' select an . additional' support; | ' Fire Seal-similar in. type,: design and function) | ||
.for each support listed.except.as noted; in'the Relief Request. This change. | |||
Ladded 3 Class 2 component supports and. | Ladded 3 Class 2 component supports and. | ||
: 8. Class 3. component supports to the- | : 8. Class 3. component supports to the- | ||
" Total Selected for Examination"' column'~ | |||
of Examination Table F-C in the Ten- | of Examination Table F-C in the Ten- | ||
. Year.ISI Program.- | |||
i | i | ||
-._.,m J-- | |||
J-- | ,__s m | ||
.J | |||
,w | |||
Page 4 of 5'- | Page 4 of 5'- | ||
==SUMMARY== | ==SUMMARY== | ||
OF CHANGES TO ASME SECTION XI RELIEF REQUESTS | OF CHANGES TO ASME SECTION XI RELIEF REQUESTS | ||
^', | |||
RELIEF REQUEST NUMBER | RELIEF REQUEST NUMBER DESCRIPTION CHANGE g | ||
a ISI-008 Supports in Penetration'(DELETED) | |||
have been transferred to :ISI-007. and . | The supports.-listed in.'this request l:- | ||
therefore'.ISI-008 has been deleted.- | have been transferred to :ISI-007. and. | ||
Relief Request ISI-0071 identifies" the supports:which are in penetrations | therefore'.ISI-008 has been deleted.- | ||
Relief Request ISI-0071 identifies" | |||
~ | |||
the supports:which are in penetrations | |||
- closed,off.by-fireseals.whereas- | |||
. ISI-008. identified.(supports which-were inside penetrations'without.- | |||
fireseals.;1A'walkdown of.the supports identifled!in'ISI-008 revealed that-- | fireseals.;1A'walkdown of.the supports identifled!in'ISI-008 revealed that-- | ||
~ | |||
' the penetrations had been. closed.off-- | |||
- by :fireseals since the previous exam. | |||
Therefore, the supports-were moved to | Therefore, the supports-were moved to ISI-007. -- | ||
ISI-007. - | ~ | ||
ISI-009 Supports Partially: Blocked by lion-. - | |||
ISI-009 | This' request has been incorporated-into Removable Thermal-Insulation ISI-006 due'.to the similarities.between :: | ||
. (DELETED): | |||
i Revised! | the;:two' requests. --:See change;of1 ISI-006 for additionalJinformation. | ||
i ISI-010 Supports Partially Blocked by Fire / | |||
Heat Insulation: | . Revised! o reflect'that all. supports: | ||
t Heat Insulation: | |||
. similar in type, design and function | |||
_ as those listed in;the relief request- | _ as those listed in;the relief request- | ||
- have beenTselected for examination. | |||
Therefore;jno' alternate. supports can'bei examined in lieu of these supports.. | Therefore;jno' alternate. supports can'bei examined in lieu of these supports.. | ||
+ <. | |||
7 a..+..~,s | |||
..], | |||
,,l., | |||
,e., | |||
w. - | |||
, i.. | |||
.c-- | |||
r | |||
,.m | |||
~ | |||
, S ',. m ls | |||
:Page:5'of 5.. | :Page:5'of 5.. | ||
~ | |||
==SUMMARY== | ==SUMMARY== | ||
OF CHANGES TO ASME SECTION XI RELIEF REQUESTS RELIEF REQUEST NUMBER | OF CHANGES TO ASME SECTION XI RELIEF REQUESTS RELIEF REQUEST NUMBER DESCRIPTION CHANGE ISI-011 Alternate Examinations of Main Revised. to include | ||
* a rarface : | * a rarface : | ||
Steam and Feedwater Nozzle Inside | Steam and Feedwater Nozzle Inside | ||
: radius section. | -examination of'at least.10% of'the M51n Radius Section Steam and Feedwa' ?r nozzle inside | ||
ISI-012 | : radius section. | ||
in Inaccessible Areas | ISI-012 Pressure Testing of Piping Located This new request' addresses' functional /;. | ||
in Inaccessible Areas inservice testing..of piping located in areas which have been determined. | |||
.to be'. inaccessible during operation. | |||
~ | |||
s.- | s.- | ||
.g | |||
.y | |||
{ | { | ||
L . | L. ~ | ||
.s. | |||
_u. | |||
1 | |||
-}} | |||
Latest revision as of 03:06, 17 December 2024
| ML20059G561 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 09/06/1990 |
| From: | Burski R ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20059G565 | List: |
| References | |
| W3P90-1163, NUDOCS 9009130022 | |
| Download: ML20059G561 (7) | |
Text
-- -
t.
.p
- Unt:r;y Oper; tion:, Inn.-
O:-
t#;w Qtans L A 70112 317 Banyve St 8%Of1S:
wss2ms 4
1el 504-739-6771 Raymond F. Burski
-- uvwu..
' $dely & RettAnsy A%
4 W3P90-1163 A4;05 QA' S
Se'ptember'6, 1990
-.U.S. Nuclear ' Reg ilatory Commission
-- ATTN:
Document ~ Contcol--Desk Washington, ' D.C. :20555 -
1;
~
3
Subject:
' Docket' No. 50-382 Waterford 3 SES 1
License No. NPF-38
= Ten Year Inservice Inspec' tion Program 1
- Relief Requests i
Gentlemen:
4
-In accordance with 10CFR50.55a(g)(5)(ill), Entergy Operations, Inc. hereby submits by attachment seven relief requests which are associated with the l
Ten Year Inservice Inspection Program.
Six of these relief. requests are
~
revisions to existing relief-requests and one is a new relief-request.
o Furthermore, four relief requests have been deleted.- The i
revisions / deletions whic'a have been made' resulted largely from the :NRC Safety Evaluations -(SE4) which were submitted to Waterfordc3 on Junef 6, 1989.
Also, Request lor Relief.No. ISI-001 has been updated to reflect information obtained nuring our second and third refueling outages.
The attachment to this letter includes a brief summary of the changes, and provides the new and 1evised relief requests.
The~ changes to the. relief requests have been noted by revision bars in the right margin..
o It is hereby requested that the ASME Section XI code relief requested be granted pursuant to Section 50.55a(g)(6)(1) of 10CFR50.
i pk 03031 I
9009130022 900906 PDR ADOCK 050003021 O
PNUg;
q._
l o
L
- .W3P90-1163 4
l-
= Ten Year Inservice Inspection Program -
Relief Requests; September.6, 1990 e
Page 2-l Should you; havejany quesUons, please contact' Ms. 3.R. Loetzerich at (504)'
?
739-6636.
Very truly yours, -
/-
. V.-
RFB/BRL/ssf Attachment -
cc. (w/ attachment):
Mr. R.D.f Martin,, NRC Region IV NRC - Resident' Inspectors Office cc -(w/o attachment): Messrs. D.L. Wigginton, NRC-NRR 1
E.L. Blake -
W.M. Stevenson R.B. McGehee-1
't i
i s
t i
r t
- -**-1e-s J
-*e-w---
m- --
_.___m,_.___A a--
4
'W
~Page 1 of 5-.
,, y i
.' s en l
~
SUfMARY OF CHANGES TO ASME SECTION XI RELIEF REQUESTS -
!~
l
^
RELIEF REQUEST NUMBER DESCRIPTION CHANGE ISI-001 Limited Examination of Welds Revised request to update exam results
- obtained'during Refuel 2 and 3..
~
ISI-002 Supplemental Examinations for No changes.
Intergranular Stress corrosion Cracking (IGSCC)
-C ISI-003 VT-3 Examinations on Pump and Valve 7 Revised' request to' address the. internal" Internals fexamination'of' pump casings.(Code ~ Item-
~
Bl.2.20).. Pump. casings had previously-been addressed as part of-Relief Request ISI-004, however, duelto thei similarities involved with internal) examination of valve bodies,:it was combined with ISI-003.-
ISI-004 Reactor Coolent Pump Casing Welds _
Waterford 3-has elected to' withdraw ~
~
C(DELETED)
~
.-this request which addressed the r --
Linternal examination.of pump casings and~ volumetric examination.of pump casing. welds.. Internal. examinations--
f
.of pump casings'is now-addressed.In-1S1-003-(see above)._'For~ pump casing welds, this. request requested to'-
volumetrically' examine the. casing welds only if the pump was' disassembled for maintenance. However, per.the Safety-
-l h
m
,, a a.
_ _. ;,_,2
'2 Page 2'of;5L a.
m
SUMMARY
OF CHANGES TO ASME SECTION XI T.ELIEF REQUESTS
~
RELIEF REQUEST NUMBER DESCRIPTION CHANGE ISI-004 Reactor Coolant PtLatp Casing Welds -
Evaluation,'the welds would require a:
(Cont'd)
(DELETED)
' volumetric _ exam at the end.of the f
- interval if.the pumps were not
~
disassembled for maint'enance. Siace
- Section XI allows the deferral of this".
~
~
exam until the'end of the-interval,. ~
no relief. request is'necessary.
ISI-005
- Categorization-of IND into IWF This request has'been5 deleted. It (DELETED) addressed theicategorization oflIND portions of component; supports into IWF. _The Safety' Evaluation stated thatc this was~ acceptable and that no Relief; Request:is n'ecessary. Therefore, Section 4.1 of the. Ten Year ISI Program-
- has been revised to address this~ and 'a figure has been included-in~Section 4'.4.-
(Figure 1D)-for. clarification; ISI-006 Support Access Partially;orL Revised to' incorporate ^the examinationL Completely Blocked by Non-i
'of,all nonexempt component' supports' j..
Removable Thermal'. Insulation'
~
within'the. Chilled Water' system.i Also,y..
~
. Request..for1 Relief ~.No. ISI-009 which'
~
i'
^
' addressed partial blockage.of component-supports-within the-Chilled Water...
l system was: combined with'ISI-006 which
~
previously.only, addressed' total..
l blockage of supports; These changes were based on the. Safety Evaluation,-
l' l
I
~
_,.L,,m
...__.;7..,
_~
~.. _,,,,,
..,,-.w m._
___m....._.~__
Page 3lof 5-
, }g C
/
-=.
j-
,, ~
SUMP 3RY OF CHANGES TO ASME SECTION XI RELIEF REQUESTS RELIEF REQUEST NUMBER DESCRIPTION
__ CHANGE ISI-006 Support Access Partially or.
' which' stated to select an alternate (Cont'd)
Completely Blocked by Non -
~ support similar initype, design ar.d Removable Thermal Insulation-function.for each. support which was-partially or completely blocked.
.However,-due'to the amount of supports
- within the Chilled Water. system which-were partially.or completely blocked:
by non-removable' insulation,;
Waterford 3 has elected to examine 100%-
~.(134)'of the nonexempt' component-...
supports within this system from the-insulation surface'to the building' structure.- Therefore, an additional 61
~
~ supports were added to the Class 3.-
" Total Selected for Examination" column-of Examination Table'F.-C-in.the. Ten Year ISI Program. This is explained
.further in.the Relief _ Request.
~ '
~..
ISI-007..
. Supports'in Penetration'with-Revised to ' select an. additional' support;
' Fire Seal-similar in. type,: design and function)
.for each support listed.except.as noted; in'the Relief Request. This change.
Ladded 3 Class 2 component supports and.
- 8. Class 3. component supports to the-
" Total Selected for Examination"' column'~
of Examination Table F-C in the Ten-
. Year.ISI Program.-
i
-._.,m J--
,__s m
.J
,w
Page 4 of 5'-
SUMMARY
OF CHANGES TO ASME SECTION XI RELIEF REQUESTS
^',
RELIEF REQUEST NUMBER DESCRIPTION CHANGE g
a ISI-008 Supports in Penetration'(DELETED)
The supports.-listed in.'this request l:-
have been transferred to :ISI-007. and.
therefore'.ISI-008 has been deleted.-
Relief Request ISI-0071 identifies"
~
the supports:which are in penetrations
- closed,off.by-fireseals.whereas-
. ISI-008. identified.(supports which-were inside penetrations'without.-
fireseals.;1A'walkdown of.the supports identifled!in'ISI-008 revealed that--
~
' the penetrations had been. closed.off--
- by :fireseals since the previous exam.
Therefore, the supports-were moved to ISI-007. --
~
ISI-009 Supports Partially: Blocked by lion-. -
This' request has been incorporated-into Removable Thermal-Insulation ISI-006 due'.to the similarities.between ::
. (DELETED):
the;:two' requests. --:See change;of1 ISI-006 for additionalJinformation.
i ISI-010 Supports Partially Blocked by Fire /
. Revised! o reflect'that all. supports:
t Heat Insulation:
. similar in type, design and function
_ as those listed in;the relief request-
- have beenTselected for examination.
Therefore;jno' alternate. supports can'bei examined in lieu of these supports..
+ <.
7 a..+..~,s
..],
,,l.,
,e.,
w. -
, i..
.c--
r
,.m
~
, S ',. m ls
- Page:5'of 5..
~
SUMMARY
OF CHANGES TO ASME SECTION XI RELIEF REQUESTS RELIEF REQUEST NUMBER DESCRIPTION CHANGE ISI-011 Alternate Examinations of Main Revised. to include
- a rarface :
Steam and Feedwater Nozzle Inside
-examination of'at least.10% of'the M51n Radius Section Steam and Feedwa' ?r nozzle inside
- radius section.
ISI-012 Pressure Testing of Piping Located This new request' addresses' functional /;.
in Inaccessible Areas inservice testing..of piping located in areas which have been determined.
.to be'. inaccessible during operation.
~