      Tennessee Valley Authority
Tennessee Valley Authority
      ATTN: Mr. H. G. Parris
ATTN: Mr. H. G. Parris
              Manager of Power
Manager of Power
      500A Chestnut Street Tower II
500A Chestnut Street Tower II
      Chattanooga, TN 37401
Chattanooga, TN 37401
      Gentlemen:
Gentlemen:
      Subject: Report No           7/8   and 50-328/82-05
Subject: Report No
      This is response to your letters dated June 1 and 25,1982 in which you discussed
7/8
      certain violations brought to your attention in the Notice of Violation with our
and 50-328/82-05
      letter of April 20, 1982.
This is response to your letters dated June 1 and 25,1982 in which you discussed
      Your actions to correct Violation A and to prevent its recurrence will be
certain violations brought to your attention in the Notice of Violation with our
      examined during future inspections of your program.
letter of April 20, 1982.
      Your denials of Violations B and C have been evaluated by our staff as shown in.
Your actions to correct Violation A and to prevent its recurrence will be
      the enclosure to this letter. For the reasons presented in the enclosure, we
examined during future inspections of your program.
      have concluded that Violation B should be withdrawn and designated an unresolved
Your denials of Violations B and C have been evaluated by our staff as shown in.
      item pending further NRC inspection. However, we have also concluded that
the enclosure to this letter.
      Violation C is valid as stated in the Notice of Violation enclosed with our
For the reasons presented in the enclosure, we
      letter of April 20, 1982. Therefore, as required by 10 CFR 2.201, please submit
have concluded that Violation B should be withdrawn and designated an unresolved
      to this office, within twenty days of the date of this letter, a written response
item pending further NRC inspection.
However, we have also concluded that
Violation C is valid as stated in the Notice of Violation enclosed with our
letter of April 20, 1982. Therefore, as required by 10 CFR 2.201, please submit
to this office, within twenty days of the date of this letter, a written response
;
;
      including corrective steps which have been taken for Violation C, corrective
including corrective steps which have been taken for Violation C, corrective
      steps which will be taken to avoid further violations, and the date when full
steps which will be taken to avoid further violations, and the date when full
      compliance will be achieved.
compliance will be achieved.
      In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosure will
In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosure will
      be placed in the NRC Public Document Room.
be placed in the NRC Public Document Room.
      The response directed by this letter is not subject to the clearance procedures
The response directed by this letter is not subject to the clearance procedures
      of the Office of Management and Budget as required by the Paperwork Reduction Act
of the Office of Management and Budget as required by the Paperwork Reduction Act
      of 1980, PL 96-511.
of 1980, PL 96-511.
i
i
i
i
      Should you have any questions concerning this letter, we will be glad to discuss
Should you have any questions concerning this letter, we will be glad to discuss
      them with you.
them with you.
                                            Sincerely,
Sincerely,
                                            Richard C. Lewis, Director
Richard C. Lewis, Director
Division of Project and
,
,
                                          Division of Project and
Resident Programs
                                              Resident Programs
Enclosure:
      Enclosure:
l
l     (See Page 2)
(See Page 2)
                                        ~
~
            8208160436 820809
8208160436 820809
            PDR ADOCK 05000327
PDR ADOCK 05000327
            O                   PDR
O
                                --
PDR
--


  -
-
    .
.
              Tennessee Valley Authority                     AUG 0 9 1982
Tennessee Valley Authority
                                                    2
AUG 0 9 1982
            Enclosure: Evaluation
2
                of Licensee Response
Enclosure:
            cc w/ enc 1:
Evaluation
            H. J. Green, Director of
of Licensee Response
              Nuclear Power
cc w/ enc 1:
            G. G. Stack. Project Manager
H. J. Green, Director of
            C. C. Mason, Plant Superintendent
Nuclear Power
            J. F. Cox, Supervisor, Nuclear
G. G. Stack. Project Manager
              Licensing Section
C. C. Mason, Plant Superintendent
          M. J. Burzynski, Project Engineer
J. F. Cox, Supervisor, Nuclear
          H. N. Culver, Chief Nuclear
Licensing Section
              Safety Review Staf f
M. J. Burzynski, Project Engineer
          bcc w/o enc 1:
H. N. Culver, Chief Nuclear
          NRC Resident Inspector
Safety Review Staf f
          Document Management Branch
bcc w/o enc 1:
          State of Tennessee
NRC Resident Inspector
\
Document Management Branch
State of Tennessee
\\
)
QT
RII
{
{
      RII
CEA erson: cmc
                                              y
CM right
                                                                    )    QT
t 3wis
      CEA erson: cmc         CM right
G Ick
                                                        . -
y
                                                                    7
.
                                              t 3wis  G Ick                1
-
      8y82                  8i   i82
7
                                                                              f
8y82
            -
y82
      $ ''t bi llt f
upv
                                ,
grYe(f,'hyy
                                            y82      upv    grYe(f,'hyy
1
                            sh
f
8i
i82
,
-
$ ''t bi llt f
sh


- - -
- - -
                                                                                                                              '
AUS 0 91882
  ,
'
                                                                                                                AUS 0 91882
,
                                                                                                                              i
i
                                                                                                                              !
!
!
!
                                                      Enclosure
Enclosure
                                        Evaluation of Licensee Response                                                       ,
Evaluation of Licensee Response
;
,
                                                                                                                              l
;
I     1. The licensee denied Item B of the Notice of Violation which stated that                                             :
l
          retraining had never been conducted and provided evidence to support the
I
        contention that such training had been conducted. In retrospect, Region II
1.
        believes that the citation was not clearly articulated and thus implied a                                             ,
The licensee denied Item B of the Notice of Violation which stated that
          scope beyond what was intended. Specifically, the violation related to
:
          substantive changes which had been made in the quality assurance program                                             ;
retraining had never been conducted and provided evidence to support the
        through Revision 4 to the approved program (TVA-TR75-1A) which affect the                                           *
contention that such training had been conducted.
          following General Employee Training (GET) segments:
In retrospect, Region II
        a.    The course objective of GET 4 is to familiarize personnel with the
believes that the citation was not clearly articulated and thus implied a
                purpose and meaning of QA/QC, the TVA organizations having QA/QC
,
                responsibility, and the objectives and methods of implementing the
scope beyond what was intended.
                total QA program. Revision 4 to TVA-TR75-1A modified existing                                                 ,
Specifically, the violation related to
                responsibilities           and added     new responsibilities                     for program
substantive changes which had been made in the quality assurance program
                implementation.
;
through Revision 4 to the approved program (TVA-TR75-1A) which affect the
*
following General Employee Training (GET) segments:
The course objective of GET 4 is to familiarize personnel with the
a.
purpose and meaning of QA/QC, the TVA organizations having QA/QC
responsibility, and the objectives and methods of implementing the
total QA program.
Revision 4 to TVA-TR75-1A modified existing
,
responsibilities
and
added
new
responsibilities
for program
implementation.
b.
The course objective of GET 5.1 is to familiarize personnel with
4
4
        b.    The course objective of GET 5.1 is to familiarize personnel with
requirements for preparation, review, approval, distribution, and
                requirements for preparation, review, approval, distribution, and                                             t
t
                                                                                                                              ,
,
revision of plant documents.
Revision 4 modified various respon-
*
*
                revision of plant documents.                Revision 4 modified various respon-
sibilities and controls regarding procedures,
                sibilities and controls regarding procedures, instructions, and
instructions, and
                drawings.
drawings.
                                                                                                                              t
t
        c.     The objective of GET 14.1 is to familiarize personnel with the                                               F
c.
                procurement of materials, components, and spare parts and with
The objective of GET 14.1 is to familiarize personnel with the
                preparation of purchase requests. Revision 4 modified responsibilities
F
                for the determination of type and extent of supplier evaluations, for                                         ;
procurement of materials, components, and spare parts and with
preparation of purchase requests. Revision 4 modified responsibilities
for the determination of type and extent of supplier evaluations, for
;
inspection and surveillance at vendor facilities, and for receipt
i
i
                inspection and surveillance at vendor facilities, and for receipt
inspections.
                inspections.
It should also be noted that procedure AI-14 which implements Section 17.2.2
,
,
        It should also be noted that procedure AI-14 which implements Section 17.2.2
of the approved QA program requires the assistant plant manager to evaluate
        of the approved QA program requires the assistant plant manager to evaluate                                         ,
,
        the GET program annually and recommend any required retraining. The                                                 !
the GET program annually and recommend any required retraining.
        documents provided by the licensee in their response indicates that the most
The
        recent evaluation of the GET program performed by the Assistant Plant
!
        Manager was conducted in November 1980 and that evaluation did not appear to
documents provided by the licensee in their response indicates that the most
        address retraining.
recent evaluation of the GET program performed by the Assistant Plant
L       Notwithstanding the above, and in view of both the ambiguity of the
Manager was conducted in November 1980 and that evaluation did not appear to
        violation and the information submitted by the licensee regarding other
address retraining.
        segments of the GET retraining program, we conclude that the violation
L
        should be withdrawn and designated an unresolved item pending further NRC                                           '
Notwithstanding the above, and in view of both the ambiguity of the
        inspection in this area.
violation and the information submitted by the licensee regarding other
                                                                                                                            :
segments of the GET retraining program, we conclude that the violation
should be withdrawn and designated an unresolved item pending further NRC
'
inspection in this area.
:
l
l
                                                                                                                            t
t
                            _ _ _ _ . _   _       . _ _ _     _   _
_ _ _ _ . _
                                                                        . _ - _ _ . . _ _ ~ - - - - .         -     --
_
. _ _ _
_
_
.
-
. .
~ - - - - .
-
--


  -   -   --     . . - - . - =_ . _
-
                                            -~ . -_ -             _.       - - _ -   -             --
-
        '
--
    '
. . - - . - =_ .
-~ . -_ -
_.
- - _ -
-
--
_
'
I
'
,,
,,
                                                                                                              I
DB 0 9 C82
                                                                                          DB 0 9 C82         ,
,
          Enclosure                                   2
Enclosure
          2.   The licensee denied Item C of the Notice of Violation stating that they                       ,
2
                believed their program which includes training of engineers and general                       ,
2.
The licensee denied Item C of the Notice of Violation stating that they
,
believed their program which includes training of engineers and general
,
foremen in the QA requirements and the instruction of temporary employees to
always follow appropriate procedures when performing quality-related work
'
'
                foremen in the QA requirements and the instruction of temporary employees to
ensures compliance with the intent of 10 CFR 50, /ppendix B, Criterion II.
                always follow appropriate procedures when performing quality-related work
                ensures compliance with the intent of 10 CFR 50, /ppendix B, Criterion II.
,
,
The licensee further stated that temporary craftsmen are trained to follow
I
,
,
procedures and the quality-related work they do is performed in accordance
'
'
'
                The licensee further stated that temporary craftsmen are trained to follow                    I
with written approved procedures or instructions containing appropr"te
                procedures and the quality-related work they do is performed in accordance                    '
#
#
                with written approved procedures or instructions containing appropr"te
quality control holdpoints for inspection.
                quality control holdpoints for inspection.         Finally, the licensee stated               ,
Finally, the licensee stated
                that the cognizant engineer reviews the completed work to ensure that all                     ;
,
                required inspections and holdpoints have been observed and completed.
that the cognizant engineer reviews the completed work to ensure that all
                With regard to the assertion that temporary employees work under the
;
                supervision of engineers and general foremen who have been trained in QA
required inspections and holdpoints have been observed and completed.
With regard to the assertion that temporary employees work under the
supervision of engineers and general foremen who have been trained in QA
requirements, it should be noted that the inspection disclosed that two of
4
4
'
'
                requirements, it should be noted that the inspection disclosed that two of
six outage foremen and nine engineers and supervisors in the outage group
                six outage foremen and nine engineers and supervisors in the outage group
had received some, but not all, of the training specified in administrative
i              had received some, but not all, of the training specified in administrative
i
instruction AI-14.
j
'
'
                instruction AI-14.                                                                          j
t
                                                                                                              t
The licensee has established an excellent training program for permanent
                The licensee has established an excellent training program for permanent                     i
i
                craftsmen at the Sequoyah site to ensure their knowledge of the                               !
craftsmen at the Sequoyah site to ensure their knowledge of the
                adminisrative, quality, and safety aspects of their assigned position. In                     !
!
                that outage craftsmen perform essentially the same function as permanently
adminisrative, quality, and safety aspects of their assigned position. In
!
that outage craftsmen perform essentially the same function as permanently
.
.
                assigned craftsmen, it is appropriate and necessary that they receive the                     i
assigned craftsmen, it is appropriate and necessary that they receive the
i
4
4
                same training. The latest industry standard on this subject, ANS 3.1-1981                     i
same training. The latest industry standard on this subject, ANS 3.1-1981
i               supports the position that temporary employees must be trained in all areas
i
                where their activities could affect the quality of an operating nuclear                       '
i
;               power plant.         Moreover, Procedure N79A7, Nuclear Plant General Employee
supports the position that temporary employees must be trained in all areas
.               Training Program, in the Division of Nuclear Power Procedures Manual
where their activities could affect the quality of an operating nuclear
                specifically includes temporary and field services personnel in the training
'
;               program.
;
                Finally, tne licensee's contention that outage craftsmen are instructed to                     '
power plant.
                follow procedures which contain appropriate instructions and holdpoints for
Moreover, Procedure N79A7, Nuclear Plant General Employee
l               inspection and that their work is inspected and reviewed, is not persuasive.
.
                The same is true of permanently assigned craftsmen and the licensee has not                   ,
Training Program, in the Division of Nuclear Power Procedures Manual
                argued, nor would the NRC accept, that such limited training would satisfy
specifically includes temporary and field services personnel in the training
                the intens of Criterion II of 10 CFR 50 Appendix B.       Likewise, the NRC does
;
                not accept the premise that quality can be inspectea or audited into the                       :
program.
                                                                                                              '
Finally, tne licensee's contention that outage craftsmen are instructed to
                work; the primary responsibility for quality must be placed on the
'
                individual performing the activity af fecting quality and that individual
follow procedures which contain appropriate instructions and holdpoints for
                must be trained to carry out that responsibility.
l
                Therefore, we conclude that the violation is valid as written in the Notice
inspection and that their work is inspected and reviewed, is not persuasive.
                of Violation.                                                                                 '
The same is true of permanently assigned craftsmen and the licensee has not
,
argued, nor would the NRC accept, that such limited training would satisfy
the intens of Criterion II of 10 CFR 50 Appendix B.
Likewise, the NRC does
not accept the premise that quality can be inspectea or audited into the
:
work; the primary responsibility for quality must be placed on the
'
individual performing the activity af fecting quality and that individual
must be trained to carry out that responsibility.
Therefore, we conclude that the violation is valid as written in the Notice
of Violation.
'
!
!
                                                                                                              !
!;
                                                                                                            ;
h
h
i
i
                                                                                                              i
i
                                                                                            - . - - .   --
., .--
- _ . . . , - _ - . . . - . _
_
.
- - .
.
- . - -
.
--
}}
}}

Latest revision as of 23:45, 16 December 2024

Ack Receipt of 820601 & 25 Ltrs Re IE Insp Repts 50-327/82-05 & 50-328/82-05.Corrective Actions Re Violation a Will Be Examined at Later Date.Violation B Designated Unresolved Item.Response Requested within 20 Days
ML20062J673
Person / Time
Site: Sequoyah  
Issue date: 08/09/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20062J676 List:
References
NUDOCS 8208160436
Download: ML20062J673 (4)


See also: IR 05000327/1982005

Text

,

y<lka)

,

.

N 0 9 1982

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report No

7/8

and 50-328/82-05

This is response to your letters dated June 1 and 25,1982 in which you discussed

certain violations brought to your attention in the Notice of Violation with our

letter of April 20, 1982.

Your actions to correct Violation A and to prevent its recurrence will be

examined during future inspections of your program.

Your denials of Violations B and C have been evaluated by our staff as shown in.

the enclosure to this letter.

For the reasons presented in the enclosure, we

have concluded that Violation B should be withdrawn and designated an unresolved

item pending further NRC inspection.

However, we have also concluded that

Violation C is valid as stated in the Notice of Violation enclosed with our

letter of April 20, 1982. Therefore, as required by 10 CFR 2.201, please submit

to this office, within twenty days of the date of this letter, a written response

including corrective steps which have been taken for Violation C, corrective

steps which will be taken to avoid further violations, and the date when full

compliance will be achieved.

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosure will

be placed in the NRC Public Document Room.

The response directed by this letter is not subject to the clearance procedures

of the Office of Management and Budget as required by the Paperwork Reduction Act

of 1980, PL 96-511.

i

i

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Richard C. Lewis, Director

Division of Project and

,

Resident Programs

Enclosure:

l

(See Page 2)

~

8208160436 820809

PDR ADOCK 05000327

O

PDR

--

-

.

Tennessee Valley Authority

AUG 0 9 1982

2

Enclosure:

Evaluation

of Licensee Response

cc w/ enc 1:

H. J. Green, Director of

Nuclear Power

G. G. Stack. Project Manager

C. C. Mason, Plant Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief Nuclear

Safety Review Staf f

bcc w/o enc 1:

NRC Resident Inspector

Document Management Branch

State of Tennessee

\\

)

QT

RII

{

CEA erson: cmc

CM right

t 3wis

G Ick

y

.

-

7

8y82

y82

upv

grYe(f,'hyy

1

f

8i

i82

,

-

$ t bi llt f

sh

- - -

AUS 0 91882

'

,

i

!

!

Enclosure

Evaluation of Licensee Response

,

l

I

1.

The licensee denied Item B of the Notice of Violation which stated that

retraining had never been conducted and provided evidence to support the

contention that such training had been conducted.

In retrospect, Region II

believes that the citation was not clearly articulated and thus implied a

,

scope beyond what was intended.

Specifically, the violation related to

substantive changes which had been made in the quality assurance program

through Revision 4 to the approved program (TVA-TR75-1A) which affect the

following General Employee Training (GET) segments:

The course objective of GET 4 is to familiarize personnel with the

a.

purpose and meaning of QA/QC, the TVA organizations having QA/QC

responsibility, and the objectives and methods of implementing the

total QA program.

Revision 4 to TVA-TR75-1A modified existing

,

responsibilities

and

added

new

responsibilities

for program

implementation.

b.

The course objective of GET 5.1 is to familiarize personnel with

4

requirements for preparation, review, approval, distribution, and

t

,

revision of plant documents.

Revision 4 modified various respon-

sibilities and controls regarding procedures,

instructions, and

drawings.

t

c.

The objective of GET 14.1 is to familiarize personnel with the

F

procurement of materials, components, and spare parts and with

preparation of purchase requests. Revision 4 modified responsibilities

for the determination of type and extent of supplier evaluations, for

inspection and surveillance at vendor facilities, and for receipt

i

inspections.

It should also be noted that procedure AI-14 which implements Section 17.2.2

,

of the approved QA program requires the assistant plant manager to evaluate

,

the GET program annually and recommend any required retraining.

The

!

documents provided by the licensee in their response indicates that the most

recent evaluation of the GET program performed by the Assistant Plant

Manager was conducted in November 1980 and that evaluation did not appear to

address retraining.

L

Notwithstanding the above, and in view of both the ambiguity of the

violation and the information submitted by the licensee regarding other

segments of the GET retraining program, we conclude that the violation

should be withdrawn and designated an unresolved item pending further NRC

'

inspection in this area.

l

t

_ _ _ _ . _

_

. _ _ _

_

_

.

-

. .

~ - - - - .

-

--

-

-

--

. . - - . - =_ .

-~ . -_ -

_.

- - _ -

-

--

_

'

I

'

,,

DB 0 9 C82

,

Enclosure

2

2.

The licensee denied Item C of the Notice of Violation stating that they

,

believed their program which includes training of engineers and general

,

foremen in the QA requirements and the instruction of temporary employees to

always follow appropriate procedures when performing quality-related work

'

ensures compliance with the intent of 10 CFR 50, /ppendix B, Criterion II.

,

The licensee further stated that temporary craftsmen are trained to follow

I

,

procedures and the quality-related work they do is performed in accordance

'

'

with written approved procedures or instructions containing appropr"te

quality control holdpoints for inspection.

Finally, the licensee stated

,

that the cognizant engineer reviews the completed work to ensure that all

required inspections and holdpoints have been observed and completed.

With regard to the assertion that temporary employees work under the

supervision of engineers and general foremen who have been trained in QA

requirements, it should be noted that the inspection disclosed that two of

4

'

six outage foremen and nine engineers and supervisors in the outage group

had received some, but not all, of the training specified in administrative

i

instruction AI-14.

j

'

t

The licensee has established an excellent training program for permanent

i

craftsmen at the Sequoyah site to ensure their knowledge of the

!

adminisrative, quality, and safety aspects of their assigned position. In

!

that outage craftsmen perform essentially the same function as permanently

.

assigned craftsmen, it is appropriate and necessary that they receive the

i

4

same training. The latest industry standard on this subject, ANS 3.1-1981

i

i

supports the position that temporary employees must be trained in all areas

where their activities could affect the quality of an operating nuclear

'

power plant.

Moreover, Procedure N79A7, Nuclear Plant General Employee

.

Training Program, in the Division of Nuclear Power Procedures Manual

specifically includes temporary and field services personnel in the training

program.

Finally, tne licensee's contention that outage craftsmen are instructed to

'

follow procedures which contain appropriate instructions and holdpoints for

l

inspection and that their work is inspected and reviewed, is not persuasive.

The same is true of permanently assigned craftsmen and the licensee has not

,

argued, nor would the NRC accept, that such limited training would satisfy

the intens of Criterion II of 10 CFR 50 Appendix B.

Likewise, the NRC does

not accept the premise that quality can be inspectea or audited into the

work; the primary responsibility for quality must be placed on the

'

individual performing the activity af fecting quality and that individual

must be trained to carry out that responsibility.

Therefore, we conclude that the violation is valid as written in the Notice

of Violation.

'

!

!;