{{#Wiki_filter:p-South 4rn Nuclear Operat.ng Company Post O*f;ce Box 129s B,rmingham. Alabama 35201
{{#Wiki_filter:p-South 4rn Nuclear Operat.ng Company Post O*f;ce Box 129s B,rmingham. Alabama 35201 Te(ephone (205) 868 5131 L{
    . Te(ephone (205) 868 5131 L{
Southern Nudear Operating Company o.. uo,,y l$e '?rfe*c"t the southem electnc system July 14,1994 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commis< c ATTN: Document Control Dee Washington, D.C. 20555 Joseph M. Farley Nuclear Plant Monthly Operating Data Report Gentlemen:
o .. uo,,y                                       Southern Nudear Operating Company l$e '?rfe*c"t                                                           the southem electnc system July 14,1994 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commis< c ATTN: Document Control Dee Washington, D.C. 20555 Joseph M. Farley Nuclear Plant Monthly Operating Data Report Gentlemen:
Attached are the June 1994 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
Attached are the June 1994 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
If you have any questions, please advise.
Respectfully submitted, V"l })t,u ,
Respectfully submitted, V"l })t,u,
Dave Morey [
Dave Morey [
RWC:jgp(mor)
RWC:jgp(mor)
Attachments cc:       Mr. S. D. Ebneter Mr. B. L. Siege' Mr. T. M. Ross 9407250155 940630                                                                                       ''
Attachments cc:
PDR     ADOCK 05000348                                                                               /   g R                           PDR
Mr. S. D. Ebneter Mr. B. L. Siege' Mr. T. M. Ross 9407250155 940630 PDR ADOCK 05000348
/
g R
PDR


Joseph M. Farley Nuclear Plant                                           '
Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations June 1994 The unit was ramped down to 24 percent power on 06/06/94 due to a low oil level in the lower reservoir of the 1C reactor coolant pump motor. Oil was added to the motor and preliminary investigations were performed to determine the necessity of future modifications.
Unit 1 Narrative Summary of Operations l
The following. major safety related maintenance was performed during the month:
June 1994                                                   l l
1.
The unit was ramped down to 24 percent power on 06/06/94 due to a low oil level in the lower reservoir of the 1C reactor coolant pump motor. Oil was added to the motor and preliminary investigations were performed to determine the necessity of future modifications.
Performed miscellaneous corrective and preventive maintenance on the diesel generators.
l The following . major safety related maintenance was performed during the month:
: 1.     Performed miscellaneous corrective and preventive maintenance on the diesel generators.
1 l
l 1
l l
i I


OPERATING DATA REPORT DOCKET NO.                     50-340                 ,
OPERATING DATA REPORT DOCKET NO.
DATE         July 12,1994 COMPLETED IW                 R. D. iiill TELEPHONE               (205) 899-5156
50-340 DATE July 12,1994 COMPLETED IW R. D. iiill TELEPHONE (205) 899-5156
                                                                                                                                                    .l OPERATINGSTATU.S
.l OPERATINGSTATU.S
      .I. Unit Name:                                     Joseph M. Farley - Unit i         Notes
.I.
: 2. Reporting Period:                                                   June 1994   I) Cumulative data since 12-01-77, date
Unit Name:
' 3,     Licensed Thermal Power (MWt):                                           2,652     of commercial operation.
Joseph M. Farley - Unit i Notes 2.
    ' 4.     Nameplate Rating (Gross MWe):                                             860
Reporting Period:
,      5. Design Electrical Rating (Net MWe):                                       829
June 1994 I) Cumulative data since 12-01-77, date
;      6. Maximum Dependable Capacity (Gross MWe):                               855.7
' 3, Licensed Thermal Power (MWt):
: 7. Maximum Dependable Capacity (Net MWe):                                   812
2,652 of commercial operation.
: 8.   . If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reason       N/A L
' 4.
: 9. Power Level To Whis h Restricted, if Any (Net MWe N/A
Nameplate Rating (Gross MWe):
: 10. Reasons For Restrictions, if Any:                     N/A t
860 5.
This Month               Yr.to Date             Cumulative
Design Electrical Rating (Net MWe):
.      11. l{ours in Reporting Period                                             720.0                 4,343.0               145,34Q
829 6.
: 12. Number Of flours Reactor Was Critical                                   720.0                 3,175.9               114,83Q
Maximum Dependable Capacity (Gross MWe):
: 13. Reactor Reserve Shutdown ilours                                           0.0                   0.0                 3,65 Q.
855.7 7.
: 14. Ilours Generator On-line                                               720.0                 3,130.3               113,036 3
Maximum Dependable Capacity (Net MWe):
: 15. Unit Reserve Shutdown llours                                               0.0                   0.0                     0.0
812 8.
: 16. Gross Thennal Energy Generated (MWil)                           1,887,518.7             7,964,948.5         290,457,353.7
. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reason N/A L
: 17. Gross Electrical Energy Generated (MWil)                           611,731.0           2,585,577.0           93,600,623.0
9.
: 18. Net Electrical Energy Generated (MWil)                             580,517.0           2,436,539.0           88,376,693.0             i 19   Unit Service Factor                                                     100.0                   72.1                     77.8
Power Level To Whis h Restricted, if Any (Net MWe N/A 10.
: 20. Unit Availabilty Factor                                                 100.0                   72.1                     77.8           t
Reasons For Restrictions, if Any:
: 21. Unit Capacity Factor (Using MDC Net)                                     99.3                   69.1                     74.6
N/A t
.      22. Unit Capacity Factor (Using DER Net)                                     97.3                   67.7                   '73.3
This Month Yr.to Date Cumulative 11.
: 23. Unit Forced Outage Rate                                                   0.0                   0.0                     6.2
l{ours in Reporting Period 720.0 4,343.0 145,34Q 12.
    - 24. Shutdowns Scheduled Over Next 6 Mombs (Type, Date, and Duration of Each):
Number Of flours Reactor Was Critical 720.0 3,175.9 114,83Q 13.
N/A
Reactor Reserve Shutdown ilours 0.0 0.0 3,65 Q.
: 25. If Shut Down at End Of Report Period. Estimated Date of Startup:                   N/A                                                   j
14.
    . 26. Units in Test Status (Prior To Commercial Operation):                                 Forecast                 Achieved                   j t                                                                                                   .
Ilours Generator On-line 720.0 3,130.3 113,036 3 15.
I Initial Criticality                                       08MD1                   08/09/77                   l
Unit Reserve Shutdown llours 0.0 0.0 0.0 16.
{                                       initial Electricity                                       0820al                   08/18n7 Commercial Operation                                     12/0101                   12/01n7 i-                                                                                                                                                     j l
Gross Thennal Energy Generated (MWil) 1,887,518.7 7,964,948.5 290,457,353.7 17.
Gross Electrical Energy Generated (MWil) 611,731.0 2,585,577.0 93,600,623.0 18.
Net Electrical Energy Generated (MWil) 580,517.0 2,436,539.0 88,376,693.0 i
19 Unit Service Factor 100.0 72.1 77.8 20.
Unit Availabilty Factor 100.0 72.1 77.8 t
21.
Unit Capacity Factor (Using MDC Net) 99.3 69.1 74.6 22.
Unit Capacity Factor (Using DER Net) 97.3 67.7
'73.3 23.
Unit Forced Outage Rate 0.0 0.0 6.2
- 24.
Shutdowns Scheduled Over Next 6 Mombs (Type, Date, and Duration of Each):
N/A 25.
If Shut Down at End Of Report Period. Estimated Date of Startup:
N/A j
. 26.
Units in Test Status (Prior To Commercial Operation):
Forecast Achieved j
t Initial Criticality 08MD1 08/09/77
{
initial Electricity 0820al 08/18n7 Commercial Operation 12/0101 12/01n7 i-j


oocxET so.                                   50 348 ourr                   1 nrTE Ju_ly 12,1994 couru:TEo ny                                   R. D. Ilill TELEPHONE _(20_5) 899-5156 MONTil _._ June ___
oocxET so.
DAY           AVERAGE DAILY POWER LEVEL                   DAY   AVERAGE DAILY POWER LEVEL (MWe-Net)                                                   (MWe-Net) i 1                                               818       17                                                 81.7 2                                               818       18                                                 817 3                                               816       19                                                 819 4          _                    __
50 348 ourr 1
816       20 _
nrTE Ju_ly 12,1994 couru:TEo ny R. D. Ilill TELEPHONE _(20_5) 899-5156 MONTil _._ June ___
816 5                                               816       21                                                 816 l
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
6                                               796       22                                                 817 7                                               550       23                                                 818 8                           _
(MWe-Net) i 1
801       24                                                 818 9                       _                    __ 813       25                                                 820 10                                               813       26                                                 815                 ,
818 17 81.7 2
II        _ _ _ _ _ _ . . . _
818 18 817 3
816 ._
816 19 819 816 20 816 4
27 _
5 816 21 816 l
812 12                                               816       28                                                 812 13                                               817       29                                                 814 14                                               817       30                                                 814 15                                               819       3i                                               N/A 16                                               818 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
6 796 22 817 7
550 23 818 8
801 24 818 9
__ 813 25 820 10 813 26 815 816 27 812 II 12 816 28 812 13 817 29 814 14 817 30 814 15 819 3i N/A 16 818 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.


                                                                                                                                                                                                                  ~'
UNIT SHUTDOWNS AND POWER REDUCTIONS
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.                 50-348                       .          ,
~'
UNIT NAME J. M. Farley - Unit 1 DATE         July 12,1994                           .
DOCKET NO.
COMPLETED BY                 R. D. Hill REPORT MONTH                   June                                                           TELEPilONE           (205)899-5156 r - - -                                                         -                x-
50-348 UNIT NAME J. M. Farley - Unit 1 DATE July 12,1994 COMPLETED BY R. D. Hill REPORT MONTH June TELEPilONE (205)899-5156 r - - -
    !!                                                                                                                                i                                                                       -
x-i A1ETHOD OF LICENSEE CAUSE AND CORRECTIVE DURATION SIIUTTING EVENT SYSTEM rONtPONENT ACT10N TO
A1ETHOD OF     LICENSEE                                   !              CAUSE AND CORRECTIVE DURATION                         SIIUTTING         EVENT         SYSTEM   rONtPONENT                               ACT10N TO                                   !
!s-NO.
s-NO.         DATE   TYPE (1)       HOURS     REASON (2) DOWN REACIORgj REPORT #                 CODEy L CODEtt                             PREVENT RECURRENCE                                   !
DATE TYPE (1)
CD3        06/06/94      F          18.0            A    I N/A           N/A     l     N/A         N/A           'Re unit was ramped down to 24 percent power on 6W94 due i
HOURS REASON (2) DOWN REACIORgj REPORT #
to low oil level in the lower reservoir of the IC reactor coolant pump motor. Oil was added to the motor and preliminary investigations were performed to determine the necessity of         ,
CODEy L CODEtt PREVENT RECURRENCE I
fu:ure modifications.
N/A N/A l
N/A N/A
'Re unit was ramped down to 24 percent power on 6W94 due CD3 06/06/94 F
18.0 A
i to low oil level in the lower reservoir of the IC reactor coolant pump motor. Oil was added to the motor and preliminary investigations were performed to determine the necessity of fu:ure modifications.
1 I
1 I
1:                     2:                                                     3:                           4:                                         5:
1:
F: Forced             Reason                                                     Method                     Exhibit G- Instrucuans for                 Exhibit 1 - Same Source S: Scheduled             A - Equipment Failure (Explain)                         1 - Manual                 Preparations of Date Entry B - Main:enance or Test                                 2 - Manual Scram           Sheets for twensee Event C - Refuelmg                                             3 - Automatic Scram         Report (LER) File (NUREG-0161)
2:
D - Regulatory Restricton                               4 - Other (Explain)
3:
E - Operator Trainmg a License Examination I                               F - Adnunistrative G - Operational Lrror (Explain)
4:
5:
F: Forced Reason Method Exhibit G-Instrucuans for Exhibit 1 - Same Source S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations of Date Entry B - Main:enance or Test 2 - Manual Scram Sheets for twensee Event C - Refuelmg 3 - Automatic Scram Report (LER) File (NUREG-0161)
D - Regulatory Restricton 4 - Other (Explain)
E - Operator Trainmg a License Examination I
F - Adnunistrative G - Operational Lrror (Explain)
II - Other (Explain) l l
II - Other (Explain) l l


1 Joseph Mo Farley Nuclear Plant Unit 2                                               l Narrative Summary of Operations                                     l June 1994                                                 !
1 Joseph Mo Farley Nuclear Plant l
      .                                                                                              q f
Unit 2 Narrative Summary of Operations l
i There were no unit shutdowns or major po er reductions during the month.
June 1994 q
The following major safety related maintenance was performed:                             j
f i
: 1.     Perforraed miscellaneous corrective and preventive maintenance on the diesel generators.
There were no unit shutdowns or major po er reductions during the month.
The following major safety related maintenance was performed:
j 1.
Perforraed miscellaneous corrective and preventive maintenance on the diesel generators.
1
1
                                                                                                    )
)


_ _ - ~ _ _                     .              ._          _      .            _          . . . .
_ _ - ~ _ _
      ~         ' '
~
c                                                       OPERATING DATA REPORT 4
c OPERATING DATA REPORT DOCKET NO.
DOCKET NO.                   50-364
50-364 4
,                                                                                                              DATE           July 12,1994 COMPLETED BY                 R. D. Hill l                                                                                                 TELEPIIONE               (205) 899-5156 1
DATE July 12,1994 COMPLETED BY R. D. Hill l
TELEPIIONE (205) 899-5156 1
' OPERATINGSTAT.US 4
' OPERATINGSTAT.US 4
: 1.     Unit Name:                                       Joseph M. Farley - Unit 2         Notes f
1.
: 2.   . Reporting Period:                                                       June 1994   1) Cumulative data since 07-30-81, date
Unit Name:
: _ ' 3.       Licensed Thermal Power (MW ):                                               2,652   of commercial operation.
Joseph M. Farley - Unit 2 Notes f
! ' 4.         Nameplate Rating (Gross MWe):                                                 860 Design Electrical Rating (Net MWo):                                           829
2.
{ . ~ 5.
. Reporting Period:
: j.      6.'     Maximum Dependable Capacity (Gross MWe):                                   863.6
June 1994
;      7,     Maximum Dependable Capacity (Net MWe):                                       822
: 1) Cumulative data since 07-30-81, date
!-      fl. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason       N/A
: _ ' 3.
    ' 9.'     Power Level To Which Restricted,if Any (Net MWe N/A
Licensed Thermal Power (MW ):
: 10. Reasons For Restrictions,if Any;                         N/A This Month             Yr.to Date             Cumulative
2,652 of commercial operation.
        !!. Ilours in Reporting Period                                                 720.0             4,343.0             113,256.0
! ' 4.
: 12. Number Of Ilours Reactor Was Critical                                       720.0             4,343.0               97,296.7
Nameplate Rating (Gross MWe):
: 13. Reactor Reserve Shutdown flours                                               0.0                 0.0                 138.0 '
860
: 14.   'Ifours Generator On-line                                                     720.0             4,343.0               95,904.8
{. ~ 5.
: 15.   . Unit Reserve Shutdown llours                                                   0.0                 0.0                     0.0 i
Design Electrical Rating (Net MWo):
      .16.     Gross Thermal Energy Generated (MWil)                               1,903,897.7         11,449,332.5         244,984,685.3   j
829 j.
: 17. Gross Electrical Energy Generated (MWil)                             620,031.0-         3,777,745.0           80,327,206.0 18,     Net Electrical Energy Generated (MWil)                               590,521.0           3,599,353.0           76,174,442.0
6.'
: 19. Unit Service Factor                                                         100.0               100.0                   84.7
Maximum Dependable Capacity (Gross MWe):
: 20. Unit Availabilty Factor                                                     100.0               100.0                   84.7 21,     Unit Capacity Factor (Using M DC Net)                                       99.8               100.8                   82.0 22.-   Unit Capacity Factor (Using DER Net)                                         98.9               100.0                   81.1
863.6 7,
: 23. Unit Forced Outage Rate                                                       0.0                 0.0                     4.0
Maximum Dependable Capacity (Net MWe):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
822 fl.
N/A                                                                                             _
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason N/A
      ' 25.   ' If Shut Down at End Of Report Period, Estimated Date of Startup:                   N/A
' 9.'
: 26. Units in Test Status (Prior To Commercial Operation _):                                 Forecast               Achieved p'                                        initial Criticality                                         05/06/11               05L03181 Initial Electricity 05/24 & 1             05/25/31 Commercial Operation                                       03!all81               07/20LM
Power Level To Which Restricted,if Any (Net MWe N/A 10.
Reasons For Restrictions,if Any; N/A This Month Yr.to Date Cumulative Ilours in Reporting Period 720.0 4,343.0 113,256.0 12.
Number Of Ilours Reactor Was Critical 720.0 4,343.0 97,296.7 13.
Reactor Reserve Shutdown flours 0.0 0.0 138.0 '
14.
'Ifours Generator On-line 720.0 4,343.0 95,904.8 15.
. Unit Reserve Shutdown llours 0.0 0.0 0.0 i
.16.
Gross Thermal Energy Generated (MWil) 1,903,897.7 11,449,332.5 244,984,685.3 j
17.
Gross Electrical Energy Generated (MWil) 620,031.0-3,777,745.0 80,327,206.0 18, Net Electrical Energy Generated (MWil) 590,521.0 3,599,353.0 76,174,442.0 19.
Unit Service Factor 100.0 100.0 84.7 20.
Unit Availabilty Factor 100.0 100.0 84.7 21, Unit Capacity Factor (Using M DC Net) 99.8 100.8 82.0 22.-
Unit Capacity Factor (Using DER Net) 98.9 100.0 81.1 23.
Unit Forced Outage Rate 0.0 0.0 4.0 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
' 25.
' If Shut Down at End Of Report Period, Estimated Date of Startup:
N/A 26.
Units in Test Status (Prior To Commercial Operation _):
Forecast Achieved initial Criticality 05/06/11 05L03181 p'
Initial Electricity 05/24 & 1 05/25/31 Commercial Operation 03!all81 07/20LM


DOCKET No.       50-364 UNIT         2 nATE July 12,1994 cosin.ETro av     R. D. Hill Tottruost_(205) 899-5156 MONTil __ June DAY         AVERAGE DAILY POWER LEVEL               DAY   AVERAGE DAILY POWER LEVEL           ,
DOCKET No.
(MWe-Net)                                         (MWe-Net)           i I                         821                       17                       820 2                         822                       18                     820 3         __    ._
50-364 UNIT 2
855                      19                       820 4                           820                       20                       817 5                           822                       21                       820 6                           821                       22                       818 7                         f21                       23                       822 8                         816 .                     24                       825 9                   __._816                         25   ___
nATE July 12,1994 cosin.ETro av R. D. Hill Tottruost_(205) 899-5156 MONTil __ June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
826           __
(MWe-Net)
10                         818                       26                       820 11                         820                       27                       818 12                         820                       28                       818 13                         821                       29                       819 14                         821                       30                       824 15                         820                       31                     N/A i
I 821 17 820 2
16                         821 i
822 18 820 3
19 820 855 4
820 20 817 5
822 21 820 6
821 22 818 7
f21 23 822 8
816.
24 825 9
__._816 25 826 10 818 26 820 11 820 27 818 12 820 28 818 13 821 29 819 14 821 30 824 15 820 31 N/A i
16 821 i
INSTRU.CTIONS On this fimnat, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
INSTRU.CTIONS On this fimnat, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
: g.                         y                                           _    __          _- __ _                ._ _.              _ _ _        - _ _ _ _ _ _ _
 
DOCKET NO.                     50-364                   ,
g.
UNIT NAME J. M. Farley - Unit 2                         -
y DOCKET NO.
DATE     July 12,1994                       '
50-364 UNIT NAME J. M. Farley - Unit 2 DATE July 12,1994 COMPLETED BY R. D. Hill REPORT MONTH June TELEPHONE (205)899-5156 p
COMPLETED BY                     R. D. Hill REPORT MONTH               June                                                             TELEPHONE             (205)899-5156 p             , _ _ _ _ _ _
g
g
    'i l                                                                             METi!OD OF       LICENSEE                                                               CAUSE AND CORRECTIVE h"
'i h"
9 f                                               DURATION                       SIIUTTING       EVENT         SYSTEh!       COMN)NENT                                         ACTION TO                                     N NO l              DATE TY PE (1)              If0URS  ! R EASON (2) , DOWN _ REACTOR (3)
l METi!OD OF LICENSEE CAUSE AND CORRECTIVE 9
REPORib CODE (4)               CODE (5) l                               PREVENT RECURRENCE There were no shutdowns or power reductions during the month.                                                                                                                                                                 O i
f DURATION SIIUTTING EVENT SYSTEh!
COMN)NENT ACTION TO N
! R EASON (2), DOWN _ REACTOR (3) REPORib CODE (4)
CODE (5) l PREVENT RECURRENCE NO l DATE TY PE (1)
If0URS There were no shutdowns or power reductions during the month.
O i
l I
l I
1                                                                                                                                                       ;
1 I:
I:                         2:                                                           3:                           4:                                               5:
2:
F; Forced                 Reason                                                         Method                         Exhibit G- Instructions for                   Exhibit I - Same Soutte S; Scheduled                 A - Equipment Failure (Explain)                             1 - Manual                     Preparatior,s of Date Entry B - Mamtenance oc Test                                       2 - Manual Scram               Sheets for Licensee Event C - Refueling                                               3 - Automatic Scram           Report (LER) File (NUREG-016!)
3:
D - Regulatory Restnction                                   4 - Other (Explain)
4:
E - Opersor Training & License Examit.ation                                                                                                                                                           1 j
5:
F- Administrative G - Operational Error (Exptmn) 11 - Other (Explain)
F; Forced Reason Method Exhibit G-Instructions for Exhibit I - Same Soutte S; Scheduled A - Equipment Failure (Explain) 1 - Manual Preparatior,s of Date Entry B - Mamtenance oc Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-016!)
                                                                                                    ,                                                                                                   .'}}
D - Regulatory Restnction 4 - Other (Explain) 1 E - Opersor Training & License Examit.ation j
F-Administrative G - Operational Error (Exptmn) 11 - Other (Explain)
,}}

Latest revision as of 09:35, 16 December 2024

Monthly Operating Repts for June 1994 for Joseph M Farley Nuclear Plant,Units 1 & 2
ML20070J519
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/30/1994
From: Hill R, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9407250155
Download: ML20070J519 (9)


Text

p-South 4rn Nuclear Operat.ng Company Post O*f;ce Box 129s B,rmingham. Alabama 35201 Te(ephone (205) 868 5131 L{

Southern Nudear Operating Company o.. uo,,y l$e '?rfe*c"t the southem electnc system July 14,1994 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commis< c ATTN: Document Control Dee Washington, D.C. 20555 Joseph M. Farley Nuclear Plant Monthly Operating Data Report Gentlemen:

Attached are the June 1994 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, V"l })t,u,

Dave Morey [

RWC:jgp(mor)

Attachments cc:

Mr. S. D. Ebneter Mr. B. L. Siege' Mr. T. M. Ross 9407250155 940630 PDR ADOCK 05000348

/

g R

PDR

Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations June 1994 The unit was ramped down to 24 percent power on 06/06/94 due to a low oil level in the lower reservoir of the 1C reactor coolant pump motor. Oil was added to the motor and preliminary investigations were performed to determine the necessity of future modifications.

The following. major safety related maintenance was performed during the month:

1.

Performed miscellaneous corrective and preventive maintenance on the diesel generators.

OPERATING DATA REPORT DOCKET NO.

50-340 DATE July 12,1994 COMPLETED IW R. D. iiill TELEPHONE (205) 899-5156

.l OPERATINGSTATU.S

.I.

Unit Name:

Joseph M. Farley - Unit i Notes 2.

Reporting Period:

June 1994 I) Cumulative data since 12-01-77, date

' 3, Licensed Thermal Power (MWt):

2,652 of commercial operation.

' 4.

Nameplate Rating (Gross MWe):

860 5.

Design Electrical Rating (Net MWe):

829 6.

Maximum Dependable Capacity (Gross MWe):

855.7 7.

Maximum Dependable Capacity (Net MWe):

812 8.

. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reason N/A L

9.

Power Level To Whis h Restricted, if Any (Net MWe N/A 10.

Reasons For Restrictions, if Any:

N/A t

This Month Yr.to Date Cumulative 11.

l{ours in Reporting Period 720.0 4,343.0 145,34Q 12.

Number Of flours Reactor Was Critical 720.0 3,175.9 114,83Q 13.

Reactor Reserve Shutdown ilours 0.0 0.0 3,65 Q.

14.

Ilours Generator On-line 720.0 3,130.3 113,036 3 15.

Unit Reserve Shutdown llours 0.0 0.0 0.0 16.

Gross Thennal Energy Generated (MWil) 1,887,518.7 7,964,948.5 290,457,353.7 17.

Gross Electrical Energy Generated (MWil) 611,731.0 2,585,577.0 93,600,623.0 18.

Net Electrical Energy Generated (MWil) 580,517.0 2,436,539.0 88,376,693.0 i

19 Unit Service Factor 100.0 72.1 77.8 20.

Unit Availabilty Factor 100.0 72.1 77.8 t

21.

Unit Capacity Factor (Using MDC Net) 99.3 69.1 74.6 22.

Unit Capacity Factor (Using DER Net) 97.3 67.7

'73.3 23.

Unit Forced Outage Rate 0.0 0.0 6.2

- 24.

Shutdowns Scheduled Over Next 6 Mombs (Type, Date, and Duration of Each):

N/A 25.

If Shut Down at End Of Report Period. Estimated Date of Startup:

N/A j

. 26.

Units in Test Status (Prior To Commercial Operation):

Forecast Achieved j

t Initial Criticality 08MD1 08/09/77

{

initial Electricity 0820al 08/18n7 Commercial Operation 12/0101 12/01n7 i-j

oocxET so.

50 348 ourr 1

nrTE Ju_ly 12,1994 couru:TEo ny R. D. Ilill TELEPHONE _(20_5) 899-5156 MONTil _._ June ___

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) i 1

818 17 81.7 2

818 18 817 3

816 19 819 816 20 816 4

5 816 21 816 l

6 796 22 817 7

550 23 818 8

801 24 818 9

__ 813 25 820 10 813 26 815 816 27 812 II 12 816 28 812 13 817 29 814 14 817 30 814 15 819 3i N/A 16 818 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS

~'

DOCKET NO.

50-348 UNIT NAME J. M. Farley - Unit 1 DATE July 12,1994 COMPLETED BY R. D. Hill REPORT MONTH June TELEPilONE (205)899-5156 r - - -

x-i A1ETHOD OF LICENSEE CAUSE AND CORRECTIVE DURATION SIIUTTING EVENT SYSTEM rONtPONENT ACT10N TO

!s-NO.

DATE TYPE (1)

HOURS REASON (2) DOWN REACIORgj REPORT #

CODEy L CODEtt PREVENT RECURRENCE I

N/A N/A l

N/A N/A

'Re unit was ramped down to 24 percent power on 6W94 due CD3 06/06/94 F

18.0 A

i to low oil level in the lower reservoir of the IC reactor coolant pump motor. Oil was added to the motor and preliminary investigations were performed to determine the necessity of fu:ure modifications.

1 I

1:

2:

3:

4:

5:

F: Forced Reason Method Exhibit G-Instrucuans for Exhibit 1 - Same Source S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations of Date Entry B - Main:enance or Test 2 - Manual Scram Sheets for twensee Event C - Refuelmg 3 - Automatic Scram Report (LER) File (NUREG-0161)

D - Regulatory Restricton 4 - Other (Explain)

E - Operator Trainmg a License Examination I

F - Adnunistrative G - Operational Lrror (Explain)

II - Other (Explain) l l

1 Joseph Mo Farley Nuclear Plant l

Unit 2 Narrative Summary of Operations l

June 1994 q

f i

There were no unit shutdowns or major po er reductions during the month.

The following major safety related maintenance was performed:

j 1.

Perforraed miscellaneous corrective and preventive maintenance on the diesel generators.

1

)

_ _ - ~ _ _

~

c OPERATING DATA REPORT DOCKET NO.

50-364 4

DATE July 12,1994 COMPLETED BY R. D. Hill l

TELEPIIONE (205) 899-5156 1

' OPERATINGSTAT.US 4

1.

Unit Name:

Joseph M. Farley - Unit 2 Notes f

2.

. Reporting Period:

June 1994

1) Cumulative data since 07-30-81, date
_ ' 3.

Licensed Thermal Power (MW ):

2,652 of commercial operation.

! ' 4.

Nameplate Rating (Gross MWe):

860

{. ~ 5.

Design Electrical Rating (Net MWo):

829 j.

6.'

Maximum Dependable Capacity (Gross MWe):

863.6 7,

Maximum Dependable Capacity (Net MWe):

822 fl.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason N/A

' 9.'

Power Level To Which Restricted,if Any (Net MWe N/A 10.

Reasons For Restrictions,if Any; N/A This Month Yr.to Date Cumulative Ilours in Reporting Period 720.0 4,343.0 113,256.0 12.

Number Of Ilours Reactor Was Critical 720.0 4,343.0 97,296.7 13.

Reactor Reserve Shutdown flours 0.0 0.0 138.0 '

14.

'Ifours Generator On-line 720.0 4,343.0 95,904.8 15.

. Unit Reserve Shutdown llours 0.0 0.0 0.0 i

.16.

Gross Thermal Energy Generated (MWil) 1,903,897.7 11,449,332.5 244,984,685.3 j

17.

Gross Electrical Energy Generated (MWil) 620,031.0-3,777,745.0 80,327,206.0 18, Net Electrical Energy Generated (MWil) 590,521.0 3,599,353.0 76,174,442.0 19.

Unit Service Factor 100.0 100.0 84.7 20.

Unit Availabilty Factor 100.0 100.0 84.7 21, Unit Capacity Factor (Using M DC Net) 99.8 100.8 82.0 22.-

Unit Capacity Factor (Using DER Net) 98.9 100.0 81.1 23.

Unit Forced Outage Rate 0.0 0.0 4.0 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

' 25.

' If Shut Down at End Of Report Period, Estimated Date of Startup:

N/A 26.

Units in Test Status (Prior To Commercial Operation _):

Forecast Achieved initial Criticality 05/06/11 05L03181 p'

Initial Electricity 05/24 & 1 05/25/31 Commercial Operation 03!all81 07/20LM

DOCKET No.

50-364 UNIT 2

nATE July 12,1994 cosin.ETro av R. D. Hill Tottruost_(205) 899-5156 MONTil __ June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

I 821 17 820 2

822 18 820 3

19 820 855 4

820 20 817 5

822 21 820 6

821 22 818 7

f21 23 822 8

816.

24 825 9

__._816 25 826 10 818 26 820 11 820 27 818 12 820 28 818 13 821 29 819 14 821 30 824 15 820 31 N/A i

16 821 i

INSTRU.CTIONS On this fimnat, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

g.

y DOCKET NO.

50-364 UNIT NAME J. M. Farley - Unit 2 DATE July 12,1994 COMPLETED BY R. D. Hill REPORT MONTH June TELEPHONE (205)899-5156 p

g

'i h"

l METi!OD OF LICENSEE CAUSE AND CORRECTIVE 9

f DURATION SIIUTTING EVENT SYSTEh!

COMN)NENT ACTION TO N

! R EASON (2), DOWN _ REACTOR (3) REPORib CODE (4)

CODE (5) l PREVENT RECURRENCE NO l DATE TY PE (1)

If0URS There were no shutdowns or power reductions during the month.

O i

l I

1 I:

2:

3:

4:

5:

F; Forced Reason Method Exhibit G-Instructions for Exhibit I - Same Soutte S; Scheduled A - Equipment Failure (Explain) 1 - Manual Preparatior,s of Date Entry B - Mamtenance oc Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-016!)

D - Regulatory Restnction 4 - Other (Explain) 1 E - Opersor Training & License Examit.ation j

F-Administrative G - Operational Error (Exptmn) 11 - Other (Explain)

,