TXX-3634, Interim Deficiency Rept Re Cracked Pacific Pump multi-vane Diffuser Producing Linear Indications.Initially Reported on 820414.Deficiency Not Reportable Per 10CFR50.55(e): Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:TEXAS UTILITIES GENERATING COMInNY WMit IlltY %N 111% 5:lt fi\t J AM.TlWAN 721:kW) | {{#Wiki_filter:TEXAS UTILITIES GENERATING COMInNY WMit IlltY %N 111% 5:lt fi\\t J AM.TlWAN 721:kW) | ||
R. J. GARY | R. J. GARY | ||
'": ' L':'L7:' | |||
f\\jQ, | |||
: o: | : o: | ||
FEB 281983 | FEB 281983 February 28, 1983 | ||
[ | |||
Mr. G. L. Madsen, Chief Reactor Project Branch 1 | TXX-3634 Mr. G. L. Madsen, Chief Reactor Project Branch 1 | ||
: b. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 | : b. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.: | ||
50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION PACIFIC PUMP MULTI-VANE DIFFUSER LINEAR INDICATIONS QA FILE: CP-82-04, SDAR-74 | |||
-M Y | |||
FILE N0.: | |||
10110 | |||
==Dear Mr. Madsen:== | ==Dear Mr. Madsen:== | ||
On April 14, 1982, we verbally informed your Mr. R. G. Taylor of a deficiency regarding Pacific Pump multi-vane diffuser cracking. We have submitted interim letters TXX-3518, TXX-3563, TXX-3576, TXX-3593, and TXX-3609 dated May 14, 1982, August 25, 1982, October 1, 1982, December 7, 1982 and January 13, 1983 respec-tively. | On April 14, 1982, we verbally informed your Mr. R. G. Taylor of a deficiency regarding Pacific Pump multi-vane diffuser cracking. We have submitted interim letters TXX-3518, TXX-3563, TXX-3576, TXX-3593, and TXX-3609 dated May 14, 1982, August 25, 1982, October 1, 1982, December 7, 1982 and January 13, 1983 respec-tively. | ||
We have completed our investigation and concluded that the matter is not report-able under 10 CFR 50.55(e). Records supporting this detennination are available for your Inspector's review at the CPSES site. | We have completed our investigation and concluded that the matter is not report-able under 10 CFR 50.55(e). | ||
Records supporting this detennination are available for your Inspector's review at the CPSES site. | |||
Very truly yours, | Very truly yours, | ||
/* | |||
i RJG:aq cc: NRC Region IV- (0 + 1 copy) | i RJG:aq cc: NRC Region IV- (0 + 1 copy) | ||
Director, Inspection & Enforcement (15 copies) | Director, Inspection & Enforcement (15 copies) | ||
U. S. Nuclear Regulatory Commission Washington, DC 20555 B303080378 830228 PDR ADOCK 05000445 S | U. S. Nuclear Regulatory Commission Washington, DC 20555 B303080378 830228 PDR ADOCK 05000445 S | ||
PDR | |||
__}} | __}} | ||
Latest revision as of 05:46, 15 December 2024
| ML20072C269 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/28/1983 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, TXX-3634, NUDOCS 8303080378 | |
| Download: ML20072C269 (1) | |
Text
TEXAS UTILITIES GENERATING COMInNY WMit IlltY %N 111% 5:lt fi\\t J AM.TlWAN 721:kW)
R. J. GARY
'": ' L':'L7:'
f\\jQ,
- o:
FEB 281983 February 28, 1983
[
TXX-3634 Mr. G. L. Madsen, Chief Reactor Project Branch 1
- b. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.:
50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION PACIFIC PUMP MULTI-VANE DIFFUSER LINEAR INDICATIONS QA FILE: CP-82-04, SDAR-74
-M Y
FILE N0.:
10110
Dear Mr. Madsen:
On April 14, 1982, we verbally informed your Mr. R. G. Taylor of a deficiency regarding Pacific Pump multi-vane diffuser cracking. We have submitted interim letters TXX-3518, TXX-3563, TXX-3576, TXX-3593, and TXX-3609 dated May 14, 1982, August 25, 1982, October 1, 1982, December 7, 1982 and January 13, 1983 respec-tively.
We have completed our investigation and concluded that the matter is not report-able under 10 CFR 50.55(e).
Records supporting this detennination are available for your Inspector's review at the CPSES site.
Very truly yours,
/*
i RJG:aq cc: NRC Region IV- (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, DC 20555 B303080378 830228 PDR ADOCK 05000445 S
__