ML20066D013: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:11 1 | ||
Ir kr ik, e l'unavy ys b <ivn v | |||
h v. in:r I re, u vm inh | |||
\\ 1. e l',.m ent I {! !!vt inh," | |||
W irarIny,,rytu m | |||
\\( | |||
,L | |||
'in* | |||
ilpt u ci pij (k.j, f r a DUKE POWER January 4, 1991 U. S. Nuclear Regulatory Commission ATTN: | |||
Document Control Desk Washington, D. C. | |||
20555 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 NRC Confirmation Measurements Program Station Analysis of Liquid Samples As part of the NRC Confirmatory Measurements Program, liquid samples spiked with radionuclides were sent to Catawba Nuclear Station where they were received on October 16, 1990. These samples were analyzed for tritium, iron-55, strontium *89, and strontium-90 in accordance with approved procedures for the analysis of liquid waste samples. The analyses were completed on December 7, 1990. | Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 NRC Confirmation Measurements Program Station Analysis of Liquid Samples As part of the NRC Confirmatory Measurements Program, liquid samples spiked with radionuclides were sent to Catawba Nuclear Station where they were received on October 16, 1990. | ||
Tritium | These samples were analyzed for tritium, iron-55, strontium *89, and strontium-90 in accordance with approved procedures for the analysis of liquid waste samples. The analyses were completed on December 7, 1990. | ||
The results are listed below. | |||
Tritium 4.46E-05 4/- 5.95E-06 microcuries/ml Sr-89 5.10E-05 +/- 1.00E-06 microCurries/mi Sr-90 3.40E-06 +/- 1.00E-07 microcurries/mi Fe-55 1.54E-05 +/- 2.41E-07 microcurries/ml Very truly yours, b. | |||
M. S. Tuckman, Vice President Nuclear Operations CRL/14 i | M. S. Tuckman, Vice President Nuclear Operations CRL/14 i | ||
061 | |||
\\Q | |||
-9101140053 910104 | |||
.PDR ADOCK 05000413 P | |||
PDR | |||
U. S. Nuclear Regulatory Commission | U. S. Nuclear Regulatory Commission | ||
-January 4, 1991 Page 2 o | |||
xc: Mr. S. D. Ebneter Regional Administrator, Region II U. S. Nuclear Regulatory Ccamission 1 | |||
Regional Administrator, Region II | 101 Marietta Street, N. W., Suite 2900 Atlanta, Georgia 30323 Mr. R. E. Martin Office of Nuclear Reactor Regulations i' | ||
101 Marietta Street, N. W., | U. S. Nuclear Regulatory Commission l | ||
Atlanta, Georgia 30323 | One White Flint North, Mail Stop 9H3 j | ||
Mr. R. E. Martin Office of Nuclear Reactor Regulations | Washington, D. C. | ||
One White Flint North, Mail Stop 9H3 | 20555 Mr. W. T. Orders NRC Resident inspector Catawba Nuclear Station Mr. D. M. Collins Chief i | ||
Emergency Preparedness and Radiological Protection Branch U. S. Nuclear Regulatory Commission, Region !! | |||
Mr. W. T. Orders | 101 Marietta Street, N. W. | ||
NRC Resident inspector | Atlanta, Georgia 30323 Mr, H. G. Shealy, Chief Bureau of Radiological Health 1 | ||
Catawba Nuclear Station | South Carolina Department of Health and Environment-2600 Bull Street Columbia, S. C. | ||
Mr. D. M. Collins Chief | 29201 I | ||
101 Marietta Street, N. W. | + | ||
Atlanta, Georgia 30323 | |||
Mr, H. G. Shealy, Chief Bureau of Radiological Health | |||
I | |||
i. | i. | ||
I l_ | I l_ | ||
l | l | ||
.,. ~.. | |||
,_-i}} | |||
Latest revision as of 18:36, 16 December 2024
| ML20066D013 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 01/04/1991 |
| From: | Tuckman M DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9101140053 | |
| Download: ML20066D013 (2) | |
Text
11 1
Ir kr ik, e l'unavy ys b <ivn v
h v. in:r I re, u vm inh
\\ 1. e l',.m ent I {! !!vt inh,"
W irarIny,,rytu m
\\(
,L
'in*
ilpt u ci pij (k.j, f r a DUKE POWER January 4, 1991 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C.
20555
SUBJECT:
Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 NRC Confirmation Measurements Program Station Analysis of Liquid Samples As part of the NRC Confirmatory Measurements Program, liquid samples spiked with radionuclides were sent to Catawba Nuclear Station where they were received on October 16, 1990.
These samples were analyzed for tritium, iron-55, strontium *89, and strontium-90 in accordance with approved procedures for the analysis of liquid waste samples. The analyses were completed on December 7, 1990.
The results are listed below.
Tritium 4.46E-05 4/- 5.95E-06 microcuries/ml Sr-89 5.10E-05 +/- 1.00E-06 microCurries/mi Sr-90 3.40E-06 +/- 1.00E-07 microcurries/mi Fe-55 1.54E-05 +/- 2.41E-07 microcurries/ml Very truly yours, b.
M. S. Tuckman, Vice President Nuclear Operations CRL/14 i
061
\\Q
-9101140053 910104
.PDR ADOCK 05000413 P
U. S. Nuclear Regulatory Commission
-January 4, 1991 Page 2 o
xc: Mr. S. D. Ebneter Regional Administrator, Region II U. S. Nuclear Regulatory Ccamission 1
101 Marietta Street, N. W., Suite 2900 Atlanta, Georgia 30323 Mr. R. E. Martin Office of Nuclear Reactor Regulations i'
U. S. Nuclear Regulatory Commission l
One White Flint North, Mail Stop 9H3 j
Washington, D. C.
20555 Mr. W. T. Orders NRC Resident inspector Catawba Nuclear Station Mr. D. M. Collins Chief i
Emergency Preparedness and Radiological Protection Branch U. S. Nuclear Regulatory Commission, Region !!
101 Marietta Street, N. W.
Atlanta, Georgia 30323 Mr, H. G. Shealy, Chief Bureau of Radiological Health 1
South Carolina Department of Health and Environment-2600 Bull Street Columbia, S. C.
29201 I
+
i.
I l_
l
.,. ~..
,_-i