Monthly Operating Repts for June 1994 for Joseph M Farley Nuclear Plant,Units 1 & 2
ML20070J519
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/30/1994
From: Hill R, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9407250155
Download: ML20070J519 (9)


Text

p-South 4rn Nuclear Operat.ng Company Post O*f;ce Box 129s B,rmingham. Alabama 35201

. Te(ephone (205) 868 5131 L{

o .. uo,,y Southern Nudear Operating Company l$e '?rfe*c"t the southem electnc system July 14,1994 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commis< c ATTN: Document Control Dee Washington, D.C. 20555 Joseph M. Farley Nuclear Plant Monthly Operating Data Report Gentlemen:

Attached are the June 1994 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, V"l })t,u ,

Dave Morey [

RWC:jgp(mor)

Attachments cc: Mr. S. D. Ebneter Mr. B. L. Siege' Mr. T. M. Ross 9407250155 940630

PDR ADOCK 05000348 / g R PDR

Joseph M. Farley Nuclear Plant '

Unit 1 Narrative Summary of Operations l

June 1994 l l

The unit was ramped down to 24 percent power on 06/06/94 due to a low oil level in the lower reservoir of the 1C reactor coolant pump motor. Oil was added to the motor and preliminary investigations were performed to determine the necessity of future modifications.

l The following . major safety related maintenance was performed during the month:

1. Performed miscellaneous corrective and preventive maintenance on the diesel generators.

1 l

l 1

l l

i I

OPERATING DATA REPORT DOCKET NO. 50-340 ,

DATE July 12,1994 COMPLETED IW R. D. iiill TELEPHONE (205) 899-5156

.l OPERATINGSTATU.S

.I. Unit Name: Joseph M. Farley - Unit i Notes

2. Reporting Period: June 1994 I) Cumulative data since 12-01-77, date

, ' 3, Licensed Thermal Power (MWt): 2,652 of commercial operation.

' 4. Nameplate Rating (Gross MWe): 860

, 5. Design Electrical Rating (Net MWe): 829

6. Maximum Dependable Capacity (Gross MWe)
855.7
7. Maximum Dependable Capacity (Net MWe): 812
8. . If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reason N/A L
9. Power Level To Whis h Restricted, if Any (Net MWe N/A
10. Reasons For Restrictions, if Any: N/A t

This Month Yr.to Date Cumulative

. 11. l{ours in Reporting Period 720.0 4,343.0 145,34Q

12. Number Of flours Reactor Was Critical 720.0 3,175.9 114,83Q
13. Reactor Reserve Shutdown ilours 0.0 0.0 3,65 Q.
14. Ilours Generator On-line 720.0 3,130.3 113,036 3
15. Unit Reserve Shutdown llours 0.0 0.0 0.0
16. Gross Thennal Energy Generated (MWil) 1,887,518.7 7,964,948.5 290,457,353.7
17. Gross Electrical Energy Generated (MWil) 611,731.0 2,585,577.0 93,600,623.0
18. Net Electrical Energy Generated (MWil) 580,517.0 2,436,539.0 88,376,693.0 i 19 Unit Service Factor 100.0 72.1 77.8
20. Unit Availabilty Factor 100.0 72.1 77.8 t
21. Unit Capacity Factor (Using MDC Net) 99.3 69.1 74.6

. 22. Unit Capacity Factor (Using DER Net) 97.3 67.7 '73.3

23. Unit Forced Outage Rate 0.0 0.0 6.2

- 24. Shutdowns Scheduled Over Next 6 Mombs (Type, Date, and Duration of Each):

N/A

25. If Shut Down at End Of Report Period. Estimated Date of Startup: N/A j

. 26. Units in Test Status (Prior To Commercial Operation): Forecast Achieved j t .

I Initial Criticality 08MD1 08/09/77 l

{ initial Electricity 0820al 08/18n7 Commercial Operation 12/0101 12/01n7 i- j l

oocxET so. 50 348 ourr 1 nrTE Ju_ly 12,1994 couru:TEo ny R. D. Ilill TELEPHONE _(20_5) 899-5156 MONTil _._ June ___

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) i 1 818 17 81.7 2 818 18 817 3 816 19 819 4 _ __

816 20 _

816 5 816 21 816 l

6 796 22 817 7 550 23 818 8 _

801 24 818 9 _ __ 813 25 820 10 813 26 815 ,

II _ _ _ _ _ _ . . . _

816 ._

27 _

812 12 816 28 812 13 817 29 814 14 817 30 814 15 819 3i N/A 16 818 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

~'

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 . ,

UNIT NAME J. M. Farley - Unit 1 DATE July 12,1994 .

COMPLETED BY R. D. Hill REPORT MONTH June TELEPilONE (205)899-5156 r - - - - x-

!! i -

A1ETHOD OF LICENSEE  ! CAUSE AND CORRECTIVE DURATION SIIUTTING EVENT SYSTEM rONtPONENT ACT10N TO  !

s-NO. DATE TYPE (1) HOURS REASON (2) DOWN REACIORgj REPORT # CODEy L CODEtt PREVENT RECURRENCE  !

CD3 06/06/94 F 18.0 A I N/A N/A l N/A N/A 'Re unit was ramped down to 24 percent power on 6W94 due i

to low oil level in the lower reservoir of the IC reactor coolant pump motor. Oil was added to the motor and preliminary investigations were performed to determine the necessity of ,

fu:ure modifications.

1 I

1: 2: 3: 4: 5:

F: Forced Reason Method Exhibit G- Instrucuans for Exhibit 1 - Same Source S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations of Date Entry B - Main:enance or Test 2 - Manual Scram Sheets for twensee Event C - Refuelmg 3 - Automatic Scram Report (LER) File (NUREG-0161)

D - Regulatory Restricton 4 - Other (Explain)

E - Operator Trainmg a License Examination I F - Adnunistrative G - Operational Lrror (Explain)

II - Other (Explain) l l

1 Joseph Mo Farley Nuclear Plant Unit 2 l Narrative Summary of Operations l June 1994  !

. q f

i There were no unit shutdowns or major po er reductions during the month.

The following major safety related maintenance was performed: j

1. Perforraed miscellaneous corrective and preventive maintenance on the diesel generators.

1

)

_ _ - ~ _ _ . ._ _ . _ . . . .

~ ' '

c OPERATING DATA REPORT 4

DOCKET NO. 50-364

, DATE July 12,1994 COMPLETED BY R. D. Hill l TELEPIIONE (205) 899-5156 1

' OPERATINGSTAT.US 4

1. Unit Name: Joseph M. Farley - Unit 2 Notes f
2. . Reporting Period: June 1994 1) Cumulative data since 07-30-81, date
_ ' 3. Licensed Thermal Power (MW ): 2,652 of commercial operation.

! ' 4. Nameplate Rating (Gross MWe): 860 Design Electrical Rating (Net MWo): 829

{ . ~ 5.

j. 6.' Maximum Dependable Capacity (Gross MWe): 863.6
7, Maximum Dependable Capacity (Net MWe)
822

!- fl. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason N/A

' 9.' Power Level To Which Restricted,if Any (Net MWe N/A

10. Reasons For Restrictions,if Any; N/A This Month Yr.to Date Cumulative

!!. Ilours in Reporting Period 720.0 4,343.0 113,256.0

12. Number Of Ilours Reactor Was Critical 720.0 4,343.0 97,296.7
13. Reactor Reserve Shutdown flours 0.0 0.0 138.0 '
14. 'Ifours Generator On-line 720.0 4,343.0 95,904.8
15. . Unit Reserve Shutdown llours 0.0 0.0 0.0 i

.16. Gross Thermal Energy Generated (MWil) 1,903,897.7 11,449,332.5 244,984,685.3 j

17. Gross Electrical Energy Generated (MWil) 620,031.0- 3,777,745.0 80,327,206.0 18, Net Electrical Energy Generated (MWil) 590,521.0 3,599,353.0 76,174,442.0
19. Unit Service Factor 100.0 100.0 84.7
20. Unit Availabilty Factor 100.0 100.0 84.7 21, Unit Capacity Factor (Using M DC Net) 99.8 100.8 82.0 22.- Unit Capacity Factor (Using DER Net) 98.9 100.0 81.1
23. Unit Forced Outage Rate 0.0 0.0 4.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A _

' 25. ' If Shut Down at End Of Report Period, Estimated Date of Startup: N/A

26. Units in Test Status (Prior To Commercial Operation _): Forecast Achieved p' initial Criticality 05/06/11 05L03181 Initial Electricity 05/24 & 1 05/25/31 Commercial Operation 03!all81 07/20LM

DOCKET No. 50-364 UNIT 2 nATE July 12,1994 cosin.ETro av R. D. Hill Tottruost_(205) 899-5156 MONTil __ June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL ,

(MWe-Net) (MWe-Net) i I 821 17 820 2 822 18 820 3 __ ._

855 19 820 4 820 20 817 5 822 21 820 6 821 22 818 7 f21 23 822 8 816 . 24 825 9 __._816 25 ___

826 __

10 818 26 820 11 820 27 818 12 820 28 818 13 821 29 819 14 821 30 824 15 820 31 N/A i

16 821 i

INSTRU.CTIONS On this fimnat, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

g. y _ __ _- __ _ ._ _. _ _ _ - _ _ _ _ _ _ _

DOCKET NO. 50-364 ,

UNIT NAME J. M. Farley - Unit 2 -

DATE July 12,1994 '

COMPLETED BY R. D. Hill REPORT MONTH June TELEPHONE (205)899-5156 p , _ _ _ _ _ _

g

'i l METi!OD OF LICENSEE CAUSE AND CORRECTIVE h"

9 f DURATION SIIUTTING EVENT SYSTEh! COMN)NENT ACTION TO N NO l DATE TY PE (1) If0URS  ! R EASON (2) , DOWN _ REACTOR (3)

REPORib CODE (4) CODE (5) l PREVENT RECURRENCE There were no shutdowns or power reductions during the month. O i

l I

1  ;

I: 2: 3: 4: 5:

F; Forced Reason Method Exhibit G- Instructions for Exhibit I - Same Soutte S; Scheduled A - Equipment Failure (Explain) 1 - Manual Preparatior,s of Date Entry B - Mamtenance oc Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-016!)

D - Regulatory Restnction 4 - Other (Explain)

E - Opersor Training & License Examit.ation 1 j

F- Administrative G - Operational Error (Exptmn) 11 - Other (Explain)

, .'