ML20059H339: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Y MD fMj'                    ;[y,i6Q y
{{#Wiki_filter:Y f ;[y, Q y MD Mj' i6
                                                                                                                                  '    ~
~
D. Q .N 5
D. Q
3 w'3 i
.N O
                                            +
3 w'3 5
j[: g                           .      A v . +, -                                     ,
+
11                       +
i j[: g A
fth ,,m:.      M'
v. +, -
11
+
fth M '
[
[
MN a'          ,,
,,m:.
                                          ,,                              ENCLOSURE 1 NOTICE OF VIOLATION u
MN ENCLOSURE 1 a'
i 4                             JGeorgia Power Company                                 Docket Nos. 50-424 and 50-425-f7                     r Vogtle Units 1~and 2-                               License Nos. NPF-68 and NPF-814 h                     lw
NOTICE OF VIOLATION u
[                                 During . the Nuclear Regulatory Comission - (NRC) inspection conducted on JulyJ30 - August 3, 1990, a violation of NRC requirements was identified. In d"
i 4
                            ,        accordance with the " General Statement' of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C '(1990), the violation is: listed                     1
JGeorgia Power Company Docket Nos. 50-424 and 50-425-f7 Vogtle Units 1~and 2-License Nos. NPF-68 and NPF-814 r
              +t                    ~below:-
h lw
f b                                         10 CFR Part 50.47(b)(16) requires that, responsibilities for- plan development . and review and 'for distribution of Emergency Plans be o          ' established and planners be properly trained.
[
    "                                    .10 CFR Part 50, Appendix E (G) requires that. provisions to be employed.to ensure that the emergency plan, its-implementing procedures, and emergency               '
During. the Nuclear Regulatory Comission - (NRC) inspection conducted on JulyJ30 - August 3, 1990, a violation of NRC requirements was identified.
          ;                                equipment and supplies be maintained up.to date.
In d"
Technical Specification 6.7.1(d) requires that written procedures shall-be F,                                         established, implemented, and maintained covering the Emergency ~ Plan-j implementation.
accordance with the " General Statement' of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C '(1990), the violation is: listed 1
1 Procedures 00103-C, " Document Distribution -and Control " 71002-C,                         :j
+
                                            " Controlled - Document Distribution," 70408-C, " Controlled Document                         ;
~below:-
Distribution,"=and 40005-C, " Preparation and Control of Emergency Planning                   q Documents" implement the control and distribution of the Emergency Plan                       l
t f
                                        =and Emergency Plan Implementing Procedures.                                                     !
b 10 CFR Part 50.47(b)(16) requires that, responsibilities for-plan development. and review and 'for distribution of Emergency Plans be
Contrary to the 'above requirements, during the week of July 30 - August 3,                   I 1990, multiple controlled copies of the Emergency Plan and Emergency Plan Implementing: Procedure in the Technical Support Center (TSC), Operational
' established and planners be properly trained.
    ,                                      Support Center-(OSC), Emergency Operations Facility (E0F), and Simulator                       ,
o
  ,'                                      Control: Room _ (SCR) were incomplete or had not been maintained in an                         l y                                       up-to-date manner.                                                                         .,
.10 CFR Part 50, Appendix E (G) requires that. provisions to be employed.to ensure that the emergency plan, its-implementing procedures, and emergency equipment and supplies be maintained up.to date.
                                        .This is a Severity Level IV violation (Supplement VIII).
Technical Specification 6.7.1(d) requires that written procedures shall-be F,
                  @                  Pursuant. to the provisions of 10 CFR' 2.201,' Georgia Power Company is hereby                       ,
established, implemented, and maintained covering the Emergency ~ Plan-implementation.
: required to submit a written statement or explanation to the Nuclear Regulatory
j 1
: Commission,-ATTN: Document Control Desk, Washington, DC 20555, with a copy to                         .
:j Procedures 00103-C, " Document Distribution -and Control " 71002-C,
-                                    the l Regional Administrator, Region II, . and a copy to the NRC Resident-                           i
" Controlled - Document Distribution," 70408-C, " Controlled Document Distribution,"=and 40005-C, " Preparation and Control of Emergency Planning q
                                    ; Inspector, within 30 days of the date-of the letter transmitting this Notice.
Documents" implement the control and distribution of the Emergency Plan l
      'J                           :This reply should be clearly marked as a " Reply to a Notice of Violation" and should, include: (1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid 4
=and Emergency Plan Implementing Procedures.
l 9009170121 900829 R                                                                                                   i PDR               ADOCK 05000424U
I Contrary to the 'above requirements, during the week of July 30 - August 3, 1990, multiple controlled copies of the Emergency Plan and Emergency Plan Implementing: Procedure in the Technical Support Center (TSC), Operational Support Center-(OSC), Emergency Operations Facility (E0F), and Simulator Control: Room _ (SCR) were incomplete or had not been maintained in an l
                .. G y                              PNU;
y up-to-date manner.
.This is a Severity Level IV violation (Supplement VIII).
Pursuant. to the provisions of 10 CFR' 2.201,' Georgia Power Company is hereby
: required to submit a written statement or explanation to the Nuclear Regulatory Commission,-ATTN: Document Control Desk, Washington, DC 20555, with a copy to the l Regional Administrator, Region II,. and a copy to the NRC Resident-i
; Inspector, within 30 days of the date-of the letter transmitting this Notice.
'J
:This reply should be clearly marked as a " Reply to a Notice of Violation" and should, include:
(1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid 4
l 9009170121 900829 R i
PDR ADOCK 05000424U
.. G PNU; y


ll f                   f   '
ll f f
        .n f        . m 1.
f 1.
1 y                                                                    1 9
.n m
          ,y-             %~
y 1
          'V         ' Georgia Power Company.                       Docket Nos. 50-424 and 50-425 p       'Vogtle Units.I and 2                       2   License Nos. NPF-68 and NPF-81
1 9
          , i:;
,y-
l f ' Turther-violations, and- (5) the~ date when full- compliance will be achieved.
'V
Where good cause 'is . shown, consideration will be given to extending the
' Georgia Power Company.
* response time. If an adequate reply is not received within-the time specified
Docket Nos. 50-424 and 50-425
                        -in this Notice, an order may be usued to show cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.
~
1                                                         FOR THE NUCLEAR REGULATORY. COMMISSION f
p
ffl           $k214--
'Vogtle Units.I and 2 2
Douglas M. Collins, Chief
License Nos. NPF-68 and NPF-81
        ;                                                        Emergency Preparedness and J
, i:;
Radiological Protection Branch Division of Radiation Safety
l f ' Turther-violations, and- (5) the~ date when full-compliance will be achieved.
                -;                                                  and Safeguards Georgia                                                        1
Where good cause 'is. shown, consideration will be given to extending the response time.
                      -DatedatAtlanta,Jufusf, this Eth-day of /         1990 1
If an adequate reply is not received within-the time specified
-in this Notice, an order may be usued to show cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.
1 FOR THE NUCLEAR REGULATORY. COMMISSION f
ffl
$k214--
Douglas M. Collins, Chief Emergency Preparedness and J
Radiological Protection Branch Division of Radiation Safety and Safeguards
-DatedatAtlanta,Jufusf, Georgia 1
this Eth-day of /
1990 1
r}}
r}}

Latest revision as of 01:54, 17 December 2024

Notice of Violation from Insp on 900730-0803.Violation Noted:Emergency Operations Facility & Simulator Control Room Incomplete or Not Maintained in up-to-date Manner
ML20059H339
Person / Time
Site: Vogtle  
Issue date: 08/29/1990
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20059H334 List:
References
50-424-90-15, 50-425-90-15, NUDOCS 9009170121
Download: ML20059H339 (2)


Text

Y f ;[y, Q y MD Mj' i6

~

D. Q

.N O

3 w'3 5

+

i j[: g A

v. +, -

11

+

fth M '

[

,,m:.

MN ENCLOSURE 1 a'

NOTICE OF VIOLATION u

i 4

JGeorgia Power Company Docket Nos. 50-424 and 50-425-f7 Vogtle Units 1~and 2-License Nos. NPF-68 and NPF-814 r

h lw

[

During. the Nuclear Regulatory Comission - (NRC) inspection conducted on JulyJ30 - August 3, 1990, a violation of NRC requirements was identified.

In d"

accordance with the " General Statement' of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C '(1990), the violation is: listed 1

+

~below:-

t f

b 10 CFR Part 50.47(b)(16) requires that, responsibilities for-plan development. and review and 'for distribution of Emergency Plans be

' established and planners be properly trained.

o

.10 CFR Part 50, Appendix E (G) requires that. provisions to be employed.to ensure that the emergency plan, its-implementing procedures, and emergency equipment and supplies be maintained up.to date.

Technical Specification 6.7.1(d) requires that written procedures shall-be F,

established, implemented, and maintained covering the Emergency ~ Plan-implementation.

j 1

j Procedures 00103-C, " Document Distribution -and Control " 71002-C,

" Controlled - Document Distribution," 70408-C, " Controlled Document Distribution,"=and 40005-C, " Preparation and Control of Emergency Planning q

Documents" implement the control and distribution of the Emergency Plan l

=and Emergency Plan Implementing Procedures.

I Contrary to the 'above requirements, during the week of July 30 - August 3, 1990, multiple controlled copies of the Emergency Plan and Emergency Plan Implementing: Procedure in the Technical Support Center (TSC), Operational Support Center-(OSC), Emergency Operations Facility (E0F), and Simulator Control: Room _ (SCR) were incomplete or had not been maintained in an l

y up-to-date manner.

.This is a Severity Level IV violation (Supplement VIII).

Pursuant. to the provisions of 10 CFR' 2.201,' Georgia Power Company is hereby

required to submit a written statement or explanation to the Nuclear Regulatory Commission,-ATTN: Document Control Desk, Washington, DC 20555, with a copy to the l Regional Administrator, Region II,. and a copy to the NRC Resident-i
Inspector, within 30 days of the date-of the letter transmitting this Notice.

'J

This reply should be clearly marked as a " Reply to a Notice of Violation" and should, include:

(1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid 4

l 9009170121 900829 R i

PDR ADOCK 05000424U

.. G PNU; y

ll f f

f 1.

.n m

y 1

1 9

,y-

'V

' Georgia Power Company.

Docket Nos. 50-424 and 50-425

~

p

'Vogtle Units.I and 2 2

License Nos. NPF-68 and NPF-81

, i:;

l f ' Turther-violations, and- (5) the~ date when full-compliance will be achieved.

Where good cause 'is. shown, consideration will be given to extending the response time.

If an adequate reply is not received within-the time specified

-in this Notice, an order may be usued to show cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.

1 FOR THE NUCLEAR REGULATORY. COMMISSION f

ffl

$k214--

Douglas M. Collins, Chief Emergency Preparedness and J

Radiological Protection Branch Division of Radiation Safety and Safeguards

-DatedatAtlanta,Jufusf, Georgia 1

this Eth-day of /

1990 1

r